Major Franchise Permit: MFP22004490
IVR Number: 22004490
Permit Information
Permit Name: Puget Sound Energy - Electric
Address/Location:08/22/2022Application Date:1023059487Parcel Number: 1018 CHELAN AVE NE
Permit Type:09/08/2022Issue Date:Franchise
Permit Work Class:09/08/2023Expiration Date:Major Utility
Job Number: 101146949Franchise Type:Electric
Description: Puget Sound Energy Electric Multiple sites for crews to park next to the pole in ROW and perform OH maintenance
to upgrade fuses/cutouts at P05 & P06 (NE 10th St), P07 (corner of NE 7th Pl & Hoquiam Ave NE). At the corner of
Hoquiam Ave NE & NE 4th Pl., cut in 1 phase jbox vault at J02. Customer to bore across Hoquiam Ave NE from J02
east, and then north along the west side of Hoquiam Ave NE to existing pole P08. Install new termination & riser at
P08. Crews to pull cable from J02 P08 and J02 V02. RESTORATION PER CITY OF RENTON STANDARDS.
Contacts
Name Address PhoneTypeBilling
Corrie Rydberg
Puget Sound Energy
3702 71st Ave W
University Place, WA 98466
C: (253) 905-5031ApplicantX
Vicki Henson
Potelco Inc
8001 212th St S
Kent, WA 98032
B: (253) 863-0484Contractor
Business License Number: 5109Electrical Contractor: POTELI*344O4
Construction Contractor: POTELI*227PL
GUPTA VINAY KUMAR & ANU 1018 CHELAN AVE NE
RENTON , WA 98059
Owner
Corrie Rydberg
Puget Sound Energy
3702 71st Ave W
University Place, WA 98466
C: (253) 905-5031Specialized
Billing
General Conditions & Signature
Permission is hereby given for the work described on this permit according to the conditions hereon and according to the
approved plans and specifications pertaining thereto, subject to compliance with the Ordinance of the City of Renton.
Ÿ
This permit and plans must be posted at the job site at all times.Ÿ
I hereby certify that no work is to be done except as described above and in approved plans, and that work is to conform to
Renton Trench Restoration and Street Overlay Requirements.
Ÿ
Call 425.430.7203 or go to: https://permitting.rentonwa.gov one working day in advance to schedule an inspections and for ANY
work in the Right of Way.
Ÿ
Call 8 1 1 to locate underground utilities at least two full business days prior to any excavation.Ÿ
In accordance with RCW 19.122.033(4) the permit holder is required to contact (Williams Northwest Pipeline at 425.868.1010)
(Olympic Pipeline at 206.510.0575) (Puget Sound Energy at 425.375.3397) to request a consultation with the transmission
pipeline company prior to performing any construction or excavation activities. This requirement to consult with the
transmission pipeline company is in addition to the requirement to Call before You Dig as required in RCW 19.122.
Ÿ
(Date)(Signature)
Page 1 of 1THIS PERMIT AND PLANS MUST BE POSTED AT THE JOB SITE AT ALL TIMES
Note: The Applicant is responsible for compliance with all codes and regulations, whether or not described in this document.
DEPARTMENT OF PUBLIC WORKS
Page 1 of 3 | Published: 10/27/2021
Transportation Division | 1055 South Grady Way, 5th Floor | Renton, WA 98057 | 425-430-7380
Website: rentonwa.gov
TRAFFIC CONTROL PLAN APPLICATION
Published: 10/27/2021
TRAFFIC CONTROL PLAN (TCP) MUST BE SUBMITTED TO PUBLIC WORKS TRANSPORTATION DIVISION
FOR REVIEW/APPROVAL AT LEAST FIVE (5) WORKING DAYS BEFORE THE DATE OF WORK.
The City of Renton requires any contractor, firm, corporation, or other public/private agency to prepare a traffic control
plan (TCP) and obtain city's approval of that plan when construction, repair, or maintenance work is to be conducted
within the city's right-of-way.
1. Fill out the Traffic Control Plan (TCP) Application form and prepare required submittal documents.
2. The following items are all required for submittal of the TCP Application:
☐Electronic Copy of the TCP Application
☐Electronic Copy of the TCP Layout, on 11” X 17” paper size format, which shall:
Include map(s) showing the location of the project and work area.
Be legible lettering and clear, contrasting, symbols of viewing or printing.
Must indicate street names, and north arrow and scale.
Types of plans required:
o Work hour plan – show all mobility impacts during construction hours.
o Non-work plan - show all mobility impacts after work hours when limited or no work is
happening in the right-of-way (ROW), if applicable.
o Changing construction phases – show construction sequence and each construction phase
change even if the traffic control is not modified, if applicable.
o Pedestrian access/detour plan, if applicable.
- Shall conform to the Washington State Traffic Control Flagger Certification handbook, by the
Evergreen Safety Council.
3. Submit Application via email to TCP@rentonwa.gov with the subject line “TCP Application – [Project Name].”
Project Name: Permit #:
Site Address:
Work Date: From _____________ To _____________ Work Time: Start ______________ End ______________
Construction Company:
Contact Name: Phone/Cell: _________________________
Business Address: City/State: Zip:
Description of Work:
Approval By: _________________________________________________ Date:____________________
Transportation Engineering
PLEASE SEE ATTACHED
POTELCO, INC
6905 S 228TH ST KENT, WA 98032
101146949
1018 CHELAN AVE NE
JENNY CHAU 253-208-9480
MFP22004490
Monday - Friday 8:00AM - 3:00PM
Scott Warlick CED 9/8/2022
Note: The Applicant is responsible for compliance with all codes and regulations, whether or not described in this document.
Page 2 of 3 | Published: 10/27/2021
PERMIT HOLDER AGREES TO ALL THE FOLLOWING:
Must have approved Traffic Control Plan (TCP) prior to commencing the work.
Maintain existing pedestrian access. The work on pedestrian facilities, shall be limited to one corner at a time,
with the least possible inconvenience or delay to pedestrians.
WORK TIME begins when any street or travel lane is fully or partially closed. This includes set up within the
traveled way.
Comply with all traffic regulations of the City of Renton and the State of Washington.
Prepare a traffic control plan and obtain City approval of that plan. That plan shall be implemented for all street
and lane closures, and the plan shall be performed in compliance with the Manual on Uniform Traffic Control
Devices.
Notify emergency services (253-852-2121) twenty-four (24) hours before any street or lane closures.
Contractor or entity must call Renton School District (425-204-4455) or any public/private agency, including public
transit, to be affected by a temporary lane or road closure a minimum of five business days (excluding weekends
and holidays) prior to starting any work.
Contractor or entity must notify King County Metro in writing at construction.coord@kingcounty.gov a minimum
of five business days (excluding weekends and holidays) prior to starting any work impacting bus stops, a
temporary lane or road closure. Work requiring removing a bus shelter or sign requires notification in writing a
minimum of 30 business days (excluding weekends and holidays). Please call King County Metro at 206-477-1140
with any questions.
Any lane or street closures not in conformance with the approved traffic control plan and/or without notification
of emergency services may result in receiving a citation for violation of R.C.W. 47.36.200 Signs or Flaggers at
thoroughfare work sites and R.C.W. 9A.36.050 Reckless Endangerment, and other applicable State and City codes.
Indemnify and hold harmless the City of Renton from any and all claims, actions, and judgments, including all
costs of defense and attorney’s fees incurred in defending against same, arising from and related to
implementation of the approved traffic control plans including claims arising from towing of private vehicles and
the acts of the Permit Holder’s agents and employees.
The City of Renton shall be entitled, in its reasonable discretion, to settle claims prior to suit or judgment, and in
such event shall indemnify and hold harmless the City for any such claims paid, including the City’s reasonable
attorney’s fees and litigation costs incurred resulting from such claim.
In the event any claim or suit is brought against City within the scope of this Agreement, Permit Holder will pay for
legal counsel chosen by the City to defend against same.
Flagger and sign placement are subject to revision by the City Inspector on site, if needed to address traffic or
pedestrian safety or travel.
All permit conditions shall be met.
NOTES:
Total road closure lasting more than twenty-four (24) hours is subject to the approval by the City Council.
Work Zone Traffic Control shall be in accordance with the Manual on Uniform Traffic Control Devices (MUTCD)
and shown by a traffic control plan layout or reference to WSDOT.
Approved Temporary Traffic Control Plan must be at the work site during work hours.
Complete assistance and accommodation shall be provided to all kinds of pedestrian traffic when sidewalk or
walkway is impeded to safely redirect pedestrians around a work zone.
Signage shall be used to warn motorcyclists/bicyclists of the potential hazards on any uneven surfaced or slippery
road conditions during work and non-work hours.
Any vehicle, equipment, barricade, or portable tow-away sign used within the work area must display a company
logo or any legally acceptable sign showing the company name, address, and telephone number at a conspicuous
place on the vehicle or equipment.
Note: The Applicant is responsible for compliance with all codes and regulations, whether or not described in this document.
Page 3 of 3 | Published: 10/27/2021
In the case of Temporary No Parking Zones, all the following apply in addition to previous:
Contractor must complete form to show limits of Temporary No Parking Zone identifying barricade locations for
vacate parking or curb lane usage.
Contractor must post notice of dates and time of Temporary No Parking Zone with at least two signs per block
seventy-two (72) hours in advance of effective date and time.
The cover sheet of this Traffic Control Plan form must be attached to each Temporary No Parking Sign on the
project site.
Temporary traffic control devices must be removed immediately when work is done or no construction activities
are going on. If deemed abandoned, City crews will remove and store them at the City’s maintenance shop (3555
NE 2nd Street).
I certify that the information on this application and within the submittal documents are accurate to the best of my
knowledge and I acknowledge all the requirements on this application.
Applicant’s Signature Date
Applicant’s Name (Print)
CORRIE RYDBERG
P06NE 10TH STVASHON AVE NE
STOPFLAGGERSTOP
FLAGGER
19 19 W20-7AROAD
WORK
AHEAD W20-1BEPREPARED
TO
STOP W3-4100'100'100'15151818W20-7AROADWORKAHEADW20-1W20-4ONE LANEROADAHEAD100'100'100'ROADWORKAHEADW20-1RESIDENT(S) - CLIENTS(S) WILL BE INFORMED IN ADVANCEOF TEMPORARY DRIVEWAY CLOSUREPLACE SIGNS ALONG WORK AREAFROM TO
TOW AWAY AREA
PHONE 888-9999
INFRASOURCE LLC 000 0000000
NO PARKING
NO-PARK TEMPORARY TRAFFIC CONTROL PLAN28" TRAFFIC CONELEGENDTRAFFIC FLOWSIGN LOCATIONFLAGGERSTOPPOLEWORK VEHICLE/FLASHING LIGHTSRIGHT OF WAYSIGN SPACINGMPH60/6545/5535/403025"X"1000'500'350'200'100'CHANNELIZATIONDEVICE SPACINGMPH55/7035/4525/30TAPER403020TANGENT806040Notes:1. All signs and spacing to conform to theMUTCD and King County standards.2. All sidewalks, driveways, exits and egressesshall be completely clear unless otherwise indicated.3. Channelizing devices are 28" traffic cones.Use traffic drums (barrels) with steady burningType C lights on all State State Routes and Hwys.4. Sign size can be a minimum of 36" x 36" andshall not obstruct pedestrian access.5. Crew is required to leave a minimum of 11' fortraveling lane width.6. Alert affected residents and businesses.7. Work to take place between 9 a.m. and 4 p.munless otherwise specified. All work for arterialsand major roadways will be from 9 a.m. to 3 p.m.NProject Address:PagePSEPUGETSOUNDENERGYDesigner:Job #REV07/20/2022 51021970601018 Chelan Ave NE, Renton, WAKali-Jamal Collins425-424-6425Kali-Jamal.Collins@pse.com1 OF 6Puget Sound EnergyTraffic Control Supervisor:Gregory HarwoodCard No. 012238Card Exp. 09/30/2023gregory.harwood@pse.com(425)424-6425MFP22004490
P05W20-7AROADWORKAHEADW20-1W20-4ONE LANEROADAHEAD100'100'100'191916 16 1414W20-7AROAD
WORK
AHEAD W20-1W20-4ONE LANE
ROADAHEAD100'100'100'ROADWORKAHEADW20-1STOP
FLAGGER
STOP
FLAGGERRESIDENT(S) - CLIENTS(S) WILL BE INFORMED IN ADVANCEOF TEMPORARY DRIVEWAY CLOSUREPLACE SIGNS ALONG WORK AREAFROM TO
TOW AWAY AREA
PHONE 888-9999
INFRASOURCE LLC 000 0000000
NO PARKING
NO-PARKNotes:1. All signs and spacing to conform to theMUTCD and King County standards.2. All sidewalks, driveways, exits and egressesshall be completely clear unless otherwise indicated.3. Channelizing devices are 28" traffic cones.Use traffic drums (barrels) with steady burningType C lights on all State State Routes and Hwys.4. Sign size can be a minimum of 36" x 36" andshall not obstruct pedestrian access.5. Crew is required to leave a minimum of 11' fortraveling lane width.6. Alert affected residents and businesses.7. Work to take place between 9 a.m. and 4 p.munless otherwise specified. All work for arterialsand major roadways will be from 9 a.m. to 3 p.m.NProject Address:PagePSEPUGETSOUNDENERGYDesigner:Job #REV07/20/2022 51021970601018 Chelan Ave NE, Renton, WAKali-Jamal Collins425-424-6425Kali-Jamal.Collins@pse.com2 OF 6Puget Sound EnergyTraffic Control Supervisor:Gregory HarwoodCard No. 012238Card Exp. 09/30/2023gregory.harwood@pse.com(425)424-6425TEMPORARY TRAFFIC CONTROL PLAN28" TRAFFIC CONELEGENDTRAFFIC FLOWSIGN LOCATIONFLAGGERSTOPPOLEWORK VEHICLE/FLASHING LIGHTSRIGHT OF WAYSIGN SPACINGMPH60/6545/5535/403025"X"1000'500'350'200'100'CHANNELIZATIONDEVICE SPACINGMPH55/7035/4525/30TAPER403020TANGENT806040MFP22004490
P07NE 7TH PLHOQUIAM AVE NE
111311131616 1212W20-7AROADWORKAHEADW20-1 BEPREPAREDTOSTOPW3-4 200'200'200'W20-7AROADWORKAHEADW20-1BEPREPAREDTOSTOPW3-4200'200'200'W20-7AROA
D
WO
R
K
AHE
A
D W20-1W20-4ONE LAN
E
ROAD
AHEAD100'100'100'W20-7AROADWORKAHEADW20-1W20-4ONE LANEROADAHEAD100'100'100'STO
P
FLAGGER
STOP
FLAGGER STOP
FLAGGER
STO
P
FLAGGERRESIDENT(S) - CLIENTS(S) WILL BE INFORMED IN ADVANCEOF TEMPORARY DRIVEWAY CLOSUREPLACE SIGNS ALONG WORK AREAFROM TO
TOW AWAY AREA
PHONE 888-9999
INFRASOURCE LLC 000 0000000
NO PARKING
NO-PARKNotes:1. All signs and spacing to conform to theMUTCD and King County standards.2. All sidewalks, driveways, exits and egressesshall be completely clear unless otherwise indicated.3. Channelizing devices are 28" traffic cones.Use traffic drums (barrels) with steady burningType C lights on all State State Routes and Hwys.4. Sign size can be a minimum of 36" x 36" andshall not obstruct pedestrian access.5. Crew is required to leave a minimum of 11' fortraveling lane width.6. Alert affected residents and businesses.7. Work to take place between 9 a.m. and 4 p.munless otherwise specified. All work for arterialsand major roadways will be from 9 a.m. to 3 p.m.NProject Address:PagePSEPUGETSOUNDENERGYDesigner:Job #REV07/20/2022 51021970601018 Chelan Ave NE, Renton, WAKali-Jamal Collins425-424-6425Kali-Jamal.Collins@pse.com3 OF 6Puget Sound EnergyTraffic Control Supervisor:Gregory HarwoodCard No. 012238Card Exp. 09/30/2023gregory.harwood@pse.com(425)424-6425TEMPORARY TRAFFIC CONTROL PLAN28" TRAFFIC CONELEGENDTRAFFIC FLOWSIGN LOCATIONFLAGGERSTOPPOLEWORK VEHICLE/FLASHING LIGHTSRIGHT OF WAYSIGN SPACINGMPH60/6545/5535/403025"X"1000'500'350'200'100'CHANNELIZATIONDEVICE SPACINGMPH55/7035/4525/30TAPER403020TANGENT806040MFP22004490
J02
POLICEUPO
NE 4TH STHOQUIAM AVE NESTOP
FLAGGER
11 11
W20-7AROADWORKAHEADW20-1BEPREPAREDTOSTOPW3-4100'100'100'
W20-7AROADWORKAHEADW20-1 BEPREPAREDTOSTOPW3-4
100'100'100'
12 11 12 1111111111111111111111S/W
CLOSED R9-9S/WCLOSEDR9-9W20-7AROAD
WORK
AHEAD W20-1BEPREPARED
TO
STOP W3-4200'200'200'W20-7AROADWORKAHEADW20-1BEPREPAREDTOSTOPW3-4200'200'200'20142014W20-7AROADWORKAHEADW20-1BEPREPAREDTOSTOPW3-4200'200'200'
W20-7AROADWORKAHEADW20-1 BEPREPAREDTOSTOPW3-4
200'200'200'
STOP
FLAGGER
STOP
FLAGGER RESIDENT(S) - CLIENTS(S)
WILL BE INFORMED IN ADVANCE
OF TEMPORARY DRIVEWAY CLOSURE
PLACE SIGNS ALONG
WORK AREAFROMTOTOW AWAY AREAPHONE 888-9999INFRASOURCE LLC 000 0000000NO PARKINGNO-PARKTHE CREW SHALL CEASE
WORK FOR A FLAGGER/SPOTTER
TO ESCORT PEDESTRIANS
AROUND THE WORK AREA
28" TRAFFIC CONE
LEGEND
WORK PIT
TRAFFIC FLOW
SIGN LOCATION
FLAGGER
UNIFORMED
POLICE OFFICERPOLICE
STOP
CHEVRONARROW BOARD
WORK VEHICLE/
FLASHING LIGHTS
RIGHT OF WAY
SIGN SPACING
MPH
60/65
45/55
35/40
30
25
"X"
1000'
500'
350'
200'
100'
CHANNELIZATION
DEVICE SPACING
MPH
55/70
35/45
25/30
TAPER
40
30
20
TANGENT
80
60
40
TEMPORARY TRAFFIC CONTROL PLAN
N
Notes:
1. All signs and spacing to conform to the
MUTCD and King County standards.
2. All sidewalks, driveways, exits and egresses
shall be completely clear unless otherwise indicated.
3. Channelizing devices are 28" traffic cones.
Use traffic drums (barrels) with steady burning
Type C lights on all State State Routes and Hwys.
4. Sign size can be a minimum of 36" x 36" and
shall not obstruct pedestrian access.
5. Crew is required to leave a minimum of 11' for
traveling lane width.
6. Alert affected residents and businesses.
7. Work to take place between 9 a.m. and 4 p.m
unless otherwise specified. All work for arterials
and major roadways will be from 9 a.m. to 3 p.m.
Project Address:
Page
PSE PUGETSOUNDENERGY
Designer:
Job #
REV
07/20/2022
510219706
0
1018 Chelan Ave NE, Renton, WA
Kali-Jamal Collins
425-424-6425
Kali-Jamal.Collins@pse.com
4 OF 6
Puget Sound Energy
Traffic Control Supervisor:
Gregory Harwood
Card No. 012238
Card Exp. 09/30/2023
gregory.harwood@pse.com
(425)424-6425
MFP22004490
POLICEUPO
NE 4TH STHOQUIAM AVE NESTOP
FLAGGER
11 11
W20-7AROADWORKAHEADW20-1BEPREPAREDTOSTOPW3-4100'100'100'
W20-7AROADWORKAHEADW20-1 BEPREPAREDTOSTOPW3-4
100'100'100'
12 11 12 1111111111111111111111S/W
CLOSEDR9-9S/W
CLOSEDR9-9DETOUR M4-9bW20-7AROAD
WORK
AHEAD W20-1BEPREPARED
TO
STOP W3-4200'200'200'W20-7AROADWORKAHEADW20-1BEPREPAREDTOSTOPW3-4200'200'200'20142014W20-7AROADWORKAHEADW20-1BEPREPAREDTOSTOPW3-4200'200'200'
W20-7AROADWORKAHEADW20-1 BEPREPAREDTOSTOPW3-4
200'200'200'
STOP
FLAGGER
STOP
FLAGGER RESIDENT(S) - CLIENTS(S)
WILL BE INFORMED IN ADVANCE
OF TEMPORARY DRIVEWAY CLOSURE
PLACE SIGNS ALONG
WORK AREAFROMTOTOW AWAY AREAPHONE 888-9999INFRASOURCE LLC 000 0000000NO PARKINGNO-PARKTHE CREW SHALL CEASE
WORK FOR A FLAGGER/SPOTTER
TO ESCORT PEDESTRIANS
AROUND THE WORK AREA
TEMPORARY TRAFFIC CONTROL PLAN
N
Notes:
1. All signs and spacing to conform to the
MUTCD and King County standards.
2. All sidewalks, driveways, exits and egresses
shall be completely clear unless otherwise indicated.
3. Channelizing devices are 28" traffic cones.
Use traffic drums (barrels) with steady burning
Type C lights on all State State Routes and Hwys.
4. Sign size can be a minimum of 36" x 36" and
shall not obstruct pedestrian access.
5. Crew is required to leave a minimum of 11' for
traveling lane width.
6. Alert affected residents and businesses.
7. Work to take place between 9 a.m. and 4 p.m
unless otherwise specified. All work for arterials
and major roadways will be from 9 a.m. to 3 p.m.
SIGN SPACING
MPH
60/65
45/55
35/40
30
25
"X"
1000'
500'
350'
200'
100'
CHANNELIZATION
DEVICE SPACING
MPH
55/70
35/45
25/30
TAPER
40
30
20
TANGENT
80
60
40
Project Address:
Page
PSE PUGETSOUNDENERGY
Designer:
Job #
REV
07/20/2022
510219706
0
1018 Chelan Ave NE, Renton, WA
Kali-Jamal Collins
425-424-6425
Kali-Jamal.Collins@pse.com
5 OF 6
28" TRAFFIC CONE
LEGEND
WORK PIT
TRAFFIC FLOW
SIGN LOCATION
FLAGGER
UNIFORMED
POLICE OFFICERPOLICE
STOP
CHEVRONARROW BOARD
WORK VEHICLE/
FLASHING LIGHTS
RIGHT OF WAY
Puget Sound Energy
Traffic Control Supervisor:
Gregory Harwood
Card No. 012238
Card Exp. 09/30/2023
gregory.harwood@pse.com
(425)424-6425
MFP22004490
P08
HOQUIAM AVE NENE 5TH ST
S/W
CLOSEDR9-92014201412 11 12 ROADWORKAHEADW20-1ROADWORKAHEADW20-1
ROAD
WORKAHEAD W20-1SHOULDERWORKW21-5200'200'ROADWORKAHEADW20-1ROADWORKAHEADW20-1101010 10
RESIDENT(S) - CLIENTS(S)
WILL BE INFORMED IN ADVANCE
OF TEMPORARY DRIVEWAY CLOSURE
PLACE SIGNS ALONG
WORK AREAFROMTOTOW AWAY AREAPHONE 888-9999INFRASOURCE LLC 000 0000000NO PARKINGNO-PARK
TEMPORARY TRAFFIC CONTROL PLAN
N
Notes:
1. All signs and spacing to conform to the
MUTCD and King County standards.
2. All sidewalks, driveways, exits and egresses
shall be completely clear unless otherwise indicated.
3. Channelizing devices are 28" traffic cones.
Use traffic drums (barrels) with steady burning
Type C lights on all State State Routes and Hwys.
4. Sign size can be a minimum of 36" x 36" and
shall not obstruct pedestrian access.
5. Crew is required to leave a minimum of 11' for
traveling lane width.
6. Alert affected residents and businesses.
7. Work to take place between 9 a.m. and 4 p.m
unless otherwise specified. All work for arterials
and major roadways will be from 9 a.m. to 3 p.m.
SIGN SPACING
MPH
60/65
45/55
35/40
30
25
"X"
1000'
500'
350'
200'
100'
CHANNELIZATION
DEVICE SPACING
MPH
55/70
35/45
25/30
TAPER
40
30
20
TANGENT
80
60
40
Project Address:
Page
PSE PUGETSOUNDENERGY
Designer:
Job #
REV
07/20/2022
510219706
0
1018 Chelan Ave NE, Renton, WA
Kali-Jamal Collins
425-424-6425
Kali-Jamal.Collins@pse.com
6 OF 6
28" TRAFFIC CONE
LEGEND
WORK PIT
TRAFFIC FLOW
SIGN LOCATION
FLAGGER
UNIFORMED
POLICE OFFICERPOLICE
STOP
CHEVRONARROW BOARD
WORK VEHICLE/
FLASHING LIGHTS
RIGHT OF WAY
Puget Sound Energy
Traffic Control Supervisor:
Gregory Harwood
Card No. 012238
Card Exp. 09/30/2023
gregory.harwood@pse.com
(425)424-6425
MFP22004490
1102
1070
1058
1103
1051
1045
1033
1021
1039
1027
1024
1017
1018
1011
4608
4602
4532
4526
1014
1008
4650
NE 10TH ST CHELAN PL NE#2ACSR#2ACSRABC
318518-167286
37.5 kVA 120/240V (C)
318543-167275
318519-167290
37.5 kVA 120/240V (C)
T86942 (SOLI)CHELAN AVE NEPRE
14
PRE
14
318500-167267
318543-167290
15 kVA 120/240V (C)
T86941 (25T)
ROW
45'J318504-167290
X12181 (65T)
X86943 (40T)
#2ACSR CBAN318510-167305
37.5KVA 120/240V
318503-167316
10KVA 120/240V
X11856 65T
318579-167307
750 kVA 277/480V (ABC)138TH AVE SE138TH AVE SENE 10TH ST
318539-167290
ROW
85'101146949UTILITIES
CONTACT
PHONE#
COUNTY
1/4 SEC
U-MAP NO (POWER)
OP MAP
Emer Sect Gas Wk Ctr POWER WK CTR
PLAT MAP
JOINT FACILITIES ARRANGEMENTS
DRAWN BY
CHECKED BY
APPROVED BY
FOREMAN #1
FOREMAN #2
MAPPING
INCIDENT MAOP
Gas Order Elect Order
SCALE PAGE
ENGR - POWER
FUNCTION
PROJECT MGR
PERMITREAL ESTATE/EASEMENT
2
1
REV#
3
DATE DESCRIPTIONBY
CONTACT PHONE NO DATE
OH CKT MAP CIRCUIT NOUG CKT MAP
SIGNATURE
JENNY CHAU 253-208-9480 4/11/22
JASON FELLER 253-204-1990 4/11/22
JASON FELLER N/A 4/11/22
RW-120242 RENTON
RENTON ELEMENTARY SCHOOL #16
WRECK-OUT & INSTALL 3-PH L/E
1075 DUVALL AVENUE NE, RENTON 98059
N/A N/A
N/A 101146949
AS NOTED 1 OF 4
KING COUNTY N/A N/A CSPSKEPM
T23N.R05E.S17 N/A N/A
2305E065 2305E088 2305E065 PRE-14
CenturyLink
N/A
N/A
Comcast/Xfinity
N/A
N/A
PSE - Gas
N/A
N/A
N/A
N/A
N/A
N/A N/A N/A
N/A N/A N/A
N/A N/A N/A
00 1"2"
00 50'100'
SITE SPECIFIC NOTES:
AT J01 GRID# 318539-167290: NEW
- TO BE INSTALLED UNDER WO# 101
- INSTALL (8) 12KV ELBOW KITS (6041.1000, ELB10J)
- INSTALL (4) INSULATING CAPS (MID: 7804000)
- INSTALL GRID #
AT V01 GRID# 318579-167307: NEW
- INSTALL 4'8" X 4'8" X 3'6" VAULT W/ 4'8" X 5'6" X 6" COVER (6045.5000, PM3P15M)
- INSTALL 750KVA PM TRF 277/480V (MID: 6259300)
- INSTALL (3) L/B ELBOWS (6041.1000, ELB10J)
- INSTALL CABLE TAGS
- INSTALL (8) 4-POS #501-750KCMIL CONN BARS (MID: 7651003)
- INSTALL (12) MOUNTING BOLT KITS (MID: 7651008)
- CONNECT & TAG CUSTOMER SERVICE CABLE (5 RUNS OF 400KCMIL)
- INSTALL GRID#
SITE PLAN
SCALE: 1" = 50'
CUSTOMER DEVELOPMENT NOTES:
A PRE CONSTRUCTION MEETING IS REQUIRED WITH YOUR PROJECT MANAGER PRIOR TO STARTING ANY SITE
WORK.
CUSTOMER IS RESPONSIBLE FOR ALL TRENCHING, SELECT BACKFILL, COMPACTION & RESTORATION PER PUGET
SOUND ENERGY STANDARDS & LOCAL MUNICIPALITY.
**DEVELOPER NEEDS TO FOLLOW ALL TRENCH DETAILS ON SELECT BACKFILL**
CUSTOMER IS RESPONSIBLE FOR THE FOLLOWING:
CROSSING/BORING.
-OPEN TRENCH OR BORING FOR CROSSINGS ARE ALLOWED PER LOCAL MUNICIPALITY PERMIT
REQUIREMENTS.
-CROSSINGS IN RIGHT OF WAY MUST BE SCHEDULED WITH PROJECT MANAGER PRIOR TO
CONSTRUCTION.
-PROJECT MANAGER OR DESIGNATED REPRESENTATIVE MUST BE ON SITE DURING CONSTRUCTION
WORK IN RIGHT OF WAY.
-EXCAVATION CONTRACTOR MUST BE LICENSED AND BONDED TO PERFORM WORK IN RIGHT OF WAY.
VAULTS & WORK PITS.
-REQUIRED TO PROVIDE 4' X 4' WORK PIT & 6" BEDDING OF 5/8" CRUSHED ROCK AT J01
-REQUIRED TO PROVIDE 11' X 11' WORK PIT & 6" BEDDING OF 5/8" CRUSHED ROCK AT V01
JOB SITE READINESS.
-JOB SITE NEEDS TO BE 100% READY FOR INSPECTION 5 BUSINESS DAYS PRIOR TO
CONSTRUCTION DATE.
-ALL WORK IN RIGHT OF WAY MUST BE COORDINATED WITH PROJECT MANAGER AND LOCAL
MUNICIPALITY.
-ALL TRENCH, AND LOCAL ELECTRICAL MUNICIPALITIES AKA "L&I, CITY", INSPECTIONS MUST BE
COMPLETED 5 BUSINESS DAYS PRIOR TO SCHEDULED CONSTRUCTION DATE.
-REQUIRED TO OPERATE AND PROVIDE EQUIPMENT TO PUMP OUT WATER FOR WORK PITS, VAULTS &
TRENCH AT ALL TIMES.
-REQUIRED TO HAVE EXCAVATION EQUIPMENT AND BE ON SITE THE DAY OF CONSTRUCTION TO COMPLETE
BACKFILLING.
- IF A SECOND INSPECTION IS REQUIRED, ADDITIONAL FEE'S WILL BE APPLIED.
-PLEASE REVIEW THE CITY OR KING COUNTY TRENCHING REQUIREMENTS UNDER THE PERMIT.
-IF A PRE-CON IS REQUIRED BY THE CITY, COUNTY OR W.S. DOT A PSE PROJECT MANAGER WILL SET-UP AND
SCHEDULE A MEETING WITH THE MUNICIPALITY BEFORE ANY EXCAVATION OR INSTALLATION BEGINS .
JOB SITE
UNDERGROUND CIRCUIT MAP
SCALE: 1" = 100'
OVERHEAD CIRCUIT MAP
SCALE: 6"=1mi
JOB SITE
N
Vicinity Map
47.500116, -122.157798
Owner / Developer Contact Info
officeATTN:
Renton School District
300 SW 7th St
Renton, WA 98059
Taylor Vanderkley 206-436-0402
Superior
ORDER#NOTIF#
PWR
PROJECT PHASE
FOREMAN (CHECK BOX WHEN COMPLETED)
PSE Equipment LOCKED/SECURED & Work Area left in CLEAN/SAFE Condition.
Grid, Cable, and Switch numbers INSTALLED & VERIFIED.
Field Changes RED-LINED on As-built.
Indicate correct FUSE SIZE on As-built & VERIFY proper PHASE.
Foreman's Signature _______________________________________________
Print Name ___________________________________ Date ______________
Material VERIFIED and CHANGES noted on Paperwork.
Total PRIMARY Cable noted on As-built.
Company ID#'s RECORDED in correct location on As-built.
Deviations noted on the As-built and their reason.
I certify that the work performed meets PSE's standards and procedures
and that all quality requirements are met.
PSE
No
No
No
Yes
Yes
Yes
No
YesDeveloper
"Flagging Required"
"Outages Required"
"Locates Required"THIS SKETCH NOT TO BE RELIED UPON FOR EXACT LOCATION OF EXISTING FACILITIES
CALL 811 TWO BUSINESS DAYS BEFORE YOU DIG
For contacts below dial 1-888-CALL PSE (225-5773)
101146949510219706
JOB SITE
CIRCUIT LOADING TABLE
AS OF
EXIST. PEAK LOAD
EST. NEW LOAD
TOTAL
CIRCUIT:
A PHASE B PHASE C PHASE
PRE-14
2022
384 418 415
16 16 16
400 434 431
108135192N/A
N/A
593243231N/A
593243233N/A
104346730513090698
E-Mail:
Cell Phone:
Project Manager Contact Information:
Manager:
Jenny.Chau@pse.com
253-208-9480
JENNY CHAU
Removal
OH Misc.
Mod. Svc.
POWER GENERAL NOTES - COMMERICAL PROJECT
1.All materials to be installed in accordance with Puget Sound Energy's (PSE) standards. Any deviation from this work
sketch must be AUTHORIZED by PSE's Project Manager and NOTED on the Foremans' Copy.
2.All switching arrangements and/or outage arrangements are to be made with the Project Manager at least three (3)
working days in advance.
3.Contact the Utilities Underground Location Center (1-800-424-5555) at least 48 hours prior to commencing work to get the
underground facilities located.
4.STAKING: The customer will provide all staking (transformer, handhole, trench, grade, lot, pole, sidewalk, etc.). See
sketch and details for locations. Equipment locations must be approved by the Project Manager.
5.SITE PREPARATION: The work area will be at or near finished grade, clear of trench spoils or construction materials
which would restrict construction and/or equipment access, before work can begin.
6.Roads shall be paved or have a compacted , crushed rock base in place.
7.CLEARANCES: Transformers require a minimum of 6 feet from fire fighting equipment, 10 feet from combustible walls,
overhangs, doors, and windows, and a minimum of 5 feet from the back of curb (or guard posts will be required per PSE
standards). All conduits and vaults are to be at least 5 feet away from water, storm and sewer lines when paralleling them
in the right of way, and at least 1 foot when crossing them.
8.All work is to be done in accordance with local municipal and county permit requirements as applicable.
9.Customer/Developer is responsible to provide, install and maintain all secondary service cables, conduits and crossings
from the individual unit's meter base to the designated connection point.
10.Inclement weather conditions may cause delays in construction times and dates.
11.EXCAVATION: The customer is to provide all trenching, backfill, vault excavations, compaction and restoration per this
sketch and per PSE standards. A minimum protective cover of 36" is required over PSE's primary voltage equipment and
24" is required of PSE's secondary voltage equipment. The customer will provide any and all shoring or they will side
slope the trench to 1:1.
LRC:
% V. Drop:
% Flicker:
Sq. Footage:
Panel Size:
Heat Type:
Est. Demand:
Svc Size:
Svc Length:100'
400KCMIL
2.1% @V01
4.2% @V01
481A
285.18 KW
ELECTRIC
1600 AMPS
77,000
JOB SITE
JOB SITE
CIRCUIT FEET ADDED:
1/0 = 1,010 FEET
CIRCUIT FEET REMOVED:
1/0 = 520 FEET
FAULT CURRENT TABLE
3Ø PM TRANSFORMERS (480Y/277)
277V WINDINGS 480V WINDINGS
LOCATION SIZE R/X MIN.
%Z
FAULT
CURRENT
MIN.
%Z
FAULT
CURRENT
V01 750KVA 0.1 --5.30 17,000 AMPS
Installed at site:
Grid Number:
kVA Rating:
Foreman to redline the following information
TRANSFORMER INSTALLATION
Company ID#:
Primary phase connected to:
Tested Secondary Voltage
Material ID#:
V01
318579-167307
750KVA
6259300
DEDICATED FACILITIES
SITE SPAN ADDITIONAL REMARKS LABOR UNITS
#FROM TO FOOTAGE
-J01 V01 480'DED. CONDUIT & WIRE 2-36, 2-55
V01 ---UPGRADE 300KVA TO 750KVA DUE
TO CUST. LRC -
TOTAL FT=710'
3001951883513090733
Svc Connect.
Meter
SITE SPECIFIC NOTES:
- PLEASE REFER TO SITE PLAN, TABLES, & ONE-LINE DIAGRAMS FOR SPAN INSTALLS
594150941UG Misc.
Fabian Gomez 8/16/2022
MFP22004490
RESTORATION PER CITY OF RENTON STANDARDS
This permit is for Major construction work in the ROW and will be billed at an additional
$150/HR for inspections. After hours and weekend work will be billed at $175/HR
1021
1027 1018
1011
4608
4602
4532
4526
1016
1008
4420
966
981
4531
NE 10TH ST
CHELAN CT NECHELAN AVE NE#2ACSR
#6 CU#2ACSRABC
318518-167286
37.5 kVA 120/240V (C)CHELAN AVE NEPRE
14
PRE
14
318500-167267
T53453 (SOLI)
4216
4224
4340
4324 4332
4308
4316
4232
4229 973
9674217
4313
4401
974
965 ANACORTES AVE NENE 10TH ST
ANACORTES CT NE318504-167290
X12181 (65T)
X86943 (40T)
#2ACSR CBAN318502-167191
X11307 (Soli)
X12082 (25T)
SLAH5414
318510-167305
37.5KVA 120/240V
318495-167301
25KVA 120/240V
318497-167255
25 kVA (A)
318499-167225
318500-167227
SLAH5415
318503-167230
318495-167212
37.5 kVA (C)
318500-167202
37.5 kVA (C)BREMERTON CT NEJJ
763
757
5105
5023
753
5017 HOQUIAM AVE NENE 7TH PLROW
60'
N.O.
318335-167450
X9688 (100T)
PRE
14
#2 ACSR
318337-167438
15 kVA (B)
SLAS6612
318338-167458
J J
5124
487
481
475
469
5036
5042 463
457
451
5048
5054
417
5122
5121
5115
5049
411
5041
5035 405
461
HOQUIAM AVE NEHOQUIAM PL NEHOQUIAM AVE NESE 128TH ST (NE 4TH ST)
SE 128TH ST (NE 4TH ST)
318109-167464 3/3
UNK (ERROR-SET FUSE)
318142-167470
37.5 kVA (B)
318119-167456
318149-167456
25 kVA (B)
T87268 (65T)
318119-167481
37.5 kVA (B)
PRE
14
NE 4TH PLNE 4TH PL
ROW
60'
318159-167470
25 kVA (B)
J 101146949SITE PLAN (NE 10TH ST)
SCALE: 1" = 50'
SITE PLAN (CORNER OF NE 7TH PL & 142ND AVE SE)
SCALE: 1" = 50'
SITE PLAN (CORNER OF HOQUIAM AVE NE & NE 4TH PL)
SCALE: 1" = 50'
SITE SPECIFIC NOTES:
AT P05 GRID# 318500-167267: NEW
- EXISTING 45' CL. 1 POLE TO REMAIN
- REPLACE (3) EXISTING FUSES W/ SOLID BLADE FUSES (MID: 9995608)
AT P06 GRID# 318502-167191: EXISTING
- EXISTING 45' CL.3 POLE TO REMAIN
- AT SW# X11307 REPLACE (3) EXISTING 100T FUSES W/ SOLID BLADE FUSES (MID: 9995608)
- INSTALL 1/0 OH RTE FAULT INDICATOR (MID: 7645700 OR 9999060)
AT P07 GRID# 318335-167450: EXISTING
- EXISTING 45' CL.3 POLE TO REMAIN
- AT SW# X9688 REPLACE (3) 40T FUSES W/ 100T FUSES (MID: 3412700)
- INSTALL SW# X9688 IN NORMAL OPEN POSITION
AT P08 GRID# 318149-167456: EXISTING
- EXISTING 45' CL.4 POLE & TRF TO REMAIN
- INSTALL 1Ø LI TERM ON FG ARM (6043.1000, TSU1L1)
- INSTALL STIRRUP & HOT CLAMP (MID: 2254000 & 2167000)
- FUSE AT 65T (MID: 3412600)
- INSTALL SW# T87268 & CABLE TAG CØ-EJD539
AT J02 GRID# 318119-167456: NEW
- CUT IN NEW 4'8" X 4'8" X 3'6" JBOX VAULT W/ GROUNDS (6055.1010, JBOX15S)
- INSTALL COVER 4'-8" SQ W/ 3' SQ DOOR (MID: 7656400)
- INSTALL (1) 4-POS JBOX
- INSTALL (3) 12KV ELBOW KITS (6041.1000, ELB10J)
- INSTALL (1) DUST CAP (MID: 7630600)
- INSTALL GRID #
AT IP1
- INTERCEPT EXISTING 1-2" CONDUIT
- AFTER J02 IS INSTALLED, BREAK CONDUIT AND RE-ROUTE 1-2" CONDUIT TO J02
AT IP1
- INTERCEPT EXISTING 1-2" CONDUIT
- AFTER J02 IS INSTALLED, BREAK CONDUIT AND RE-ROUTE 1-2" CONDUIT TO J02
AT V02 318119-167481: EXISTING
- EXISTING 37.5KVA 120/240V PM TRF TO REMAIN
- REPLACE EXISTING PRI CABLE & CABLE TAG W/ CØ-
AT P09 GRID# 318109-167464: EXISTING
- EXISTING 70' CL.1 TRANSMISSION POLE TO REMAIN
CUSTOMER DEVELOPMENT NOTES:
A PRE CONSTRUCTION MEETING IS REQUIRED WITH YOUR PROJECT MANAGER PRIOR TO STARTING ANY SITE
WORK.
CUSTOMER IS RESPONSIBLE FOR ALL TRENCHING, SELECT BACKFILL, COMPACTION & RESTORATION PER PUGET
SOUND ENERGY STANDARDS & LOCAL MUNICIPALITY.
**DEVELOPER NEEDS TO FOLLOW ALL TRENCH DETAILS ON SELECT BACKFILL**
CUSTOMER IS RESPONSIBLE FOR THE FOLLOWING:
CROSSING/BORING.
-OPEN TRENCH OR BORING FOR CROSSINGS ARE ALLOWED PER LOCAL MUNICIPALITY PERMIT
REQUIREMENTS.
-CROSSINGS IN RIGHT OF WAY MUST BE SCHEDULED WITH PROJECT MANAGER PRIOR TO
CONSTRUCTION.
-PROJECT MANAGER OR DESIGNATED REPRESENTATIVE MUST BE ON SITE DURING CONSTRUCTION
WORK IN RIGHT OF WAY.
-EXCAVATION CONTRACTOR MUST BE LICENSED AND BONDED TO PERFORM WORK IN RIGHT OF WAY.
VAULTS & WORK PITS.
-REQUIRED TO PROVIDE 10' X 8' WORK PIT & 6" BEDDING OF 5/8" CRUSHED ROCK AT J02
-REQUIRED TO PROVIDE 4' X 4' WORK PIT AT P08
-REQUIRED TO PROVIDE 4' X 4' WORK PIT AT IP1 & IP2
JOB SITE READINESS.
-JOB SITE NEEDS TO BE 100% READY FOR INSPECTION 5 BUSINESS DAYS PRIOR TO
CONSTRUCTION DATE.
-ALL WORK IN RIGHT OF WAY MUST BE COORDINATED WITH PROJECT MANAGER AND LOCAL
MUNICIPALITY.
-ALL TRENCH, AND LOCAL ELECTRICAL MUNICIPALITIES AKA "L&I, CITY", INSPECTIONS MUST BE
COMPLETED 5 BUSINESS DAYS PRIOR TO SCHEDULED CONSTRUCTION DATE.
-REQUIRED TO OPERATE AND PROVIDE EQUIPMENT TO PUMP OUT WATER FOR WORK PITS, VAULTS &
TRENCH AT ALL TIMES.
-REQUIRED TO HAVE EXCAVATION EQUIPMENT AND BE ON SITE THE DAY OF CONSTRUCTION TO COMPLETE
BACKFILLING.
- IF A SECOND INSPECTION IS REQUIRED, ADDITIONAL FEE'S WILL BE APPLIED.
-PLEASE REVIEW THE CITY OR KING COUNTY TRENCHING REQUIREMENTS UNDER THE PERMIT.
-IF A PRE-CON IS REQUIRED BY THE CITY, COUNTY OR W.S. DOT A PSE PROJECT MANAGER WILL SET-UP AND
SCHEDULE A MEETING WITH THE MUNICIPALITY BEFORE ANY EXCAVATION OR INSTALLATION BEGINS .
00 1"2"
00 50'100'
00 1"2"
00 50'100'
UTILITIES
CONTACT
PHONE#
COUNTY
1/4 SEC
U-MAP NO (POWER)
OP MAP
Emer Sect Gas Wk Ctr POWER WK CTR
PLAT MAP
JOINT FACILITIES ARRANGEMENTS
DRAWN BY
CHECKED BY
APPROVED BY
FOREMAN #1
FOREMAN #2
MAPPING
INCIDENT MAOP
Gas Order Elect Order
SCALE PAGE
ENGR - POWER
FUNCTION
PROJECT MGR
PERMITREAL ESTATE/EASEMENT
2
1
REV#
3
DATE DESCRIPTIONBY
CONTACT PHONE NO DATE
OH CKT MAP CIRCUIT NOUG CKT MAP
SIGNATURE
JENNY CHAU 253-208-9480 4/11/22
JASON FELLER 253-204-1990 4/11/22
JASON FELLER N/A 4/11/22
RW-120242 RENTON
RENTON ELEMENTARY SCHOOL #16
WRECK-OUT & INSTALL 3-PH L/E
1075 DUVALL AVENUE NE, RENTON 98059
N/A N/A
N/A 101146949
AS NOTED 2 OF 4
KING COUNTY N/A N/A CSPSKEPM
T23N.R05E.S17 N/A N/A
2305E065 2305E088 2305E065 PRE-14
CenturyLink
N/A
N/A
Comcast/Xfinity
N/A
N/A
PSE - Gas
N/A
N/A
N/A
N/A
N/A
N/A N/A N/A
N/A N/A N/A
N/A N/A N/A
00 1"2"
00 50'100'
ABANDONED / REMOVE / REPLACED CABLE SCHEDULE
CABLE
NO.
SAP
EQUIP
LOCATIONS CABLE
(LF) EST
EXISTING CABLE
MFG. NAME
EXISTING CABLE
MFG. DATE
CABLE
REPLACED?FROM TO
ABM743 11263624 J02 V02 250'2000 YES
TOTAL 250'
SPAN SPECIFIC NOTES:
- REFER TO SITE PLANS, TABLES, & ONE-LINE DIAGRAMS FOR SPAN INSTALLS & SPAN REMOVALS
Fabian Gomez 8/16/2022
MFP22004490
JCUST. SUPPLIED
9' X 11' WORK PIT
±290'
±15'
R=60"
45º
R=60"
90º
PSE SUPPLIED & CUST. INSTALLED
1-4" DB120 CONDUIT ±480'
IN CUST. PROVIDED TRENCH
±45'±130'
R=60"
45º
CUST. SUPPLIED
9' X 11' WORK PIT
RE-USE EXISTING
BØ-ABM743
PSE SUPPLIED & INSTALLED
1-RUN 1Ø 1/0 AL UG PRI CABLE
BØ-EJD539
PSE SUPPLIED & INSTALLED
1-RUN 1Ø 1/0 AL UG PRI CABLE
BØ-EJD540
J
PSE SUPPLIED & CUST. INSTALLED
1-2" SCH.80 CONDUIT ±270'
IN CUST. PROVIDED TRENCH
±70'
±270'
CUST. SUPPLIED
4' X 4' WORK PIT
CUST. SUPPLIED
4' X 8' RECEIVING BORE PIT
CUST. SUPPLIED
8' X 8' WORK PIT
EXISTING 1-2" CONDUIT
EXISTING 1-2" CONDUIT
CUST. SUPPLIED
4' X 8' BORE PIT
PSE SUPPLIED & CUST. INSTALLED
1-2" RED POLY CONDUIT
PSE SUPPLIED & CUST. INSTALLED
1-2" RED POLY CONDUIT
90º
R=48"
(2) 45º
R=48"
45º
R=48"
J
JPSE SUPPLIED & INSTALLED
3-PH 1/0 AL UG PRI ±520
AØ-EJD531
BØ-EJD532
CØ-EJD533
101146949 Primary Cable & Conduit Table (Foreman to Complete)
LOCATION CONDUIT PRIMARY CABLE
QTY OF LUBE (gal.)AS BUILT INFORMATION
From To Size
(in)
Qty
Design
Length
(ft)
Actual
Length
(ft)
TYPE BENDS PULL
(lbs)
PULL
Rev
(lbs)
Cable
Size
Design
Length
(ft)
Actual
Length
(ft)
CABLE NUMBERS MANUFACTURING INFORMATION
DB120 HDPE SCH 80 90°45°22°11°A B C Manufacturer Compound Year Design As Built Actual Amount Installed
(Conduit & Cable)
J01 V01 4 1 480'X 1 2 417 350 1/0 520'EJD532 EJD533 EJD534
J02 BP2 2 1 70'X
144 125 1/0 390'EJD539
BP2 P08 2 1 270'X 1
J02 IP1 2 1 10'X 2
82 82 1/0 260'EJD540
IP1 V02 2 1 250'EXIST.X
P09 IP2 2 1 230'EXIST.X
--1/0 EXIST.
260'ABM743
IP2 J02 2 1 10'X 2
CONDUIT ONE-LINE DIAGRAM
SCALE: NOT TO SCALE
CABLE ONE-LINE DIAGRAM CONDUIT ONE-LINE DIAGRAM
SCALE: NOT TO SCALE
CABLE ONE-LINE DIAGRAM
SCALE: NOT TO SCALE
(CORNER OF HOQUIAM AVE NE & NE 4TH PL)(CORNER OF HOQUIAM AVE NE & NE 4TH PL)
Vault & Equipment Table
Work
Location
Grid
Number
Vault Size
& Cover
Type & Size
Equipment
In Vault
Primary Bushings Transformer
ID Numbers
(Company ID)
ASBUILT INFORMATION
Foreman-CompleteLBDC
J02 318119-167456 JBOX15S (5'x5'x4')JBX15 3 1
V01 318579-167307 PM3P15M (7'x7'x4')PAD-3P-12-277/4
80-750 (750 kVA)3
TOTAL 2" HDPE = 70'
TOTAL 2" SCH.80 = 290'
TOTAL 4" SCH.80 = 480'
TOTAL 1Ø 1/0 = 650''
TOTAL 3Ø 1/0 = 520'
(CHELAN AVE NE)
SCALE: NOT TO SCALE
(CHELAN AVE NE)
UTILITIES
CONTACT
PHONE#
COUNTY
1/4 SEC
U-MAP NO (POWER)
OP MAP
Emer Sect Gas Wk Ctr POWER WK CTR
PLAT MAP
JOINT FACILITIES ARRANGEMENTS
DRAWN BY
CHECKED BY
APPROVED BY
FOREMAN #1
FOREMAN #2
MAPPING
INCIDENT MAOP
Gas Order Elect Order
SCALE PAGE
ENGR - POWER
FUNCTION
PROJECT MGR
PERMITREAL ESTATE/EASEMENT
2
1
REV#
3
DATE DESCRIPTIONBY
CONTACT PHONE NO DATE
OH CKT MAP CIRCUIT NOUG CKT MAP
SIGNATURE
JENNY CHAU 253-208-9480 4/11/22
JASON FELLER 253-204-1990 4/11/22
JASON FELLER N/A 4/11/22
RW-120242 RENTON
RENTON ELEMENTARY SCHOOL #16
WRECK-OUT & INSTALL 3-PH L/E
1075 DUVALL AVENUE NE, RENTON 98059
N/A N/A
N/A 101146949
AS NOTED 3 OF 4
KING COUNTY N/A N/A CSPSKEPM
T23N.R05E.S17 N/A N/A
2305E065 2305E088 2305E065 PRE-14
CenturyLink
N/A
N/A
Comcast/Xfinity
N/A
N/A
PSE - Gas
N/A
N/A
N/A
N/A
N/A
N/A N/A N/A
N/A N/A N/A
N/A N/A N/A
ARE TO BE INSTALLED, CROSS SECTION DETAILS OF THE TYPICAL EROSION
STRUCTURES, & SPECIAL REQUIREMENTS FOR WORK IN SENSITIVE AREAS.)
EROSION & SEDIMENT CONTROL REQUIREMENTS
NOTES DETAILING WHERE EROSION OR SEDIMENT CONTROL STRUCTURES
(LOCAL JURISDICTIONS MAY HAVE ADDITIONAL REQUIREMENTS INCLUDING
0150.3200 TECHNIQUES FOR TEMPORARY EROSION & SEDIMENT CONTROL
EROSION & SEDIMENT CONTROL SHALL BE PER PSE STANDARD PRACTICE
& ANY ADDITIONAL LOCAL JURISDICTION REQUIREMENTS.
Fabian Gomez 8/16/2022
MFP22004490
CUSTOMER-SUPPLIED TRENCH FOR PRIMARY CABLE
SCALE: NONE
Communications
Primary Power
Cables or Conduit
Excavated Dirt Pile
ROADSIDE
Final Grade
24" Min
12" Min
Separation
36"
Min
Cover
48"
Max
Backfill
(No rocks over 10" diameter)
Separation
12" Min
Gas
4" Sand Bedding
32" Typical
(Power, Gas, and
Communications)
JOINT TRENCH DETAIL
Primary-Mainline Gas & Communications (NTS)
Separation
12" Min
6" or 12" Min Sand Shading after Compaction
- A 6" layer of sand is allowed when excavated native material contains rocks no larger than 8" in diameter.
Trench and backfill requirements for primary electric line extension trenches (No PSE gas)
- A 12" layer of sand is required when excavated native material contains rocks up to 10" in diameter.
FLOW DIRECTION
LAY 8" BOTTOM SKIRT ON TOP OF NATIVE SOIL,
SECURE WITH PEA GRAVEL BAGS (MID 9995692).
6'
3'
8"
TECHNIQUES FOR EROSION AND SEDIMENT CONTROL
SILT FENCE DETAIL
Not to Scale 0150.3200
101146949EXISTING 1-4" SCH.80 CONDUIT
EXISTING 1-2" SCH.80 CONDUIT
BUTTERFLY DIAGRAM - CONDUIT ENTRY @J01
SCALE: NONE
PROPOSED 1-4" SCH.80 CONDUIT
TOP VIEW
Excavation - 10-1/3 cubic yards
SIDE VIEW
Rock
Crushed
6"
4'-4"
2"
8'
8'
4'-8"
3'-6"
4'-8"
6"
3,600 lbs
1,300 - 1,365 lbs
Not to scale 6055.1010
VAULT & EXCAVATION DETAIL @J02
BUTTERFLY DIAGRAM - CONDUIT ENTRY @J02
SCALE: NONE
EXISTING (CUT IN)
1-2" DB120 CONDUIT
NEW 1-2" HDPE CONDUIT
EXISTING (CUT IN)
1-2" DB120 CONDUIT
CABLE
WRAP
CABLE
WRAP
COOLING
5' MIN
5' MIN
10' MIN
5'
MIN
FINS
ACCESS
CONCRETE PAD
MINIMUM CLEARANCES FOR PSE EQUIPMENT
CURB OR EDGE OF PAVEMENT
CURB OR EDGE OF PAVEMENT
5' MIN
ROAD OR
PARKING AREA
TYP. PAD
& TRANS-
FORMER
3'
MIN
3' MIN
3' MIN
DOOR
ACCESS
DOOR
REQUIRED
WORK SPACE
AREA
6775.0035 Not to scale
UTILITIES
CONTACT
PHONE#
COUNTY
1/4 SEC
U-MAP NO (POWER)
OP MAP
Emer Sect Gas Wk Ctr POWER WK CTR
PLAT MAP
JOINT FACILITIES ARRANGEMENTS
DRAWN BY
CHECKED BY
APPROVED BY
FOREMAN #1
FOREMAN #2
MAPPING
INCIDENT MAOP
Gas Order Elect Order
SCALE PAGE
ENGR - POWER
FUNCTION
PROJECT MGR
PERMITREAL ESTATE/EASEMENT
2
1
REV#
3
DATE DESCRIPTIONBY
CONTACT PHONE NO DATE
OH CKT MAP CIRCUIT NOUG CKT MAP
SIGNATURE
JENNY CHAU 253-208-9480 4/11/22
JASON FELLER 253-204-1990 4/11/22
JASON FELLER N/A 4/11/22
RW-120242 RENTON
RENTON ELEMENTARY SCHOOL #16
WRECK-OUT & INSTALL 3-PH L/E
1075 DUVALL AVENUE NE, RENTON 98059
N/A N/A
N/A 101146949
AS NOTED 4 OF 4
KING COUNTY N/A N/A CSPSKEPM
T23N.R05E.S17 N/A N/A
2305E065 2305E088 2305E065 PRE-14
CenturyLink
N/A
N/A
Comcast/Xfinity
N/A
N/A
PSE - Gas
N/A
N/A
N/A
N/A
N/A
N/A N/A N/A
N/A N/A N/A
N/A N/A N/A
2"
Excavation - 20 cubic yards
8'-0"
or 10'-0"
7'-0"
8'-0"8"
4'-2"
SIDE VIEW
4'-6"Crushed
6"
Rock
11'
11'
TOP VIEW
3'-6"
7'-0"
6045.5000Not to scale
VAULT & EXCAVATION DETAIL
EXIST 1-2" DB120 CONDUIT
MINIMUM CLEARANCES FOR PSE EQUIPMENT
NOT TO SCALE
OIL-FILLED EQUIPMENT
TRANSFORMER
APPROVED
AREA
COMBUSTIBLE BUILDING WALLS & ROOF10'
10'
10'
BUTTERFLY DIAGRAM - CONDUIT ENTRY @V01
SCALE: NONE
NEW 1-4" CONDUIT
CUSTOMER CONDUIT RUNS
ENTRY LOCATION
CABLE WRAP
PSE
PRIMARY
CUST.
SECONDARY
CABLE WRAP
Fabian Gomez 8/16/2022
MFP22004490