FIELD REPORT
Project No. 0895.06 Page 1 of 2 Report ID 0895.06 E 08302022
Date Tue 8/30/2022 Weather 90⁰F, Clear Skies
Arrival/Departure Time(s) 12:00 PM – 4:30 PM Travel Time (hr)2.0
Project Name Weatherly Inn
Location 4500 Talbot Road S., Renton
ESNW Rep. & Phone Wilson Rawlings, GIT | Assistant Field Supervisor | 206.945.3343
Client Info/Contact RJ Development | Jeff Bennett
General Contractor Info/Contact Johannsen | Brad
Permit No(s).
Reviewed By LAC
Initials/Date
SSR
Initials/Date Field Supervisor Project Manager
Limitations: The presence of our field representative at the site is to provide our client with a source of professional advice, opinions, and recommendations based upon the field representative’s observations and testing of the contractor’s work. Our services do not include supervision or direction of the contractor, their employees, or agents. Geotechnical recommendations for
obtaining project objectives may be made by our representatives; however, direction of the actual work should come from the owner or contractor, as appropriate. The contractor is responsible
for complying with the contract documents at all times, regardless of the presence of our field representative. Jobsite safety, including compliance with all applicable state or federal regulations,
is the sole responsibility of the contractor. The observations, recommendations, and conclusions provided in this field report are preliminary until reviewed by the ESNW project manager.
As requested by the client, ESNW rep was on-site to observe and make recommendations regarding
fence post excavations along the northern margin of the site. While on-site, the following was observed:
Northern Fence Post Hole Excavation Observations & Recommendations:
Upon arrival on-site, ESNW rep observed the grading contractor, Johansen Construction, begin
excavating fence post holes directly behind the previously constructed fill rockery along the northern
margin of the site. Per ESNW project manager, Scott Riegel’s, recommendations, the grading contractor
carefully excavate a total of two pilot holes for the proposed fence posts. Each approximately 2-foot-wide
by four-foot-deep excavation was observed to consist of previously installed rockery elements, including
2-man stones, 2-inch-to-4-inch clean crushed rock, geogrid, structural backfill soil, non-woven geotextile
fabric and a perforated drainpipe. ESNW rep observed the grading contractor carefully cut and remove
localized sections of rockery elements (geogrid and nonwoven-geotextile fabric), taking care to not
disturb other elements through-out the surrounding rockery section and the associated drainpipe. ESNW
rep was then informed by the grading contractor, excavation efforts would continue tomorrow, August 31,
2022. Please see attached map and images below.
ESNW rep will return when requested.
Report ID 0895.06 E 08302022 Page 2 of 2
Earth Solutions NW, LLC
Fence Post Excavation Areas