HomeMy WebLinkAboutContract onlyAGREEMENT
CAG-22-200
THIS AGREEMENT, made and entered into this 30th day of August , 2022 by
and between the CITY OF RENTON, a municipal corporation of the State of Washington,
hereinafter referred to as "City" and CPM Development Corporation DBA ICON Materials
hereinafter referred to as "Contractor."
WITNESSETH: That in consideration of the terms and conditions contained herein and attached
and made a part of this agreement, the parties hereto covenant and agree as follows:
1.The Contractor shall do all work and furnish all tools, materials, and equipment for:
2022 Overlay Project in accordance with and as described in the attached plans and
specifications, and the 2022 Standard Specifications for Road, Bridge, and Municipal
Construction, as prepared by the Washington State Department of Transportation (WSDOT)
and the Washington State Chapter of the American Public Works Association (APWA) which
are by this reference incorporated herein and made part hereof and, shall perform any
changes in the work in accord with the Contract Documents.
The Contractor shall provide and bear the expense of all equipment, work and labor, of any
sort whatsoever that may be required for the transfer of materials and for constructing and
completing the work provided for in these Contract Documents except those items
mentioned therein to be furnished by the City.
2.The City hereby promises and agrees with the Contractor to employ, and does employ the
Contractor to provide the materials and to do and cause to be done the above described work
and to complete and furnish the same in accord with the attached plans and specifications
and the terms and conditions herein contained and hereby contracts to pay for the same
according to the attached specifications and the schedule of unit or itemized prices at the
time and in the manner and upon the conditions provided for in this contract
The sum total of all progress payments is not to exceed the Total Bid Amount listed in the
Schedule of Prices incorporated into this contract, unless the Total Bid Amount is amended
by change order(s) prepared and executed in accordance with these Contract Documents.
3.The Contractor for himself/herself, and for his/her heirs, executors, administrators,
successors, and assigns, does hereby agree to full performance of all covenants required of
the Contractor in the contract.
Bronson Way Bridge -Seismic Retrofit and Painting
TED4004020 Page 1 of 2
Agreement
2022
4.It is further provided that no liability shall attach to the City by reason of entering into this
contract, except as provided herein.
5.In the event litigation is commenced to enforce this contract, the prevailing party shall be
entitled to recover its costs, including reasonable attorney's and expert witness fees.
6.This contract is executed in two (2) identical counterparts, by the parties, each of which shall
for all purposes be deemed and original.
IN WITNESS WHEREOF, the Contractor has executed this instrument, on the day and year first
below written and the Mayor has caused this instrument to be executed by and in the name of
the City of Renton the day and year first above written.
CONTRACTOR CITY OF RENTON
k �
[Signature of Authorized Official] * Armondo Pavone, Mayor
Ric Linares, President
[Title] ATTEST
CPM Development Corporation OBA ICON Materials
[Business Name] Jason Seth, City Clerk
August 16th, 2022
[Date]
*NOTE: Evidence of the signatory's authority to sign the Agreement on behalf of the business entity shall be
submitted.
CONTRACTOR ADDRESS FOR GIVING NOTICES
1508 Valentine Ave SE
Pacific, WA 9804 7-2103
Bronson Way Bridge -Seismic Retrofit and Painting
TED4004020
CITY OF RENTON ADDRESS FOR GIVING NOTICES
Transportation Systems Division
Renton City Hall -5th Floor
1055 South Grady Way
Renton, WA 98057
Page 2 of 2
Agreement
2022