Minor Franchise Permit: MFP22004371
IVR Number: 22004371
Permit Information
Permit Name: Puget Sound Energy - Electric
Address/Location:08/16/2022Application Date:2823059034Parcel Number: 16022 116TH AVE SE
Permit Type:09/01/2022Issue Date:Franchise
Permit Work Class:09/01/2023Expiration Date:Minor Utility
Job Number: 105093907Franchise Type:Electric
Description: Puget Sound Energy Electric CREW TO TRENCH IN ROW APPROX 55' FROM P01 TO PRIVATE PROPERTY.
POTHOLE ALL EXISTING UTILITIES. RESTORATION PER CITY OF RENTON STANDARDS.
Contacts
Name Address PhoneTypeBilling
Corrie Rydberg
Puget Sound Energy
3702 71st Ave W
University Place, WA 98466
C: (253) 905-5031ApplicantX
Vicki Henson
Potelco Inc
8001 212th St S
Kent, WA 98032
B: (253) 863-0484Contractor
Business License Number: 5109Electrical Contractor: POTELI*344O4
Construction Contractor: POTELI*227PL
RENTON SCHOOL DIST 403 300 SE 7TH ST
RENTON, WA 98055
Owner
Corrie Rydberg
Puget Sound Energy
3702 71st Ave W
University Place, WA 98466
C: (253) 905-5031Specialized
Billing
General Conditions & Signature
Permission is hereby given for the work described on this permit according to the conditions hereon and according to the
approved plans and specifications pertaining thereto, subject to compliance with the Ordinance of the City of Renton.
Ÿ
This permit and plans must be posted at the job site at all times.Ÿ
I hereby certify that no work is to be done except as described above and in approved plans, and that work is to conform to
Renton Trench Restoration and Street Overlay Requirements.
Ÿ
Call 425.430.7203 or go to: https://permitting.rentonwa.gov one working day in advance to schedule an inspections and for ANY
work in the Right of Way.
Ÿ
Call 8 1 1 to locate underground utilities at least two full business days prior to any excavation.Ÿ
In accordance with RCW 19.122.033(4) the permit holder is required to contact (Williams Northwest Pipeline at 425.868.1010)
(Olympic Pipeline at 206.510.0575) (Puget Sound Energy at 425.375.3397) to request a consultation with the transmission
pipeline company prior to performing any construction or excavation activities. This requirement to consult with the
transmission pipeline company is in addition to the requirement to Call before You Dig as required in RCW 19.122.
Ÿ
(Date)(Signature)
Page 1 of 1THIS PERMIT AND PLANS MUST BE POSTED AT THE JOB SITE AT ALL TIMES
Note: The Applicant is responsible for compliance with all codes and regulations, whether or not described in this document.
DEPARTMENT OF PUBLIC WORKS
Page 1 of 3 | Published: 10/27/2021
Transportation Division | 1055 South Grady Way, 5th Floor | Renton, WA 98057 | 425-430-7380
Website: rentonwa.gov
TRAFFIC CONTROL PLAN APPLICATION
Published: 10/27/2021
TRAFFIC CONTROL PLAN (TCP) MUST BE SUBMITTED TO PUBLIC WORKS TRANSPORTATION DIVISION
FOR REVIEW/APPROVAL AT LEAST FIVE (5) WORKING DAYS BEFORE THE DATE OF WORK.
The City of Renton requires any contractor, firm, corporation, or other public/private agency to prepare a traffic control
plan (TCP) and obtain city's approval of that plan when construction, repair, or maintenance work is to be conducted
within the city's right-of-way.
1. Fill out the Traffic Control Plan (TCP) Application form and prepare required submittal documents.
2. The following items are all required for submittal of the TCP Application:
☐Electronic Copy of the TCP Application
☐Electronic Copy of the TCP Layout, on 11” X 17” paper size format, which shall:
Include map(s) showing the location of the project and work area.
Be legible lettering and clear, contrasting, symbols of viewing or printing.
Must indicate street names, and north arrow and scale.
Types of plans required:
o Work hour plan – show all mobility impacts during construction hours.
o Non-work plan - show all mobility impacts after work hours when limited or no work is
happening in the right-of-way (ROW), if applicable.
o Changing construction phases – show construction sequence and each construction phase
change even if the traffic control is not modified, if applicable.
o Pedestrian access/detour plan, if applicable.
- Shall conform to the Washington State Traffic Control Flagger Certification handbook, by the
Evergreen Safety Council.
3. Submit Application via email to TCP@rentonwa.gov with the subject line “TCP Application – [Project Name].”
Project Name: Permit #:
Site Address:
Work Date: From _____________ To _____________ Work Time: Start ______________ End ______________
Construction Company:
Contact Name: Phone/Cell: _________________________
Business Address: City/State: Zip:
Description of Work:
Approval By: _________________________________________________ Date:____________________
Transportation Engineering
PLEASE SEE ATTACHED
POTELCO, INC
6905 S 228TH ST KENT, WA 98032
105093907
16022 116TH AVE SE
DAN FOGEL 253-234-6398
Note: The Applicant is responsible for compliance with all codes and regulations, whether or not described in this document.
Page 2 of 3 | Published: 10/27/2021
PERMIT HOLDER AGREES TO ALL THE FOLLOWING:
Must have approved Traffic Control Plan (TCP) prior to commencing the work.
Maintain existing pedestrian access. The work on pedestrian facilities, shall be limited to one corner at a time,
with the least possible inconvenience or delay to pedestrians.
WORK TIME begins when any street or travel lane is fully or partially closed. This includes set up within the
traveled way.
Comply with all traffic regulations of the City of Renton and the State of Washington.
Prepare a traffic control plan and obtain City approval of that plan. That plan shall be implemented for all street
and lane closures, and the plan shall be performed in compliance with the Manual on Uniform Traffic Control
Devices.
Notify emergency services (253-852-2121) twenty-four (24) hours before any street or lane closures.
Contractor or entity must call Renton School District (425-204-4455) or any public/private agency, including public
transit, to be affected by a temporary lane or road closure a minimum of five business days (excluding weekends
and holidays) prior to starting any work.
Contractor or entity must notify King County Metro in writing at construction.coord@kingcounty.gov a minimum
of five business days (excluding weekends and holidays) prior to starting any work impacting bus stops, a
temporary lane or road closure. Work requiring removing a bus shelter or sign requires notification in writing a
minimum of 30 business days (excluding weekends and holidays). Please call King County Metro at 206-477-1140
with any questions.
Any lane or street closures not in conformance with the approved traffic control plan and/or without notification
of emergency services may result in receiving a citation for violation of R.C.W. 47.36.200 Signs or Flaggers at
thoroughfare work sites and R.C.W. 9A.36.050 Reckless Endangerment, and other applicable State and City codes.
Indemnify and hold harmless the City of Renton from any and all claims, actions, and judgments, including all
costs of defense and attorney’s fees incurred in defending against same, arising from and related to
implementation of the approved traffic control plans including claims arising from towing of private vehicles and
the acts of the Permit Holder’s agents and employees.
The City of Renton shall be entitled, in its reasonable discretion, to settle claims prior to suit or judgment, and in
such event shall indemnify and hold harmless the City for any such claims paid, including the City’s reasonable
attorney’s fees and litigation costs incurred resulting from such claim.
In the event any claim or suit is brought against City within the scope of this Agreement, Permit Holder will pay for
legal counsel chosen by the City to defend against same.
Flagger and sign placement are subject to revision by the City Inspector on site, if needed to address traffic or
pedestrian safety or travel.
All permit conditions shall be met.
NOTES:
Total road closure lasting more than twenty-four (24) hours is subject to the approval by the City Council.
Work Zone Traffic Control shall be in accordance with the Manual on Uniform Traffic Control Devices (MUTCD)
and shown by a traffic control plan layout or reference to WSDOT.
Approved Temporary Traffic Control Plan must be at the work site during work hours.
Complete assistance and accommodation shall be provided to all kinds of pedestrian traffic when sidewalk or
walkway is impeded to safely redirect pedestrians around a work zone.
Signage shall be used to warn motorcyclists/bicyclists of the potential hazards on any uneven surfaced or slippery
road conditions during work and non-work hours.
Any vehicle, equipment, barricade, or portable tow-away sign used within the work area must display a company
logo or any legally acceptable sign showing the company name, address, and telephone number at a conspicuous
place on the vehicle or equipment.
Note: The Applicant is responsible for compliance with all codes and regulations, whether or not described in this document.
Page 3 of 3 | Published: 10/27/2021
In the case of Temporary No Parking Zones, all the following apply in addition to previous:
Contractor must complete form to show limits of Temporary No Parking Zone identifying barricade locations for
vacate parking or curb lane usage.
Contractor must post notice of dates and time of Temporary No Parking Zone with at least two signs per block
seventy-two (72) hours in advance of effective date and time.
The cover sheet of this Traffic Control Plan form must be attached to each Temporary No Parking Sign on the
project site.
Temporary traffic control devices must be removed immediately when work is done or no construction activities
are going on. If deemed abandoned, City crews will remove and store them at the City’s maintenance shop (3555
NE 2nd Street).
I certify that the information on this application and within the submittal documents are accurate to the best of my
knowledge and I acknowledge all the requirements on this application.
Applicant’s Signature Date
Applicant’s Name (Print)
CORRIE RYDBERG
16022 116th Ave SE
Renton
WA 98058
USA
P01
11 111414
116TH AVE SESE 162ND ST
W20-7AW20-4ONE LANE
ROADAHEAD
100'100'100'ROAD
WORK
AHEAD W20-1W20-7AW20-4ONE LANEROADAHEAD100'100'100'ROADWORKAHEADW20-1ROADWORKAHEADW20-1
STOP
FLAGGER
STOP
FLAGGER
RESIDENT(S) WILL BE INFORMED
OF POSSIBLE TEMPORARY
DRIVEWAY CLOSURE PLACE SIGNSBOTH SIDES OFWORK AREAFROM TO
TOW AWAY AREA
PHONE 888-9999
INFRASOURCE LLC 000 0000000
NO PARKING
NO-PARKFROMTOTOW AWAY AREAPHONE 888-9999INFRASOURCE LLC 000 0000000NO PARKINGNO-PARK
28" TRAFFIC CONE
LEGEND
TRAFFIC FLOW
SIGN LOCATION
FLAGGER
STOP
POLE
WORK VEHICLE/
FLASHING LIGHTS
RIGHT OF WAY
SIGN SPACING
MPH
60/65
45/55
35/40
30
25
"X"
1000'
500'
350'
200'
100'
CHANNELIZATION
DEVICE SPACING
MPH
55/70
35/45
25/30
TAPER
40
30
20
TANGENT
80
60
40
TEMPORARY TRAFFIC CONTROL PLAN
N
Project Address:
Page
PSE PUGETSOUNDENERGY
Designer:
Job #
REV
06/29/2022
105093907
0
16022 116th Ave SE, Renton, WA
MATLOCK HIGHBARGER
808-375-4152
MATLOCK.HIGHBARGER@PSE.COM
1 OF 1
Puget Sound Energy
Traffic Control Supervisor:
Gregory Harwood
Card No. 012238
Card Exp. 09/30/2023
gregory.harwood@pse.com
(425)424-6425
Notes:
1. All signs and spacing to conform to the
MUTCD and City of Renton standards.
2. All sidewalks, driveways, exits and egresses
shall be completely clear unless otherwise indicated.
3. Channelizing devices are 28" traffic cones.
Use traffic drums (barrels) with steady burning
Type C lights on all State State Routes and Hwys.
4. Sign size can be a minimum of 36" x 36" and
shall not obstruct pedestrian access.
5. Crew is required to leave a minimum of 11' for
traveling lane width.
6. Alert affected residents and businesses.
7. Work to take place between 9 a.m. and 4 p.m
unless otherwise specified. All work for arterials
and major roadways will be from 9 a.m. to 3 p.m.
ROL
16
16022
16045
11453
11461
16211
11457
317005-166571 0/17
25 kVA 120/240V (A)
SLAG4250
316998-166571
SLAG6247
316998-166581116TH ST SESE 162ND STROW60'PARKING LOT
PARKING LOT
336 ACSRABCN
336 ACSR# COM CENTER
J 316998-166573
317007-166589
112 kVA 120/208V (A)
316998-166567
25 kVA 120/240V (B)
SW# __ (40T)
SLAT7227
316998-166567
25 kVA 120/240V (B)
SLAT7227
ROW
60'
2'
8'
16'EOPEOPEOPEOP116TH ST SEDRIVE WAY
16'
1'
5'
5'GRASSSIDEWALKGRASSPARKING LOT
SLAT7227
J
316998-166573
FAULT CURRENT TABLE
3Ø PM TRANSFORMERS (208Y/120V)
120V WINDINGS 208V WINDINGS
LOCATION SIZE R/X MIN.
%Z
FAULT
CURRENT
MIN.
%Z
FAULT
CURRENT
V01 112.5kVA 0.3 --1.65 18,900 AMPS
POWER GENERAL NOTES - COMMERCIAL PROJECT
8.
EXCAVATION: The customer is to provide all trenching, backfill, vault excavations, compaction and
restoration per this sketch and per PSE standards. A minimum protective cover of 36" is required over
PSE's primary voltage equipment and 24" is required of PSE's secondary voltage equipment. The customer
will provide any and all shoring or they will side slope the trench to 1:1.
All materials to be installed in accordance with Puget Sound Energy's (PSE) standards. Any deviation from
this work sketch must be AUTHORIZED by PSE's Project Manager and NOTED on the Foremans' Copy.
All switching arrangements and/or outage arrangements are to be made with the Project Manager at least
three (3) working days in advance.
Contact the Utilities Underground Location Center (1-800-424-5555) at least 48 hours prior to commencing
work to get the underground facilities located.
STAKING: The customer will provide all staking (transformer, handhole, trench, grade, lot, pole, sidewalk,
etc.). See sketch and details for locations. Equipment locations must be approved by the Project Manager.
SITE PREPARATION: The work area will be at or near finished grade, clear of trench spoils or construction
materials which would restrict construction and/or equipment access, before work can begin.
Roads shall be paved or have a compacted , crushed rock base in place.
CLEARANCES: Transformers require a minimum of 6 feet from fire fighting equipment, 10 feet from
combustible walls, overhangs, doors, and windows, and a minimum of 5 feet from the back of curb (or guard
posts will be required per PSE standards). All conduits and vaults are to be at least 5 feet away from water,
storm and sewer lines when paralleling them in the right of way, and at least 1 foot when crossing them, or
as required by your local municipality.
All work is to be done in accordance with local municipal and county permit requirements as applicable.
Customer/Developer is responsible to provide, install and maintain all secondary service cables, conduits
and crossings from the individual unit's meter base to the designated connection point on private property.
Inclement weather conditions may cause delays in construction times and dates.
1.
2.
3.
4.
5.
6.
7.
9.
11.
10.
N 60' ROW
CL
S
NOT TO SCALE
CROSS SECTION - 116TH ST
LOOKING NORTH
00 1"2"
00 50'100'
SITE PLAN
SCALE: 1" = 50'
JOB SITE
CUSTOMER DEVELOPMENT NOTES:
A PRE CONSTRUCTION MEETING IS REQUIRED WITH YOUR PROJECT MANAGER PRIOR TO STARTING ANY SITE
WORK.
CUSTOMER IS RESPONSIBLE FOR ALL TRENCHING, SELECT BACKFILL, COMPACTION & RESTORATION PER PUGET
SOUND ENERGY STANDARDS & LOCAL MUNICIPALITY.
**DEVELOPER NEEDS TO FOLLOW ALL TRENCH DETAILS ON SELECT BACKFILL**
CUSTOMER IS RESPONSIBLE FOR THE FOLLOWING:
CROSSING/BORING.
-OPEN TRENCH OR BORING FOR CROSSINGS ARE ALLOWED PER LOCAL MUNICIPALITY PERMIT
REQUIREMENTS.
-CROSSINGS IN RIGHT OF WAY MUST BE SCHEDULED WITH PROJECT MANAGER PRIOR TO
CONSTRUCTION.
-PROJECT MANAGER OR DESIGNATED REPRESENTATIVE MUST BE ON SITE DURING CONSTRUCTION
WORK IN RIGHT OF WAY.
-EXCAVATION CONTRACTOR MUST BE LICENSED AND BONDED TO PERFORM WORK IN RIGHT OF WAY.
VAULTS & WORK PITS.
-REQUIRED TO PROVIDE 4' X 4' WORK PIT & 1 CUBIC YARD 5/8" CRUSHED ROCK AT P01
-REQUIRED TO PROVIDE 9' X 11' WORK PIT & 19-1/2 CUBIC YARD OF 6" CRUSHED ROCK AT J01
-REQUIRED TO PROVIDE 8' X 8' WORK PIT 10-1/3 CUBIC YARDS OF 6” CRUSHED ROCK AT V01
JOB SITE READINESS.
-JOB SITE NEEDS TO BE 100% READY FOR INSPECTION 5 BUSINESS DAYS PRIOR TO
CONSTRUCTION DATE.
-ALL WORK IN RIGHT OF WAY MUST BE COORDINATED WITH PROJECT MANAGER AND LOCAL
MUNICIPALITY.
-ALL TRENCH, AND LOCAL ELECTRICAL MUNICIPALITIES AKA "L&I, CITY", INSPECTIONS MUST BE
COMPLETED 5 BUSINESS DAYS PRIOR TO SCHEDULED CONSTRUCTION DATE.
-REQUIRED TO OPERATE AND PROVIDE EQUIPMENT TO PUMP OUT WATER FOR WORK PITS, VAULTS &
TRENCH AT ALL TIMES.
-REQUIRED TO HAVE EXCAVATION EQUIPMENT AND BE ON SITE THE DAY OF CONSTRUCTION TO COMPLETE
BACKFILLING.
- IF A SECOND INSPECTION IS REQUIRED, ADDITIONAL FEE'S WILL BE APPLIED.
-PLEASE REVIEW THE CITY OR KING COUNTY TRENCHING REQUIREMENTS UNDER THE PERMIT.
-IF A PRE-CON IS REQUIRED BY THE CITY, COUNTY OR W.S. DOT A PSE PROJECT MANAGER WILL SET-UP AND
SCHEDULE A MEETING WITH THE MUNICIPALITY BEFORE ANY EXCAVATION OR INSTALLATION BEGINS .
N
Vicinity Map
N/A
ARE TO BE INSTALLED, CROSS SECTION DETAILS OF THE TYPICAL EROSION
STRUCTURES, & SPECIAL REQUIREMENTS FOR WORK IN SENSITIVE AREAS.)
EROSION & SEDIMENT CONTROL REQUIREMENTS
NOTES DETAILING WHERE EROSION OR SEDIMENT CONTROL STRUCTURES
(LOCAL JURISDICTIONS MAY HAVE ADDITIONAL REQUIREMENTS INCLUDING
0150.3200 TECHNIQUES FOR TEMPORARY EROSION & SEDIMENT CONTROL
EROSION & SEDIMENT CONTROL SHALL BE PER PSE STANDARD PRACTICE
& ANY ADDITIONAL LOCAL JURISDICTION REQUIREMENTS.
FOREMAN (CHECK BOX WHEN COMPLETED)
PSE Equipment LOCKED/SECURED & Work Area left in CLEAN/SAFE Condition.
Grid, Cable, and Switch numbers INSTALLED & VERIFIED.
Field Changes RED-LINED on As-built.
Indicate correct FUSE SIZE on As-built & VERIFY proper PHASE.
Foreman's Signature _______________________________________________
Print Name ___________________________________ Date ______________
Material VERIFIED and CHANGES noted on Paperwork.
Total PRIMARY Cable noted on As-built.
Company ID#'s RECORDED in correct location on As-built.
Deviations noted on the As-built and their reason.
I certify that the work performed meets PSE's standards and procedures
and that all quality requirements are met.
JOB SITE
ASPLUNDH CONSTRUCTION CORP. - QA/QC T. MYER
PSE
No
No
No
Yes
Yes
Yes
No
YesDeveloper
"Flagging Required"
"Outages Required"
"Locates Required"THIS SKETCH NOT TO BE RELIED UPON FOR EXACT LOCATION OF EXISTING FACILITIES
CALL 811 TWO BUSINESS DAYS BEFORE YOU DIG
For contacts below dial 1-888-CALL PSE (225-5773)
UTILITIES
CONTACT
PHONE#
COUNTY
1/4 SEC
U-MAP NO (POWER)
OP MAP
Emer Sect Gas Wk Ctr POWER WK CTR
PLAT MAP
JOINT FACILITIES ARRANGEMENTS
DRAWN BY
CHECKED BY
APPROVED BY
FOREMAN #1
FOREMAN #2
MAPPING
INCIDENT MAOP
Gas Order Elect Order
SCALE PAGE
ENGR - POWER
ENGR - GAS
FUNCTION
PROJECT MGR
PERMITREAL ESTATE/EASEMENT
2
1
REV#
3
DATE DESCRIPTIONBY
CONTACT PHONE NO DATE
OH CKT MAP CIRCUIT NOUG CKT MAP
D. HONEYSETT 253-395-6839 01/17/20
D. HONEYSETT 253-395-6839 01/17/20
E. MARTINEZ 714-893-2405 01/17/20
REQUIRED RENTON
FAMILY FIRST COMMUNITY CHURCH
3Ø PRI L/E
16022 116TH AVE SE, RENTON, WA 98058
N/A N/A
N/A 105093907
AS NOTED 1 OF 2
KING N/A N/A CSPSKEIN
NW 28-23N-05E N/A N/A
2305E110 2305E136 2305E110 ROL-16
N/A
N/A
N/A
N/A
N/A
N/A
N/A
N/A
N/A
N/A
N/A
N/A
N/A N/A N/A
N/A N/A N/A
N/A N/A N/A
E-Mail:
Cell Phone:
Project Manager Contact Information:
Manager:DAVE HONEYSETT
253-245-0883
DAVE.HONEYSETT@PSE.COM
GAS
PHONE
CABLE TV
PROJECT PHASE
PWR
NOTIF#ORDER#
508571629 105093907Superior 105093907SCALE: 6" = 1 MILE
OVERHEAD CIRCUIT MAP 2305E136
Owner / Developer Contact Info
officeATTN:
CITY OF RENTON
1055 S GRADY WAY
RENTON, WA 98057
RYAN ARP 206-285-2966
CIRCUIT FEET ADDED:
SQ. FOOTAGE:
PANEL SIZE:
HEAT TYPE:
EST. DEMAND:
LRC:
% V. DROP:
% FLICKER:
195'
21,100 SQ FT
1000A
ELECTRIC
66.19kW
UNK
2.6%
0.0%
PARTIAL PLAN
SCALE: 1" = 50'
ROW
60'
SITE SPECIFIC NOTES
AT P01:316998-166567
-EXISTING POLE TO REMAIN
-INSTALL (3) STIRRUP, BOLTED & HOT CLAMP 1/0-397.5 & TAP ABCØ (MID: 2254100 & 2153100)
-INSTALL 12kV 3Ø PRI ARM PER STD 6033.3012 (TAP313)
-INSTALL 336 ACSR INS TIES PER STD 6099.9999, TBL 15 (MID: 9486200)
-INSTALL (1) 3Ø 12kV OH/UG TERMINATION PER STD 6043.1000 (TSU3C1F)
-INSTALL (3) LB C/O ON NEW FG ARM, FUSE @ 40T (MID: 3412500)
-INSTALL SWITCH #T__________
-INSTALL (1) 2" PRIMARY RISER ON NEW STANDOFF BRACKETS PER STD 6042.1000 (RIS2CSS)
AT J01: 316998-166573
-INSTALL (1) 12kV 5' X 7' X 5' 4-POS J-BOX PER STD 6055.1030
-INSTALL (6) 12kV ELBOW KIT PER STD 6041.1000 (ELB10J)
-INSTALL GRID #316998-166573
AT V01: 316998-166586
-INSTALL (1) HH 4'8" X 4'8" X 3'6" HH W/ GROUNDS PER STD 6045.5000 (PM3P15S)
-INSTALL (1) COVER HH 4'8' X 5'6" X 6" W/ 20" X 44" ACCESS (MID: 7655200)
-INSTALL (1) 112.5KVA 120/208v PADMOUNT TRF (MID: 6258050)
-INSTALL (3) 12kV ELBOW KIT PER STD 6041.1000 (ELB10J)
-INSTALL (3) 501 KCMIL TO 750 KCMIL SEC CONNECTOR LUGS (MID 7651003)
-INSTALL (12) MOUNTING BOLT KITS (MID 7651008)
-INSTALL CUSTOMER OWNED, INSTALLED, & MAINTAINED 3-RUNS OF 600 KCMIL AL SVC
-INSTALL GRID #316998-166586
___
Installed at site:
Grid Number:
kVA Rating:
Foreman to redline the following information
TRANSFORMER INSTALLATION
Company ID#:
Primary phase connected to:
Tested Secondary Voltage
Material ID#:
V01
316998-166586
112.5kVA
6258050
PRIMARY CABLE & CONDUIT TABLE
LOCATION CONDUIT CABLE ASBUILT INFORMATION - FOREMAN COMPLETE
FROM TO SIZE
(IN)QTY.
DESIGN
LENGTH
(FT)
BENDS PULL
(LBS)
PULL
REV
(LBS)
CABLE
SIZE
DESIGN
LENGTH
(FT)
PHASE - ID TAG RECORD RECORD PHASE TAPPED & ACTUAL FOOTAGE INSTALLED
90°45°22°11°A B C MANUFACTURER COMPOUND YEAR NOTES CONDUIT CABLE
P01 J01 4 1 65'--1/0AL JKT 105'----
J01 V01 4 1 130'--1/0AL JKT 150'---
4" PVC (FT) & BENDS =195'0 0 0 0 3Ø 1/0 AL JKT TTL (FT) =255'x3=
765'
CIRCUIT LOADING TABLE
AS OF
EXIST. PEAK LOAD
EST. NEW LOAD
TOTAL
CIRCUIT:
A PHASE B PHASE C PHASE
ROL-16
05/2019
184.00 206.00 181.00
3.60 3.60 3.60
187.60 209.60 184.60
Vault & Equipment Table
Work
Location
Grid
Number
Vault Size
& Cover
Type & Size
Equipment
In Vault
Primary Bushings Transformer
ID Numbers
(Company ID)
ASBUILT INFORMATION
Foreman-CompleteLBDC
JBOX15L (5'x7'x6')JBOX
PM3P15S
(4.67'x4.67'x3.5')
PAD-3P-12-120/2
08-112 (112 kVA)
CUSTOMER OWNED AND INSTALLED SECONDARY WIRE TABLE
BLDG.# OF
METERS SOURCE # OF RUNS WIRE SIZE REMARKS
108 1 V01 2 350KCMIL -
-
-
-
ALL CUSTOMER-OWNED WIRE MUST BE INSTALLED ACCORDING TO THIS TABLE
316998-166567
25 kVA 120/240V (B)
SLAT7227
316998-166573
8' X 8' WORK PIT
CUSTOMER SUPPLIED
4' X 4' WORK PIT
CUSTOMER SUPPLIED
11' X 9' WORK PIT
CUSTOMER SUPPLIED
CUSTOMER SUPPLIED
19-1/2" CUBIC YARDS OF 6" CRUSHED ROCK
1 CUBIC YARD 5/8" CRUSHED ROCK
CUSTOMER SUPPLIED
1-4" SCH'L 40 CONTINUOUS PVC CONDUIT ± 65'1-4" SCH'L 40 CONTINUOUS PVC CONDUIT ± 130'
CUSTOMER SUPPLIED
10-1/3" CUBIC YARD OF 6" CRUSHED ROCK
J 316998-166586
112.5 kVA 120/208V
316998-166567
25 kVA 120/240V (B)
SLAT7227
316998-166586
112.5 kVA 120/208V316998-166573
PSE INST. 3Ø 1/0 UG JKT CABLE ± 150'
(AØXXXXXX)
(BØXXXXXX)
(CØXXXXXX)
PSE INST. 3Ø 1/0 UG JKT CABLE ± 105'
(AØXXXXXX)
(BØXXXXXX)
(CØXXXXXX)
J
Field Face
Quadrant
Road Face
Quadrant
Climbing
Space
5" Min
CL Direction of Vehicular TrafficCL
TOP VIEW
Standoff Bracket
15" Min Length
Conduit Clamp
Conduit
CONDUIT RISER PLACEMENT DETAIL (P??)
SCALE: NONE
4'x4' Work Pit
ASPLUNDH CONSTRUCTION CORP. - QA/QC T. MYER
THIS SKETCH NOT TO BE RELIED UPON FOR EXACT LOCATION OF EXISTING FACILITIES
CALL 811 TWO BUSINESS DAYS BEFORE YOU DIG
For contacts below dial 1-888-CALL PSE (225-5773)
UTILITIES
CONTACT
PHONE#
COUNTY
1/4 SEC
U-MAP NO (POWER)
OP MAP
Emer Sect Gas Wk Ctr POWER WK CTR
PLAT MAP
JOINT FACILITIES ARRANGEMENTS
DRAWN BY
CHECKED BY
APPROVED BY
FOREMAN #1
FOREMAN #2
MAPPING
INCIDENT MAOP
Gas Order Elect Order
SCALE PAGE
ENGR - POWER
ENGR - GAS
FUNCTION
PROJECT MGR
PERMITREAL ESTATE/EASEMENT
2
1
REV#
3
DATE DESCRIPTIONBY
CONTACT PHONE NO DATE
OH CKT MAP CIRCUIT NOUG CKT MAP
D. HONEYSETT 253-395-6839 01/17/20
D. HONEYSETT 253-395-6839 01/17/20
E. MARTINEZ 714-893-2405 01/17/20
REQUIRED RENTON
FAMILY FIRST COMMUNITY CHURCH
3Ø PRI L/E
16022 116TH AVE SE, RENTON, WA 98058
N/A N/A
N/A 105093907
AS NOTED 2 OF 2
KING N/A N/A CSPSKEIN
NW 28-23N-05E N/A N/A
2305E110 2305E136 2305E110 ROL-16
N/A
N/A
N/A
N/A
N/A
N/A
N/A
N/A
N/A
N/A
N/A
N/A
N/A N/A N/A
N/A N/A N/A
N/A N/A N/A 105093907FLOW DIRECTION
LAY 8" BOTTOM SKIRT ON TOP OF NATIVE SOIL,
SECURE WITH PEA GRAVEL BAGS.
6'
3'
8"
TECHNIQUES FOR EROSION AND SEDIMENT CONTROL
SILT FENCE DETAIL
Not to Scale 0150.3200
Communications
Primary Power
Cables or Conduit
Excavated Dirt Pile
ROADSIDE
Final Grade
24" Min
12" Min
Separation
36"
Min
Cover
48"
Max
Backfill
(No rocks over 10" diameter)
Separation
12" Min
Gas
4" Sand Bedding
32" Typical
(Power, Gas, and
Communications)
JOINT TRENCH DETAIL
Primary-Mainline Gas & Communications (NTS)
Separation
12" Min
6" or 12" Min Sand Shading after Compaction
- A 6" layer of sand is allowed when excavated native material contains rocks no larger than 8" in diameter.
Trench and backfill requirements for primary electric line extension trenches (No PSE gas)
- A 12" layer of sand is required when excavated native material contains rocks up to 10" in diameter.
TOP VIEW
Excavation - 10-1/3 cubic yards
SIDE VIEW
Rock
Crushed
6"
4'-4"
2"
8'
8'
4'-8"
3'-6"
4'-8"
6"
20"
4'-8"5'-6"
44"
Not to scale 6045.5000-1
3,600 lbs
1,657 lbs
VAULT & EXCAVATION DETAIL @ V01
NEW CONDUIT DIAGRAM
NOT TO SCALE
NEW CABLE DIAGRAM
NOT TO SCALE
2"
Excavation - 19-1/2 cubic yards
SIDE VIEW
5'-4"Crushed
6"
Rock
TOP VIEW
9'
11'
7'-0"
4'-0"
1'
4'-8"
4,750 lbs
2,490 lbs
VAULT & EXCAVATION DETAIL @ J01
Not to scale 6055.1030
COOLING
5' MIN
5' MIN
10' MIN
5'
MIN
FINS
ACCESS
CONCRETE PAD
MINIMUM CLEARANCES FOR PADMOUNT TRANSFORMER AND VAULT
CURB OR EDGE OF PAVEMENT
CURB OR EDGE OF PAVEMENT
5' MIN
ROAD OR
PARKING AREA
TYP. PAD
& TRANS-
FORMER
1.5' MIN
DOOR
ACCESS
DOOR
REQUIRED
WORK SPACE
AREA
Not to scale
1.5' MIN
3'
MIN
3' MIN
3' MIN
10' MIN
3'
MIN
CLEAR WORKING SPACE FOR J-BOX
NOT TO SCALE
FIELD SIDE (PREFERRED)
ROAD SIDE (PREFERRED)
6' MIN
3'
MIN
3'
MIN
3' MIN
DEDICATED FACILITIES (####) for XX LRC & Dedicated Stub Location
SITE SPAN ADDITIONAL REMARKS LABOR UNITS
#FROM TO FOOTAGE
----DED. CONDUIT & WIRE 2-36, 2-54A
----UPGRADE 25KVA TO 50KVA -
----REDUCED FLAMMABILITY -
TOTAL FT=##
Cables should enter the vault so that all of
the cables will lay in the same direction.
TOP VIEW
J- BOX CABLE ENTRY DETAIL
Not to scale