Loading...
HomeMy WebLinkAboutCO 35ADocuSign Envelope ID: 2EEF922B-4ACC-4FDF-99A3-A0EBDA768DB2 CAG-20-001, CO #35A Contract Title: Change Order No. 35A Williams Ave S and Wells Ave S Conversion Project Contractor:Cascade Civil Construction Contract No.CAG-20-001 Federal Aid No.HIPUL-STP 9917 (034) IZI Ordered by Engineer D Proposed by the Contractor (VECP} Unilateral □LumpSum□Bid Item 181 Force Account Amount Working Days Original Contract: Current Contract: Estimated Net Change This Order: New Contract: Reviewed By: Engineer of Record Date Reviewed By:�/( t._ju!J: ... 06_/1ojzo22 0-- City of Renton Project Manager Date Reviewed By: Approved by Cheryl Beyer via 6/3/2022 email City Attorney Date 35A $7,733,422.80 250 $9,678,322.96 318 $0.00 24 $9,678,322.96 342 Design Manager) Consent By: Surety (Greater than 25% cost and/or 20% time increase) Endorsed By: Contractor EG;·;��• ;astucha _ 8B8131FD98B449D ... City of Renton Public Works Administrator/ Mayor Change Order No. Contract Title: Williams Ave Sand Wells Ave S Conversion Project Contract No. CAG-20-001 Date Date 6/16/2022 I 4:16 PM PDT Date Page 1 of7 K EŽ Ž d t t ŽŽ WŽ Ž EŽ W Ž d,KEdZ d DK K>>Kt^ Ž Ž d K Ž Ž Ž ŽŽ Ž Ž Ž ŽŽ Ž Ž Ž WŽ Ž K Ž Ž Ž Ž Ž Ž K Ž Ž Ž Ž Ž Ž Ž Ž Ž WD Ž Ž K d Ž Ž Ž Ž Ž Ž ŽŽ Ž Ž K Ž Ž Ž Ž Ž Ž Ž W Ž d K Ž Ž Ž Ž WD Ž ŽŽ K K K K K K ZŽ Ž Ž Ž Ž Ž Ž Ž Ž Ž Ž Ž K Ž Ž Ž Ž Ž ŽŽ Ž Ž Ž Ž Ž Ž Ž Ž Ž Ž tŽ z EŽ D EŽ K EŽ Ž d t t ŽŽ WŽ Ž EŽ W Ž W EŽ d K Ž EKd Ž Ž t^Kd Wt Ž Ž Ž d d d Ž ŽŽ tŽ Ž Ž t^Kd Wt Ž Ž K d tŽ Ž Ž Ž Ž d Ž Ž Ž Ž Ž Ž Ž Ž Ž Ž Ž ŽŽ Ž Ž Ž Ž Ž tŽ Ž K Ž Ž Ž Ž tŽ ŽŽ h W ŽŽ YŽ W WŽ Ž ŽŽ t^Kd Z Ž Ž Ž Ž Ž Ž