Loading...
HomeMy WebLinkAboutContractSMALL PUBLIC WORKS CONTRACT AGREEMENT THIS AGREEMENT (“Agreement”) is made as of the _____ day of ________, 2022, (the “Effective Date”) by and between the City of Renton, a non-charter code city under RCW 35A, and a Washington municipal corporation (“City”), Public Works Department and Specialized Pavement Marking, LLC), (“Contractor”), a Delaware Limited Liability Company registered in Washington State, who are collectively referred to as the “Parties”, to grind off and replace existing pavement markings in the City. City and Contractor agree as set forth below. 1. Scope of Work: Contractor will provide all material and labor necessary to perform all work described in the Scope of Work which is attached and fully incorporated into this Agreement by reference as Attachment “A.” 2. Changes in Scope of Work: City, without invalidating this Agreement, may order changes to the Scope of Work consisting of additions, deletions or modifications, the Agreement Sum being adjusted accordingly by Parties mutual agreement. Such changes in the work shall be authorized by written Change Order or Amendment signed by the Parties. 3. Time of Performance: Contractor shall commence performance of the Agreement no later than 42 calendar days after the Agreement’s Effective Date. All work must be completed by September 30, 2022. 4. Term of Agreement: The Term of this Agreement shall end at completion of the Scope of Work, no later than on December 31, 2022. This Agreement may be extended to accomplish change orders, if required, upon mutual written agreement of City and Contractor. 5. Agreement Sum: The total amount of this Agreement is the sum of ($252,054.00) which includes Washington State Sales Tax . This amount may be adjusted to a mutually agreed amount based on changes to the Scope of Work. 6. Consideration: In exchange for Contractor’s performance of the items and responsibilities identified in the Scope of Work, City agrees to make payment of the amount identified as the Agreement Sum. 7. Prevailing Wage/ Method of Payment/ Retainage/ Bonding: Payment by the City for the Work will only be made after the Work has been performed and a voucher or invoice is submitted in a form acceptable to the City. ϮϳϬϴϵ       5th September CAG-22-260 PAGE 2 OF 13 A.Prevailing Wage Rates: Contractor must comply with the State of Washington prevailing wage requirements. Contractor must file an Intent To Pay Prevailing Wage at the beginning of the project and an Affidavit of Wages Paid at the end of the project with the Washington State Department of Labor and Industries. The State of Washington prevailing wage rates applicable for this project, which is located in King County, may be found at the following website address of the Department of Labor and Industries: http://www.lni.wa.gov/TradesLicensing/PrevWage/default.asp http://www.lni.wa.gov/TradesLicensing/PrevWage/WageRates/default.asp Pursuant to WAC 296-127-011, the applicable effective date for prevailing wage rates paid for the duration of this contract shall be the date the contract is executed as reflected in the “Effective Date” identified at the top of the first page of this Agreement. Upon request, the City will provide a copy of the applicable prevailing wages for this project. Alternatively, the rates may be viewed at the City of Renton City Hall by making an appointment with the contact person identified herein or prior to contract award with the contact person identified as the City of Renton contact in Paragraph 15 Notices of this agreement. B.Retainage held by the City or in Escrow Account: Pursuant to RCW Chapter 60.28, a sum equal to five percent (5%) of the monies earned by the Contractor will be retained from payments made by the City to the Contractor under this Contract. This retainage shall be used as a trust fund for the protection and payment (1) to the State with respect to taxes imposed pursuant to RCW Title 82 and (2) the claims of any person arising under the Contract. Monies retained under the provisions of RCW Chapter 60.28 shall be: Contractor must pick one – if contractor does not pick one then the first option (retainage held in a fund by the City) applies. _______ Retained in a fund by the City. or ________ Deposited by the City in an escrow (interest-bearing) account in a bank, mutual saving bank, or savings and loan association (interest on monies so y       PAGE 3 OF 13 retained shall be paid to the Contractor). Deposits are to be in the name of the City and are not to be allowed to be withdrawn without the City’s written authorization. The City will issue a check representing the sum of the monies reserved, payable to the bank or trust company. Such check shall be converted into bonds and securities chosen by the Contractor as the interest accrues. At or before the time the Contract is executed, the Contractor shall designate the option desired. The Contractor in choosing option (2) agrees to assume full responsibility to pay all costs that may accrue from escrow services, brokerage charges or both, and further agrees to assume all risks in connection with the investment of the retained percentages in securities. The City may also, at its option, accept a bond in lieu of retainage. C.For Agreements over $150,000: Pursuant to RCW 60.26 and 39.08 The City requires a 5 % Retainage be withheld and that the Contractor will provide a Performance and Payment (Contract) Bond on the City approved form upon execution of the Agreement. Payment of the initial 95% will be made in the next pay cycle of the Renton Finance Department after receipt of such voucher or invoice (pay cycles are bi-weekly). The remaining 5% will be retained for the purpose of completion of the project and fulfillment of claims and liens. D.For Agreements under $150,000 Pursuant to RCW 60.26 and 39.08 the City requires a 5 % Retainage be withheld and that the Contractor will provide either a Performance and Payment (Contract) Bond on the City approved form upon execution of the Agreement or waive the payment and performance bond and instead the City will retain 10%. Payment of the initial 95% will be made in the next pay cycle of the Renton Finance Department after receipt of such voucher or invoice (pay cycles are bi-weekly). The remaining 5% will be retained for the purpose of completion of the project and fulfillment of claims and liens. (Unless the Contractor waives the payment and performance bond below and opts for a 10% retainage below.) Contractor must pick one – if contractor does not pick one then the first option (5% retainage with contract bond) applies: _______ To provide a payment and performance bond (contract bond) in the amount of 100% of the estimate including taxes with a 5% retainage. or       PAGE 4 OF 13 _______ To waive a payment and performance bond (contract bond) and instead the city will retain the remaining 10% will be retained for the purpose of completion of the project and fulfillment of claims and liens. E.For limited Public Works Contracts under $35,000 For limited public works projects, the City may choose to waive the payment and performance bond requirements of chapter 39.08 RCW and the retainage requirements of chapter 60.28 RCW, for laborers, mechanics, subcontractors, material persons, suppliers, and taxes imposed under Title 82 RCW that may be due from the contractor for the limited public works project, however The City shall have the right of recovery against the contractor for any payments made on the contractor's behalf. F. City shall have the right to withhold payment to Contractor for any work not completed in a satisfactory manner until such time as Contractor modifies such work so that the same is satisfactory. G. Final Acceptance. Final Acceptance of the Project occurs when the Public Works Director has determined that the Project is one hundred percent (100%) complete and has been constructed in accordance with the Plans and Specifications. H. Payment in the Event of Termination. In the event this Contract is terminated by the either party, the Contractor shall not be entitled to receive any further amounts due under this Contract until the work specified in the Scope of Work is satisfactorily completed, as scheduled, up to the date of termination. At such time, if the unpaid balance of the amount to be paid under the Contract exceeds the expense incurred by the City in finishing the work, and all damages sustained by the City or which may be sustained by the City or which may be sustained by the reason of such refusal, neglect, failure or discontinuance of Contractor performing the work, such excess shall be paid by the City to the Contractor. If the City’s expense and damages exceed the unpaid balance, Contractor and his surety shall be jointly and severally liable therefore to the City and shall pay such difference to the City. Such expense and damages shall include all reasonable legal expenses and costs incurred by the City to protect the rights and interests of the City under the Contract. 8. Hold Harmless: Contractor shall indemnify, defend and hold harmless City, its elected officials, officers, agents, employees and volunteers, from and against any and all claims, losses or liability, or any portion of the same, including but not limited to reasonable attorneys’ fees, legal expenses and litigation costs, arising from injury or death to persons, including injuries, sickness, disease or death of Contractor’s own employees, agents and volunteers, or damage to property caused by Contractor’s negligent act or omission,       PAGE 5 OF 13 except for those acts caused by or resulting from a negligent act or omission by City and its officers, agents, employees and volunteers. Should a court of competent jurisdiction determine that this agreement is subject to RCW 4.24.115, (Validity of agreement to indemnify against liability for negligence relative to construction, alteration, improvement, etc., of structure or improvement attached to real estate…) then, in the event of liability for damages arising out of bodily injury to persons or damages to property caused by or resulting from the concurrent negligence of the contractor and City, its officers, officials, employees and volunteers, Contractor’s liability shall be only to the extent of Contractor’s negligence. It is further specifically and expressly understood that the indemnification provided in this Agreement constitute Contractor’s waiver of immunity under the Industrial Insurance Act, RCW Title 51, solely for the purposes of this indemnification. The Parties have mutually negotiated and agreed to this waiver. The provisions of this section shall survive the expiration or termination of this Agreement. 9. Insurance: Contractor shall secure and maintain: A. Commercial general liability insurance in the minimum amounts of $1,000,000 for each occurrence/$2,000,000 aggregate for the Term of this Agreement. B. Professional liability insurance, in the minimum amount of $1,000,000 for each occurrence, shall also be secured for any professional services being provided to City that are excluded in the commercial general liability insurance. C. Workers’ compensation coverage, as required by the Industrial Insurance laws of the State of Washington, shall also be secured. D. It is agreed that on Contractor’s commercial general liability policy, the City of Renton will be named as an Additional Insured on a non-contributory primary basis. City’s insurance policies shall not be a source for payment of any Contractor liability. E. Subject to City’s review and acceptance, a certificate of insurance showing the proper endorsements, shall be delivered to City before executing the work of this Agreement. F. Contractor shall provide City with written notice of any policy cancellation, within two (2) business days of their receipt of such notice. G.Additional Insurance if marked as “Required” by City: 1.܆ Required. Builders Risk insurance covering interests of the City, the Contractor, Subcontractors, and Sub-contractors in the work. Builders Risk       PAGE 6 OF 13 insurance shall be on a special perils policy form and shall insure against the perils of fire and extended coverage and physical loss or damage including flood, earthquake, theft, vandalism, malicious mischief, and collapse. The Builders Risk insurance shall include coverage for temporary buildings, debris removal and damage to materials in transit or stored off- site. This Builders Risk insurance covering the work will have a deductible of $5,000 for each occurrence, which will be the responsibility of the Contractor. Higher deductibles for flood and earthquake perils may be accepted by the City upon written request by the Contractor and written acceptance by the City. Any increased deductibles accepted by the City will remain the responsibility of the Contractor. The Builders Risk insurance shall be maintained until final acceptance of the work by the City. 2.܆ Required. Contractors Pollution Liability insurance covering losses caused by pollution conditions that arise from the operations of the Contractor. Contractors Pollution Liability insurance shall be written in an amount of at least $1,000,000 per loss, with an annual aggregate of at least $1,000,000. Contractors Pollution Liability shall cover bodily injury, property damage, cleanup costs and defense including costs and expenses incurred in the investigation, defense, or settlement of claims. If the Contractors Pollution Liability insurance is written on a claims-made basis, the Contractor warrants that any retroactive date applicable to coverage under the policy precedes the effective date of this contract; and that continuous coverage will be maintained or an extended discovery period will be exercised for a period of three (3) years beginning from the time that work under the contract is completed. The City shall be named by endorsement as an additional insured on the Contractors Pollution Liability insurance policy. If the scope of services as defined in this contract includes the disposal of any hazardous materials from the job site, the Contractor must furnish to the City evidence of Pollution Liability insurance maintained by the disposal site operator for losses arising from the insured facility accepting waste under this contract. Coverage certified to the Public Entity under this paragraph must be maintained in minimum amounts of $1,000,000 per loss, with an annual aggregate of at least $1,000,000. Pollution Liability coverage at least as broad as that provided under ISO Pollution Liability-Broadened Coverage for Covered Autos Endorsement CA       PAGE 7 OF 13 99 48 shall be provided and the Motor Carrier Act Endorsement (MCS 90) shall be attached. 10. Discrimination Prohibited: Except to the extent permitted by a bona fide occupational qualification, the Contractor agrees as follows: A. Contractor, and Contractor’s agents, employees, representatives, and volunteers with regard to the Work performed or to be performed under this Agreement, shall not discriminate on the basis of race, color, sex, religion, nationality, creed, marital status, sexual orientation or preference, age (except minimum age and retirement provisions), honorably discharged veteran or military status, or the presence of any sensory, mental or physical handicap, unless based upon a bona fide occupational qualification in relationship to hiring and employment, in employment or application for employment, the administration of the delivery of Work or any other benefits under this Agreement, or procurement of materials or supplies. B. The Contractor will take affirmative action to insure that applicants are employed and that employees are treated during employment without regard to their race, creed, color, national origin, sex, age, sexual orientation, physical, sensory or mental handicaps, or marital status. Such action shall include, but not be limited to the following employment, upgrading, demotion or transfer, recruitment or recruitment advertising, layoff or termination, rates of pay or other forms of compensation and selection for training. C. If Contractor fails to comply with any of this Agreement’s non-discrimination provisions, City shall have the right, at its option, to cancel the Agreement in whole or in part. D. Contractor is responsible to be aware of and in compliance with all federal, state and local laws and regulations that may affect the satisfactory completion of the project, which includes but is not limited to fair labor laws and worker's compensation. 11. Independent Contractor: Contractor’s employees, while engaged in the performance of any of Contractor’s Work under this Agreement, shall be considered employees of the Contractor and not employees, agents, representatives of City and as a result, shall not be entitled to any coverage or benefits from the City of Renton. Contractor’s relation to City shall be at all times as an independent contractor. Any and all Workman’s Compensation Act claims on behalf of Contractor employees, and any and all claims made by a third-party as a consequence of any negligent act or omission on the part of Contractor’s employees,       PAGE 8 OF 13 while engaged in Work provided to be rendered under this Agreement, shall be the solely Contractor’s obligation and responsibility. 12. City of Renton Business License: The Consultant shall obtain a City of Renton Business License prior to performing any Work and maintain the business license in good standing throughout the term of this agreement with the City. Information regarding acquiring a city business license can be found at: http://www.rentonwa.gov/cms/One.aspx?portalId=7922741&pageId=9824882 Information regarding State business licensing requirements can be found at: http://dor.wa.gov/doing-business/register-my-business 13. Record Keeping and Reporting: Contractor shall maintain accounts and records, which properly reflect all direct and indirect costs expended and Work provided in the performance of this Agreement. The Contractor agrees to provide access to and copies of any records related to this Agreement as required by the City to audit expenditures and charges and/or to comply with the Washington State Public Records Act (Chapter 42.56 RCW). 14. Public Records Compliance. To the full extent the City determines necessary to comply with the Washington State Public Records Act, Contractor shall make a due diligent search of all records in its possession, including, but not limited to, e-mail, correspondence, notes, saved telephone messages, recordings, photos, or drawings and provide them to the City for production. In the event Contractor believes said records need to be protected from disclosure, it shall, at Contractor’s own expense, seek judicial protection. Contractor shall indemnify, defend, and hold harmless the City for all costs, including attorneys’ fees, attendant to any claim or litigation related to a Public Records Act request for which Contractor has responsive records and for which Contractor has withheld records or information contained therein, or not provided them to the City in a timely manner. Contractor shall produce for distribution any and all records responsive to the Public Records Act request in a timely manner, unless those records are protected by court order. 15. Other Provisions: A.Administration and Notices. Each individual executing this Agreement on behalf of City and Contractor represents and warrants that such individuals are duly authorized to execute and deliver this Agreement on behalf of City or Contractor. Any notices required to be given by the Parties shall be delivered at the addresses set forth below. Any notices may be delivered personally to the addressee of the notice or may be deposited in the United States mail, postage prepaid, to the address set forth below. Any notice so posted in the United States mail shall be deemed received three (3) calendar days after the date of mailing. This Agreement       PAGE 9 OF 13 shall be administered by and any notices should be sent to the undersigned individuals or their designees. CITY OF RENTON Ethan Belen, Civil Engineer III 1055 South Grady Way Renton, WA 98057 Phone: (425) 430-7221 Ebelen@rentonwa.gov Fax: (425) 430-7376 CONTRACTOR Tyler Pierce 175 Roy Rd SW Bldg C Pacific, WA 98047 Phone: (253) 299-1200 tyler.pierce@spmnw.com Fax: (253) 299-1250 B.Amendment and Modification. This Agreement may be amended only by an instrument in writing, duly executed by both Parties. C.Assignment and Subcontract. Contractor shall not assign or subcontract any portion of this Agreement without the City of Renton’s prior express written consent. D.Compliance with Laws. Contractor and all of the Contractor’s employees shall perform the Work in accordance with all applicable federal, state, county and city laws, codes and ordinances. A copy of this language must be made a part of any contractor or subcontractor agreement. E.Conflicts. In the event of any inconsistencies between contractor proposals and this contract, the terms of this contract shall prevail. F.Governing Law. This Agreement shall be made in and shall be governed by and interpreted in accordance with the laws of the State of Washington. G.Joint Drafting Effort. This Agreement shall be considered for all purposes as prepared by the joint efforts of the Parties and shall not be construed against one party or the other as a result of the preparation, substitution, submission or other event of negotiation, drafting or execution. H.Jurisdiction and Venue. Any lawsuit or legal action brought by any party to enforce or interpret this Agreement or any of its terms or covenants shall be brought in the King County Superior Court for the State of Washington at the Maleng Regional Justice Center in Kent, King County, Washington, or its replacement or successor. Contractor hereby expressly consents to the personal and exclusive jurisdiction             9-5-2022 PAGE 11 OF 13 City Clerk Approved as to Legal Form _______________________________ Shane Moloney Renton City Attorney Non-standard 05/04/20 CLB 8/11/22 clb (2047)       Approved by Cheryl Beyer via 8/24/2022 email PAGE 12 OF 13 Attachment A City of Renton Pavement Marking Refresh Scope of Work Description of Work: Grind off and replace existing pavement markings at various locations. Project Location: 15 Locations: 1. Northeast 4th Street & 156th Avenue Southeast 2. Northeast 4th Street & Bremerton Avenue Northeast 3. Northeast 4th Street & Hoquiam Avenue Northeast 4. Northeast 4th Street & Jericho Avenue Northeast 5. South Grady Way & Talbot Road South 6. Southwest Sunset Blvd & Hardie Avenue Southwest / Southwest Langston Road 7. Northeast Sunset Boulevard & Hoquiam Avenue Northeast 8. Bronson Way North & Factory Avenue North 9. Maple Valley Road & Southeast 7 th Street / Monroe Avenue Southeast 10. Southwest 7th Street & Oakesdale Avenue Southwest 11. South 3rd Street & Burnett Avenue South 12. Southeast Petrovitsky Road & 128 th Avenue Southeast 13. SR 515 & Southeast Carr Road / Southeast Petrovitsky Road 14. South Carr Road (Southeast 176th Street) & 106th Place Southeast 15. Southeast 180 th Street & SR 515 (bids shall be broke out by location and include any associated sales tax) General information: x This scope of work is based on the information provided by City of Renton Representative Ethan Belen. x The performance of all work will be in accordance with OSHA and WISHA safety requirements. x Daily job site cleanup is required before the work crew leaves the site each day and final cleanup is required prior to final inspection and acceptance by the Transportation Maintenance Division. x Project requires State of Washington prevailing wages to be paid including intents to pay and affidavits of wages paid. x Work to be inspected by the City of Renton Transportation Department prior to Acceptance. x Contractor to provide traffic control. x The City reserves the right to reject any and all bids. x Bid Bond is not required for this project.       PAGE 13 OF 13 Technical Scope of Work: All work performance shall be completed in accordance with all Local, city, and state authority having jurisdiction requirements and regulations. Provide all labor, materials, and equipment to complete the following work package to the extent necessary to complete the intended scope of work. x Mobilize and demobilize according to site access requirements and restrictions. x All traffic control per Washington State Zone Traffic control Plans. x Contractor shall comply with King County Ordinance 18166 codified in King County Code Chapter 10.30 Construction and Demolition Waste. 1. General construction x Provide site protection as necessary to prevent damage during construction. x Thermal plastic shall contain 3M wet/dry elements x Thermal plastic shall only be installed when pavement has been dry for 48 hours and when it is above 50 degrees x Contractor shall install thermal plastic per city standard detail 109, 127 and 128 x Demobilize and clean up. x If the pavement marking is being applied to concrete, we would need to grind off the existing and overlay with MMA. If the pavement marking is being applied to asphalt, we can just overlay with thermal plastic. x Work is expected to be completed by September 30 31, 2022 x There are no liquidated damages for this project 2. Traffic control x Provide traffic control plan per WSDOT for approval by City of Renton Transportation Department. x Provide traffic control equipment, signs, and personnel for removal/replacement of light pole work activity. 3. Permits x All permits to be obtained by contractor. 4. Material Submittals x Construction schedule x Submittals (To be sent to Eric Cutshall for approval) Schedule of Prices - Attachment A – continued (attached) Thermal Plastic Locations Planning Areas – Attachment A-continued (attached) Map Locations – Attachment A-continued (attached)