Minor Franchise Permit: MFP22004756
IVR Number: 22004756
Permit Information
Permit Name: Puget Sound Energy Gas Permits
Address/Location:09/07/2022Application Date:9236500160Parcel Number: 6709 NE 2ND PL
Permit Type:09/19/2022Issue Date:Franchise
Permit Work Class:09/19/2023Expiration Date:Minor Utility
Job Number: 106388857Franchise Type:Natural Gas
Description: PSE Gas CREW TO INSTALL 2 UG SERVICES AT MAIN, APPROX 18' ROW TO 13233 AND 13229 158TH AVE SE.
2:3'X5' ASDPHALT CUTS ANTICIPATED. POTHOLE ALL EXISTING UTILITIES. RESTORATION PER CITY OF
RENTON STANDARDS.
Contacts
Name Address PhoneTypeBilling
Corrie Rydberg
Puget Sound Energy
3702 71st Ave W
University Place, WA 98466
C: (253) 905-5031ApplicantX
Stuart Bennett
Infrasource Services LLC
1622 Eastport Plaza Dr
Collinsville, IL 62234
B: (303) 419-8755
H: (425) 677-5197
C: (713) 985-6489
Contractor
Business License Number: 36742Construction Contractor: INFRASL871C2
CITY OF RENTON ROW 1055 S Grady Way
Renton, WA 98057-3232
Owner
Corrie Rydberg
Puget Sound Energy
3702 71st Ave W
University Place, WA 98466
C: (253) 905-5031Specialized
Billing
General Conditions & Signature
Permission is hereby given for the work described on this permit according to the conditions hereon and according to the
approved plans and specifications pertaining thereto, subject to compliance with the Ordinance of the City of Renton.
Ÿ
This permit and plans must be posted at the job site at all times.Ÿ
I hereby certify that no work is to be done except as described above and in approved plans, and that work is to conform to
Renton Trench Restoration and Street Overlay Requirements.
Ÿ
Call 425.430.7203 or go to: https://permitting.rentonwa.gov one working day in advance to schedule an inspections and for ANY
work in the Right of Way.
Ÿ
Call 8 1 1 to locate underground utilities at least two full business days prior to any excavation.Ÿ
In accordance with RCW 19.122.033(4) the permit holder is required to contact (Williams Northwest Pipeline at 425.868.1010)
(Olympic Pipeline at 206.510.0575) (Puget Sound Energy at 425.375.3397) to request a consultation with the transmission
pipeline company prior to performing any construction or excavation activities. This requirement to consult with the
transmission pipeline company is in addition to the requirement to Call before You Dig as required in RCW 19.122.
Ÿ
(Date)(Signature)
Page 1 of 1THIS PERMIT AND PLANS MUST BE POSTED AT THE JOB SITE AT ALL TIMES
Note: The Applicant is responsible for compliance with all codes and regulations, whether or not described in this document.
DEPARTMENT OF PUBLIC WORKS
Page 1 of 3 | Published: 10/27/2021
Transportation Division | 1055 South Grady Way, 5th Floor | Renton, WA 98057 | 425-430-7380
Website: rentonwa.gov
TRAFFIC CONTROL PLAN APPLICATION
Published: 10/27/2021
TRAFFIC CONTROL PLAN (TCP) MUST BE SUBMITTED TO PUBLIC WORKS TRANSPORTATION DIVISION
FOR REVIEW/APPROVAL AT LEAST FIVE (5) WORKING DAYS BEFORE THE DATE OF WORK.
The City of Renton requires any contractor, firm, corporation, or other public/private agency to prepare a traffic control
plan (TCP) and obtain city's approval of that plan when construction, repair, or maintenance work is to be conducted
within the city's right-of-way.
1. Fill out the Traffic Control Plan (TCP) Application form and prepare required submittal documents.
2. The following items are all required for submittal of the TCP Application:
☐Electronic Copy of the TCP Application
☐Electronic Copy of the TCP Layout, on 11” X 17” paper size format, which shall:
Include map(s) showing the location of the project and work area.
Be legible lettering and clear, contrasting, symbols of viewing or printing.
Must indicate street names, and north arrow and scale.
Types of plans required:
o Work hour plan – show all mobility impacts during construction hours.
o Non-work plan - show all mobility impacts after work hours when limited or no work is
happening in the right-of-way (ROW), if applicable.
o Changing construction phases – show construction sequence and each construction phase
change even if the traffic control is not modified, if applicable.
o Pedestrian access/detour plan, if applicable.
- Shall conform to the Washington State Traffic Control Flagger Certification handbook, by the
Evergreen Safety Council.
3. Submit Application via email to TCP@rentonwa.gov with the subject line “TCP Application – [Project Name].”
Project Name: Permit #:
Site Address:
Work Date: From _____________ To _____________ Work Time: Start ______________ End ______________
Construction Company:
Contact Name: Phone/Cell: _________________________
Business Address: City/State: Zip:
Description of Work:
Approval By: _________________________________________________ Date:____________________
Transportation Engineering
INFRASOURCE, INC
6905 S 228TH ST KENT, WA 98032
PLEASE SEE ATTACHED
106388857
13233 158TH AVE SE
SHANNON MOORE 206-681-7086
MFP22004756
Monday - Friday 8:00AM - 3:00PM
Scott Warlick CED 9/15/2022
Note: The Applicant is responsible for compliance with all codes and regulations, whether or not described in this document.
Page 2 of 3 | Published: 10/27/2021
PERMIT HOLDER AGREES TO ALL THE FOLLOWING:
Must have approved Traffic Control Plan (TCP) prior to commencing the work.
Maintain existing pedestrian access. The work on pedestrian facilities, shall be limited to one corner at a time,
with the least possible inconvenience or delay to pedestrians.
WORK TIME begins when any street or travel lane is fully or partially closed. This includes set up within the
traveled way.
Comply with all traffic regulations of the City of Renton and the State of Washington.
Prepare a traffic control plan and obtain City approval of that plan. That plan shall be implemented for all street
and lane closures, and the plan shall be performed in compliance with the Manual on Uniform Traffic Control
Devices.
Notify emergency services (253-852-2121) twenty-four (24) hours before any street or lane closures.
Contractor or entity must call Renton School District (425-204-4455) or any public/private agency, including public
transit, to be affected by a temporary lane or road closure a minimum of five business days (excluding weekends
and holidays) prior to starting any work.
Contractor or entity must notify King County Metro in writing at construction.coord@kingcounty.gov a minimum
of five business days (excluding weekends and holidays) prior to starting any work impacting bus stops, a
temporary lane or road closure. Work requiring removing a bus shelter or sign requires notification in writing a
minimum of 30 business days (excluding weekends and holidays). Please call King County Metro at 206-477-1140
with any questions.
Any lane or street closures not in conformance with the approved traffic control plan and/or without notification
of emergency services may result in receiving a citation for violation of R.C.W. 47.36.200 Signs or Flaggers at
thoroughfare work sites and R.C.W. 9A.36.050 Reckless Endangerment, and other applicable State and City codes.
Indemnify and hold harmless the City of Renton from any and all claims, actions, and judgments, including all
costs of defense and attorney’s fees incurred in defending against same, arising from and related to
implementation of the approved traffic control plans including claims arising from towing of private vehicles and
the acts of the Permit Holder’s agents and employees.
The City of Renton shall be entitled, in its reasonable discretion, to settle claims prior to suit or judgment, and in
such event shall indemnify and hold harmless the City for any such claims paid, including the City’s reasonable
attorney’s fees and litigation costs incurred resulting from such claim.
In the event any claim or suit is brought against City within the scope of this Agreement, Permit Holder will pay for
legal counsel chosen by the City to defend against same.
Flagger and sign placement are subject to revision by the City Inspector on site, if needed to address traffic or
pedestrian safety or travel.
All permit conditions shall be met.
NOTES:
Total road closure lasting more than twenty-four (24) hours is subject to the approval by the City Council.
Work Zone Traffic Control shall be in accordance with the Manual on Uniform Traffic Control Devices (MUTCD)
and shown by a traffic control plan layout or reference to WSDOT.
Approved Temporary Traffic Control Plan must be at the work site during work hours.
Complete assistance and accommodation shall be provided to all kinds of pedestrian traffic when sidewalk or
walkway is impeded to safely redirect pedestrians around a work zone.
Signage shall be used to warn motorcyclists/bicyclists of the potential hazards on any uneven surfaced or slippery
road conditions during work and non-work hours.
Any vehicle, equipment, barricade, or portable tow-away sign used within the work area must display a company
logo or any legally acceptable sign showing the company name, address, and telephone number at a conspicuous
place on the vehicle or equipment.
Note: The Applicant is responsible for compliance with all codes and regulations, whether or not described in this document.
Page 3 of 3 | Published: 10/27/2021
In the case of Temporary No Parking Zones, all the following apply in addition to previous:
Contractor must complete form to show limits of Temporary No Parking Zone identifying barricade locations for
vacate parking or curb lane usage.
Contractor must post notice of dates and time of Temporary No Parking Zone with at least two signs per block
seventy-two (72) hours in advance of effective date and time.
The cover sheet of this Traffic Control Plan form must be attached to each Temporary No Parking Sign on the
project site.
Temporary traffic control devices must be removed immediately when work is done or no construction activities
are going on. If deemed abandoned, City crews will remove and store them at the City’s maintenance shop (3555
NE 2nd Street).
I certify that the information on this application and within the submittal documents are accurate to the best of my
knowledge and I acknowledge all the requirements on this application.
Applicant’s Signature Date
Applicant’s Name (Print)
CORRIE RYDBERG
121212 12 1212NE 1ST PL
NE 2ND PL158TH AVE SE12 12
158TH AVE SESTOP
FLAGGER
STOP
FLAGGER
W20-7AW20-4ONE LANEROADAHEAD100'ROAD
WORK
AHEAD W20-1BEPREPAREDTOSTOPW3-4ROADWORKAHEADW20-1W20-7AW20-4ONE LANEROADAHEADROADWORKAHEADW20-1W20-7AW20-4ONE LANEROADAHEADROADWORKAHEADW20-1RESIDENT(S) WILL BE INFORMED
OF POSSIBLE TEMPORARY
DRIVEWAY CLOSURE
USE MAXIMUM AVAILABLE
SPACE FOR SIGNS
PLACE SIGNSBOTH SIDES OFWORK AREAFROMTOTOW AWAY AREAPHONE 888-9999INFRASOURCE LLC 000 0000000NO PARKINGNO-PARK
FROM TO
TOW AWAY AREA
PHONE 888-9999
INFRASOURCE LLC 000 0000000
NO PARKING
NO-PARK100'100'X'X'X'
X'X'100'100'100'WORK PIT
28" TRAFFIC CONE
LEGEND
TRAFFIC FLOW
SIGN LOCATION
FLAGGER
STOP
WORK VEHICLE/
FLASHING LIGHTS
RIGHT OF WAY
SIGN SPACING
MPH
60/65
45/55
35/40
30
25
"X"
1000'
500'
350'
200'
100'
CHANNELIZATION
DEVICE SPACING
MPH
55/70
35/45
25/30
TAPER
40
30
20
TANGENT
80
60
40
TEMPORARY TRAFFIC CONTROL PLAN
N
Project Address:
Page
PSE PUGETSOUNDENERGY
Designer:
Job #
REV
08/25/2022
106388857
0
13229 158TH AVE SE, RENTON, WA
MATLOCK HIGHBARGER
808-375-4152
MATLOCK.HIGHBARGER@PSE.COM
1 OF 1
Puget Sound Energy
Traffic Control Supervisor:
Gregory Harwood
Card No. 012238
Card Exp. 09/30/2023
gregory.harwood@pse.com
(425)424-6425
Notes:
1. All signs and spacing to conform to the
MUTCD and City of Renton standards.
2. All sidewalks, driveways, exits and egresses
shall be completely clear unless otherwise indicated.
3. Channelizing devices are 28" traffic cones.
Use traffic drums (barrels) with steady burning
Type C lights on all State State Routes and Hwys.
4. Sign size can be a minimum of 36" x 36" and
shall not obstruct pedestrian access.
5. Crew is required to leave a minimum of 11' for
traveling lane width.
6. Alert affected residents and businesses.
7. Work to take place between 9 a.m. and 4 p.m
unless otherwise specified. All work for arterials
and major roadways will be from 9 a.m. to 3 p.m.
8. Work area for 13233-13229 158TH AVE SE will
be at 12' West of centerline of 158TH AVE SE, and
between 62'-152' South of centerline of SE 2ND
PL.
MFP22004756
Service Address:
City Zip:
Customer:Phone:
Customer Email:
Est. Start Date:
Site Contact Email:
&
&
208.089 * Clean - Dispose of Soil Normally *
3 X 5 X 2152'SOUTH of CL SE 2ND PL 12'WEST of CL 158TH AVE SE
PM / Inspector:
Justin@americanclassichomes.com
98059
Phone:253-405-5587
Puget Sound Energy Gas Pre-Inspect Form
8/15/22Date:
106388857Job #:
RENTON, 98059
13233 13229 158TH AVE SE
JUSTIN LAGERS 253-405-5587
Justin@americanclassichomes.com
Phone:(206) 681-7086SHANNON MOORE9/26/22
62'SOUTH
Surface Type
A
A
Size of Cut
of CL SE 2ND PL 12'WEST of CL 158TH AVE SE 3 X 5 X 2
Work Location
No New Residential Svc
Service Information Street Information
1-1/8" PE
9997039
Del Press:6" W.C.Traffic Signal:Bus Stop:No KNT FLT - KentBollards:2.5" #4" #ADA Ramps #:0 Route #'s:
Meter Loc:Trolley Lines:No Mtr Hoods #:00
Steel - 1" Serv x 1/8" PE Outlet (MOP) - 125
(3/4" Cutter)
PLAT Map:
N
EFV:1-1/8" - 2600 - 9999144 Police #:0 TCP:No Tie-In Fitting
Meter:Speed Limit:25 No Parks #:0
Job Type
Diameter:Flaggers #:0 Arterial:
RENTON
Yes
Soil Condition: 0 - 20ppm Estimated Soil: yard(s)
ROW Permit:
Jurisdiction:
Project Scope: TIE INTO 2" STW IP 12' W, INSTALL 2 - 18' 1-1/8" PE STUBS, CST TO DO G/O IN ROAD PRIOR TO CONSTRUCTION.
CleanSoil Management:
Est. Duration:
Yes
Job Description
New Construction:
Construction Method
Building Foundation Type
Septic System
1 Day (8 Hours)
No
Slab
Hole Hog
3664500228 -
13233 8" GRAVITY
WASTEWATER
MAIN
Proposed 1-1/8" STUB
60' ROW
Proposed 1-1/8" STUB 60' ROW42' ROW2"STW IP 12' W 3133-196312"
CULVERT/WATER
DITCH
12" GRAVITY
SURFACE WATER
MAIN
3664500226 -
13229
MFP22004756
POTHOLE ALL EXISTING UTILITIES
RESTORATION PER CITY OF RENTON STANDARDS
recommend verifying with
developer the home configuration
is the most current. driveway
configuration has changed which
may have resulted in a different
home configuration.
existing ditch is being
replaced with a new
culvert. ensure that
gas utility is not in
conflict with new
surface water main
(construction plan
for main has not been
approved but shows
the bottom of pipe to
be approximately 2
feet below grade).