HomeMy WebLinkAboutAddendum No. 2Rainier Ave S Corridor Improvements – Phase 4 Addendum No. 2
Page 1 of 2
RAINIER AVE S CORRIDOR IMPROVEMENTS - PHASE 4
(S 3RD ST TO NW 3RD PL)
ADDENDUM NO. 2
Federal Aid Number: STPUL-1615(005)
TIB Number: 8-1-102(038)-1
City Project Number: TED4003813
CAG 22-163
DATE OF ADDENDUM ISSUE: September 27, 2022
BID DUE DATE: October 11, 2022 (CHANGED FROM DATE IN CALL FOR BIDS)
DATE OF BID OPENING: October 13, 2022 (CHANGED FROM DATE IN CALL FOR BIDS)
NOTE TO ALL PLANHOLDERS:
This Addendum No. 2, containing the following revisions, additions, deletions, and/or clarifications, is
hereby made a part of the Plans and Contract Provisions (Contract Documents) for the above-named
project. Bidders shall take this Addendum into consideration when preparing and submitting their bids.
Bidders shall acknowledge receipt and acceptance of this Addendum No. 2 in the space provided on the
Proposal Signature Page or by signing in the space provided below and submitting the signed addendum
with the bid package. Failure to provide this written acknowledge may result in disqualification of the Bidder’s
submittal.
BID PROPOSAL
1. DELETE Proposal Schedule A (Pages 13-19) and REPLACE with attached Proposal (Pages 13-19).
Revisions include:
Addition of new bid item A34 5-04 Asphalt Cost Price Adjustment 1 CALC $199,200.
Revise schedule A bid item numbers following new item A34 to renumber bid items for
Schedule A.
PLANS
2. DELETE Plan Sheets 251, 253, 254 and REPLACE with attached Plan Sheet 251, 253, 254.
Revisions include:
Update construction note #3 to specify 4’x6’ tree grate size.
3.DELETEPlanSheets200-209,213,216,218,221,223andREPLACEwithattachedPlanSheets200-209,213,216,218,221,223.Revisionsinclude:•Revisionstoilluminationplansheetsluminaireschedulesfor16.5’mountingheight.•Revisionstosignalizationplanconstructionnotesclarifyingfiberworktobecompletedbycontractor.SPECIALPROVISIONS4.RevisetheSpecialProvisionSection8-28.2Materials(PageSP-296)asfollows:Modifythethirdparagraphasfollows:TreeGrateshallbeapproximately4’x6’asdetailedonPlans.TreeGrateshallberectangulargratewitha15.5”diametersingletreeopening,castin4pieces,patternasshowninthePlans.Materialshallbecastductileiron,ASTMA536Grade65-45-12withbakedonoilfinish.5.RevisetheSpecialProvisionSection8-20.3(8)Wiring(PageSP-271)asfollows:Modifysentencefromthefirstparagraphasfollows:InstallationincludingsplicingandlabelingshallbedonebytheContractor.6.RevisetheSpecialProvisionSection7-04.2Materials(PageSP-153)asfollows:Delete3rdand4thparagraphsandaddthefollowingnew3’’paragraph:PVCpipeforStormSewershallconformtotherequirementsofSection9-05.12(1)oftheStandardSpecifications.PVCC900PipeforStormSewershallconformtotherequirementsforPVCPressurePipe(‘1inchesandover)describedinSection930.1(5)AoftheStandardSpecifications.Whereuuiiarespecificallycalledoutontheplans,theyshallbeofthecamemiuiiiiiumanufacturerasthemainpipeandmeetthemanuicuirecommenaauons.ALLOTHERREQUIREMENTSOFTHECONTRACTDOCUMENTSREMAININEFFECT.Sincey,BobHanson,P.E.TransportationDesignManagerCityofRentonReceiptacknowledged,andconditionsagreedtothis_____dayof________,2020Bidder_________________________________SignatureRainierAveSCorridorimprovements—Phase4AddendumNo.2Page2of2
Item
No.
Spec.
Section Description Quantity Unit Unit Price* Amount
A1 1-04 Minor Change 1 EST 200,000.00$ 200,000.00$
A2 1-05 Roadway Surveying 1 LS LUMP SUM $
A3 1-05 ADA Features Surveying 1 LS LUMP SUM $
A4 1-05 Record Drawings (Minimum Bid $25,000) 1 LS LUMP SUM $
A5 1-07 SPCC Plan 1 LS LUMP SUM $
A6 1-07 Training 2400 HR $ $
A7 1-08
Type B Progress Schedule (Minimum Bid
$15,000)1 LS LUMP SUM $
A8 1-09 Mobilization 1 LS LUMP SUM $
A9 1-09 Field Office Building 1 LS LUMP SUM $
A10 1-10 Project Temporary Traffic Control 1 LS LUMP SUM $
A11 1-10 Business Access Signs 40 EA $ $
A12 1-10 Project Identification Signs 2 EA $ $
A13 1-10 Traffic Control Supervisor 1 LS LUMP SUM $
A14 1-10 Flaggers 17600 HR $ $
A15 1-10 Other Traffic Control Labor 2000 HR $ $
A16 1-10 Off-Duty Uniformed Police Officer 2300 HR $ $
A17 2-01 Clearing and Grubbing 1 LS LUMP SUM $
A18 2-01 Roadside Cleanup 1 EST 30,000.00$ 30,000.00$
A19 2-02 Removal of Structures and Obstructions 1 LS LUMP SUM $
A20 2-03 Roadway Excavation Incl. Haul 14970 CY $ $
A21 2-03 Unsuitable Foundation Excavation Incl. Haul 800 CY $ $
A22 2-03 Gravel Borrow Inc. Haul 2350 CY $ $
A23 2-05
Petroleum Contaminated Excavation and Disposal
Incl. Haul 1 EST 172,000.00$ 172,000.00$
A24 2-05
Contaminated Groundwater Treatment and
Disposal 1 EST 200,000.00$ 200,000.00$
A25 2-09 Controlled Density Fill 800 CY $ $
Note: Unit prices for all items, all extensions, and total amount of Bid shall be shown. Enter unit prices in numerical
figures only in dollars and cents, i.e. to two (2) decimal places (including for whole dollar amounts). All figures must be
clearly legible. Bids with illegible figures in the Unit Price column will be rejected as unresponsive. Where conflict
occurs between the unit price and the total amount specified for any item, the unit price shall prevail, and totals shall be
corrected to conform thereto.
PROPOSAL (BID SCHEDULE A - ROADWAY IMPROVEMENTS)
Rainier Ave S Corridor Improvements - Phase 4 (S 3rd St to NW 3rd PL)
ALL ENTRIES SHALL BE WRITTEN IN INK OR TYPED TO VALIDATE BID
Contract Documents
Rainier Ave S Corridor Improvements - Phase 4
Page 13
August 2022
Item
No.
Spec.
Section Description Quantity Unit Unit Price* Amount
Note: Unit prices for all items, all extensions, and total amount of Bid shall be shown. Enter unit prices in numerical
figures only in dollars and cents, i.e. to two (2) decimal places (including for whole dollar amounts). All figures must be
clearly legible. Bids with illegible figures in the Unit Price column will be rejected as unresponsive. Where conflict
occurs between the unit price and the total amount specified for any item, the unit price shall prevail, and totals shall be
corrected to conform thereto.
PROPOSAL (BID SCHEDULE A - ROADWAY IMPROVEMENTS)
Rainier Ave S Corridor Improvements - Phase 4 (S 3rd St to NW 3rd PL)
ALL ENTRIES SHALL BE WRITTEN IN INK OR TYPED TO VALIDATE BID
A26 2-12 Construction Geotextile for Separation 16560 SY $ $
A27 4-04 Crushed Surfacing Base Course 9070 TON $ $
A28 5-04 Commercial HMA 960 TON $ $
A29 5-04 Fiber Reinforced HMA Cl. 1/2" PG 64-22 8650 TON $ $
A30 5-04 HMA for Shared-Use Path Cl. 1/2" PG 64-22 250 TON $ $
A31 5-04 HMA Cl. 1/2" PG 70-22 6300 TON $ $
A32 5-04 HMA for Preleveling Cl. 1/2" PG 70-22 1200 TON $ $
A33 5-04 Planing Bituminous Pavement 23100 SY $ $
A34 5-04 Temporary Pavement 2860 TON $ $
A35 5-04 Asphalt Price Cost Adjustment 1 CALC 199,200.00$ 199,200.00$
A36 5-05 Reinforced Cement Concrete Pavement 110 CY $ $
A37 5-05 Cement Concrete Pavement for Driveway 50 CY $ $
A38 5-05 River Rock Treatment 360 SY $ $
A39 6-02 Cement Conc. Switchback Ramp 1 LS $ $
A40 6-11 Cement Concrete Fill Wall 10 CY $ $
A41 6-11 Concrete Cast in Place Wall 10 CY $ $
A42 6-13 Modular Block Wall 790 SF $ $
A43 6-21 Pedestrian Railing 80 LF $ $
A44 6-32 Handrail 100 LF $ $
A45 7-01 Underdrain Pipe 8 In. Diam. 140 LF $ $
A46 7-04 Ductile Iron Storm Sewer Pipe 8 In. Diam. 110 LF $ $
A47 7-04 Ductile Iron Storm Sewer Pipe 12 In. Diam. 680 LF $ $
A48 7-04 PVC Storm Sewer Pipe 6 In. Diam. 280 LF $ $
A49 7-04 PVC Storm Sewer Pipe 8 In. Diam. 150 LF $ $
A50 7-04 Polypropylene Storm Sewer Pipe 12 In. Diam. 3570 LF $ $
Contract Documents
Rainier Ave S Corridor Improvements - Phase 4
Page 14
August 2022
Item
No.
Spec.
Section Description Quantity Unit Unit Price* Amount
Note: Unit prices for all items, all extensions, and total amount of Bid shall be shown. Enter unit prices in numerical
figures only in dollars and cents, i.e. to two (2) decimal places (including for whole dollar amounts). All figures must be
clearly legible. Bids with illegible figures in the Unit Price column will be rejected as unresponsive. Where conflict
occurs between the unit price and the total amount specified for any item, the unit price shall prevail, and totals shall be
corrected to conform thereto.
PROPOSAL (BID SCHEDULE A - ROADWAY IMPROVEMENTS)
Rainier Ave S Corridor Improvements - Phase 4 (S 3rd St to NW 3rd PL)
ALL ENTRIES SHALL BE WRITTEN IN INK OR TYPED TO VALIDATE BID
A51 7-04 Polypropylene Storm Sewer Pipe 18 In. Diam. 1110 LF $ $
A52 7-04 Polypropylene Storm Sewer Pipe 24 In. Diam. 360 LF $ $
A53 7-04 Bank Run Gravel for Trench Backfill Storm 7970 TON $ $
A54 7-04 Temporary Stormwater Diversion 1 LS $ $
A55 7-05 Catch Basin Type 1 40 EA $ $
A56 7-05 Catch Basin Type 1 With Beehive Grate 2 EA $ $
A57 7-05 Catch Basin Type 1L 9 EA $ $
A58 7-05 Catch Basin Type 2 48 In. Diam. 43 EA $ $
A59 7-05 Catch Basin Type 2 54 In. Diam. 2 EA $ $
A60 7-05 Catch Basin Type 2 60 In. Diam. 1 EA $ $
A61 7-05 Catch Basin Type 2 72 In. Diam. 2 EA $ $
A62 7-05 Storm Round Frame and Cover 26 EA $ $
A63 7-05 Storm Rectangular Solid Metal Cover 6 EA $ $
A64 7-05 Adjust Storm Drainage Structure 21 EA $ $
A65 7-05 Connect to Existing Drainage Structures 11 EA $$
A66 7-06 Filterra Unit 12 EA $ $
A67 7-06 Filterra Unit with Internal Bypass 2 EA $ $
A68 7-06 Filterra Unit with Peak Diversion 1 EA $ $
A69 7-08 Shoring or Extra Excavation Class B for Storm 1 LS $ $
A70 7-08 Dewatering 1 EST 800,000.00$ 800,000.00$
A71 7-08 Television Inspection 1 LS $ $
A72 7-10 Bioretention Planter 800 SF $ $
A73 8-01 Erosion/Water Pollution Control 1 EST 120,000.00$ 120,000.00$
A74 8-02 Topsoil Type A 1710 CY $ $
A75 8-02 Bark or Wood Chip Mulch 340 CY $ $
Contract Documents
Rainier Ave S Corridor Improvements - Phase 4
Page 15
August 2022
Item
No.
Spec.
Section Description Quantity Unit Unit Price* Amount
Note: Unit prices for all items, all extensions, and total amount of Bid shall be shown. Enter unit prices in numerical
figures only in dollars and cents, i.e. to two (2) decimal places (including for whole dollar amounts). All figures must be
clearly legible. Bids with illegible figures in the Unit Price column will be rejected as unresponsive. Where conflict
occurs between the unit price and the total amount specified for any item, the unit price shall prevail, and totals shall be
corrected to conform thereto.
PROPOSAL (BID SCHEDULE A - ROADWAY IMPROVEMENTS)
Rainier Ave S Corridor Improvements - Phase 4 (S 3rd St to NW 3rd PL)
ALL ENTRIES SHALL BE WRITTEN IN INK OR TYPED TO VALIDATE BID
A76 8-02 Coarse Compost 40 CY $ $
A77 8-02 Bioretention Media 190 CY $ $
A78 8-02 Seeded Lawn Installation 2310 SY $ $
A79 8-02
PS Tilia tomentosa 'PNI 6051'/ Green Mountain
Linden; 2.5" Cal., 12'-14' Ht.13 EA $ $
A80 8-02
PS Quercus frainetto 'Schmidt'/ Forest Green
Oak; 2.5" Cal., 12'-14' Ht.11 EA $ $
A81 8-02
PS Parrotia persica 'Inge's Ruby Vase'/ Ruby
Vase Persian Ironwood; 2.5" Cal., 12'-14' Ht.11 EA $ $
A82 8-02
PS Nyssa sylvatica 'David Odom'/ Afterburner
Tupelo; 2.5" Cal., 12'-14' Ht.21 EA $ $
A83 8-02
PS Cercidiphyllum japonicum/ Katsura Tree; 2.5"
Cal., 12'-14' Ht.2 EA $ $
A84 8-02
PS Acer Triflorum/ Foughbark Maple; 2" Cal., 10'-
12' Ht. 1 EA $ $
A85 8-02
PS Malus 'Golden Raindrops'/ Golden Raindrops
Crabapple; 2" Cal., 10'-12' Ht. 6 EA $ $
A86 8-02
PS Calocedrus decurrens/ Incense Cedar; 7'-8'
Ht.3 EA $ $
A87 8-02
PS Cornus kousa x nuttallii ' KN4-43'/ Starlight
Dogwood; 2" Cal., 10'-12' Ht. 11 EA $ $
A88 8-02
PS Berberis thunbergii 'Royal Cloak'/ Royal Cloak
Japanese Barberry; 2 Gal, Cont. 188 EA $ $
A89 8-02 PS Cistus hybridus/ White Rockrose; 2 Gal. Cont. 176 EA $ $
A90 8-02
PS Spiraea betulifolia 'Tor'/ Tor Birchleaf Spirea; 2
Gal. Cont. 138 EA $ $
A91 8-02
PS Euonymus japonicus 'Microphyllus'/ Boxleaf
Euonymus; 2 Gal. Cont. 435 EA $ $
A92 8-02 PS Ilex crenata 'Helleri''/ Helleri Holly; 2 Gal. Cont. 147 EA $ $
A93 8-02
PS Cornus sericea 'Kelseyii'/ Dwarf Redtwig
Dogwood; 2 Gal. Cont. 539 EA $ $
A94 8-02
PS Rosa x 'NOATRAUM'/ Flower Carpet Pink
Groundcover Rose; 2 Gal. Cont. 26 EA $ $
A95 8-02
PS Nassella tenuissima/ Mexican Feather Grass;
1 Gal Cont.554 EA $ $
A96 8-02
PS Calamagrostis x acutiflora 'Karl Foerster'/ Karl
Foerster Feather Reed Grass; 1 Gal. Cont. 39 EA $ $
A97 8-02
PS Hemericalis 'Stella de Oro'/ Stella de Oro
Daylily; 1 Gal. Cont. 341 EA $ $
A98 8-02
PS Mahonia nervosa/ Dwarf Oregon Grape; 1 Gal.
Cont. 413 EA $ $
A99 8-02
PS Polystichum munitum/ Western Sword Fern; 1
Gal. Cont. 192 EA $ $
A100 8-02
PS Cotoneaster dammeri 'Eichholz'/ Eichholz
Coteoneater; 1 Gal. Cont. 35 EA $ $
Contract Documents
Rainier Ave S Corridor Improvements - Phase 4
Page 16
August 2022
Item
No.
Spec.
Section Description Quantity Unit Unit Price* Amount
Note: Unit prices for all items, all extensions, and total amount of Bid shall be shown. Enter unit prices in numerical
figures only in dollars and cents, i.e. to two (2) decimal places (including for whole dollar amounts). All figures must be
clearly legible. Bids with illegible figures in the Unit Price column will be rejected as unresponsive. Where conflict
occurs between the unit price and the total amount specified for any item, the unit price shall prevail, and totals shall be
corrected to conform thereto.
PROPOSAL (BID SCHEDULE A - ROADWAY IMPROVEMENTS)
Rainier Ave S Corridor Improvements - Phase 4 (S 3rd St to NW 3rd PL)
ALL ENTRIES SHALL BE WRITTEN IN INK OR TYPED TO VALIDATE BID
A101 8-02
PS Epimedium x perralchicum 'Frohnleiten'/
Frohnleiten Barrenwort; 1 Gal. Con. 1285 EA $ $
A102 8-02
PS Veronica peduncularis 'Georgia Blue'/ Georgia
Blue Speedwell; 1 Gal. Cont. 380 EA $ $
A103 8-02
PS Juncus ensifolius/ Dagger-Leaf Rush; 1 Gal.
Cont. 210 EA $ $
A104 8-02
PS Juncus 'Blue Dart'/ Blue Dart Rush; 1 Gal.
Cont. 210 EA $ $
A105 8-02 PS Iris douglasiana/ Douglas Iris; 1 Gal. Cont. 50 EA $ $
A106 8-02 Protection of Private Property and Tree Protection 1 LS $ $
A107 8-02 Root Barrier 950 LF $ $
A108 8-02 Property Restoration 1 EST 50,000.00$ 50,000.00$
A109 8-02 Plant Establishment - 1 Year 1 LS LUMP SUM $
A110 8-03 Automatic Irrigation System, Complete 1 LS LUMP SUM $
A111 8-04 Cement Conc. Traffic Curb and Gutter 7550 LF $$
A112 8-04 Modified Cement Concrete Extruded Curb, Type 6 3980 LF $ $
A113 8-04 Extruded Curb 2420 LF $ $
A114 8-05 Wheel Stop 44 EA $ $
A115 8-06 Cement Conc. Driveway Entrance 2060 SY $ $
A116 8-07 Precast Dual Faced Sloped Mountable Curb 1220 LF $ $
A117 8-09 Raised Pavement Marker Type 1 42 HUND $ $
A118 8-09 Raised Pavement Marker Type 2 11 HUND $ $
A119 8-10 Curb Mounted Delineator Post 330 LF $ $
A120 8-13 Adjust Monument Case and Cover 6 EA $ $
A121 8-14 Cement Conc. Sidewalk 5260 SY $ $
A122 8-14 Thickened Edge Sidewalk 320 LF $ $
A123 8-14 Cement Conc. Curb Ramp, Type Perpendicular A 17 EA $ $
A124 8-14 Cement Conc. Curb Ramp, Type Perpendicular B 4 EA $ $
A125 8-14 Cement Conc. Curb Ramp, Type Parallel A 2 EA $$
Contract Documents
Rainier Ave S Corridor Improvements - Phase 4
Page 17
August 2022
Item
No.
Spec.
Section Description Quantity Unit Unit Price* Amount
Note: Unit prices for all items, all extensions, and total amount of Bid shall be shown. Enter unit prices in numerical
figures only in dollars and cents, i.e. to two (2) decimal places (including for whole dollar amounts). All figures must be
clearly legible. Bids with illegible figures in the Unit Price column will be rejected as unresponsive. Where conflict
occurs between the unit price and the total amount specified for any item, the unit price shall prevail, and totals shall be
corrected to conform thereto.
PROPOSAL (BID SCHEDULE A - ROADWAY IMPROVEMENTS)
Rainier Ave S Corridor Improvements - Phase 4 (S 3rd St to NW 3rd PL)
ALL ENTRIES SHALL BE WRITTEN IN INK OR TYPED TO VALIDATE BID
A126 8-14
Cement Conc. Curb Ramp, Type Single Direction
A 1 EA $ $
A127 8-14 Cement Conc. Curb Ramp, Type Combination 1 EA $ $
A128 8-14 Detectable Warning Surface 460 SF $ $
A129 8-14 Decorative Concrete Finish 400 SY $ $
A130 8-14 Smooth Cement Conc. Band 80 LF $ $
A131 8-14 Bus Shelter Foundation 2 EA $ $
A132 8-19 Adjust Gas Valve 11 EA $ $
A133 8-20
Modification of Existing Traffic Signal and
Illumination System at Rainier Avenue S & S 3rd
Street Intersection, Complete
1 LS LUMP SUM $
A134 8-20
Replacement of Existing Traffic Signal and
Illumination System at Rainier Avenue S & S 2nd
Street Intersection, Complete
1 LS LUMP SUM $
A135 8-20
Portable Temporary Traffic Signal System with
Mast Arm 1 LS LUMP SUM $
A136 8-20
Pedestrian Hybrid Beacon Traffic Signal and
Illumination System at Rainier Avenue S & SW
Victoria Street, Complete
1 LS LUMP SUM $
A137 8-20
Replacement of Existing Traffic Signal and
Illumination System at Rainier Avenue S & Airport
Way Intersection, Complete
1 LS LUMP SUM $
A138 8-20
Pedestrian Hybrid Beacon Traffic Signal and
Illumination System at Rainier Avenue N & NW
3rd Place, Complete
1 LS LUMP SUM $
A139 8-20 Decorative Illumination System, Complete 1 LS LUMP SUM $
A140 8-20 Fiber Optic Interconnect System, Complete 1 LS LUMP SUM $
A141 8-20 5G Small Cell Network Conduit System, Complete 1 LS LUMP SUM $
A142 8-20 PTZ Camera Systems, Complete 1 LS LUMP SUM $
A143 8-21 Permanent Signing 1 LS LUMP SUM $
A144 8-22 Plastic Stop Line 90 LF $ $
A145 8-22 Plastic Crosswalk Line 3250 SF $ $
A146 8-22 Plastic Traffic Arrow 72 EA $ $
A147 8-22 Plastic Traffic Letter 12 EA $ $
Contract Documents
Rainier Ave S Corridor Improvements - Phase 4
Page 18
August 2022
Item
No.
Spec.
Section Description Quantity Unit Unit Price* Amount
Note: Unit prices for all items, all extensions, and total amount of Bid shall be shown. Enter unit prices in numerical
figures only in dollars and cents, i.e. to two (2) decimal places (including for whole dollar amounts). All figures must be
clearly legible. Bids with illegible figures in the Unit Price column will be rejected as unresponsive. Where conflict
occurs between the unit price and the total amount specified for any item, the unit price shall prevail, and totals shall be
corrected to conform thereto.
PROPOSAL (BID SCHEDULE A - ROADWAY IMPROVEMENTS)
Rainier Ave S Corridor Improvements - Phase 4 (S 3rd St to NW 3rd PL)
ALL ENTRIES SHALL BE WRITTEN IN INK OR TYPED TO VALIDATE BID
A148 8-22 Bicycle Lane Symbol 6 EA $ $
A149 8-22 Plastic Line, 4 In.1250 LF $ $
A150 8-22 Paint Line, 4 In.5680 LF $ $
A151 8-22 Removing Existing Pavement Markings 1 LS LUMP SUM $
A152 8-23 Temporary Pavement Marking 59000 LF $ $
A153 8-24 Rock Wall 60 SF $ $
A154 8-26 Resolution of Utility Conflicts for Storm Drainage 1 EST 145,000.00$ 145,000.00$
A155 8-26 Utility Potholing 220 EA $ $
A156 8-27 Gateway Trellis Relocation 1 LS LUMP SUM $
A157 8-28 Tree Grate 3 EA $ $
A158 8-30 Waste Receptacle 3 EA $ $
A159 8-31 Bench 2 EA $ $
A160 8-32 Gateway Wall A & B 1 LS $ $
A161 8-33 Bollard 7 EA $ $
Total Schedule A (Roadway Improvements)*$
* All applicable sales tax shall be included in the unit and lump sum Bid price per Section 1-07.2(1) and WAC 458-20-171.
Contract Documents
Rainier Ave S Corridor Improvements - Phase 4
Page 19
August 2022
RAINIER AVE S SW SUNSET BLVDS 3RD ST GENERAL NOTES CONSTRUCTION NOTES
LEGEND
LUMINAIRE SCHEDULE
WIRE NOTES
PLAN
NUMBER BY APP.REVISION DESCRIPTION
DRAWN BY:
DESIGN BY:
CHECK BY:
PROJ MGR:
FILE:BY:DATE:
APPROVED FOR CONSTRUCTION
DATE
DRAWING NO.
PROJECT NO.
FED AID NO.
DATE:
SHEET NO.OF
SURVEYED:
14087A-ILL01.dwg
BID
DOCUMENT
Public Works Department
CITY OF RENTON
REGIST E R E D NOTGNI
HSAWFOETATS
ERNEPRFO
E NNALIO
E
S IGS
39324JAN C IGANI
K
Tacoma Wenatchee KPG.com
Seattle
3131 Elliott Avenue, Suite 400
Seattle, WA 98121 206.286.1640
7 -13-2022ILLUMINATION AND INTERCONNECT PLAN
STA 11+00 TO STA 15+00
200
14087A
JULY 2022
285200
RAINIER AVE S CORRIDOR IMPROVEMENTS - PHASE 4
(S 3RD ST TO NW 3RD PL)
KPG
JF
EH
DE
JC
STP(UL) -1615(005)
RAINIER AVE S
GENERAL NOTES CONSTRUCTION NOTES
LEGEND
LUMINAIRE SCHEDULE WIRE NOTES
NUMBER BY APP.REVISION DESCRIPTION
DRAWN BY:
DESIGN BY:
CHECK BY:
PROJ MGR:
FILE:BY:DATE:
APPROVED FOR CONSTRUCTION
DATE
DRAWING NO.
PROJECT NO.
FED AID NO.
DATE:
SHEET NO.OF
SURVEYED:
14087A-ILL01.dwg
BID
DOCUMENT
Public Works Department
CITY OF RENTON
REGIST E R E D NOTGNI
HSAWFOETATS
ERNEPRFO
E NNALIO
E
S IGS
39324JAN C IGANI
K
Tacoma Wenatchee KPG.com
Seattle
3131 Elliott Avenue, Suite 400
Seattle, WA 98121 206.286.1640
7 -13-2022JF
KPG
(S 3RD ST TO NW 3RD PL)
RAINIER AVE S CORRIDOR IMPROVEMENTS - PHASE 4
201 285
JULY 2022
14087A
201
STA 15+00 TO STA 18+25
ILLUMINATION AND INTERCONNECT PLANJC
PLAN
STP(UL) -1615(005)
EH
DE
RAINIER AVE S
S 2ND ST CONSTRUCTION NOTES
LUMINAIRE SCHEDULE
GENERAL NOTES
LEGEND
WIRE NOTES
NUMBER BY APP.REVISION DESCRIPTION
DRAWN BY:
DESIGN BY:
CHECK BY:
PROJ MGR:
FILE:BY:DATE:
APPROVED FOR CONSTRUCTION
DATE
DRAWING NO.
PROJECT NO.
FED AID NO.
DATE:
SHEET NO.OF
SURVEYED:
14087A-ILL01.dwg
BID
DOCUMENT
Public Works Department
CITY OF RENTON
REGIST E R E D NOTGNI
HSAWFOETATS
ERNEPRFO
E NNALIO
E
S IGS
39324JAN C IGANI
K
Tacoma Wenatchee KPG.com
Seattle
3131 Elliott Avenue, Suite 400
Seattle, WA 98121 206.286.1640
7 -13-2022JF
KPG
(S 3RD ST TO NW 3RD PL)
RAINIER AVE S CORRIDOR IMPROVEMENTS - PHASE 4
202 285
JULY 2022
14087A
202
STA 18+25 TO STA 22+50
ILLUMINATION AND INTERCONNECT PLANJC
PLAN
STP(UL) -1615(005)
EH
DE
RAINIER AVE S SW VICTORIA STHAY
E
S
P
L
S
W
LEGEND
LUMINAIRE SCHEDULE
GENERAL NOTES
WIRE NOTES
NUMBER BY APP.REVISION DESCRIPTION
DRAWN BY:
DESIGN BY:
CHECK BY:
PROJ MGR:
FILE:BY:DATE:
APPROVED FOR CONSTRUCTION
DATE
DRAWING NO.
PROJECT NO.
FED AID NO.
DATE:
SHEET NO.OF
SURVEYED:
14087A-ILL01.dwg
BID
DOCUMENT
Public Works Department
CITY OF RENTON
REGIST E R E D NOTGNI
HSAWFOETATS
ERNEPRFO
E NNALIO
E
S IGS
39324JAN C IGANI
K
Tacoma Wenatchee KPG.com
Seattle
3131 Elliott Avenue, Suite 400
Seattle, WA 98121 206.286.1640
7 -13-2022JF
KPG
(S 3RD ST TO NW 3RD PL)
RAINIER AVE S CORRIDOR IMPROVEMENTS - PHASE 4
203 285
JULY 2022
14087A
203
STA 22+50 TO STA 27+00
ILLUMINATION AND INTERCONNECT PLAN
PLAN
JC
DE
EH
STP(UL) -1615(005)
RAINIER AVE S
S TOBIN ST CONSTRUCTION NOTES
LEGEND
GENERAL NOTES
LUMINAIRE SCHEDULE
WIRE NOTES
NUMBER BY APP.REVISION DESCRIPTION
DRAWN BY:
DESIGN BY:
CHECK BY:
PROJ MGR:
FILE:BY:DATE:
APPROVED FOR CONSTRUCTION
DATE
DRAWING NO.
PROJECT NO.
FED AID NO.
DATE:
SHEET NO.OF
SURVEYED:
14087A-ILL02.dwg
BID
DOCUMENT
Public Works Department
CITY OF RENTON
REGIST E R E D NOTGNI
HSAWFOETATS
ERNEPRFO
E NNALIO
E
S IGS
39324JAN C IGANI
K
Tacoma Wenatchee KPG.com
Seattle
3131 Elliott Avenue, Suite 400
Seattle, WA 98121 206.286.1640
7 -13-2022PLAN
ILLUMINATION AND INTERCONNECT PLAN
STA 27+00 TO STA 31+00
204
14087A
JULY 2022
285204
RAINIER AVE S CORRIDOR IMPROVEMENTS - PHASE 4
(S 3RD ST TO NW 3RD PL)
KPG
JF
EH
DE
JC
STP(UL) -1615(005)
RENTON AVENUE
EXT
RAINIER AVE N
AIRPORT WAYRAINIER AVE S
CONSTRUCTION NOTES
LUMINAIRE SCHEDULE
LUMINAIRE SCHEDULE
WIRE NOTES
NUMBER BY APP.REVISION DESCRIPTION
DRAWN BY:
DESIGN BY:
CHECK BY:
PROJ MGR:
FILE:BY:DATE:
APPROVED FOR CONSTRUCTION
DATE
DRAWING NO.
PROJECT NO.
FED AID NO.
DATE:
SHEET NO.OF
SURVEYED:
14087A-ILL02.dwg
BID
DOCUMENT
Public Works Department
CITY OF RENTON
REGIST E R E D NOTGNI
HSAWFOETATS
ERNEPRFO
E NNALIO
E
S IGS
39324JAN C IGANI
K
Tacoma Wenatchee KPG.com
Seattle
3131 Elliott Avenue, Suite 400
Seattle, WA 98121 206.286.1640
7 -13-2022PLAN
JF
KPG
(S 3RD ST TO NW 3RD PL)
RAINIER AVE S CORRIDOR IMPROVEMENTS - PHASE 4
205 285
JULY 2022
14087A
205
STA 31+00 TO STA 35+50
ILLUMINATION AND INTERCONNECT PLANJC
DE
EH
FOR LEGEND AND
GENERAL NOTES, SEE
SHEET 204
STP(UL) -1615(005)
RAINIER AVE N
CONSTRUCTION NOTES
LEGEND
GENERAL NOTES
LUMINAIRE SCHEDULE
WIRE NOTES
NUMBER BY APP.REVISION DESCRIPTION
DRAWN BY:
DESIGN BY:
CHECK BY:
PROJ MGR:
FILE:BY:DATE:
APPROVED FOR CONSTRUCTION
DATE
DRAWING NO.
PROJECT NO.
FED AID NO.
DATE:
SHEET NO.OF
SURVEYED:
14087A-ILL02.dwg
BID
DOCUMENT
Public Works Department
CITY OF RENTON
REGIST E R E D NOTGNI
HSAWFOETATS
ERNEPRFO
E NNALIO
E
S IGS
39324JAN C IGANI
K
Tacoma Wenatchee KPG.com
Seattle
3131 Elliott Avenue, Suite 400
Seattle, WA 98121 206.286.1640
7 -13-2022PLAN
JF
KPG
(S 3RD ST TO NW 3RD PL)
RAINIER AVE S CORRIDOR IMPROVEMENTS - PHASE 4
206 285
JULY 2022
14087A
206
STA 35+50 TO STA 39+00
ILLUMINATION AND INTERCONNECT PLANJC
DE
EH
STP(UL) -1615(005)
RAINIER AVE NNW 3RD PLNE
L
S
O
N
P
L
N
W
CONSTRUCTION NOTES
LEGEND
GENERAL NOTES
LUMINAIRE SCHEDULE
WIRE NOTES
NUMBER BY APP.REVISION DESCRIPTION
DRAWN BY:
DESIGN BY:
CHECK BY:
PROJ MGR:
FILE:BY:DATE:
APPROVED FOR CONSTRUCTION
DATE
DRAWING NO.
PROJECT NO.
FED AID NO.
DATE:
SHEET NO.OF
SURVEYED:
14087A-ILL02.dwg
BID
DOCUMENT
Public Works Department
CITY OF RENTON
REGIST E R E D NOTGNI
HSAWFOETATS
ERNEPRFO
E NNALIO
E
S IGS
39324JAN C IGANI
K
Tacoma Wenatchee KPG.com
Seattle
3131 Elliott Avenue, Suite 400
Seattle, WA 98121 206.286.1640
7 -13-2022PLAN
JF
KPG
(S 3RD ST TO NW 3RD PL)
RAINIER AVE S CORRIDOR IMPROVEMENTS - PHASE 4
207 285
JULY 2022
14087A
STA 39+00 TO STA 43+50
ILLUMINATION AND INTERCONNECT PLAN
207
JC
DE
EH
STP(UL) -1615(005)
S 3RD ST
CONSTRUCTION NOTES
LEGEND
LUMINAIRE SCHEDULE
GENERAL NOTES
WIRE NOTES
NUMBER BY APP.REVISION DESCRIPTION
DRAWN BY:
DESIGN BY:
CHECK BY:
PROJ MGR:
FILE:BY:DATE:
APPROVED FOR CONSTRUCTION
DATE
DRAWING NO.
PROJECT NO.
FED AID NO.
DATE:
SHEET NO.OF
SURVEYED:
14087A-ILL03.dwg
BID
DOCUMENT
Public Works Department
CITY OF RENTON
REGIST E R E D NOTGNI
HSAWFOETATS
ERNEPRFO
E NNALIO
E
S IGS
39324JAN C IGANI
K
Tacoma Wenatchee KPG.com
Seattle
3131 Elliott Avenue, Suite 400
Seattle, WA 98121 206.286.1640
7 -13-2022PLAN
JF
KPG
(S 3RD ST TO NW 3RD PL)
RAINIER AVE S CORRIDOR IMPROVEMENTS - PHASE 4
208 285
JULY 2022
14087A
208
STA 201+50 TO STA 205+00
ILLUMINATION AND INTERCONNECT PLAN
EH
DE
JC
STP(UL) -1615(005)
AIRPORT WAY
LAKE AVE S CONSTRUCTION NOTES
LUMINAIRE SCHEDULE
LEGEND
GENERAL NOTES
WIRE NOTES
NUMBER BY APP.REVISION DESCRIPTION
DRAWN BY:
DESIGN BY:
CHECK BY:
PROJ MGR:
FILE:BY:DATE:
APPROVED FOR CONSTRUCTION
DATE
DRAWING NO.
PROJECT NO.
FED AID NO.
DATE:
SHEET NO.OF
SURVEYED:
14087A-ILL03.dwg
BID
DOCUMENT
Public Works Department
CITY OF RENTON
REGIST E R E D NOTGNI
HSAWFOETATS
ERNEPRFO
E NNALIO
E
S IGS
39324JAN C IGANI
K
Tacoma Wenatchee KPG.com
Seattle
3131 Elliott Avenue, Suite 400
Seattle, WA 98121 206.286.1640
7 -13-2022PLAN
JF
KPG
(S 3RD ST TO NW 3RD PL)
RAINIER AVE S CORRIDOR IMPROVEMENTS - PHASE 4
209 285
JULY 2022
14087A
209
STA 601+50 TO STA 605+50
ILLUMINATION AND INTERCONNECT PLANJC
DE
EH
STP(UL) -1615(005)
NUMBER BY APP.REVISION DESCRIPTION
DRAWN BY:
DESIGN BY:
CHECK BY:
PROJ MGR:
FILE:BY:DATE:
APPROVED FOR CONSTRUCTION
DATE
DRAWING NO.
PROJECT NO.
FED AID NO.
DATE:
SHEET NO.OF
SURVEYED:
14087A-SIG01.dwg
BID
DOCUMENT
Public Works Department
CITY OF RENTON
REGIST E R E D NOTGNI
HSAWFOETATS
ERNEPRFO
E NNALIO
E
S IGS
39324JAN C I GANI
K
Tacoma Wenatchee KPG.com
Seattle
3131 Elliott Avenue, Suite 400
Seattle, WA 98121 206.286.1640
7 -13-2022VALUE VALUE
SIGNALIZATION PLAN
RAINIER AVE S & S 3RD ST NOTES
213
14087A
JULY 2022
285213
RAINIER AVE S CORRIDOR IMPROVEMENTS - PHASE 4
(S 3RD ST TO NW 3RD PL)
KPG
EH
DE
JC
JF
CONSTRUCTION NOTESGENERAL NOTES
STP(UL) -1615(005)
WIRE NOTES
SIGNAL POLE EQUIPMENT SCHEDULE
PUSH BUTTON SCHEDULE
SIGN SCHEDULE
Rainier Ave S
NUMBER BY APP.REVISION DESCRIPTION
DRAWN BY:
DESIGN BY:
CHECK BY:
PROJ MGR:
FILE:BY:DATE:
APPROVED FOR CONSTRUCTION
DATE
DRAWING NO.
PROJECT NO.
FED AID NO.
DATE:
SHEET NO.OF
SURVEYED:
14087A-SIG02.dwg
BID
DOCUMENT
Public Works Department
CITY OF RENTON
REGIST E R E D NOTGNI
HSAWFOETATS
ERNEPRFO
E NNALIO
E
S IGS
39324JAN C I GANI
K
Tacoma Wenatchee KPG.com
Seattle
3131 Elliott Avenue, Suite 400
Seattle, WA 98121 206.286.1640
7 -13-2022VALUE VALUE
SIGNALIZATION PLAN
RAINIER AVE S & S 2ND ST NOTES
216
14087A
JULY 2022
285216
RAINIER AVE S CORRIDOR IMPROVEMENTS - PHASE 4
(S 3RD ST TO NW 3RD PL)
KPG
EH
DE
JC
JF
SIGN SCHEDULE CONSTRUCTION NOTES
STP(UL) -1615(005)
WIRE NOTES
SIGNAL POLE EQUIPMENT SCHEDULE
PUSH BUTTON SCHEDULE
LEGEND
ONE WAYONEWAY
DO NOT
ENTER
ONLY
INTERSTATE
405
TO
CROSSWALK
USE
CROSSWALK
USE
S 2nd St Rainier Ave S
RAINIER AVE S SW VICTORIA STHAY
E
S
P
L
S
W
NUMBER BY APP.REVISION DESCRIPTION
DRAWN BY:
DESIGN BY:
CHECK BY:
PROJ MGR:
FILE:BY:DATE:
APPROVED FOR CONSTRUCTION
DATE
DRAWING NO.
PROJECT NO.
FED AID NO.
DATE:
SHEET NO.OF
SURVEYED:
14087A-SIG03.dwg
BID
DOCUMENT
Public Works Department
CITY OF RENTON
REGIST E R E D NOTGNI
HSAWFOETATS
ERNEPRFO
E NNALIO
E
S IGS
39324JAN C IGANI
K
Tacoma Wenatchee KPG.com
Seattle
3131 Elliott Avenue, Suite 400
Seattle, WA 98121 206.286.1640
7 -13-2022JF
KPG
(S 3RD ST TO NW 3RD PL)
RAINIER AVE S CORRIDOR IMPROVEMENTS - PHASE 4
218 285
JULY 2022
14087A
218
RAINIER AVE S & SW VICTORIA ST
SIGNALIZATION PLAN
PLAN
EH
DE
JC
EVPE SCHEDULE
LEGEND
CONSTRUCTION NOTES
CROSSWALK
STOP
ON RED
STOP ON
FLASHING
IF NO
THEN PROCEED
STP(UL) -1615(005)
WIRE NOTES
SIGN SCHEDULE
CITY OF RENTON STANDARD PLAN NOTES PUSH BUTTON SCHEDULE
NUMBER BY APP.REVISION DESCRIPTION
DRAWN BY:
DESIGN BY:
CHECK BY:
PROJ MGR:
FILE:BY:DATE:
APPROVED FOR CONSTRUCTION
DATE
DRAWING NO.
PROJECT NO.
FED AID NO.
DATE:
SHEET NO.OF
SURVEYED:
14087A-SIG04_PHASECHANGE.dwg
BID
DOCUMENT
Public Works Department
CITY OF RENTON
REGIST E R E D NOTGNI
HSAWFOETATS
ERNEPRFO
E NNALIO
E
S IGS
39324JAN C IGANI
K
Tacoma Wenatchee KPG.com
Seattle
3131 Elliott Avenue, Suite 400
Seattle, WA 98121 206.286.1640
7 -13-2022SIGN SCHEDULE
CONSTRUCTION NOTESWIRE NOTES
900
RAINIER AVE S & AIRPORT WAY NOTESVALUE
221
14087A
VALUE
SIGNALIZATION PLAN JULY 2022
RAINIER AVE S CORRIDOR IMPROVEMENTS - PHASE 4
285221
(S 3RD ST TO NW 3RD PL)DE
EH
JC
JF
STP(UL) -1615(005)
SIGNAL POLE EQUIPMENT SCHEDULE
PUSH BUTTON SCHEDULE
GENERAL NOTES
LEGEND
CONCURRENT PHASE SCHEDULE
EVPE SCHEDULE SCHEDULE
VIDEO DETECTION
Rainier Ave S Renton Ave ExtAirport Way
Airport WayRenton Ave Ext
RAINIER AVE NNW 3RD PLNUMBER BY APP.REVISION DESCRIPTION
DRAWN BY:
DESIGN BY:
CHECK BY:
PROJ MGR:
FILE:BY:DATE:
APPROVED FOR CONSTRUCTION
DATE
DRAWING NO.
PROJECT NO.
FED AID NO.
DATE:
SHEET NO.OF
SURVEYED:
14087A-SIG05.dwg
BID
DOCUMENT
Public Works Department
CITY OF RENTON
REGIST E R E D NOTGNI
HSAWFOETATS
ERNEPRFO
E NNALIO
E
S IGS
39324JAN C IGANI
K
Tacoma Wenatchee KPG.com
Seattle
3131 Elliott Avenue, Suite 400
Seattle, WA 98121 206.286.1640
7 -13-2022JF
KPG
(S 3RD ST TO NW 3RD PL)
RAINIER AVE S CORRIDOR IMPROVEMENTS - PHASE 4
223 285
JULY 2022
14087A
223
RAINIER AVE N & NW 3RD PL
SIGNALIZATION PLAN
EH
DE
JC
STP(UL) -1615(005)
EVPE SCHEDULE
CROSSWALK
STOP
ON RED
STOP ON
IF NO
THEN PROCEED
SIGN SCHEDULE
CONSTRUCTION NOTES
PLAN
WIRE NOTES
FLASHING
CITY OF RENTON STANDARD PLAN NOTES
LEGEND
PUSH BUTTON SCHEDULE
RAINIER AVE S
CORRESPONDING SHEETS
CONSTRUCTION NOTES CONSTRUCTION NOTES
GENERAL NOTES GENERAL NOTES
TREE GRATE SCHEDULE
NUMBER BY APP.REVISION DESCRIPTION
DRAWN BY:
DESIGN BY:
CHECK BY:
PROJ MGR:
FILE:BY:DATE:
APPROVED FOR CONSTRUCTION
DATE
DRAWING NO.
PROJECT NO.
FED AID NO.
DATE:
SHEET NO.OF
SURVEYED:
14087A-URB01.dwg
BID
DOCUMENT
Public Works Department
CITY OF RENTONPHUONG N. NGU
Y
E
NNO. 1 493 EXP. 0 9 /1 6 /2022STATE O F W A SHIN
GTONLAND
S
CAPE A R C H ITECTTacoma Wenatchee KPG.com
Seattle
3131 Elliott Avenue, Suite 400
Seattle, WA 98121 206.286.1640
7 -13-2022JF
KPG
(S 3RD ST TO NW 3RD PL)
RAINIER AVE S CORRIDOR IMPROVEMENTS - PHASE 4
251 285
JULY 2022
14087A
251
STA 15+00 TO STA 18+25
URBAN DESIGN PLAN
PLAN
HF
PN
PN
STP(UL) -1615(005)
SW VICTORIA STHAY
E
S
PL
S
W
RAINIER AVE S
CORRESPONDING SHEETS
CONSTRUCTION NOTES CONSTRUCTION NOTES
GENERAL NOTES GENERAL NOTES
TREE GRATE SCHEDULE
NUMBER BY APP.REVISION DESCRIPTION
DRAWN BY:
DESIGN BY:
CHECK BY:
PROJ MGR:
FILE:BY:DATE:
APPROVED FOR CONSTRUCTION
DATE
DRAWING NO.
PROJECT NO.
FED AID NO.
DATE:
SHEET NO.OF
SURVEYED:
14087A-URB01.dwg
BID
DOCUMENT
Public Works Department
CITY OF RENTONPHUONG N. NGU
Y
E
NNO. 1 493 EXP. 0 9 /1 6 /2022STATE O F W A SHIN
GTONLAND
S
CAPE A R C H ITECTTacoma Wenatchee KPG.com
Seattle
3131 Elliott Avenue, Suite 400
Seattle, WA 98121 206.286.1640
7 -13-2022JF
KPG
(S 3RD ST TO NW 3RD PL)
RAINIER AVE S CORRIDOR IMPROVEMENTS - PHASE 4
253 285
JULY 2022
14087A
253
STA 22+50 TO STA 27+00
URBAN DESIGN PLAN
PLAN
JS
PN
PN
STP(UL) -1615(005)
CORRESPONDING SHEETS
S TOBIN STRAINIER AVE S
CONSTRUCTION NOTES
GENERAL NOTES
TREE GRATE SCHEDULE
PLAN
NUMBER BY APP.REVISION DESCRIPTION
DRAWN BY:
DESIGN BY:
CHECK BY:
PROJ MGR:
FILE:BY:DATE:
APPROVED FOR CONSTRUCTION
DATE
DRAWING NO.
PROJECT NO.
FED AID NO.
DATE:
SHEET NO.OF
SURVEYED:
14087A-URB02.dwg
BID
DOCUMENT
Public Works Department
CITY OF RENTONPHUONG N. NGU
Y
E
NNO. 1 493 EXP. 0 9 /1 6 /2022STATE O F W A SHIN
GTONLAND
S
CAPE A R C H ITECTTacoma Wenatchee KPG.com
Seattle
3131 Elliott Avenue, Suite 400
Seattle, WA 98121 206.286.1640
7 -13-2022URBAN DESIGN PLAN
STA 27+00 TO STA 31+00
254
14087A
JULY 2022
285254
RAINIER AVE S CORRIDOR IMPROVEMENTS - PHASE 4
(S 3RD ST TO NW 3RD PL)
KPG
JF
JS
PN
PN
STP(UL) -1615(005)
Special Provisions – BID DOCUMENT SP-153
Rainier Ave S Corridor Improvements – Phase 4 September 2022
Payment will be made in accordance with Section 1-04.1 for the following Bid item included
in the Proposal:
“Underdrain Pipe, 8 In. Diam.”, per linear foot.
The unit Contract price per linear foot for storm sewer pipe of any kind and size specified shall
be full pay for all labor, tools, materials, and equipment necessary to provide and install the
item complete including removal, hauling, and disposing of pavement; Structure excavation
including haul; backfilling with native material; bedding materials; compaction; and cleaning
(flushing), connection to new or existing storm sewer or drainage structures, surface
restoration.
7-04 STORM SEWERS
7-04.2 Materials
Ductile Iron Storm Sewer Pipe shall conform to the requirements of Section 9-05.13 of the
Standard Specifications.
Ductile Iron Storm Sewer Pipe with Polywrap shall conform to the requirements of Section 9-
05.13 shall conform to the requirements of Section 9-05.13 of the Standard Specification
except the pipe shall be Special Thickness Class 52 and shall be wrapped with 8-mil black,
tube-type, polyethylene plastic per AWWA C105 standards.
PVC pipe for Storm Sewer shall conform to the requirements of Section 9-05.12(1) of the
Standard Specifications.
The second paragraph of Section 7-04.2 is supplemented as follows:
The Contractor shall require pipe suppliers to furnish certificates signed by their authorized
representative, stating the specifications to which the materials or products were
manufactured. The Contractor shall provide 2 copies of these certifications to the Engineer
for approval. Certificates showing nonconformance with the Contract shall be sufficient
evidence for rejection. Approval of certificates shall be considered only as tentative
acceptance of the materials and products, and such action by Engineer will not relieve
Contractor of his/her responsibility to perform field tests and to replace or repair faulty
materials, equipment, and/or workmanship and Contractor’s own expense.
Section 7-04.2 is supplemented with the following:
Dense foam shall be 6.0 pounds per cubic foot closed cell Polyethylene foam.
Bank Run Gravel for Trench Backfill Storm shall conform to Section 9-03.19.
Direct Pipe Tee Connections:
Special Provisions – BID DOCUMENT SP-271
Rainier Ave S Corridor Improvements – Phase 4 September 2022
existing cables, the new vault will need to be bottomless to allow the existing conduit and
cables to be routed into the new vault.
· All mounting equipment shall be included with the small cable vault.
Cable Racking in Small Cable Vaults
Cables shall be racked and secured with nylon ties. Nylon ties shall not be over-tightened.
Identification or warning tags shall be securely attached to the cables in at least two locations
in each small cable vault.
All coiled cable shall be protected to prevent damage to the cable and fibers. Racking shall
include securing cables to brackets (racking hardware) that extend from the sidewalls of the
small cable vault.
8-20.3(8) Wiring
Section 8-20.3(8) is supplemented with the following:
The Contractor shall provide all the fiber optic cabling and associated equipment. Installation
including splicing and labeling shall be done by the Contractor.
All illumination circuits shall be labeled with a PVC marking sleeve bearing the circuit number
at each junction box whether splices are present or not. Terminal strips in cabinets, or when
used as a connection device between conductors, shall bear the circuit numbers.
All stranded wires terminated at a terminal block shall have an open end, crimp style solderless
terminal connector, and all solid wires terminated at a terminal block shall have an open end
soldered terminal connector. All terminals shall be installed with a tool designed for the
installation of the correct type of connector and crimping with pliers, wire cutters, etc., will not
be allowed. All wiring inside the controller cabinet shall be trimmed and cabled together to
make a neat, clean appearing installation. No splicing of any traffic signal conductor shall be
permitted unless otherwise indicated on the Plans. All conductor runs shall be attached to
appropriate signal terminal boards with pressure type binding posts.
Field Wiring Chart
501 AC+ Input 521-540 Spare
502 AC- Input 541-580 Coordination
503-510 Control-Display 581-592 Emergency Pre-emp
511-515 Sign Lights 593-599 Spare
516-520 Railroad Pre-empt
Movement 1 2 3 4 5 6 7 8 9
Number
____________________________________________________________________________
Vehicle Heads
Special Provisions – BID DOCUMENT SP-296
Rainier Ave S Corridor Improvements – Phase 4 September 2022
8-28 TREE GRATE (NEW SECTION)
8-28.1 Description
This work shall consist of providing and installing Tree Grate, grate frames, mounting
attachments and pea gravel in locations as shown on the Plans and as specified herein.
8-28.2 Materials
Materials shall meet the requirements of the following sections as applicable unless noted:
Aggregates 9-03.12(4)
Structural Steel and related materials 9-06
Pea gravel under tree grate as noted on Plans shall be in accordance with Section 9-03.12(4)
gravel backfill for drains of the Standard Specifications.
Tree Grate shall be approximately 4’x6’ as detailed on Plans. Tree Grate shall be rectangular
grate with a 15.5” diameter single tree opening, cast in 4 pieces, pattern as shown in the
Plans. Material shall be cast ductile iron, ASTM A53 6 Grade 65-45-12 with baked on oil finish.
Tree grate and mounting attachments shall be steel angle frames and bolts by same
manufacturer as the Tree Grate, size frame to accommodate Tree Grate as shown in the
Plans.
8-28.3 Construction Requirements
Tree Grate and frames shall typically require 8 to 10 weeks lead time prior to delivery and
installation on site.
Contractor shall break center opening to accommodate tree root flare from new street trees
as needed. Contractor shall carefully ensure proper care around trees and avoid further
damage to tree during installation.
Install Tree Grate per manufacturer’s instructions and as approved by Engineer. Install in
locations and details per Plans.
Contractor shall field verify all Tree Grate location with Engineer’s approval prior to installation.
Submittals
The Contractor shall submit tree grate product cut sheets including model and name,
dimensions and descriptions of pea gravel supplier, Tree Grate, grate frames and mounting
attachments for Engineer’s approval.
Contractor shall provide shop drawings of Tree Grate including all dimensions, sections,
plans, colors, materials, finishes, pea gravel, mounting attachments, grate frame, fabrication
methodology and installation requirements for Engineer’s approval.