HomeMy WebLinkAboutMFP22004351.pdfDEPARTMENT OF COMMUNITY AND ECONOMIC DEVELOPMENT Minor Franchise Permit: MFP22004351 IVR Number: 22004351 Permit Information Permit Name: Puget Sound Energy - Electric Address/Location:08/15/2022Application Date:6198400125Parcel Number: 19016 116TH AVE SE Permit Type:09/08/2022Issue Date:Franchise Permit Work Class:09/08/2023Expiration Date:Minor Utility Job Number: 105094139Franchise Type:Electric Description: Puget Sound Energy Electric CREW TO PARK IN ROW AT V02 (316042 166583). CREW TO TRENCH APPROX 40' IN ROW AT V01. POTHOLE ALL EXISTING UTILITIES. RESTORATION PER CITY OF RENTON STANDARDS Contacts Name Address PhoneTypeBilling Corrie Rydberg Puget Sound Energy 3702 71st Ave W University Place, WA 98466 C: (253) 905-5031ApplicantX Vicki Henson Potelco Inc 8001 212th St S Kent, WA 98032 B: (253) 863-0484Contractor Business License Number: 5109Electrical Contractor: POTELI*344O4 Construction Contractor: POTELI*227PL 19016 116TH LLC 19016 116TH AVE SE RENTON, WA 98058 Owner Corrie Rydberg Puget Sound Energy 3702 71st Ave W University Place, WA 98466 C: (253) 905-5031Specialized Billing General Conditions & Signature Permission is hereby given for the work described on this permit according to the conditions hereon and according to the approved plans and specifications pertaining thereto, subject to compliance with the Ordinance of the City of Renton. Ÿ This permit and plans must be posted at the job site at all times.Ÿ I hereby certify that no work is to be done except as described above and in approved plans, and that work is to conform to Renton Trench Restoration and Street Overlay Requirements. Ÿ Call 425.430.7203 or go to: https://permitting.rentonwa.gov one working day in advance to schedule an inspections and for ANY work in the Right of Way. Ÿ Call 8 1 1 to locate underground utilities at least two full business days prior to any excavation.Ÿ In accordance with RCW 19.122.033(4) the permit holder is required to contact (Williams Northwest Pipeline at 425.868.1010) (Olympic Pipeline at 206.510.0575) (Puget Sound Energy at 425.375.3397) to request a consultation with the transmission pipeline company prior to performing any construction or excavation activities. This requirement to consult with the transmission pipeline company is in addition to the requirement to Call before You Dig as required in RCW 19.122. Ÿ (Date)(Signature) Page 1 of 1THIS PERMIT AND PLANS MUST BE POSTED AT THE JOB SITE AT ALL TIMES Note: The Applicant is responsible for compliance with all codes and regulations, whether or not described in this document. DEPARTMENT OF PUBLIC WORKS Page 1 of 3 | Published: 10/27/2021 Transportation Division | 1055 South Grady Way, 5th Floor | Renton, WA 98057 | 425-430-7380 Website: rentonwa.gov TRAFFIC CONTROL PLAN APPLICATION Published: 10/27/2021 TRAFFIC CONTROL PLAN (TCP) MUST BE SUBMITTED TO PUBLIC WORKS TRANSPORTATION DIVISION FOR REVIEW/APPROVAL AT LEAST FIVE (5) WORKING DAYS BEFORE THE DATE OF WORK. The City of Renton requires any contractor, firm, corporation, or other public/private agency to prepare a traffic control plan (TCP) and obtain city's approval of that plan when construction, repair, or maintenance work is to be conducted within the city's right-of-way. 1. Fill out the Traffic Control Plan (TCP) Application form and prepare required submittal documents. 2. The following items are all required for submittal of the TCP Application: ☐Electronic Copy of the TCP Application ☐Electronic Copy of the TCP Layout, on 11” X 17” paper size format, which shall: Include map(s) showing the location of the project and work area. Be legible lettering and clear, contrasting, symbols of viewing or printing. Must indicate street names, and north arrow and scale. Types of plans required: o Work hour plan – show all mobility impacts during construction hours. o Non-work plan - show all mobility impacts after work hours when limited or no work is happening in the right-of-way (ROW), if applicable. o Changing construction phases – show construction sequence and each construction phase change even if the traffic control is not modified, if applicable. o Pedestrian access/detour plan, if applicable. - Shall conform to the Washington State Traffic Control Flagger Certification handbook, by the Evergreen Safety Council. 3. Submit Application via email to TCP@rentonwa.gov with the subject line “TCP Application – [Project Name].” Project Name: Permit #: Site Address: Work Date: From _____________ To _____________ Work Time: Start ______________ End ______________ Construction Company: Contact Name: Phone/Cell: _________________________ Business Address: City/State: Zip: Description of Work: Approval By: _________________________________________________ Date:____________________ Transportation Engineering PLEASE SEE ATTACHED POTELCO, INC 6905 S 228TH ST KENT, WA 98032 105094139 19016 116TH AVE SE RANDY BLACKIE 425-457-2614 MFP22004351 Monday - Friday 8:00AM - 3:00PM Scott Warlick CED 9/7/2022 Note: The Applicant is responsible for compliance with all codes and regulations, whether or not described in this document. Page 2 of 3 | Published: 10/27/2021 PERMIT HOLDER AGREES TO ALL THE FOLLOWING: Must have approved Traffic Control Plan (TCP) prior to commencing the work. Maintain existing pedestrian access. The work on pedestrian facilities, shall be limited to one corner at a time, with the least possible inconvenience or delay to pedestrians. WORK TIME begins when any street or travel lane is fully or partially closed. This includes set up within the traveled way. Comply with all traffic regulations of the City of Renton and the State of Washington. Prepare a traffic control plan and obtain City approval of that plan. That plan shall be implemented for all street and lane closures, and the plan shall be performed in compliance with the Manual on Uniform Traffic Control Devices. Notify emergency services (253-852-2121) twenty-four (24) hours before any street or lane closures. Contractor or entity must call Renton School District (425-204-4455) or any public/private agency, including public transit, to be affected by a temporary lane or road closure a minimum of five business days (excluding weekends and holidays) prior to starting any work. Contractor or entity must notify King County Metro in writing at construction.coord@kingcounty.gov a minimum of five business days (excluding weekends and holidays) prior to starting any work impacting bus stops, a temporary lane or road closure. Work requiring removing a bus shelter or sign requires notification in writing a minimum of 30 business days (excluding weekends and holidays). Please call King County Metro at 206-477-1140 with any questions. Any lane or street closures not in conformance with the approved traffic control plan and/or without notification of emergency services may result in receiving a citation for violation of R.C.W. 47.36.200 Signs or Flaggers at thoroughfare work sites and R.C.W. 9A.36.050 Reckless Endangerment, and other applicable State and City codes. Indemnify and hold harmless the City of Renton from any and all claims, actions, and judgments, including all costs of defense and attorney’s fees incurred in defending against same, arising from and related to implementation of the approved traffic control plans including claims arising from towing of private vehicles and the acts of the Permit Holder’s agents and employees. The City of Renton shall be entitled, in its reasonable discretion, to settle claims prior to suit or judgment, and in such event shall indemnify and hold harmless the City for any such claims paid, including the City’s reasonable attorney’s fees and litigation costs incurred resulting from such claim. In the event any claim or suit is brought against City within the scope of this Agreement, Permit Holder will pay for legal counsel chosen by the City to defend against same. Flagger and sign placement are subject to revision by the City Inspector on site, if needed to address traffic or pedestrian safety or travel. All permit conditions shall be met. NOTES: Total road closure lasting more than twenty-four (24) hours is subject to the approval by the City Council. Work Zone Traffic Control shall be in accordance with the Manual on Uniform Traffic Control Devices (MUTCD) and shown by a traffic control plan layout or reference to WSDOT. Approved Temporary Traffic Control Plan must be at the work site during work hours. Complete assistance and accommodation shall be provided to all kinds of pedestrian traffic when sidewalk or walkway is impeded to safely redirect pedestrians around a work zone. Signage shall be used to warn motorcyclists/bicyclists of the potential hazards on any uneven surfaced or slippery road conditions during work and non-work hours. Any vehicle, equipment, barricade, or portable tow-away sign used within the work area must display a company logo or any legally acceptable sign showing the company name, address, and telephone number at a conspicuous place on the vehicle or equipment. Note: The Applicant is responsible for compliance with all codes and regulations, whether or not described in this document. Page 3 of 3 | Published: 10/27/2021 In the case of Temporary No Parking Zones, all the following apply in addition to previous: Contractor must complete form to show limits of Temporary No Parking Zone identifying barricade locations for vacate parking or curb lane usage. Contractor must post notice of dates and time of Temporary No Parking Zone with at least two signs per block seventy-two (72) hours in advance of effective date and time. The cover sheet of this Traffic Control Plan form must be attached to each Temporary No Parking Sign on the project site. Temporary traffic control devices must be removed immediately when work is done or no construction activities are going on. If deemed abandoned, City crews will remove and store them at the City’s maintenance shop (3555 NE 2nd Street). I certify that the information on this application and within the submittal documents are accurate to the best of my knowledge and I acknowledge all the requirements on this application. Applicant’s Signature Date Applicant’s Name (Print) CORRIE RYDBERG 13131515SE 191ST STV02116TH AVE SE RESIDENT(S) WILL BE INFORMEDOF POSSIBLE TEMPORARYDRIVEWAY CLOSURES/WCLOSEDR9-9S/W CLOSEDR9-9DETOURM4-9bDETOURM 4 - 9 b FROMTOTOW AWAY AREAPHONE 888-9999INFRASOURCE LLC 000 0000000NO PARKINGNO-PARK FROM TO TOW AWAY AREA PHONE 888-9999 INFRASOURCE LLC 000 0000000 NO PARKING NO-PARK STOP FLAGGERSTOP FLAGGER W20-7AROADWORKAHEADW20-1 W20-4ONE LANEROADAHEAD100'100'100'W20-7AROAD WORK AHEAD W20-1W20-4ONE LANEROADAHEAD100'100'100'Puget Sound EnergyTraffic Control Supervisor:Gregory HarwoodCard No. 012238Card Exp. 09/30/2023gregory.harwood@pse.com(425)424-6425TEMPORARY TRAFFIC CONTROL PLANNotes:1. All signs and spacing to conform to theMUTCD and City of Renton standards.2. All sidewalks, driveways, exits and egressesshall be completely clear unless otherwise indicated.3. Channelizing devices are 28" traffic cones.Use traffic drums (barrels) with steady burningType C lights on all State State Routes and Hwys.4. Sign size can be a minimum of 36" x 36" andshall not obstruct pedestrian access.5. Crew is required to leave a minimum of 11' fortraveling lane width.6. Alert affected residents and businesses.7. Work to take place between 9 a.m. and 4 p.munless otherwise specified. All work for arterialsand major roadways will be from 9 a.m. to 3 p.m.NSIGN SPACINGMPH60/6545/5535/403025"X"1000'500'350'200'100'CHANNELIZATIONDEVICE SPACINGMPH55/7035/4525/30TAPER403020TANGENT806040TRENCH28" TRAFFIC CONELEGENDTRAFFIC FLOWSIGN LOCATIONFLAGGERSTOPWORK VEHICLE/FLASHING LIGHTSRIGHT OF WAYPSEPUGETSOUNDENERGYJOB10509413919016 116th Ave SE, Renton, WA 9805910/28/20KALI-JAMAL.COLLINS@PSE.COM425-424-6425SHEET 1 of 2MFP22004351 13131515SE 191ST ST116TH AVE SE RESIDENT(S) WILL BE INFORMEDOF POSSIBLE TEMPORARYDRIVEWAY CLOSUREFROM TO TOW AWAY AREA PHONE 888-9999 INFRASOURCE LLC 000 0000000 NO PARKING NO-PARK STOP FLAGGERSTOP FLAGGER W20-7AROADWORKAHEADW20-1 W20-4ONE LANEROADAHEAD100'100'100'W20-7AROAD WORK AHEAD W20-1W20-4ONE LANEROADAHEAD100'100'100'Notes:1. All signs and spacing to conform to theMUTCD and City of Renton standards.2. All sidewalks, driveways, exits and egressesshall be completely clear unless otherwise indicated.3. Channelizing devices are 28" traffic cones.Use traffic drums (barrels) with steady burningType C lights on all State State Routes and Hwys.4. Sign size can be a minimum of 36" x 36" andshall not obstruct pedestrian access.5. Crew is required to leave a minimum of 11' fortraveling lane width.6. Alert affected residents and businesses.7. Work to take place between 9 a.m. and 4 p.munless otherwise specified. All work for arterialsand major roadways will be from 9 a.m. to 3 p.m.NSIGN SPACINGMPH60/6545/5535/403025"X"1000'500'350'200'100'CHANNELIZATIONDEVICE SPACINGMPH55/7035/4525/30TAPER403020TANGENT806040TRENCH28" TRAFFIC CONELEGENDTRAFFIC FLOWSIGN LOCATIONFLAGGERSTOPWORK VEHICLE/FLASHING LIGHTSRIGHT OF WAYPuget Sound EnergyTraffic Control Supervisor:Gregory HarwoodCard No. 012238Card Exp. 09/30/2023gregory.harwood@pse.com(425)424-6425TEMPORARY TRAFFIC CONTROL PLANPSEPUGETSOUNDENERGYJOB10509413919016 116th Ave SE, Renton, WA 9805910/28/20KALI-JAMAL.COLLINS@PSE.COM425-424-6425SHEET 2 of 2MFP22004351 N Vicinity Map 47.4316, -122.1863 Owner / Developer Contact Info officeATTN: 19016 116th LLC 39805 212TH AVE SE ENUMCLAW, WA 98022 SCOTT L JEPSON 253.592.4299 THIS SKETCH NOT TO BE RELIED UPON FOR EXACT LOCATION OF EXISTING FACILITIES CALL (800) 424-5555 2 BUSINESS DAYS BEFORE YOU DIG For contacts below dial 1-888-CALL PSE (225-5773) PSE No No No Yes Yes Yes No YesDeveloper "Flagging Required" "Outages Required" "Locates Required" ARE TO BE INSTALLED, CROSS SECTION DETAILS OF THE TYPICAL EROSION STRUCTURES, & SPECIAL REQUIREMENTS FOR WORK IN SENSITIVE AREAS.) EROSION & SEDIMENT CONTROL REQUIREMENTS NOTES DETAILING WHERE EROSION OR SEDIMENT CONTROL STRUCTURES (LOCAL JURISDICTIONS MAY HAVE ADDITIONAL REQUIREMENTS INCLUDING 0150.3200 TECHNIQUES FOR TEMPORARY EROSION & SEDIMENT CONTROL EROSION & SEDIMENT CONTROL SHALL BE PER PSE STANDARD PRACTICE & ANY ADDITIONAL LOCAL JURISDICTION REQUIREMENTS. FOREMAN (CHECK BOX WHEN COMPLETED) PSE Equipment LOCKED/SECURED & Work Area left in CLEAN/SAFE Condition. Grid, Cable, and Switch numbers INSTALLED & VERIFIED. Field Changes RED-LINED on As-built. Indicate correct FUSE SIZE on As-built & VERIFY proper PHASE. Foreman's Signature _______________________________________________ Print Name ___________________________________ Date ______________ Material VERIFIED and CHANGES noted on Paperwork. Total PRIMARY Cable noted on As-built. Company ID#'s RECORDED in correct location on As-built. Deviations noted on the As-built and their reason. I certify that the work performed meets PSE's standards and procedures and that all quality requirements are met. GAS PHONE CABLE TV 508847364 105094139 N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A 509074578 107059526 N/A 106365570 N/A N/A PROJECT PHASE PWR NOTIF#ORDER# Superior Perm. Service Relocation Removal Temporary Job Order Distribution Service Stubs HP Svc/MSA 10. 9. 8. 7. 6. 5. 4. 3. 2. 1. THE CUSTOMER IS RESPONSIBLE FOR PROVIDING ALL TRENCHING, PER THE TRENCH PROFILE, AND ALL EXCAVATIONS AT THE TRANSFORMER/HANDHOLE VAULT SITES SUCH THAT PSE FACILITIES WILL MATCH FINAL GRADE. VAULT HOLES WILL HAVE STABLE LEVEL BOTTOMS. CUSTOMER WILL PROVIDE 6" OF CRUSHED ROCK FOR VAULT BEDDING. ALL TRENCHES WILL HAVE 6" OF WASHED SAND COVER AND 4" BEDDING FOR ALL CONDUITS. THE CUSTOMER WILL PROVIDE SELECT BACKFILL, IF REQUIRED, AND COMPACTION AS NECESSARY. THE CUSTOMER IS RESPONSIBLE FOR DISPOSAL OF ALL NATIVE SPOILS NOT SUITABLE FOR USE AS BACKFILL. ALL TRENCHES MAY BE JOINT WITH GAS, TELEPHONE AND TV CABLE. ALL CABLES/CONDUITS TO BE INSTALLED IN CUSTOMER'S TRENCH AT THE DEPTH INDICATED IN TRENCH DETAIL (DEPENDENT UPON SIZE OF CONDUIT BEING INSTALLED TO MEET MIN 36" OF COVER). INSTALL CABLE ID TAGS AT EACH END OF THE PRIMARY CABLES PER THE CIRCUIT ONE-LINE DIAGRAM. UNLESS OTHERWISE SPECIFIED BY MUNICIPALITIES, INSTALL PVC (DB-120) ROAD CROSSINGS AS INDICATED ON THE CROSSINGS CONDUIT TABLE & AS SHOWN ON WORK SKETCH. CROSSINGS SHALL BE INSTALLED BY CUSTOMER/DEVELOPER PER PUGET SOUND ENERGY STANDARDS. AT SYMBOL: INSTALL UNDERGROUND PRIMARY CABLES IN CONDUIT. CABLE LENGTH AND CONDUIT SIZE AS INDICATED ON PRIMARY CABLE & CONDUIT TABLE. AT SYMBOL: INSTALL 600 VOLT UG SECONDARY CABLES IN CONDUIT. CABLE/CONDUIT SIZE AND LENGTH AS INDICATED ON SECONDARY CABLE & CONDUIT TABLE. AT SYMBOL: INSTALL MINI-PAD HANDHOLE & PADMOUNT TRANSFORMER. ADDITIONAL EQUIPMENT AS INDICATED ON VAULT TABLE. AT SYMBOL: INSTALL SECONDARY PEDESTAL/HANDHOLE W/ (3) MULTI-CONNECTORS. SIZE AS INDICATED ON SECONDARY HH/PEDESTAL TABLE. (EXCAVATION: 3' SQ.) AT SYMBOL: INSTALL JUNCTION BOX HANDHOLE. ADDITIONAL EQUIPMENT AS INDICATED ON VAULT TABLE. AT SYMBOL: INSTALL SECONDARY CABLE & CONDUIT STUB-OUT. AT SYMBOL: INSTALL STREET LIGHTING STANDARD. SIZE AND TYPE OF STANDARD/LUMINARIE AS INDICATED ON STREET LIGHTING TABLE. (CUSTOMER TO EXCAVATE & INSTALL CORRUGATED STREET LIGHT TUBES FOR PLACEMENT OF THE STREET LIGHT STANDARDS. ) INCLEMENT WEATHER CONDITIONS MAY CAUSE DELAYS IN CONSTRUCTION TIMES AND DATES. POWER GENERAL NOTES - PLAT PROJECT 105094139 107059526 DESIGNED BY UTILITIES CONTACT PHONE# COUNTY 1/4 SEC U-MAP NO (POWER) OP MAP Emer Sect Gas Wk Ctr POWER WK CTR PLAT MAP JOINT FACILITIES ARRANGEMENTS DRAWN BY CHECKED BY APPROVED BY FOREMAN #1 FOREMAN #2 MAPPING INCIDENT MAOP Gas Order Elect Order SCALE PAGE ENGR - POWER ENGR - GAS FUNCTION PROJECT MGR PERMITREAL ESTATE/EASEMENT 2 1 REV# 3 DATE DESCRIPTIONBY CONTACT PHONE NO DATE OH CKT MAP CIRCUIT NOUG CKT MAP R. BLACKIE 425.457.2614 . K.COSTLEY 425.272.7075 11.23.20 K.COSTLEY 425.272.7075 11.23.20 E. PASAYE . 11.18.20 REDT # ( RW-117396 )CITY OF RENTON WANG SHORT PLAT 1Ø PRIMARY U/G LINE EXTENSION - 7 S/F LOTS 19016 116TH AVE SE, RENTON, WA 98058 PUGET SOUND ENERGY N/A IP 132-60 107059526 105094139 N/A 1 OF 3 KING 132A CIKNC QCSOKE 33SW-T23N-R05E 212.080 215.084 2305E131 2305E136 2305E131 PAN-15 COMCAST TODD ZIMNY . LUMEN TECHNOLOGIES KENNETH LUU 206.346.0144 RIGHT OF WAY AMBER YANG 425.456.2774 . . . 11. E-Mail: Cell Phone: Project Manager Contact Information: Manager:RANDY BLACKIE 425.457.2614 randy.blackie@pse.com x x x ... ... ... x Scott@AnaiyahHomes.com TYPICAL NOTCH-OUT FOR TRANSFORMER, NOT TO SCALE & SECONDARY PEDESTAL/HANDHOLE BACK OF EASEMENT STANDARD EASEMENT LINE ROW 10' PL 1' 4' - 5' Min. 1' 7'7' TRANSFORMER (WHEN PRESENT) 42" 45°42" 1' 45°Property LineRoad Side Top View of Mainline Trench for Single Stubout Location 4'Property LineRoad Side Top View of Mainline Trench for Pedestal or Double Stubout Location 42"45° 4' 45° STUBOUT EXCAVATION DIMENSIONS NOT TO SCALE JOINT TRENCH DETAIL NOT TO SCALE JOINT TRENCH DETAIL NOTES: 1. If the final backfill contains rocks greater than 8 inches in diameter, install 12 inches compacted sand shading across the full width of the trench. * If the final backfill contains rocks 8 inches in diameter or smaller, install 6 inches compacted sand shading across the full width of the trench. * 2. Rocks greater than 10 inches diameter are not permitted in the final backfill. 3. Sand bedding is required under PSE gas pipe. Bedding is not required for the full width of the trench; it shall extend from the side of the trench nearest to where the gas main/service is installed to a minimum of 6 inches on the opposite side of the gas line. 4. Utilities shall not be stacked over the gas line in the trench. 5. If wet utilities will be included in the trench, please contact PSE or local power company directly for clearance requirements. 6. Reduced clearance of 4 inches between power and communication, must have approval of the communications companies. * Alternatives to full-width trench shading require PSE approval. Primary & Secondary-Mainline Gas & Communications (NTS) ROAD SIDE NATIVE SECONDARY POWER PEDESTAL MATERIAL P/L Power Secondary Power Primary Conduit Tel. & TV 12" Min 12" Sand Cover when gas line is in trench Sand 6" or 12" 4" Sand Bedding 1' 36" Cover 42" Gas 12" 18" Lower 2" 10" Pedestal PSE 10' FRONTAGE EASEMENT 1' Cover ROAD SIDE MINIPAD MINIPAD FIELD SIDE VAULT 6" of crushed rock (base for vault) P/L Power Secondary Power Primary Gas 12" Min Horizontal Separation Communications 48" Min 21"1' Feeder 38" 2" 4" Sand Bedding 12" Sand Cover 36" Cover 4" Sand Bedding 42" 6" Additional depth when Feeder is required PSE 10' FRONTAGE EASEMENT 1' TRANSFORMER Final Backfill Initial Backfill Trench Depth 42" - 48" Primary Dirt Pile Final Grade 24" Min 36" Min Cover Over Power 48" Max Depth Final Backfill Gas 4" Sand Bedding Property Line intercept (depth varies). SidewalkCurb Location of roof drain 48" Typical Width may vary per Number of Utilities and Conduits 6" or 12" Min Sand Shading Over Gas after Compaction 12" Min R/W or Excavated 12" Typical Power Secondary Power TV & TEL 12" Min 12" Min Separation 4,5 1,2 1 3 6 6" or 12" Min Sand Shading Over Power after Compaction1 MINIMUM CLEARANCES FOR PSE EQUIPMENT NOT TO SCALE OIL-FILLED EQUIPMENT TRANSFORMER APPROVED AREA COMBUSTIBLE BUILDING WALLS & ROOF10' 10' 10' COOLING 5' MIN 5' MIN 10' MIN 5' MIN FINS ACCESS CONCRETE PAD MINIMUM CLEARANCES FOR PSE EQUIPMENT NOT TO SCALE CURB OR EDGE OF PAVEMENT CURB OR EDGE OF PAVEMENT 5' MIN ROAD OR PARKING AREA TYP. PAD & TRANS- FORMER 3' MIN 3' MIN DOOR ACCESS DOOR REQUIRED WORK SPACE AREA 3' MIN @ H1A SHALL BE STAGGERED CONNECTOR BARS IN THE FRONT NEUTRALS SHALL BE 18" 16" 13" 12"10" 2" 10" Pedestal will accept up to six 3" conduits SEALED WITH FOAM CONDUIT SHALL BE 120 PVC CONDUIT ELBOWS TYPICAL 24" RADIUS DB SIDE VIEW WITH CONDUIT 10" 18" 16" 13" 10" 2" 36" FRONT VIEW WITH CONDUIT SECONDARY PEDESTAL DETAIL NOT TO SCALE SITE VAULT DETAIL @ V01 NOT TO SCALE EXCAVATION: _____ CUBIC YARDS 3'-6" SIDE VIEW 2" 6" CRUSHED ROCK TOP VIEW 7' 7' 6 1/3 206.584.4408 01.21.21 01.21.21 MFP22004351 116TH AVE SESE 189TH PLACE (PUBLIC) SE 191ST ST (PUBLIC)117TH PLACE SE(PUBLIC)(PUBLIC)116TH AVENUE SE(PUBLIC)ROAD A ROAD A TRACT B LOT 1 LOT 2 LOT 3 LOT 4 LOT 5 LOT 6 LOT 7 EX: 1-2" EX: 1-2"397 AACABCN 115KV115KV397 AACABCN C#4ACSR CUST. OWNED, INSTALLED, & MAINTAINED CONDUIT/WIRE FROM H1A TO METER LOCATION COR ST. LIGHT 11719 116TH AVENUE SEF.H. UTILITY CONFLICT 117TH PL SE(PUBLIC)11725 11731 19015 19009 1911319101 19107 11645 FUT: 1-2" 60'26'47'33' FEED PAN 15'A' 'B' TRACT A FEEDPAN 15 19030 19021 5.5' ROW DEDICATION FUT: 1-3" 1" = 50' DESIGNED BY UTILITIES CONTACT PHONE# COUNTY 1/4 SEC U-MAP NO (POWER) OP MAP Emer Sect Gas Wk Ctr POWER WK CTR PLAT MAP JOINT FACILITIES ARRANGEMENTS DRAWN BY CHECKED BY APPROVED BY FOREMAN #1 FOREMAN #2 MAPPING INCIDENT MAOP Gas Order Elect Order SCALE PAGE ENGR - POWER ENGR - GAS FUNCTION PROJECT MGR PERMITREAL ESTATE/EASEMENT 2 1 REV# 3 DATE DESCRIPTIONBY CONTACT PHONE NO DATE OH CKT MAP CIRCUIT NOUG CKT MAP R. BLACKIE 425.457.2614 . K.COSTLEY 425.272.7075 11.23.20 K.COSTLEY 425.272.7075 11.23.20 E. PASAYE . 11.18.20 REDT # ( RW-117396 )CITY OF RENTON WANG SHORT PLAT 1Ø PRIMARY U/G LINE EXTENSION - 7 S/F LOTS 19016 116TH AVE SE, RENTON, WA 98058 PUGET SOUND ENERGY N/A IP 132-60 107059526 105094139 1" = 50' 2 OF 3 KING 132A CIKNC QCSOKE 33SW-T23N-R05E 212.080 215.084 2305E131 2305E136 2305E131 PAN-15 COMCAST TODD ZIMNY . LUMEN TECHNOLOGIES KENNETH LUU 206.346.0144 RIGHT OF WAY AMBER YANG 425.456.2774 . . . SITE PLAN CIRCUIT LOADING TABLE AS OF EXIST. PEAK LOAD EST. NEW LOAD TOTAL CIRCUIT: A PHASE B PHASE C PHASE PAN-15 6.8.20 217 214 193 - - 5 217 214 198 ... ... ... SCHED.SQ. FT. MAX LRC = CIRCUIT FEET ADDED: 315 FT. 27 3,212 130 AMPS THIS SKETCH NOT TO BE RELIED UPON FOR EXACT LOCATION OF EXISTING FACILITIES CALL (800) 424-5555 2 BUSINESS DAYS BEFORE YOU DIG For contacts below dial 1-888-CALL PSE (225-5773) CONTACT PSE PROJECT MANAGER IMMEDIATELY REGARDING CONVERSION OF OVERHEAD SYSTEM TO UNDERGROUND ON 116TH AVE SE. CONVERSION WORK TO BE COMPLETED UNDER SEPARATE WORK ORDER , COST AGREEMENTS, AND TARIFFS. LRC: % V. Drop: % Flicker: Sq. Footage: Panel Size: Heat Type: Est. Demand: Units: BUILDING #ST. LIGHT N/A N/A 100A N/A 1KW N/A 1.3 @ H1A 2.0 @ H1A Developer Note: The following Fault Current information MUST BE conveyed to the builder of the units: All units may require upgraded house electrical equipment as the fault current at the meter base may exceed 10,000 amps. CUSTOMER OWNED AND INSTALLED SECONDARY WIRE TABLE BLDG.# OF METERS SOURCE # OF RUNS WIRE SIZE REMARKS -1 H1A 1 #2 CITY OF RENTON ST. LIGHT ALL CUSTOMER-OWNED WIRE MUST BE INSTALLED ACCORDING TO THIS TABLE FAULT CURRENT TABLE 1Ø PM TRANSFORMERS (240/120V) 120V WINDINGS 240V WINDINGS LOCATION SIZE R/X MIN. %Z FAULT CURRENT MIN. %Z FAULT CURRENT V01 75kVA 0.5 2.30 36,200 AMPS 1.80 23,100 AMPS DEDICATED FACILITIES (105094139) for 130 LRC & Dedicated Stub Locations SITE SPAN ADDITIONAL REMARKS LABOR UNITS # FROM TO FOOTAGE -V01 LOT 4 65 DED. CONDUIT & WIRE 2-36, 2-54A -V01 LOT 5 65 DED. CONDUIT & WIRE 2-36, 2-54A -V01 LOT 7 70 DED. CONDUIT & WIRE 2-36, 2-54A V01 --- UPGRADE 50KVA TO 75KVA - TOTAL FT=200 DEVELOPER TO COORDINATE WITH PSE PROJECT MANGER & SERVICE PROVIDER PRIOR TO EXCAVATING WITHIN 3' OF LOCATE MARKS OF PSE ENERGIZED FACILITIES DEVELOPER TO PROVIDE TYPICAL 10' PSE FRONTAGE EASEMENT FOR OPERATION AND MAINTENANCE OF PSE EQUIPMENT. EASEMENT TO BE CLEAR OF ALL BUILDING OVERHANGS AND FOUNDATION FOOTINGS CROSSING CONDUIT TABLE X-ING # LOCATION GAS POWER XING LENGTH TYPE OF CROSSING (Feeder, Primary, Secondary, etc.)FROM TO SIZE (IN)TYPE QTY LOCATION SIZE (IN)TYPE QTY CONDUIT OFFSET (As Built) X01 'A' 'B' 4 40 1 E 2 80 1 ( )' ECL 55 GAS MAIN, PRIMARY 3 80 1 ( )' ECL 55 SECONDARY 4" PVC PLUG /CAPS = 2 4" YELLOW SCH 40 PVC = 55 FT 2" SCH 80 GREY PVC = 55 FT 2" PVC PLUG /CAPS = 2 3" SCH 80 GREY PVC = 55 FT 3" PVC PLUG /CAPS = 2 206.584.4408 01.21.21 01.21.21 MFP22004351 POTHOLE ALL EXISTING UTILITIES RESTORATION PER CITY OF RENTON STANDARDS FEED PAN 15 NEW 1/O AL EIY674-CØ CØAEH732 CØAEH731 'A' 'B' LOT 1 LOT 2 LOT 3 LOT 4 LOT 5 LOT 6 LOT 7 CUST. OWNED, INSTALLED, & MAINTAINED CONDUIT/WIRE FROM H1A TO METER LOCATION COR ST. LIGHT 'A' 'B' DESIGNED BY UTILITIES CONTACT PHONE# COUNTY 1/4 SEC U-MAP NO (POWER) OP MAP Emer Sect Gas Wk Ctr POWER WK CTR PLAT MAP JOINT FACILITIES ARRANGEMENTS DRAWN BY CHECKED BY APPROVED BY FOREMAN #1 FOREMAN #2 MAPPING INCIDENT MAOP Gas Order Elect Order SCALE PAGE ENGR - POWER ENGR - GAS FUNCTION PROJECT MGR PERMITREAL ESTATE/EASEMENT 2 1 REV# 3 DATE DESCRIPTIONBY CONTACT PHONE NO DATE OH CKT MAP CIRCUIT NOUG CKT MAP R. BLACKIE 425.457.2614 . K.COSTLEY 425.272.7075 11.23.20 K.COSTLEY 425.272.7075 11.23.20 E. PASAYE . 11.18.20 REDT # ( RW-117396 )CITY OF RENTON WANG SHORT PLAT 1Ø PRIMARY U/G LINE EXTENSION - 7 S/F LOTS 19016 116TH AVE SE, RENTON, WA 98058 PUGET SOUND ENERGY N/A IP 132-60 107059526 105094139 AS SHOWN 3 OF 3 KING 132A CIKNC QCSOKE 33SW-T23N-R05E 212.080 215.084 2305E131 2305E136 2305E131 PAN-15 COMCAST TODD ZIMNY . LUMEN TECHNOLOGIES KENNETH LUU 206.346.0144 RIGHT OF WAY AMBER YANG 425.456.2774 . . . ... ... ... EX OVERHEAD CIRCUIT MAP 2305E136 SCALE: 6" = 1 MILE NEW PRIMARY UNDERGROUND CIRCUIT ONE-LINE DIAGRAM NOT TO SCALE EX UNDERGROUND CIRCUIT MAP 2305E131 NOT TO SCALE VAULT & EQUIPMENT TABLE SITE # GRID # VAULT SIZE & COVER TYPE & SIZE EQUIPMENT IN VAULT PRIMARY BUSHINGS TRANSFORMER ID NUMBERS (COMPANY ID) AS-BUILT INFORMATION LB DC FOREMAN: INCLUDE PHASE TAPPED V01 316037 130586 54"x54"x38" Unistrut HH Matid: 7663002 75KVA MP TRF 120/240 Matid: 6247150 1 1 MINU1LR 6045.1010 CØ Existing V02 316042 166583 54"x54"x38" Unistrut HH Matid: Existing 75KVA MP TRF 120/240 Matid: Existing 1 - ELB10J 6041.1000 TAP CØ THIS SKETCH NOT TO BE RELIED UPON FOR EXACT LOCATION OF EXISTING FACILITIES CALL (800) 424-5555 2 BUSINESS DAYS BEFORE YOU DIG For contacts below dial 1-888-CALL PSE (225-5773) SITE SITE PRIMARY CABLE & CONDUIT TABLE LOCATION CONDUIT CABLE ASBUILT INFORMATION - FOREMAN COMPLETE FROM TO SIZE (IN)QTY. DESIGN LENGTH (FT) BENDS PULL (LBS) PULL REV (LBS) CABLE SIZE DESIGN LENGTH (FT) PHASE - ID TAG RECORD RECORD PHASE TAPPED & ACTUAL FOOTAGE INSTALLED LUBRICANT (Gal.) 90°45°22° 11°A B C MANUFACTURER COMPOUND YEAR NOTES CONDUIT CABLE EST. ACTUAL V02 V01 2 1 260 1 - 2 -163 182 1/0 AL JKT 325 --EIY674 -1.3 V01 E01 2 1 325 - 2 - -CONDUIT ONLY --- 2" PVC (FT) & BENDS =585 1 2 2 0 1/0 AL JKT TOTAL (FT) =325 TTL (Gal.)1.3 NOT TO SCALE NEW CONDUIT DIAGRAM SECONDARY 2" SECONDARY 3" PRIMARY 2" CONDUIT LEGEND CUST. OWNED SECONDARY HH/PEDESTAL TABLE Site Pedestal or Handhole Number of Positions Required Remarks H1A PEDESTAL 4 - SEPS4 6050.1000 SECONDARY CABLE & CONDUIT TABLE LOCATION CABLE CONDUIT VOLTAGE ASBUILT INFORMATION SIZE LENGTH ASSUMED SIZE LENGTH BENDS DROP FLICKER Foreman - Complete FROM TO (1/O,4/O,350)Design (ft)Lot Corner to Meter (ft)(in) Design (ft)90° 45°22° 11°(Percent) (Percent)Actual Amount Installed Cable Conduit V01 H1A 350 235 3 235 2 1.8 2.6 V01 LOT 3 4/O 85 60 3 85 1 1.7 3.0 V01 LOT 4 1/O 80 60 3 80 1 2.1 3.7 V01 LOT 5 1/O 80 60 3 80 1 2.1 3.7 V01 LOT 6 4/O 85 60 3 85 1 1.7 3.0 V01 LOT 7 350 225 60 3 225 1 2 2.0 3.7 H1A LOT 1 4/O 60 2 2.1 3.2 LABEL YELLOW TAG "MUST BE 4/0 TO MTR" H1A LOT 2 4/O 60 2 2.1 3.2 LABEL YELLOW TAG "MUST BE 4/0 TO MTR" 1/O UG Triplex (ft) =160 3" PVC & BENDS (ft)=790 7 0 2 0 1.7 4/O UG Triplex (ft) =170 350 UG Triplex (ft) =460 TOTAL QTS OF GLUE 1.7 206.584.4408 01.21.21 01.21.21 MFP22004351