HomeMy WebLinkAboutMFP22004735.pdfDEPARTMENT OF COMMUNITY
AND ECONOMIC DEVELOPMENT
Minor Franchise Permit: MFP22004735
IVR Number: 22004735
Permit Information
Permit Name: Puget Sound Energy Gas Permits
Address/Location:09/06/2022Application Date:3342101750Parcel Number: 910 N 31ST ST
Permit Type:09/15/2022Issue Date:Franchise
Permit Work Class:09/15/2023Expiration Date:Minor Utility
Job Number: 106385364Franchise Type:Natural Gas
Description: PSE Gas CREW TO TIE INTO EXISTING MAIN AND INSTALL NEW 1 1/8" PE GAS SERVICE, APPROC 38' IN ROW.
2:3'X5' ASPHALT CUTS ANTICIPATED. POTHOLE ALL EXISTING UTILITIES. RESTORATION PER CITY OF RENTON
STANDARDS.
Contacts
Name Address PhoneTypeBilling
Corrie Rydberg
Puget Sound Energy
3702 71st Ave W
University Place, WA 98466
C: (253) 905-5031ApplicantX
Stuart Bennett
Infrasource Services LLC
1622 Eastport Plaza Dr
Collinsville, IL 62234
B: (303) 419-8755
H: (425) 677-5197
C: (713) 985-6489
Contractor
Business License Number: 36742Construction Contractor: INFRASL871C2
CITY OF RENTON ROW 1055 S Grady Way
Renton, WA 98057-3232
Owner
Corrie Rydberg
Puget Sound Energy
3702 71st Ave W
University Place, WA 98466
C: (253) 905-5031Specialized
Billing
General Conditions & Signature
Permission is hereby given for the work described on this permit according to the conditions hereon and according to the
approved plans and specifications pertaining thereto, subject to compliance with the Ordinance of the City of Renton.
Ÿ
This permit and plans must be posted at the job site at all times.Ÿ
I hereby certify that no work is to be done except as described above and in approved plans, and that work is to conform to
Renton Trench Restoration and Street Overlay Requirements.
Ÿ
Call 425.430.7203 or go to: https://permitting.rentonwa.gov one working day in advance to schedule an inspections and for ANY
work in the Right of Way.
Ÿ
Call 8 1 1 to locate underground utilities at least two full business days prior to any excavation.Ÿ
In accordance with RCW 19.122.033(4) the permit holder is required to contact (Williams Northwest Pipeline at 425.868.1010)
(Olympic Pipeline at 206.510.0575) (Puget Sound Energy at 425.375.3397) to request a consultation with the transmission
pipeline company prior to performing any construction or excavation activities. This requirement to consult with the
transmission pipeline company is in addition to the requirement to Call before You Dig as required in RCW 19.122.
Ÿ
(Date)(Signature)
Page 1 of 1THIS PERMIT AND PLANS MUST BE POSTED AT THE JOB SITE AT ALL TIMES
Note: The Applicant is responsible for compliance with all codes and regulations, whether or not described in this document.
DEPARTMENT OF PUBLIC WORKS
Page 1 of 3 | Published: 10/27/2021
Transportation Division | 1055 South Grady Way, 5th Floor | Renton, WA 98057 | 425-430-7380
Website: rentonwa.gov
TRAFFIC CONTROL PLAN APPLICATION
Published: 10/27/2021
TRAFFIC CONTROL PLAN (TCP) MUST BE SUBMITTED TO PUBLIC WORKS TRANSPORTATION DIVISION
FOR REVIEW/APPROVAL AT LEAST FIVE (5) WORKING DAYS BEFORE THE DATE OF WORK.
The City of Renton requires any contractor, firm, corporation, or other public/private agency to prepare a traffic control
plan (TCP) and obtain city's approval of that plan when construction, repair, or maintenance work is to be conducted
within the city's right-of-way.
1. Fill out the Traffic Control Plan (TCP) Application form and prepare required submittal documents.
2. The following items are all required for submittal of the TCP Application:
☐Electronic Copy of the TCP Application
☐Electronic Copy of the TCP Layout, on 11” X 17” paper size format, which shall:
Include map(s) showing the location of the project and work area.
Be legible lettering and clear, contrasting, symbols of viewing or printing.
Must indicate street names, and north arrow and scale.
Types of plans required:
o Work hour plan – show all mobility impacts during construction hours.
o Non-work plan - show all mobility impacts after work hours when limited or no work is
happening in the right-of-way (ROW), if applicable.
o Changing construction phases – show construction sequence and each construction phase
change even if the traffic control is not modified, if applicable.
o Pedestrian access/detour plan, if applicable.
- Shall conform to the Washington State Traffic Control Flagger Certification handbook, by the
Evergreen Safety Council.
3. Submit Application via email to TCP@rentonwa.gov with the subject line “TCP Application – [Project Name].”
Project Name: Permit #:
Site Address:
Work Date: From _____________ To _____________ Work Time: Start ______________ End ______________
Construction Company:
Contact Name: Phone/Cell: _________________________
Business Address: City/State: Zip:
Description of Work:
Approval By: _________________________________________________ Date:____________________
Transportation Engineering
INFRASOURCE, INC
6905 S 228TH ST KENT, WA 98032
PLEASE SEE ATTACHED
106385364
910 N 31ST ST
DAVE FLORES 425-449-6019
MFP22004735
Monday - Friday 8:00AM - 3:00PM
Scott Warlick CED 9/15/2022
Note: The Applicant is responsible for compliance with all codes and regulations, whether or not described in this document.
Page 2 of 3 | Published: 10/27/2021
PERMIT HOLDER AGREES TO ALL THE FOLLOWING:
Must have approved Traffic Control Plan (TCP) prior to commencing the work.
Maintain existing pedestrian access. The work on pedestrian facilities, shall be limited to one corner at a time,
with the least possible inconvenience or delay to pedestrians.
WORK TIME begins when any street or travel lane is fully or partially closed. This includes set up within the
traveled way.
Comply with all traffic regulations of the City of Renton and the State of Washington.
Prepare a traffic control plan and obtain City approval of that plan. That plan shall be implemented for all street
and lane closures, and the plan shall be performed in compliance with the Manual on Uniform Traffic Control
Devices.
Notify emergency services (253-852-2121) twenty-four (24) hours before any street or lane closures.
Contractor or entity must call Renton School District (425-204-4455) or any public/private agency, including public
transit, to be affected by a temporary lane or road closure a minimum of five business days (excluding weekends
and holidays) prior to starting any work.
Contractor or entity must notify King County Metro in writing at construction.coord@kingcounty.gov a minimum
of five business days (excluding weekends and holidays) prior to starting any work impacting bus stops, a
temporary lane or road closure. Work requiring removing a bus shelter or sign requires notification in writing a
minimum of 30 business days (excluding weekends and holidays). Please call King County Metro at 206-477-1140
with any questions.
Any lane or street closures not in conformance with the approved traffic control plan and/or without notification
of emergency services may result in receiving a citation for violation of R.C.W. 47.36.200 Signs or Flaggers at
thoroughfare work sites and R.C.W. 9A.36.050 Reckless Endangerment, and other applicable State and City codes.
Indemnify and hold harmless the City of Renton from any and all claims, actions, and judgments, including all
costs of defense and attorney’s fees incurred in defending against same, arising from and related to
implementation of the approved traffic control plans including claims arising from towing of private vehicles and
the acts of the Permit Holder’s agents and employees.
The City of Renton shall be entitled, in its reasonable discretion, to settle claims prior to suit or judgment, and in
such event shall indemnify and hold harmless the City for any such claims paid, including the City’s reasonable
attorney’s fees and litigation costs incurred resulting from such claim.
In the event any claim or suit is brought against City within the scope of this Agreement, Permit Holder will pay for
legal counsel chosen by the City to defend against same.
Flagger and sign placement are subject to revision by the City Inspector on site, if needed to address traffic or
pedestrian safety or travel.
All permit conditions shall be met.
NOTES:
Total road closure lasting more than twenty-four (24) hours is subject to the approval by the City Council.
Work Zone Traffic Control shall be in accordance with the Manual on Uniform Traffic Control Devices (MUTCD)
and shown by a traffic control plan layout or reference to WSDOT.
Approved Temporary Traffic Control Plan must be at the work site during work hours.
Complete assistance and accommodation shall be provided to all kinds of pedestrian traffic when sidewalk or
walkway is impeded to safely redirect pedestrians around a work zone.
Signage shall be used to warn motorcyclists/bicyclists of the potential hazards on any uneven surfaced or slippery
road conditions during work and non-work hours.
Any vehicle, equipment, barricade, or portable tow-away sign used within the work area must display a company
logo or any legally acceptable sign showing the company name, address, and telephone number at a conspicuous
place on the vehicle or equipment.
Note: The Applicant is responsible for compliance with all codes and regulations, whether or not described in this document.
Page 3 of 3 | Published: 10/27/2021
In the case of Temporary No Parking Zones, all the following apply in addition to previous:
Contractor must complete form to show limits of Temporary No Parking Zone identifying barricade locations for
vacate parking or curb lane usage.
Contractor must post notice of dates and time of Temporary No Parking Zone with at least two signs per block
seventy-two (72) hours in advance of effective date and time.
The cover sheet of this Traffic Control Plan form must be attached to each Temporary No Parking Sign on the
project site.
Temporary traffic control devices must be removed immediately when work is done or no construction activities
are going on. If deemed abandoned, City crews will remove and store them at the City’s maintenance shop (3555
NE 2nd Street).
I certify that the information on this application and within the submittal documents are accurate to the best of my
knowledge and I acknowledge all the requirements on this application.
Applicant’s Signature Date
Applicant’s Name (Print)
CORRIE RYDBERG
#910N 31ST STBURNETT AVE N
11 111111 11111111W20-7AROAD
WORK
AHEAD W20-1W20-4ONE LANEROADAHEAD100'100'100'W20-7AROADWORKAHEADW20-1W20-4ONE LANEROADAHEAD100'100'100'W20-7AROADWORKAHEADW20-1 BEPREPAREDTOSTOPW3-4 200'200'200'W20-7AROADWORKAHEADW20-1BEPREPAREDTOSTOPW3-4200'200'200'STOP
FLAGGER
STOPFLAGGER
STO
P
FLAGGERSTOP
FLAGGER
RESIDENT(S) - CLIENTS(S) WILL BE INFORMED IN ADVANCEOF TEMPORARY DRIVEWAY CLOSUREPLACE SIGNS ALONG WORK AREAFROM TO
TOW AWAY AREA
PHONE 888-9999
INFRASOURCE LLC 000 0000000
NO PARKING
NO-PARK TEMPORARY TRAFFIC CONTROL PLANWORK PIT28" TRAFFIC CONELEGENDTRAFFIC FLOWSIGN LOCATIONFLAGGERSTOPWORK VEHICLE/FLASHING LIGHTSRIGHT OF WAYSIGN SPACINGMPH60/6545/5535/403025"X"1000'500'350'200'100'CHANNELIZATIONDEVICE SPACINGMPH55/7035/4525/30TAPER403020TANGENT806040Notes:1. All signs and spacing to conform to theMUTCD and City of Renton standards.2. All sidewalks, driveways, exits and egressesshall be completely clear unless otherwise indicated.3. Channelizing devices are 28" traffic cones.Use traffic drums (barrels) with steady burningType C lights on all State State Routes and Hwys.4. Sign size can be a minimum of 36" x 36" andshall not obstruct pedestrian access.5. Crew is required to leave a minimum of 11' fortraveling lane width.6. Alert affected residents and businesses.7. Work to take place between 9 a.m. and 4 p.munless otherwise specified. All work for arterialsand major roadways will be from 9 a.m. to 3 p.m.8. Work area will be 125' ECL of Burnett Ave N & 11'SCL of N 31st StNProject Address:PagePSEPUGETSOUNDENERGYDesigner:Job #REV08/23/2022 5126532590910 N 31st St, Renton, WAKali-Jamal Collins425-424-6425Kali-Jamal.Collins@pse.com1 OF 2Puget Sound EnergyTraffic Control Supervisor:Gregory HarwoodCard No. 012238Card Exp. 09/30/2023gregory.harwood@pse.com(425)424-6425MFP22004735
#910N 31ST STBURNETT AVE N
11 111111 11111111W20-7AROAD
WORK
AHEAD W20-1W20-4ONE LANEROADAHEAD100'100'100'W20-7AROADWORKAHEADW20-1W20-4ONE LANEROADAHEAD100'100'100'W20-7AROADWORKAHEADW20-1 BEPREPAREDTOSTOPW3-4 200'200'200'W20-7AROADWORKAHEADW20-1BEPREPAREDTOSTOPW3-4200'200'200'STOP
FLAGGER
STOPFLAGGER
STO
P
FLAGGERSTOP
FLAGGER
RESIDENT(S) - CLIENTS(S) WILL BE INFORMED IN ADVANCEOF TEMPORARY DRIVEWAY CLOSUREPLACE SIGNS ALONG WORK AREAFROM TO
TOW AWAY AREA
PHONE 888-9999
INFRASOURCE LLC 000 0000000
NO PARKING
NO-PARK CREW SHALL POTHOLEFOR WATER MAIN DEPTHPRIOR TO PROJECT STARTNotes:1. All signs and spacing to conform to theMUTCD and City of Renton standards.2. All sidewalks, driveways, exits and egressesshall be completely clear unless otherwise indicated.3. Channelizing devices are 28" traffic cones.Use traffic drums (barrels) with steady burningType C lights on all State State Routes and Hwys.4. Sign size can be a minimum of 36" x 36" andshall not obstruct pedestrian access.5. Crew is required to leave a minimum of 11' fortraveling lane width.6. Alert affected residents and businesses.7. Work to take place between 9 a.m. and 4 p.munless otherwise specified. All work for arterialsand major roadways will be from 9 a.m. to 3 p.m.NProject Address:PagePSEPUGETSOUNDENERGYDesigner:Job #REV08/23/2022 5126532590910 N 31st St, Renton, WAKali-Jamal Collins425-424-6425Kali-Jamal.Collins@pse.com2 OF 2Puget Sound EnergyTraffic Control Supervisor:Gregory HarwoodCard No. 012238Card Exp. 09/30/2023gregory.harwood@pse.com(425)424-6425TEMPORARY TRAFFIC CONTROL PLANWORK PIT28" TRAFFIC CONELEGENDTRAFFIC FLOWSIGN LOCATIONFLAGGERSTOPWORK VEHICLE/FLASHING LIGHTSRIGHT OF WAYSIGN SPACINGMPH60/6545/5535/403025"X"1000'500'350'200'100'CHANNELIZATIONDEVICE SPACINGMPH55/7035/4525/30TAPER403020TANGENT806040MFP22004735
Service Address:
City Zip:
Site Contact:Phone:
Site Contact Email:
Est. Start Date:
Customer Contact:
&
&
Q203082
3 X 5 X 3125'East of CL Burnett Ave N 10'North of CL N 31st St
PM / Inspector:
brandon@meadinvestments.com
98056
Phone: 425-443-5458
Puget Sound Energy Gas Pre-Inspect Form
8/9/22Date:
106385364Job #:
Renton, 98056
910 N 31ST ST
Chris Reed 206-793-2247
Chris@sahbuilt.com
Phone:425-449-6019Dave Flores
125'East
Surface Type
A
A
Size of Cut
of CL Burnett Ave N 11'South of CL N 31st St 3 X 5 X 3
Work Location
No New Residential Svc
Service Information Street Information
1-1/8" PE
Del Press:6" W.C.Traffic Signal:No Bus Stop:No KNT FLT - KentBollards:2.5" #4" #ADA Ramps #:0 Route #'s:N/A
Meter Loc:Trolley Lines:No Mtr Hoods #:00
A250
PLAT Map:
N
EFV:1-1/8" - 2600 - 9999144 Police #:0 TCP:Yes Tie-In Fitting
Meter:Speed Limit:0 No Parks #:0
Job Type
Diameter:Flaggers #:0 Arterial:
Renton
YesROW Permit:
Jurisdiction:
Project Scope: Tie in main 62' of 1-1/8" PE Svc (38' SCAT Stub w/2600 EFV, 24' Plat Ext), A250 MSA
Est. Duration:
Yes
Job Description
New Construction:
Construction Method
Building Foundation Type
Septic System
Hole Hog
Grass/Dirt
Grass/Dirt
CL
Existing Water 10' NCL
910Burnett Ave NN 31st St
Existing Sewer 3' NCL
2" PE IP 11'S
920013
Proposed1-1/8" MPE IP Svc
50' ROWPaving
MFP22004735
POTHOLE ALL EXISTING UTILITIES
RESTORATION PER CITY OF RENTON STANDARDS