HomeMy WebLinkAboutCO 7CAG-21-002, CO #7
Surface
WaterEngineeringManager
08/
16/
2022
8/11/2022Approved by Cheryl Beyer via 8/11/2022 email
ŝƚLJ
ŽZŽWtŽ
ŝĞůĚ
tŽtWŽEEŽEŽŽŽWŽŽŽŽŽDŽ
Ž/
ƚ
ŚĂƐ
ďĞĞŶ
ĚĞƚĞƌŵŝŶĞĚ
ƚŚĂƚ
Ž
ϳϮϮϳϬϭϱϰϬ
ϳϮϮϳϬϭϱϱϬ
ĂŶĚ
ϳϮϮϳϬϭϲϮϬ
ŚĂĚ
Ž
ƐƚƌŝƉƐ
ƵŶĚĞƌ
ƚŚĞŝƌ
ĨĞŶĐĞ
ƚŚĂƚ
ŚĂǀĞ
ďĞĞŶ
Ž
dŽ
Ž
ƚŚĞ
ƌĞƐŝĚĞŶƚƐ
ǁŝƚŚ
ƚŚĞ
ƐĂŵĞ
ĨĞŶĐĞ
ŽŽ
ƚŚĞLJ
ŚĂĚ
Ž
Ž
ŽŽ
ƚŚĞ
ŝƚLJ
Ž
ZŽ
ŝƐ
ĚŝƌĞĐƚŝŶŐ
ƚŚĞ
ŽŽ
Ž
ƉůĂĐĞ
Ă
ŶĞǁ
Ž
ƐƚƌŝƉ
ƵŶĚĞƌ
ƚŚĞ
ŽŽ
ĨĞŶĐĞ
Ž
ϭϬ
Ž
Ž
Ž
ƐƚƌŝƉ
d
Ž
ƐƚƌŝƉ
ƐŚĂůů
ďĞ
Ž
ƉĞƌ
ƚŚĞ
ĂƚƚĂĐŚĞĚ
ĚĞƚĂŝů
Z
ƌĂǁŝŶŐ
EŽ
Ϯ
ʹ
Ž
DŽ
Ƶƌď
Ž
Ž
Ž
ƐŚĂůů
ďĞ
ƚƌĂĐŬĞĚ
ĂŶĚ
ƐƵďŵŝƚƚĞĚ
Ž
ƌĞǀŝĞǁ
ďLJ
ƚŚĞ
ŝƚLJ
Ž
ZŽ
ƚ
ŝƐ
ĞdžƉĞĐƚĞĚ
ƚŚĂƚ
Ž
ǁŝůů
ďĞ
ƉĂŝĚ
ƵŶĚĞƌ
ďŝĚ
ŝƚĞŵ
ϭ
DŽ
ŚĂŶŐĞ
ƚƚĂĐŚŵĞŶƚ;Ɛ
Z
ƌĂǁŝŶŐ
EŽ
Ϯ
ʹ
Ž
DŽ
Ƶƌď
d,/^
tKZ<
Z
d/
s
K
EKd
WZKs/
KZ
d,
Z
d/
D
yd
E^/
KE
KZ
E'
E
d,
KEdZ
d
WZ/
KZ
Yh/
WD
Ed
E
KZ
D
d
Z/
Khd>/
E
E
d,/^
tKZ<
Z
d/
s
W
z
d
D^
KZ
E'
KZ
Z
s
KW
KZ
d/
D
yd
E^/
KE
KZ
KEdZ
d
WZ/
E
Z
Ez
WZKd
d
dK
d,
tKZ<
Z
d/
s
K>>
Kt
ϭϬϰ
ϱ
K&
d,
t^
Kd
d
E
Z
W
d/
KE^
ŽŽ
ŽLJ
ŽŽ
ŝŐŶĂƚƵƌĞ
ĂƚĞd
LJ
ͺͺͺͺͺͺͺͺͺͺͺͺͺͺͺͺͺͺͺͺͺͺͺͺͺͺ
ŝŐŶĂƚƵƌĞ
ĂƚĞ
ŝƚLJ
Ž
ZŽ
WŽ
D
10/
19/
2021
Jared
McDonald,
CONTRACTOR:
Date:
CONTRACT: CHANGE
NUMBER:
REFERANCE
TO
QUOTE:
REFERANCE
TO
FORCE
ACCOUNT:
CHANGE
DESCRIPTION:
Added
mow
strips
to
project
SUB
CONTRACTOR'
S
WORK
EXCLUDING
MARKUPS
Revisions/
Comments
1.
Direct
Materials $
0.
00
2.
Direct
Labor $
1,
380.
00
3.
Direct
Supervision (
hourly
workers)
0.
00%
of
line
3 $
0.
00
5.
Rental
Equipment $
0.
00
6.
Sales
Tax
on
Material
0.
00%
of
line
5 $
0.
00
7.
Owned
Equipment $
2,
280.
00
8.
SUB
CONTRACTOR
SUBTOTAL (
Add
Lines
1-
7 )$
3,
660.
00
Remarks:SUB
CONTRACTOR
NAMES &
TOTALS
EXCLUDING
PRIME
MARKUPS
Revisions/
Comments
13.
Wilco
Construction
LLC $
10,
534.
00
14.$
0.
00
15.16.17.18.19.
SUB
CONTRACTORS'
SUBTOTAL (
Add
lines
13-
26 )$
10,
534.
00
Remarks:SUB
CONTRACTOR
MARKUPS
Revisions/
Comments
20.
Prime
Contractor'
s
Work (
from
line
12) $
3,
660.
00
21.
Subcontractor'
s
Work (
from
line
19) $
10,
534.
00
22.
SUBTOTAL (
add
lines
20-
21)$
14,
194.
00
23.
Prime'
s
Fee
on
Self-
Performed
Work
21.
00%
of
line
20 $
2,
980.
74
24.
Prime'
s
Fee
on
Sub
tier
Work
0.
00%
of
line
21 $
0.
00
25.
TOTAL
COST (
Add
Lines
22 -
24 )$
17,
174.
74
Signature &
Title
of
preparer:
This
proposal
is
based
solely
on
the
usual
cost
elements
such
as
labor,
material,
equipment
and
normal
markups.
Strickland & Sons21-
002
NE
16th
St/
Jefferson
Ave.
NE
GreenConnectionsPBasedonFWD21
Page
1
of
2
approved
to
be
paid
under
change
order #
7.
j.
mcdonald,
pe
city
of
renton
08/
02/
2022
CONTRACTOR:
STRICKLAND & SONSCONTRACT: GAC-
21-
002
NE
16th
St/
Jefferson
Ave.
NE
GreenConnectionsProjectCHANGENUMBER:
CHANGE
DESCRIPTION:
Cost
Associated
with
FWD #11SUBCONTRACTOR'S
WORK
EXCLUDING
MARKUPS
Revisions/Comments1.
Direct
Materials $
595.
002.
Direct
Labor $
1,
035.003.
Direct
Supervision (
hourly
workers)
0.
00%
of
line
3 $
0.
005.
Rental
Equipment $
0.
006.
Sales
Tax
on
Material
0.
00%
of
line
5 $
0.
00
7.
Owned
Equipment $
0.
00
8.
SUB
CONTRACTOR
SUBTOTAL (
Add
Lines
1-
7 )$
1,
630.
00
Remarks:SUB
CONTRACTOR
NAMES &
TOTALS
EXCLUDING
PRIME
MARKUPS
Revisions/
Comments
13.
West
Coast
Land
Development $
1,
752.
83
14.15.16.17.18.19.
SUB
CONTRACTORS'
SUBTOTAL (
Add
lines
13-
26 )$
1,
752.
83
Remarks: SUB
CONTRACTOR
MARKUPS
Revisions/
Comments
20.
Prime
Contractor'
s
Work (
from
line
12) $
1,
630.
00
21.
Subcontractor'
s
Work (
from
line
19) $
1,
752.
83
22.
SUBTOTAL (
add
lines
20-
21)$
3,
382.
83
23.
Prime'
s
Fee
on
Self-
Performed
Work
21.
00%
of
line
20 $
710.
39
24.
Prime'
s
Fee
on
Subtier
Work
0.
00%
of
line
21 $
0.
00
25.
TOTAL
COST (
Add
Lines
22 -
24 )$
4,
093.
22
Project
Manager
Signature &
Title
of
preparer:
This
proposal
is
based
solely
on
the
usual
cost
elements
such
as
labor,
material,
equipment
and
normal
markups.
Page
1
of
2
approvedd
ass
corrected
to
be
paid
under
change
order #
7
j.
mcdonald,
pe
city
of
renton
07/
27/
2022
0.
00
0.
00342.
30
1,
972.
30
1,
630.
00
nott
applicable
not
applicable
not
applicable
CONTRACTOR:
Date:
CONTRACT: CHANGE
NUMBER:
REFERANCE
TO
QUOTE:
REFERANCE
TO
FORCE
ACCOUNT:
CHANGE
DESCRIPTION:
Additional
Rockery
Wall
SUB
CONTRACTOR'
S
WORK
EXCLUDING
MARKUPS
Revisions/
Comments
1.
Direct
Materials $
119.
00
2.
Direct
Labor $
1,
180.
00
3.
Direct
Supervision (
hourly
workers)
0.
00%
of
line
3 $
0.
00
5.
Rental
Equipment $
0.
00
6.
Sales
Tax
on
Material
0.
00%
of
line
5 $
0.
00
7.
Owned
Equipment $
1,
095.
00
8.
SUB
CONTRACTOR
SUBTOTAL (
Add
Lines
1-
7 )$
2,
394.
00
Remarks:SUB
CONTRACTOR
NAMES &
TOTALS
EXCLUDING
PRIME
MARKUPS
Revisions/
Comments
13.$
0.
00
14.$
0.
00
15.16.17.18.19.
SUB
CONTRACTORS'
SUBTOTAL (
Add
lines
13-
26 )$
0.
00
Remarks:SUB
CONTRACTOR
MARKUPS
Revisions/
Comments
20.
Prime
Contractor'
s
Work (
from
line
12) $
2,
394.
00
21.
Subcontractor'
s
Work (
from
line
19) $
0.
00
22.
SUBTOTAL (
add
lines
20-
21)$
2,
394.
00
23.
Prime'
s
Fee
on
Self-
Performed
Work
21.
00%
of
line
20 $
502.
74
24.
Prime'
s
Fee
on
Sub
tier
Work
0.
00%
of
line
21 $
0.
00
25.
TOTAL
COST (
Add
Lines
22 -
24 )$
2,
896.
74
Signature &
Title
of
preparer:
This
proposal
is
based
solely
on
the
usual
cost
elements
such
as
labor,
material,
equipment
and
normal
markups.
Strickland & Sons21-
002
NE
16th
St/
Jefferson
Ave.
NE
Green
Connections
P
Page
1
of
2
approved
to
be
paid
under
change
order #
7
j.
mcdonald,
pe
city
of
renton
07/
27/
2022
approved
to
be
paid
under
change
order #
7.
j.
mcdonald,
pe
city
of
renton
08/
02/
2022
approved
to
be
paid
under
change
order #
7.
j.
mcdonald,
pe
city
of
renton
08/
02/
2022
approved
to
be
paid
under
change
order #
7.
j.
mcdonald,
pe
city
of
renton
08/
02/
2022