Loading...
HomeMy WebLinkAboutC_STRUCTURAL_PLAN_RESPONSE_LETTER_210608_V3 May 31, 2021 Mr. Alan Findlay City of Renton 1055 S Grady Way Renton, Washington 98057 Project: 4th Dimension Mixed Use 4502 NE 4th Street Renton, Washington Re: City of Renton Permit #B20003319 – Second Submittal Dear Alan: We have reviewed your April 2, 2021 plan check comments for this project and have the following responses. Our numbering corresponds to the numbering in your plan check. Structural Comments 3. Structural submittals. Reports, certificates and other documents related to structural special inspections and tests should be submitted by the contractor to the City of Renton. The certificates of compliance are required to state that the work was performed in accordance with the approved construction documents. See IBC Sections 107.1, 107.3.4, and 107.3.4.1. See also the structural comments below. The following is a summary: a. Submittal of material certificates from the manufacturers of masonry units, mortar materials and grout materials. Please note, by TMS 602-13 Figure SC-4, achieving 4,000 psi Prism Test results may be extremely difficult; the engineer may want to reconsider the f’m equal 4,000 psi design. See also IBC Section 1704.5 and TMS 602-13 Section 1.5. The drawings should be revised to indicate the above requirements and the revised drawings should be submitted for review. See IBC Sections 107.2.1. Response: a. Requested notes added. See updated submittal schedule on sheet S1.2 and Masonry note #7 on sheet S1.3. 8. Sheet S2.2 shows a Plan View of Level 1 PT and Reinforcing. There is text along Grid A that is obscured by the canopy framing. Below is an image from Sheet S2.2 with our redlined comment. Please revise the Sheet to have the text legible and submit the revised drawings for review. See IBC Sections 107.2.1 and 1603.1. Below is an image from Sheet S2.2 of the revised drawings. It appears there has RECEIVED 06/09/2021 striplett BUILDING DIVISION B20003319_v3 Mr. Alan Findlay City of Renton May 31, 2021 Page 2 been a drafting error and that the 4-inch dimension should be a 6-inch dimension to match the submitted calculations. Please revise the drawings to clarify the scope of work and design intent. The revised drawings should be resubmitted for review. See IBC Sections 107.2.1, 1603.1, and 1901.2. Response: PT profile has been updated see revised sheet S2.2. 9. Sheet S5.5 has a note under the submittals section which refers to shop drawings being submitted to the City of Bellingham. Below is an image from Sheet S5.5 with our redlined comment. Please revise the note to refer to the City of Renton and submit the revised drawings for review. See IBC Section 107.2.1. Response: This was previously updated in Phase 1 response, see sheet S5.5. 10. Detail 8 on Sheet S5.5 has a drafting error with respect to showing the extents of the #5 bars at 24 inches on center. Below is an image from Detail 8/S5.5 with our redlined comments. Please revise the drawings to clarify the extents and submit the revised drawings for review. See IBC Section 107.2.1. Response: Detail 8/S5.5 and rebar extent appears to be correct. 16. Detail 15/S5.2 should be revised to indicate ½ specified spacing from the lowest horizontal reinforcement in the slab, drop panel, or shear cap as indicated in ACI - 318-14 Section 10.7.6.2.2. Currently the drawings do not indicate this requirement. Below is an image of the situation and a redlined note showing the concern. Please revise the drawings and resubmit for review. See IBC Sections 107.2.1 and 1901.2. Response: Detail 15/S5.2 has been updated. Enclosed please find the revised drawings. Please feel free to contact me if you have any further questions or need additional information. Sincerely, COFFMAN ENGINEERS, INC. Brian Walkenhauer, P.E., S.E. Operations Manager Enclosures: Revised Drawings p:\sea\18jobs\180948 4th dimension mixed use\6.0 construction administration\6.12 permits\permit corrections\round 2\180948 permit corrections response letter round 2.docx B20003319_v3 RECEIVED 06/09/2021 striplett BUILDING DIVISION