Loading...
HomeMy WebLinkAboutMFP22004737.pdfDEPARTMENT OF COMMUNITY AND ECONOMIC DEVELOPMENT Minor Franchise Permit: MFP22004737 IVR Number: 22004737 Permit Information Permit Name: Puget Sound Energy - Electric Address/Location:09/06/2022Application Date:1023059124Parcel Number: 1075 DUVALL AVE NE Permit Type:09/20/2022Issue Date:Franchise Permit Work Class:09/20/2023Expiration Date:Minor Utility Job Number: 101151700Franchise Type:Electric Description: Puget Sound Energy Electric CREW TO REMOVE EXISTING OH SPAN FROM P01 P02 AND P02 P03. LUMEN TO REMOVE THEIR OWN POLE AT P02 AND PSE TO SET NEW PSE OWNED POLE IN IT'S PLACE AND TRANSFER EQUIPMENT. Intercept pit at IP1 to intercept & reroute cable from V01 directly east approximately 10' to private property, which includes replacing/installing new cable AT V01. Perform OH maintenance work on P03 to upgrade fuse/cutouts. Install new span guy from P03 P04 along Chelan Ave NE going south. 1 GRASS CUT ANTICIPATED. POTHOLE ALL EXISTING UTILITIES. RESTORATION PER CITY OF RENTON STANDARDS. Contacts Name Address PhoneTypeBilling Corrie Rydberg Puget Sound Energy 3702 71st Ave W University Place, WA 98466 C: (253) 905-5031ApplicantX Vicki Henson Potelco Inc 8001 212th St S Kent, WA 98032 B: (253) 863-0484Contractor Business License Number: 5109Electrical Contractor: POTELI*344O4 Construction Contractor: POTELI*227PL RENTON SCHOOL DISTRICT NO 4 300 SW 7TH ST RENTON, WA 98057 Owner Corrie Rydberg Puget Sound Energy 3702 71st Ave W University Place, WA 98466 C: (253) 905-5031Specialized Billing General Conditions & Signature Permission is hereby given for the work described on this permit according to the conditions hereon and according to the approved plans and specifications pertaining thereto, subject to compliance with the Ordinance of the City of Renton. Ÿ This permit and plans must be posted at the job site at all times.Ÿ I hereby certify that no work is to be done except as described above and in approved plans, and that work is to conform to Renton Trench Restoration and Street Overlay Requirements. Ÿ Call 425.430.7203 or go to: https://permitting.rentonwa.gov one working day in advance to schedule an inspections and for ANY work in the Right of Way. Ÿ Call 8 1 1 to locate underground utilities at least two full business days prior to any excavation.Ÿ In accordance with RCW 19.122.033(4) the permit holder is required to contact (Williams Northwest Pipeline at 425.868.1010) (Olympic Pipeline at 206.510.0575) (Puget Sound Energy at 425.375.3397) to request a consultation with the transmission pipeline company prior to performing any construction or excavation activities. This requirement to consult with the transmission pipeline company is in addition to the requirement to Call before You Dig as required in RCW 19.122. Ÿ (Date)(Signature) Page 1 of 1THIS PERMIT AND PLANS MUST BE POSTED AT THE JOB SITE AT ALL TIMES E-Mail: Cell Phone: Project Manager Contact Information: Manager: Jenny.Chau@pse.com 253-208-9480 JENNY CHAU Removal TRF Relocate OH Misc. UG Misc. POWER GENERAL NOTES - COMMERICAL PROJECT 1.All materials to be installed in accordance with Puget Sound Energy's (PSE) standards. Any deviation from this work sketch must be AUTHORIZED by PSE's Project Manager and NOTED on the Foremans' Copy. 2.All switching arrangements and/or outage arrangements are to be made with the Project Manager at least three (3) working days in advance. 3.Contact the Utilities Underground Location Center (1-800-424-5555) at least 48 hours prior to commencing work to get the underground facilities located. 4.STAKING: The customer will provide all staking (transformer, handhole, trench, grade, lot, pole, sidewalk, etc.). See sketch and details for locations. Equipment locations must be approved by the Project Manager. 5.SITE PREPARATION: The work area will be at or near finished grade, clear of trench spoils or construction materials which would restrict construction and/or equipment access, before work can begin. 6.Roads shall be paved or have a compacted , crushed rock base in place. 7.CLEARANCES: Transformers require a minimum of 6 feet from fire fighting equipment, 10 feet from combustible walls, overhangs, doors, and windows, and a minimum of 5 feet from the back of curb (or guard posts will be required per PSE standards). All conduits and vaults are to be at least 5 feet away from water, storm and sewer lines when paralleling them in the right of way, and at least 1 foot when crossing them. 8.All work is to be done in accordance with local municipal and county permit requirements as applicable. 9.Customer/Developer is responsible to provide, install and maintain all secondary service cables, conduits and crossings from the individual unit's meter base to the designated connection point. 10.Inclement weather conditions may cause delays in construction times and dates. 11.EXCAVATION: The customer is to provide all trenching, backfill, vault excavations, compaction and restoration per this sketch and per PSE standards. A minimum protective cover of 36" is required over PSE's primary voltage equipment and 24" is required of PSE's secondary voltage equipment. The customer will provide any and all shoring or they will side slope the trench to 1:1.101151700UTILITIES CONTACT PHONE# COUNTY 1/4 SEC U-MAP NO (POWER) OP MAP Emer Sect Gas Wk Ctr POWER WK CTR PLAT MAP JOINT FACILITIES ARRANGEMENTS DRAWN BY CHECKED BY APPROVED BY FOREMAN #1 FOREMAN #2 MAPPING INCIDENT MAOP Gas Order Elect Order SCALE PAGE ENGR - POWER FUNCTION PROJECT MGR PERMITREAL ESTATE/EASEMENT 2 1 REV# 3 DATE DESCRIPTIONBY CONTACT PHONE NO DATE OH CKT MAP CIRCUIT NOUG CKT MAP SIGNATURE JENNY CHAU 253-208-9480 4/11/22 JASON FELLER 253-204-1990 4/11/22 JASON FELLER N/A 4/11/22 RW-120242 RENTON RENTON ELEMENTARY SCHOOL #16 SCH.73 OH-UG CONVERSION & SYSTEM WORK 1075 DUVALL AVENUE NE, RENTON 98059 N/A N/A N/A 101151700 AS NOTED 1 OF 3 KING COUNTY N/A N/A CSPSKEPM T23N.R05E.S17 N/A N/A 2305E065 2305E088 2305E065 PRE-14 CenturyLink N/A N/A Comcast/Xfinity N/A N/A PSE - Gas N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A JOB SITE UNDERGROUND CIRCUIT MAP SCALE: 1" = 100' OVERHEAD CIRCUIT MAP SCALE: 6"=1mi JOB SITE N Vicinity Map 47.500116, -122.157798 Owner / Developer Contact Info officeATTN: Renton School District 300 SW 7th St Renton, WA 98059 Taylor Vanderkley 206-436-0402 Superior ORDER#NOTIF# PWR PROJECT PHASE FOREMAN (CHECK BOX WHEN COMPLETED) PSE Equipment LOCKED/SECURED & Work Area left in CLEAN/SAFE Condition. Grid, Cable, and Switch numbers INSTALLED & VERIFIED. Field Changes RED-LINED on As-built. Indicate correct FUSE SIZE on As-built & VERIFY proper PHASE. Foreman's Signature _______________________________________________ Print Name ___________________________________ Date ______________ Material VERIFIED and CHANGES noted on Paperwork. Total PRIMARY Cable noted on As-built. Company ID#'s RECORDED in correct location on As-built. Deviations noted on the As-built and their reason. I certify that the work performed meets PSE's standards and procedures and that all quality requirements are met. PSE No No No Yes Yes Yes No YesDeveloper "Flagging Required" "Outages Required" "Locates Required"THIS SKETCH NOT TO BE RELIED UPON FOR EXACT LOCATION OF EXISTING FACILITIES CALL 811 TWO BUSINESS DAYS BEFORE YOU DIG For contacts below dial 1-888-CALL PSE (225-5773) 101151700513129683 JOB SITE CIRCUIT LOADING TABLE AS OF EXIST. PEAK LOAD EST. NEW LOAD TOTAL CIRCUIT: A PHASE B PHASE C PHASE PRE-14 2022 384 418 415 --- 384 418 415 108139401N/A 583070240N/A 593246027N/A 594150946N/A DEVELOPER TO PROVIDE ALL CIVIL WORK: TO AND INCLUDING EXCAVATION, BACKFILL, SHORING, TRENCH MAINTENANCE, SANDING FOR DUCT, SELECT 5/8" CRUSH FOR UNDER VAULTS, COMPACTION, ALL HARD SURFACE RESTORATION AND RELATED LANDSCAPING RESTORATION. DEVELOPER TO PROVIDE TEMPORARY EXCAVATION PLATING (IF REQUIRED). ALL CROSSING TO BE DONE PARALLEL OR PERPENDICULAR TO ROAD. STRAIGHT CROSSING ONLY. 1. GENERAL Pre-construction Notify appropriate City or County 48 to 72 hours or as required by permitting agency before starting work on any right-of-way involving a permit. Follow all requirements as outlined by the permitting agency. Locate and mark all underground utilities prior to start of construction. If there is a conflict with the intended trench route as shown on the site plan and existing utilities or obstructions, trench route may need to be moved to opposite side of street. Cooperation with Quality Inspector, Puget Sound Energy Contractor, City or County authorities during Pre-construction meeting will determine the final trench route. 2. Existing Utilities Hand excavate (pothole) all marked utility crossings to verify exact location and depth at point of crossing. Protect underground utilities during excavation. Use hand excavation methods if necessary to avoid damage. Fabricate and install adequate temporary structures to support and protect underground utilities while exposed during construction. Maintain 12" minimum clearance at crossings between existing utilities and new duct installations. Transition trench or tunnel profile gradually as required at crossings. Maintain 24" minimum separation between new trench or tunnel and parallel existing utilities or as required by the PERMIT AGENCY . In the event of damage to an underground utility, notify Puget Sound Energy at once. Contractor agrees to make work force and resources available at once to Puget Sound Energy or municipal authorities to repair damage at no cost. 3. Work Drawings Maintain on site, in good condition, a complete file of all work drawings. These drawings shall be available at all times to a Puget Sound Energy representative. Corrections and changes made during the job shall be recorded continuously on these drawings. All underground electrical facilities shall have a minimum of 36 inches of cover. Any change must be approved by the PSE engineer or project manager. Furnish Puget Sound Energy a complete set of as built prints (foreman's copies) at the end of the job. 4. Safety Provide signs, barricades, and traffic control in conformance with local jurisdictions and regulations. Provide flagging and or other vehicle traffic control as needed in conformance with local regulations. (see SPM # 100.4000) Provide adequate signage and protection to traffic during non-working hours. Maintain traffic flow as required by permitting agency. Provide signs and barricades to warn pedestrians, motorcycles and bicycles. Install warning barricades at least every 50 feet along the trench route from the time the trench is opened until the trenching is complete. 5. Existing Systems Maintain existing electrical system in service until new system is complete, tested, and ready for service. Disable existing system only to make cutovers and connections as directed by Puget Sound Energy's representative. ELECTRICAL 1. Conduit Conduit for installation in unpaved areas shall be 2", 3", 4", or 6" PVC SCHL 80 or 2", 3", 4", or 6" SCHL 80 for direct burial. Maintain 36" minimum cover above top conduit at all times or as required by the permitting agency. Where conduit is routed from road edge to vault location, maintain 36" minimum cover above top conduit at all times or as required by the permitting agency. Bends shall be made with as long a radius as possible (48" minimum). Avoid making sharp bends or kinks in conduit during installation. Obtain exact location of conduit entrance into vault from Puget Sound Energy before penetrating vault. Penetrate the vault using existing knockout or use core drilled holes. Stub the 4" or 6" PVC 2"-3" into vault interior and grout between the conduit and vault wall. Leave a 10' minimum of extra pull rope in each end of installed conduit where 4" or 6" PVC is installed and cap conduit to prevent the entry of dirt and moisture. Arrange work so conduit plays directly off reel into trench. Place the conduit in the trench as straight as possible. Avoid vertical and horizontal "snaking" of the conduit. Multiple conduit runs may be stacked vertically. Where conduit must be pulled through a trench to allow a crossing under an existing utility, cap conduit end before pulling to avoid contamination. If a kink occurs, cut the conduit ahead of kink and splice to new conduit to continue run. 2. Underground Primary Cable Primary cable shall be 1/O Alum Sol Jacketed Cable rated for 15 KV service with a polyethylene jacket. Primary cable shall be 61 strand 750 MCM aluminum conductor rated for 15 KV service with a copper tape neutral conductor and polyethylene jacket. A 4/0 copper neutral shall be run with each 3 phase circuit of 750 MCM. Install cable into existing or new conduit systems using approved installation equipment. Approved equipment includes either cable pullers and/or cable pushers. Pulling socks shall be non-conductive or similar material. Steel pulling socks are prohibited. Bare steel cable shall not be used to pull cable. Cable pulling equipment (winches, hoist, driven reels, etc.) shall be equipped with instrumentation to continually monitor and record peak tension encountered during a pull. Before installing cable, obtain rated pulling tension for cable from Puget Sound Energy. Do not exceed rating at any time during installation. Notify Puget Sound Energy immediately if pulling tension equals or exceeds rating (828/1657lbs for 1/0 or 5000lbs for 750 .) Do not exceed minimum bend radius of cable or impose kinks or sharp bends on cable during pulling operations. Install cable directly off reel without dragging it on the ground. Apply Puget Sound Energy approved lubricant to cable continually during pulling to reduce pulling tension and to permit future removal. Install adequate amounts of 3/4 " plywood on existing sidewalk areas to support pulling equipment and prevent un-necessary damage to sidewalks. Train and coil cables in vaults as required to form a smooth transition from conduit to termination. if terminations are to be performed by others, coil 15' of cable in vault and cap end. 3. Terminations and Splices Install approved terminations on cables in accordance with Puget Sound Energy SPM 2247.5115- 5119. Unless otherwise directed, approved terminations will be load break elbows in vaults and cold shrink pin terminals on pole risers per Puget Sound Energy SPM 2247.9317. Splice cable with approved splice kits in vaults, hand holes or similar enclosures. Do not splice cables in runs between vaults. See Puget Sound Energy SPM 2233.2075-2076. 4. Concrete Vaults Excavate, install base material, and compact base material in accordance with Puget Sound Energy SPM 6775.0040. Install and seal precast sections in accordance with Puget Sound Energy SPM 6775.0040. Use precast neck and shaft sections to bring manhole entrance to proper elevation. Install manholes plumb. Set the top of each manhole to finished elevation or no higher than 6" above existing road elevation. Install hillholders as required on sketch or by construction notes. 5. Grounding Install ground rod per Puget Sound Energy SPM 6275.6100 at each vault in which primary cable is terminated. Locate rod in trench excavation wherever possible to obtain maximum driven depth in undisturbed soil. Connect each ground individually to ground loop inside vault with bare no. 2 copper jumper or to Concentric neutral at each splice vault location. Minimum grounding requirement is 4 grounds per mile. 6. Existing Underground Primary Cable (if applicable) Abandon existing primary cable in place. Cut off old cable ends inside vault flush with wall. Before cutting, pigtail concentric neutral strands and connect to ground loop inside vault. Return scrap cable and existing cable tags to Puget Sound Energy. Remove or fill existing vaults as required by permitting agency. 7. Traffic Control All traffic control to comply with current specifications in M.U.T.C.D. Provide temporary wiring and connections to maintain existing systems in service during construction; if a scheduled outage is not possible. When work must be performed on energized equipment or circuits, use qualified personnel for such operations. EARTHWORK See Puget Sound Energy SPM 6800.4050 1. Back hoe, Hand Dug Excavations Paved Surfaces Cut the edges of the trench prior to digging. Use the narrowest bucket practical or plow off the edge of paved surface far enough to minimize asphalt disturbance. Repair any blow out areas (where edge has been broken) by sawing. The depth of the trench shall be enough to allow 36" of cover . Backfill material shall be Controlled Density Fill (CDF) cover or select fill (5/8" minus) to meet permit requirements. Unpaved Surfaces Conduit/cable trenches are to be excavated just off the existing road edge or in the shoulder of the road behind the existing ditch line. Contractor shall use a back hoe with the narrowest width bucket practical or plow. Trench shall be deep enough to allow a minimum of 36" of cover over the top most cable. All ditch crossings shall have a minimum of 36" cover from the lowest point within the existing ditch line. Culverts; when installing facilities under a culvert, excavation must be filled with packed crush rock. If any culvert is damaged it will be repaired or replaced in accordance with permitting agency and contractors responsibility. Spoils shall be removed quickly to minimize blocking of traffic. All spoils and wastes become the property of the contractor immediately upon removal. Remove spoils and wastes promptly to an approved disposal site. Remove spoils containing asphalt or concrete to a disposal site specifically approved for such materials. Provide Puget Sound Energy with a disposal receipt for all spoils. 2. Backfill Unpaved Road Surfaces Backfill for unpaved road crossings shall consist of 1-1/2" to 2-1/2" material compacted to 95% density. Backfill for unpaved road sections shall consist of native material compacted to 95% density. At the end of each workday, backfill or plate all trench, remove all spoils and clean roadway surface of large hazardous debris. 3. Surface Restoration Unpaved Surfaces Restore ground surface to original contour. Restore to original condition or better. 4. Landscaping Arrange and perform work to minimize impact to existing landscaping. Restore landscaping that has been disturbed during the course of work, including seeding of banks and fills. Vaults set in bank areas may require re-sloping the surrounding land to avoid sloughing. Leave area in its original state or better at the end of construction. Hand dig if required to prevent damage to tree roots. RENTON ELEMENTARY SCHOOL #16 SCHEDULE 73 OH TO UG DISTRIBUTION CONVERSION Fabian Gomez 7/22/2022 MFP22004737 POTHOLE ALL EXISTING UTILITIES RESTORATION PER CITY OF RENTON STANDARDS 1058 1051 1045 1033 1021 1039 1027 1024 1017 1018 1011 4608 4602 4532 4526 981 976 975 4531 973 NE 10TH ST CHELAN CT NECHELAN AVE NEC #2ACSR #6 CU#2ACSR318518-167286 37.5 kVA 120/240V (C) 318543-167275 318519-167290 37.5 kVA 120/240V (C) X10675 (40T) T86942 (SOLI)CHELAN AVE NE318479-167290 37.5 kVA (C) PRE 14 PRE 14 318500-167267 (SOLI) 318543-167290 15 kVA 120/240V (C) T86941 (25T) ROW 45'J318504-167290 X12181 (65T) X86943 (40T) #2ACSR CBAN318539-167290 318495-167301 25KVA 120/240V ABC 1051 1045 1033 1021 1039 1027 1017 1018 1011 4608 4602 4532 4526 981 NE 10TH ST CHELAN CT NEC #2ACSR#6 CU#6 CU318518-167286 37.5 kVA 120/240V (C) 318543-167275 318519-167290 37.5 kVA 120/240V (C) X10675 (40T) T86942 (SOLI)CHELAN AVE NEPRE 14 PRE 14 318500-167267 T53453 (SOLI) 318543-167290 15 kVA 120/240V (C) T86941 (25T) ROW 45' 318504-167290 X12181 (65T) X86943 (40T) #2ACSR CBAN318495-167301 25KVA 120/240V#6 CUJCUST. SUPPLIED 4' X 4' WORK PIT CUST. SUPPLIED 9' X 11' WORK PIT CUST. SUPPLIED 4' X 4' WORK PIT CUST. SUPPLIED 5' X 5' WORK PIT ±210'PSE SUPPLIED & CUST. INSTALLED 1-4" DB120 CONDUIT ±190' IN CUST. PROVIDED TRENCH PSE SUPPLIED & CUST. INSTALLED 1-2" DB120 CONDUIT ±210' IN CUST. PROVIDED TRENCH ±50' ±40' EXISTING 1-2" CONDUIT 22° R=36" R=60" 90º ±20' 22° R=48" ±20' ±40'J6043_1 00 1 PSE SUPPLIED & INSTALLED 3-PH 1/0 AL UG PRI ±290 AØ-EJD534 BØ-EJD535 CØ-EJD536 PSE SUPPLIED & INSTALLED 1-PH 1/0 AL UG PRI ±380 CØ-EJD537PSE SUPPLIED & INSTALLED 1-PH 1/0 AL UG PRI ±290' CØ-EJD538 101151700UTILITIES CONTACT PHONE# COUNTY 1/4 SEC U-MAP NO (POWER) OP MAP Emer Sect Gas Wk Ctr POWER WK CTR PLAT MAP JOINT FACILITIES ARRANGEMENTS DRAWN BY CHECKED BY APPROVED BY FOREMAN #1 FOREMAN #2 MAPPING INCIDENT MAOP Gas Order Elect Order SCALE PAGE ENGR - POWER FUNCTION PROJECT MGR PERMITREAL ESTATE/EASEMENT 2 1 REV# 3 DATE DESCRIPTIONBY CONTACT PHONE NO DATE OH CKT MAP CIRCUIT NOUG CKT MAP SIGNATURE JENNY CHAU 253-208-9480 4/11/22 JASON FELLER 253-204-1990 4/11/22 JASON FELLER N/A 4/11/22 RW-120242 RENTON RENTON ELEMENTARY SCHOOL #16 SCH.73 OH-UG CONVERSION & SYSTEM WORK 1075 DUVALL AVENUE NE, RENTON 98059 N/A N/A N/A 101151700 AS NOTED 2 OF 3 KING COUNTY N/A N/A CSPSKEPM T23N.R05E.S17 N/A N/A 2305E065 2305E088 2305E065 PRE-14 CenturyLink N/A N/A Comcast/Xfinity N/A N/A PSE - Gas N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A 00 1"2" 00 50'100' INSTALL SITE NOTES: AT P01 GRID# 318543-167290: EXISTING - EXISTING 45' CL.3 POLE & TRF TO REMAIN - REMOVE 1PH DEAD-END FRAMING & OH PRIMARY WIRE AT J01 GRID# 318539-167290: NEW - INSTALL NEW 5' X 7' X 5' JBOX VAULT W/ ANTI-SKID LID (6055.1030, JBOX3AS) - INSTALL (3) 4-POS JBOX - INSTALL (8) 12KV ELBOW KITS (6041.1000, ELB10J) - INSTALL (4) INSULATING CAPS (MID: 7804000) - INSTALL GRID # AT P02 GRID# 318519-167290: RELOCATE - EXISTING LUMEN OWNED POLE TO BE REPLACED - INSTALL 50' CL.3 POLE W/ GROUNDS, AS STAKED (6010.1000, PD503) - INSTALL COMPACT FRAMING 3-PH FIBERGLASS DEADEND #2 ACSR (6033.2030, DEC0315) - INSTALL 3-PH LI TERM ON FG ARM (6043.1000, TSU3L1F) - INSTALL (3) STIRRUPS & HOT CLAMPS - INSTALL (3) SOLID BLADE FUSES (MID: 9995608) - INSTALL SW# T86942 - TRANSFER EXISTING 37.5KVA 120/240V OH XFMR - INSTALL 3/8" GUY ANCHOR W/ AUTO GRIP (6013.0100, GYD3SA) - INSTALL 3/8" GUY ANCHOR W/ AUTO GRIP, NEUTRAL (6013.0100, GYD3SA) - INSTALL SINGE HELIX ANCHOR, L=15' (N) (6012.1000, ANDH1) - INSTALL (1) 4" PRIMARY CONDUIT RISER ON S/O BRACKETS (6042.1000, RIS4CSS) AT IP1 - INTERCEPT EXISTING 2" CONDUIT FROM V01 - REROUTE NEW 2" CONDUIT FROM IP1 TO J01 AT V01 318518-167286: EXISTING - EXISTING 37.5KVA 120/240V PM TRF TO REMAIN - REPLACE EXISTING CABLE TAG W/ CØ-EJD538 AT P03 GRID# 318504-167290: EXISTING - EXISTING 45' CL.4 POLE TO REMAIN - REPLACE 1-PH BUCK-ARM FRAMING WITH 3-PHASE TAP BUCK-ARM #2ACSR (6033.5100, LAT312) - INSTALL SW# X86943 - FUSE @65T (MID: 3412600) - INSTALL (3) STIRRUPS, BOLTED (MID: 2254000) - REPLACE FUSE AT SW# X12181 W/ 65T FUSE (MID: 3412600) - INSTALL SPAN GUY (SOUTH) TO P04 ±240' (ACTUAL:___) (6013.0170, GYD3OW) AT P04 GRID# 318479-167290: EXISTING - EXISTING 40' CL.2 POLE (1971) TO REMAIN - INSTALL SPAN GUY (NORTH) TO P03 ±240' (ACTUAL:___) (6013.0170, GYD3OW) WIRE STRINGING PRIMARY & SECONDARY Location Pri Sec Wire Size & Type Quantity Length (Per conductor)Total ActualFromTo P02 P03 X #2 ACSR 3 190'570' P02 P03 X #2 ACSR NEUTRAL 1 190'190' P03 P04 X 3/18" SPAN GUY 1 240'240' INSTALL SITE PLAN SCALE: 1" = 50' CUSTOMER DEVELOPMENT NOTES: A PRE CONSTRUCTION MEETING IS REQUIRED WITH YOUR PROJECT MANAGER PRIOR TO STARTING ANY SITE WORK. CUSTOMER IS RESPONSIBLE FOR ALL TRENCHING, SELECT BACKFILL, COMPACTION & RESTORATION PER PUGET SOUND ENERGY STANDARDS & LOCAL MUNICIPALITY. **DEVELOPER NEEDS TO FOLLOW ALL TRENCH DETAILS ON SELECT BACKFILL** CUSTOMER IS RESPONSIBLE FOR THE FOLLOWING: CROSSING/BORING. -OPEN TRENCH OR BORING FOR CROSSINGS ARE ALLOWED PER LOCAL MUNICIPALITY PERMIT REQUIREMENTS. -CROSSINGS IN RIGHT OF WAY MUST BE SCHEDULED WITH PROJECT MANAGER PRIOR TO CONSTRUCTION. -PROJECT MANAGER OR DESIGNATED REPRESENTATIVE MUST BE ON SITE DURING CONSTRUCTION WORK IN RIGHT OF WAY. -EXCAVATION CONTRACTOR MUST BE LICENSED AND BONDED TO PERFORM WORK IN RIGHT OF WAY. VAULTS & WORK PITS. -REQUIRED TO PROVIDE 4' X 4' WORK PIT & 6" BEDDING OF 5/8" CRUSHED ROCK AT P01 & P02 -REQUIRED TO PROVIDE 11' X 9' WORK PIT & 6" BEDDING OF 5/8" CRUSHED ROCK AT J01 JOB SITE READINESS. -JOB SITE NEEDS TO BE 100% READY FOR INSPECTION 5 BUSINESS DAYS PRIOR TO CONSTRUCTION DATE. -ALL WORK IN RIGHT OF WAY MUST BE COORDINATED WITH PROJECT MANAGER AND LOCAL MUNICIPALITY. -ALL TRENCH, AND LOCAL ELECTRICAL MUNICIPALITIES AKA "L&I, CITY", INSPECTIONS MUST BE COMPLETED 5 BUSINESS DAYS PRIOR TO SCHEDULED CONSTRUCTION DATE. -REQUIRED TO OPERATE AND PROVIDE EQUIPMENT TO PUMP OUT WATER FOR WORK PITS, VAULTS & TRENCH AT ALL TIMES. -REQUIRED TO HAVE EXCAVATION EQUIPMENT AND BE ON SITE THE DAY OF CONSTRUCTION TO COMPLETE BACKFILLING. - IF A SECOND INSPECTION IS REQUIRED, ADDITIONAL FEE'S WILL BE APPLIED. -PLEASE REVIEW THE CITY OR KING COUNTY TRENCHING REQUIREMENTS UNDER THE PERMIT. -IF A PRE-CON IS REQUIRED BY THE CITY, COUNTY OR W.S. DOT A PSE PROJECT MANAGER WILL SET-UP AND SCHEDULE A MEETING WITH THE MUNICIPALITY BEFORE ANY EXCAVATION OR INSTALLATION BEGINS . POLE TABLE (NEW) Work Location Pole Data Grid #Height Class Year Remarks / Location Ref. P02 318519-167290 45 CL-3 WIRE REMOVAL TABLE Work Location Wire Size & Type Quantity Length (per conductor) Remarks From To P01 P02 LEGACY - #6 CU 1 230' P01 P02 NEUTRAL 1 230' P02 P03 LEGACY - #6 CU 3 190' CIRCUIT FEET ADDED: 1/0 = 1,010 FEET CIRCUIT FEET REMOVED: 1/0 = 520 FEET ABANDONED / REMOVE / REPLACED CABLE SCHEDULE CABLE NO. SAP EQUIP LOCATIONS CABLE (LF) EST EXISTING CABLE MFG. NAME EXISTING CABLE MFG. DATE CABLE REPLACED?FROM TO AEW469 11507955 V02 P02 90' TOTAL 90' New pole at site: Grid Number: kVA Rating: Foreman to redline the following information TRANSFORMER TRANSFER Company ID#: Primary phase connected to: Tested Secondary Voltage P02 318519-167290 37.5KVA REMOVAL SITE PLAN SCALE: 1" = 50' REMOVAL SITE NOTES: AT P02 GRID# 318519-167290: RELOCATE - EXISTING LUMEN OWNED POLE TO BE REMOVED BY LUMEN - PSE TO INSTALL NEW POLE, SEE INSTALL NOTES - TRANSFER EXISTING 37.5KVA 120/240V OH XFMR TO NEW POLE - REMOVE ALL PSE EQUIPMENT REMOVAL SPAN NOTES: - PLEASE REFER TO SITE PLAN & TABLES FOR SPAN REMOVALS Primary Cable & Conduit Table (Foreman to Complete) LOCATION CONDUIT PRIMARY CABLE QTY OF LUBE (gal.)AS BUILT INFORMATION From To Size (in) Qty Design Length (ft) Actual Length (ft) TYPE BENDS PULL (lbs) PULL Rev (lbs) Cable Size Design Length (ft) Actual Length (ft) CABLE NUMBERS MANUFACTURING INFORMATION DB120 HDPE SCH 80 90°45°22°11°A B C Manufacturer Compound Year Design As Built Actual Amount Installed (Conduit & Cable) J01 P01 2 1 40'X 1 33 33 1/0 90'EJD531 J01 P02 4 1 240'X 1 89 73 1/0 290'EJD535 EJD536 EJD537 J01 IP1 2 1 260'X 2 120 102 1/0 380'EJD538 IP1 V02 2 1 100'EXIST.1 CONDUIT ONE-LINE DIAGRAM SCALE: NOT TO SCALE CABLE ONE-LINE DIAGRAM TOTAL 2" DB120 = 40' TOTAL 2" SCH.80 = 260' TOTAL 4" SCH.80 = 240' TOTAL 1Ø 1/0 = 470' TOTAL 3Ø 1/0 = 290' SCALE: NOT TO SCALE Fabian Gomez 7/22/2022 SCH.80 SCH.80 PSE SUPPLIED & CUST. INSTALLED 1-2" DB120 CONDUIT ±210' IN CUST. PROVIDED TRENCH SCH.80 40'DB120 240 260 1 1 1 MFP22004737 CUSTOMER-SUPPLIED TRENCH FOR PRIMARY CABLE SCALE: NONE Communications Primary Power Cables or Conduit Excavated Dirt Pile ROADSIDE Final Grade 24" Min 12" Min Separation 36" Min Cover 48" Max Backfill (No rocks over 10" diameter) Separation 12" Min Gas 4" Sand Bedding 32" Typical (Power, Gas, and Communications) JOINT TRENCH DETAIL Primary-Mainline Gas & Communications (NTS) Separation 12" Min 6" or 12" Min Sand Shading after Compaction - A 6" layer of sand is allowed when excavated native material contains rocks no larger than 8" in diameter. Trench and backfill requirements for primary electric line extension trenches (No PSE gas) - A 12" layer of sand is required when excavated native material contains rocks up to 10" in diameter. 4'-0" 1'-0" 5'-8" 8" 7'-0" Tubes for 1" adjustable bolts ( 4) Cover 2,490 lbs Top Section 1,835 lbs Base 4,760 lbs 4'-8" (2) 3' Square Plate Doors NOTE: For Installations in pavement or sidewalks with adjustable cover SIDE VIEW TOP VIEW 9'-0" 11'-0" 2" 6'-0" 6" Crushed Rock 3-piece handhole, increase excavation Depth to 6'-6" and 24 cubic yards. 4'-8" x 7' Handhole ( 575) w/adjustable Cover MID#: 7663206 VAULT & EXCAVATION DETAIL Not to scale 6051.1500 Excavation - 20 cubic yards FLOW DIRECTION LAY 8" BOTTOM SKIRT ON TOP OF NATIVE SOIL, SECURE WITH PEA GRAVEL BAGS (MID 9995692). 6' 3' 8" TECHNIQUES FOR EROSION AND SEDIMENT CONTROL SILT FENCE DETAIL Not to Scale 0150.3200 6" to 12" Under Normal Conditions 40" Min for Single Helix 65" Min for Triple Helix Not To Scale ANCHOR DETAIL - SINGLE HELIX 5" Min CLDirection of Vehicular TrafficCL TOP VIEW CONDUIT RISER PLACEMENT DETAIL (P02) SCALE: NONE Field Face Quadrant Road Face Quadrant Climbing Space Climbing Space 101151700NEW 1-4" SCH.80 CONDUIT NEW 1-2" SCH.80 CONDUIT NEW 1-2" DB120 CONDUIT BUTTERFLY DIAGRAM - CONDUIT ENTRY @J01 SCALE: NONE NEW 1-4" SCH.80 CONDUIT @J01 BUTTERFLY DIAGRAM - CONDUIT ENTRY @J02 SCALE: NONE EXISTING (CUT IN) 1-2" DB120 CONDUIT NEW 1-2" HDPE CONDUIT EXISTING (CUT IN) 1-2" DB120 CONDUIT UTILITY POLE EROSION CONTROL DETAIL TOP VIEW FLOWING DITCH or BODY OF WATER SLOPE Secure bottom of fence with gravel bags Place straw mulch on disturbed areaExcavated or Augered Hole Pole SLOPE Not to scale Adjacent to flowing ditches or bodies of water Install silt fence around pole excavation 5" Min CLDirection of Vehicular TrafficCL TOP VIEW CONDUIT RISER PLACEMENT DETAIL (P08) SCALE: NONE Field Face Quadrant Road Face Quadrant Climbing Space Climbing Space CABLE WRAP CABLE WRAP COOLING 5' MIN 5' MIN 10' MIN 5' MIN FINS ACCESS CONCRETE PAD MINIMUM CLEARANCES FOR PSE EQUIPMENT CURB OR EDGE OF PAVEMENT CURB OR EDGE OF PAVEMENT 5' MIN ROAD OR PARKING AREA TYP. PAD & TRANS- FORMER 3' MIN 3' MIN 3' MIN DOOR ACCESS DOOR REQUIRED WORK SPACE AREA 6775.0035 Not to scale POSSIBLE CUSTOMER ENTRY LOCATION POSSIBLE CUSTOMER PSE ENTRY LOCATION ENTRY LOCATION POSSIBLE CUSTOMER CABLE INSTALLATION DIAGRAM R Not to scale UTILITIES CONTACT PHONE# COUNTY 1/4 SEC U-MAP NO (POWER) OP MAP Emer Sect Gas Wk Ctr POWER WK CTR PLAT MAP JOINT FACILITIES ARRANGEMENTS DRAWN BY CHECKED BY APPROVED BY FOREMAN #1 FOREMAN #2 MAPPING INCIDENT MAOP Gas Order Elect Order SCALE PAGE ENGR - POWER FUNCTION PROJECT MGR PERMITREAL ESTATE/EASEMENT 2 1 REV# 3 DATE DESCRIPTIONBY CONTACT PHONE NO DATE OH CKT MAP CIRCUIT NOUG CKT MAP SIGNATURE JENNY CHAU 253-208-9480 4/11/22 JASON FELLER 253-204-1990 4/11/22 JASON FELLER N/A 4/11/22 RW-120242 RENTON RENTON ELEMENTARY SCHOOL #16 SCH.73 OH-UG CONVERSION & SYSTEM WORK 1075 DUVALL AVENUE NE, RENTON 98059 N/A N/A N/A 101151700 AS NOTED 3 OF 3 KING COUNTY N/A N/A CSPSKEPM T23N.R05E.S17 N/A N/A 2305E065 2305E088 2305E065 PRE-14 CenturyLink N/A N/A Comcast/Xfinity N/A N/A PSE - Gas N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A 2" Excavation - 20 cubic yards 8'-0" or 10'-0" 7'-0" 8'-0"8" 4'-2" SIDE VIEW 4'-6"Crushed 6" Rock 11' 11' TOP VIEW 3'-6" 7'-0" 6045.5000Not to scale VAULT & EXCAVATION DETAIL @V01 Fabian Gomez 7/22/2022 MFP22004737 Note: The Applicant is responsible for compliance with all codes and regulations, whether or not described in this document. DEPARTMENT OF PUBLIC WORKS Page 1 of 3 | Published: 10/27/2021 Transportation Division | 1055 South Grady Way, 5th Floor | Renton, WA 98057 | 425-430-7380 Website: rentonwa.gov TRAFFIC CONTROL PLAN APPLICATION Published: 10/27/2021 TRAFFIC CONTROL PLAN (TCP) MUST BE SUBMITTED TO PUBLIC WORKS TRANSPORTATION DIVISION FOR REVIEW/APPROVAL AT LEAST FIVE (5) WORKING DAYS BEFORE THE DATE OF WORK. The City of Renton requires any contractor, firm, corporation, or other public/private agency to prepare a traffic control plan (TCP) and obtain city's approval of that plan when construction, repair, or maintenance work is to be conducted within the city's right-of-way. 1. Fill out the Traffic Control Plan (TCP) Application form and prepare required submittal documents. 2. The following items are all required for submittal of the TCP Application: ☐Electronic Copy of the TCP Application ☐Electronic Copy of the TCP Layout, on 11” X 17” paper size format, which shall: Include map(s) showing the location of the project and work area. Be legible lettering and clear, contrasting, symbols of viewing or printing. Must indicate street names, and north arrow and scale. Types of plans required: o Work hour plan – show all mobility impacts during construction hours. o Non-work plan - show all mobility impacts after work hours when limited or no work is happening in the right-of-way (ROW), if applicable. o Changing construction phases – show construction sequence and each construction phase change even if the traffic control is not modified, if applicable. o Pedestrian access/detour plan, if applicable. - Shall conform to the Washington State Traffic Control Flagger Certification handbook, by the Evergreen Safety Council. 3. Submit Application via email to TCP@rentonwa.gov with the subject line “TCP Application – [Project Name].” Project Name: Permit #: Site Address: Work Date: From _____________ To _____________ Work Time: Start ______________ End ______________ Construction Company: Contact Name: Phone/Cell: _________________________ Business Address: City/State: Zip: Description of Work: Approval By: _________________________________________________ Date:____________________ Transportation Engineering PLEASE SEE ATTACHED POTELCO, INC 6905 S 228TH ST KENT, WA 98032 101151700 1075 DUVALL AVE NE JENNY CHAU 2532089480 MFP22004737 Monday - Friday 8:00AM - 3:00PM Scott Warlick CED 9/20/2022 Note: The Applicant is responsible for compliance with all codes and regulations, whether or not described in this document. Page 2 of 3 | Published: 10/27/2021 PERMIT HOLDER AGREES TO ALL THE FOLLOWING: Must have approved Traffic Control Plan (TCP) prior to commencing the work. Maintain existing pedestrian access. The work on pedestrian facilities, shall be limited to one corner at a time, with the least possible inconvenience or delay to pedestrians. WORK TIME begins when any street or travel lane is fully or partially closed. This includes set up within the traveled way. Comply with all traffic regulations of the City of Renton and the State of Washington. Prepare a traffic control plan and obtain City approval of that plan. That plan shall be implemented for all street and lane closures, and the plan shall be performed in compliance with the Manual on Uniform Traffic Control Devices. Notify emergency services (253-852-2121) twenty-four (24) hours before any street or lane closures. Contractor or entity must call Renton School District (425-204-4455) or any public/private agency, including public transit, to be affected by a temporary lane or road closure a minimum of five business days (excluding weekends and holidays) prior to starting any work. Contractor or entity must notify King County Metro in writing at construction.coord@kingcounty.gov a minimum of five business days (excluding weekends and holidays) prior to starting any work impacting bus stops, a temporary lane or road closure. Work requiring removing a bus shelter or sign requires notification in writing a minimum of 30 business days (excluding weekends and holidays). Please call King County Metro at 206-477-1140 with any questions. Any lane or street closures not in conformance with the approved traffic control plan and/or without notification of emergency services may result in receiving a citation for violation of R.C.W. 47.36.200 Signs or Flaggers at thoroughfare work sites and R.C.W. 9A.36.050 Reckless Endangerment, and other applicable State and City codes. Indemnify and hold harmless the City of Renton from any and all claims, actions, and judgments, including all costs of defense and attorney’s fees incurred in defending against same, arising from and related to implementation of the approved traffic control plans including claims arising from towing of private vehicles and the acts of the Permit Holder’s agents and employees. The City of Renton shall be entitled, in its reasonable discretion, to settle claims prior to suit or judgment, and in such event shall indemnify and hold harmless the City for any such claims paid, including the City’s reasonable attorney’s fees and litigation costs incurred resulting from such claim. In the event any claim or suit is brought against City within the scope of this Agreement, Permit Holder will pay for legal counsel chosen by the City to defend against same. Flagger and sign placement are subject to revision by the City Inspector on site, if needed to address traffic or pedestrian safety or travel. All permit conditions shall be met. NOTES: Total road closure lasting more than twenty-four (24) hours is subject to the approval by the City Council. Work Zone Traffic Control shall be in accordance with the Manual on Uniform Traffic Control Devices (MUTCD) and shown by a traffic control plan layout or reference to WSDOT. Approved Temporary Traffic Control Plan must be at the work site during work hours. Complete assistance and accommodation shall be provided to all kinds of pedestrian traffic when sidewalk or walkway is impeded to safely redirect pedestrians around a work zone. Signage shall be used to warn motorcyclists/bicyclists of the potential hazards on any uneven surfaced or slippery road conditions during work and non-work hours. Any vehicle, equipment, barricade, or portable tow-away sign used within the work area must display a company logo or any legally acceptable sign showing the company name, address, and telephone number at a conspicuous place on the vehicle or equipment. Note: The Applicant is responsible for compliance with all codes and regulations, whether or not described in this document. Page 3 of 3 | Published: 10/27/2021 In the case of Temporary No Parking Zones, all the following apply in addition to previous: Contractor must complete form to show limits of Temporary No Parking Zone identifying barricade locations for vacate parking or curb lane usage. Contractor must post notice of dates and time of Temporary No Parking Zone with at least two signs per block seventy-two (72) hours in advance of effective date and time. The cover sheet of this Traffic Control Plan form must be attached to each Temporary No Parking Sign on the project site. Temporary traffic control devices must be removed immediately when work is done or no construction activities are going on. If deemed abandoned, City crews will remove and store them at the City’s maintenance shop (3555 NE 2nd Street). I certify that the information on this application and within the submittal documents are accurate to the best of my knowledge and I acknowledge all the requirements on this application. Applicant’s Signature Date Applicant’s Name (Print) CORRIE RYDBERG P02 16161212CHEHAN AVE NEP01 CHEHAN AVE NE (PVT DR)J01 IP1 STOP FLAGGER W20-7AROAD WORK AHEAD W20-1100'BEPREPAREDTOSTOPW3-4100'100'ROADWORKAHEADW20-1BEPREPAREDTOSTOPW3-4 100'100'ROADWORKAHEADW20-1 RESIDENT(S) - CLIENTS(S) WILL BE INFORMED IN ADVANCE OF TEMPORARY DRIVEWAY CLOSURE PLACE SIGNS BOTH SIDES OF WORK AREA FROMTOTOW AWAY AREAPHONE 888-9999INFRASOURCE LLC 000 0 000000 NO PARKINGNO-PA R K FROMTOTOW AWAY AREAPHONE 888-9999INFRASOURCE LLC 000 0000000NO PARKINGNO-PAR K NE 10TH ST S/W CLOSED R9-9THE CREW SHALL CEASE WORK FOR A FLAGGER/SPOTTER TO ESCORT PEDESTRIANS AROUND THE WORK AREA DEAD END DEAD END 1616 1414 28" TRAFFIC CONE LEGEND TRAFFIC FLOW SIGN LOCATION FLAGGER STOP POLE WORK VEHICLE/ FLASHING LIGHTS RIGHT OF WAY SIGN SPACING MPH 60/65 45/55 35/40 30 25 "X" 1000' 500' 350' 200' 100' CHANNELIZATION DEVICE SPACING MPH 55/70 35/45 25/30 TAPER 40 30 20 TANGENT 80 60 40 TEMPORARY TRAFFIC CONTROL PLAN N Project Address: Page PSE PUGETSOUNDENERGY Designer: Job # REV 08/02/2022 513129683 0 1075 Duvall Ave NE, Renton, WA Ina Ustemchuk 425-398-6063 ina.ustemchuk@pse.com 1 OF 4 Puget Sound Energy Traffic Control Supervisor: Ina Ustemchuk Card No. 012928 Card Exp.07/31/2025 ina.ustemchuk@pse.com(425)398-6063 Notes: 1. All signs and spacing to conform to the MUTCD and King County standards. 2. All sidewalks, driveways, exits and egresses shall be completely clear unless otherwise indicated. 3. Channelizing devices are 28" traffic cones. Use traffic drums (barrels) with steady burning Type C lights on all State State Routes and Hwys. 4. Sign size can be a minimum of 36" x 36" and shall not obstruct pedestrian access. 5. Crew is required to leave a minimum of 11' for traveling lane width. 6. Alert affected residents and businesses. 7. Work to take place between 9 a.m. and 4 p.m unless otherwise specified. All work for arterials and major roadways will be from 9 a.m. to 3 p.m. MFP22004737 P02 P03 16161212NE 10TH ST CHEHAN AVE NECHEHAN AVE NE (PVT DR)IP1 STOP FLAGGER STOP FLAGGER STOP FLAGGER W20-7AW20-4ONE LANEROADAHEAD100'100'100'ROADWORKAHEADW20-1W20-7A W20-4ONE LANEROADAHEAD100'100'100'ROADWORKAHEADW20-1 ROAD WORK AHEAD W20-1ROADWORKAHEADW20-1RESIDENT(S) - CLIENTS(S) WILL BE INFORMED IN ADVANCE OF TEMPORARY DRIVEWAY CLOSURE PLACE SIGNS BOTH SIDES OF WORK AREA FROMTOTOW AWAY AREAPHONE 888-9999 INFRASOURCE LLC 00 0 0000000NO PARKINGNO-PAR K FROMTOTOW AWAY AREAPHONE 888-9999INFRASOURCE LLC 000 0000000NO PARKINGNO-PAR K S/WCLOSEDR9-9THE CREW SHALL CEASE WORK FOR A FLAGGER/SPOTTER TO ESCORT PEDESTRIANS AROUND THE WORK AREA DEAD END DEAD END 1414 1616 TEMPORARY TRAFFIC CONTROL PLAN N Project Address: Page PSE PUGETSOUNDENERGY Designer: Job # REV 08/02/2022 513129683 0 1075 Duvall Ave NE, Renton, WA Ina Ustemchuk 425-398-6063 ina.ustemchuk@pse.com 2 OF 4 28" TRAFFIC CONE LEGEND TRAFFIC FLOW SIGN LOCATION FLAGGER STOP POLE WORK VEHICLE/ FLASHING LIGHTS RIGHT OF WAY SIGN SPACING MPH 60/65 45/55 35/40 30 25 "X" 1000' 500' 350' 200' 100' CHANNELIZATION DEVICE SPACING MPH 55/70 35/45 25/30 TAPER 40 30 20 TANGENT 80 60 40 Puget Sound Energy Traffic Control Supervisor: Ina Ustemchuk Card No. 012928 Card Exp.07/31/2025 ina.ustemchuk@pse.com(425)398-6063 Notes: 1. All signs and spacing to conform to the MUTCD and King County standards. 2. All sidewalks, driveways, exits and egresses shall be completely clear unless otherwise indicated. 3. Channelizing devices are 28" traffic cones. Use traffic drums (barrels) with steady burning Type C lights on all State State Routes and Hwys. 4. Sign size can be a minimum of 36" x 36" and shall not obstruct pedestrian access. 5. Crew is required to leave a minimum of 11' for traveling lane width. 6. Alert affected residents and businesses. 7. Work to take place between 9 a.m. and 4 p.m unless otherwise specified. All work for arterials and major roadways will be from 9 a.m. to 3 p.m. MFP22004737 P03 16161212NE 10TH ST CHEHAN AVE NEP04CHEHAN AVE NE (PVT DR)STOP FLAGGER STOP FLAGGER STOP FLAGGER STOP FLAGGER W20-7AROADWORKAHEADW20-1 W20-4ONE LANEROADAHEAD100'100'100'W20-7AROADWORKAHEADW20-1W20-4ONE LANEROADAHEAD100'100'100'W20-7AROADWORKAHEADW20-1W20-4ONE LANEROADAHEADX'X'X'FLAGGERS SHALL STOP TRAFFIC IN ALL DIRECTIONS (SHORT DURATION: APPROX 10 MINUTES) FOR LINE DROP. ROAD WORK AHEAD W20-1RESIDENT(S) - CLIENTS(S) WILL BE INFORMED IN ADVANCE OF TEMPORARY DRIVEWAY CLOSURE PLACE SIGNS BOTH SIDES OF WORK AREA FROMTOTOW AWAY AREAPHONE 888-9999INFRASOURCE LLC 000 0 000000 NO PARKINGNO-PA R K FROMTOTOW AWAY AREAPHONE 888-9999INFRASOURCE LLC 000 0000000NO PARKINGNO-PAR K S/WCLOSEDR9-9S/WCLOSEDR9-9THE CREW SHALL CEASE WORK FOR A FLAGGER/SPOTTER TO ESCORT PEDESTRIANS AROUND THE WORK AREA DEAD END DEAD END 1414 1616 TEMPORARY TRAFFIC CONTROL PLAN N Project Address: Page PSE PUGETSOUNDENERGY Designer: Job # REV 08/02/2022 513129683 0 1075 Duvall Ave NE, Renton, WA Ina Ustemchuk 425-398-6063 ina.ustemchuk@pse.com 3 OF 4 28" TRAFFIC CONE LEGEND TRAFFIC FLOW SIGN LOCATION FLAGGER STOP POLE WORK VEHICLE/ FLASHING LIGHTS RIGHT OF WAY SIGN SPACING MPH 60/65 45/55 35/40 30 25 "X" 1000' 500' 350' 200' 100' CHANNELIZATION DEVICE SPACING MPH 55/70 35/45 25/30 TAPER 40 30 20 TANGENT 80 60 40 Puget Sound Energy Traffic Control Supervisor: Ina Ustemchuk Card No. 012928 Card Exp.07/31/2025 ina.ustemchuk@pse.com(425)398-6063 Notes: 1. All signs and spacing to conform to the MUTCD and King County standards. 2. All sidewalks, driveways, exits and egresses shall be completely clear unless otherwise indicated. 3. Channelizing devices are 28" traffic cones. Use traffic drums (barrels) with steady burning Type C lights on all State State Routes and Hwys. 4. Sign size can be a minimum of 36" x 36" and shall not obstruct pedestrian access. 5. Crew is required to leave a minimum of 11' for traveling lane width. 6. Alert affected residents and businesses. 7. Work to take place between 9 a.m. and 4 p.m unless otherwise specified. All work for arterials and major roadways will be from 9 a.m. to 3 p.m. MFP22004737 P02 16161212NE 10TH ST CHEHAN AVE NEV01 CHEHAN AVE NE (PVT DR)IP1 STOP FLAGGER W20-7AROAD WORK AHEAD W20-1100'BEPREPAREDTOSTOPW3-4100'100'ROADWORKAHEADW20-1BEPREPAREDTOSTOPW3-4 100'100'ROADWORKAHEADW20-1 RESIDENT(S) - CLIENTS(S) WILL BE INFORMED IN ADVANCE OF TEMPORARY DRIVEWAY CLOSURE PLACE SIGNS BOTH SIDES OF WORK AREA FROMTOTOW AWAY AREAPHONE 888-9999INFRASOURCE LLC 000 0000 000 NO PARKINGNO-PA RK FROMTOTOW AWAY AREAPHONE 888-9999INFRASOURCE LLC 000 0000000NO PARKINGNO-PA R K THE CREW SHALL CEASE WORK FOR A FLAGGER/SPOTTER TO ESCORT PEDESTRIANS AROUND THE WORK AREA DEAD END DEAD END 1414 1616 STOP FLAGGER TEMPORARY TRAFFIC CONTROL PLAN N Project Address: Page PSE PUGETSOUNDENERGY Designer: Job # REV 08/02/2022 513129683 0 1075 Duvall Ave NE, Renton, WA Ina Ustemchuk 425-398-6063 ina.ustemchuk@pse.com 4 OF 4 28" TRAFFIC CONE LEGEND TRAFFIC FLOW SIGN LOCATION FLAGGER STOP POLE WORK VEHICLE/ FLASHING LIGHTS RIGHT OF WAY SIGN SPACING MPH 60/65 45/55 35/40 30 25 "X" 1000' 500' 350' 200' 100' CHANNELIZATION DEVICE SPACING MPH 55/70 35/45 25/30 TAPER 40 30 20 TANGENT 80 60 40 Puget Sound Energy Traffic Control Supervisor: Ina Ustemchuk Card No. 012928 Card Exp.07/31/2025 ina.ustemchuk@pse.com(425)398-6063 Notes: 1. All signs and spacing to conform to the MUTCD and King County standards. 2. All sidewalks, driveways, exits and egresses shall be completely clear unless otherwise indicated. 3. Channelizing devices are 28" traffic cones. Use traffic drums (barrels) with steady burning Type C lights on all State State Routes and Hwys. 4. Sign size can be a minimum of 36" x 36" and shall not obstruct pedestrian access. 5. Crew is required to leave a minimum of 11' for traveling lane width. 6. Alert affected residents and businesses. 7. Work to take place between 9 a.m. and 4 p.m unless otherwise specified. All work for arterials and major roadways will be from 9 a.m. to 3 p.m. MFP22004737