HomeMy WebLinkAboutCO 167/26/2022
CAG-20-065, CO #16-22
Approved by Cheryl Beyer via 7/20/2022 email
Change Order No. 16
Contract Title: Duvall Ave NE
Contract No. CAG 20-065
Page 3 of 3
Plans:
Plan Sheet WA6-060122
Equitable Adjustment:
This work is an unforeseen change and therefore the Change Order does include an
equitable adjustment per Section 1-09.4 of the 2021 WSDOT/APWA Standard
Specifications. See attached.
Extension of Time:
The Time for Completion is extended 0 Working Days.
Sections 1-04.4 and 1-04.5 of the 2021 WSDOT/APWA Standard Specifications shall govern
this Change Order. The Work of the referenced Contract is modified to include the changes
detailed herein. The payment provided for herein shall constitute the complete and final
settlement for all costs of labor, equipment, materials, overhead, profit, permit fees, and all
other claims that may be made by the Contractor as a result of this change.
To be attached to Change Order:
܈܈ Plans