Loading...
HomeMy WebLinkAboutAddendum No. 2Rainier Ave S Corridor Improvements – Phase 4 Addendum No. 2 Page 1 of 2 RAINIER AVE S CORRIDOR IMPROVEMENTS - PHASE 4 (S 3RD ST TO NW 3RD PL) ADDENDUM NO. 2 Federal Aid Number: STPUL-1615(005) TIB Number: 8-1-102(038)-1 City Project Number: TED4003813 CAG 22-163 DATE OF ADDENDUM ISSUE: September 27, 2022 BID DUE DATE: October 11, 2022 (CHANGED FROM DATE IN CALL FOR BIDS) DATE OF BID OPENING: October 13, 2022 (CHANGED FROM DATE IN CALL FOR BIDS) NOTE TO ALL PLANHOLDERS: This Addendum No. 2, containing the following revisions, additions, deletions, and/or clarifications, is hereby made a part of the Plans and Contract Provisions (Contract Documents) for the above-named project. Bidders shall take this Addendum into consideration when preparing and submitting their bids. Bidders shall acknowledge receipt and acceptance of this Addendum No. 2 in the space provided on the Proposal Signature Page or by signing in the space provided below and submitting the signed addendum with the bid package. Failure to provide this written acknowledge may result in disqualification of the Bidder’s submittal. BID PROPOSAL 1. DELETE Proposal Schedule A (Pages 13-19) and REPLACE with attached Proposal (Pages 13-19). Revisions include:  Addition of new bid item A34 5-04 Asphalt Cost Price Adjustment 1 CALC $199,200.  Revise schedule A bid item numbers following new item A34 to renumber bid items for Schedule A. PLANS 2. DELETE Plan Sheets 251, 253, 254 and REPLACE with attached Plan Sheet 251, 253, 254. Revisions include:  Update construction note #3 to specify 4’x6’ tree grate size. 3.DELETEPlanSheets200-209,213,216,218,221,223andREPLACEwithattachedPlanSheets200-209,213,216,218,221,223.Revisionsinclude:•Revisionstoilluminationplansheetsluminaireschedulesfor16.5’mountingheight.•Revisionstosignalizationplanconstructionnotesclarifyingfiberworktobecompletedbycontractor.SPECIALPROVISIONS4.RevisetheSpecialProvisionSection8-28.2Materials(PageSP-296)asfollows:Modifythethirdparagraphasfollows:TreeGrateshallbeapproximately4’x6’asdetailedonPlans.TreeGrateshallberectangulargratewitha15.5”diametersingletreeopening,castin4pieces,patternasshowninthePlans.Materialshallbecastductileiron,ASTMA536Grade65-45-12withbakedonoilfinish.5.RevisetheSpecialProvisionSection8-20.3(8)Wiring(PageSP-271)asfollows:Modifysentencefromthefirstparagraphasfollows:InstallationincludingsplicingandlabelingshallbedonebytheContractor.6.RevisetheSpecialProvisionSection7-04.2Materials(PageSP-153)asfollows:Delete3rdand4thparagraphsandaddthefollowingnew3’’paragraph:PVCpipeforStormSewershallconformtotherequirementsofSection9-05.12(1)oftheStandardSpecifications.PVCC900PipeforStormSewershallconformtotherequirementsforPVCPressurePipe(‘1inchesandover)describedinSection930.1(5)AoftheStandardSpecifications.Whereuuiiarespecificallycalledoutontheplans,theyshallbeofthecamemiuiiiiiumanufacturerasthemainpipeandmeetthemanuicuirecommenaauons.ALLOTHERREQUIREMENTSOFTHECONTRACTDOCUMENTSREMAININEFFECT.Sincey,BobHanson,P.E.TransportationDesignManagerCityofRentonReceiptacknowledged,andconditionsagreedtothis_____dayof________,2020Bidder_________________________________SignatureRainierAveSCorridorimprovements—Phase4AddendumNo.2Page2of2 Item No. Spec. Section Description Quantity Unit Unit Price* Amount A1 1-04 Minor Change 1 EST 200,000.00$ 200,000.00$ A2 1-05 Roadway Surveying 1 LS LUMP SUM $ A3 1-05 ADA Features Surveying 1 LS LUMP SUM $ A4 1-05 Record Drawings (Minimum Bid $25,000) 1 LS LUMP SUM $ A5 1-07 SPCC Plan 1 LS LUMP SUM $ A6 1-07 Training 2400 HR $ $ A7 1-08 Type B Progress Schedule (Minimum Bid $15,000)1 LS LUMP SUM $ A8 1-09 Mobilization 1 LS LUMP SUM $ A9 1-09 Field Office Building 1 LS LUMP SUM $ A10 1-10 Project Temporary Traffic Control 1 LS LUMP SUM $ A11 1-10 Business Access Signs 40 EA $ $ A12 1-10 Project Identification Signs 2 EA $ $ A13 1-10 Traffic Control Supervisor 1 LS LUMP SUM $ A14 1-10 Flaggers 17600 HR $ $ A15 1-10 Other Traffic Control Labor 2000 HR $ $ A16 1-10 Off-Duty Uniformed Police Officer 2300 HR $ $ A17 2-01 Clearing and Grubbing 1 LS LUMP SUM $ A18 2-01 Roadside Cleanup 1 EST 30,000.00$ 30,000.00$ A19 2-02 Removal of Structures and Obstructions 1 LS LUMP SUM $ A20 2-03 Roadway Excavation Incl. Haul 14970 CY $ $ A21 2-03 Unsuitable Foundation Excavation Incl. Haul 800 CY $ $ A22 2-03 Gravel Borrow Inc. Haul 2350 CY $ $ A23 2-05 Petroleum Contaminated Excavation and Disposal Incl. Haul 1 EST 172,000.00$ 172,000.00$ A24 2-05 Contaminated Groundwater Treatment and Disposal 1 EST 200,000.00$ 200,000.00$ A25 2-09 Controlled Density Fill 800 CY $ $ Note: Unit prices for all items, all extensions, and total amount of Bid shall be shown. Enter unit prices in numerical figures only in dollars and cents, i.e. to two (2) decimal places (including for whole dollar amounts). All figures must be clearly legible. Bids with illegible figures in the Unit Price column will be rejected as unresponsive. Where conflict occurs between the unit price and the total amount specified for any item, the unit price shall prevail, and totals shall be corrected to conform thereto. PROPOSAL (BID SCHEDULE A - ROADWAY IMPROVEMENTS) Rainier Ave S Corridor Improvements - Phase 4 (S 3rd St to NW 3rd PL) ALL ENTRIES SHALL BE WRITTEN IN INK OR TYPED TO VALIDATE BID Contract Documents Rainier Ave S Corridor Improvements - Phase 4 Page 13 August 2022 Item No. Spec. Section Description Quantity Unit Unit Price* Amount Note: Unit prices for all items, all extensions, and total amount of Bid shall be shown. Enter unit prices in numerical figures only in dollars and cents, i.e. to two (2) decimal places (including for whole dollar amounts). All figures must be clearly legible. Bids with illegible figures in the Unit Price column will be rejected as unresponsive. Where conflict occurs between the unit price and the total amount specified for any item, the unit price shall prevail, and totals shall be corrected to conform thereto. PROPOSAL (BID SCHEDULE A - ROADWAY IMPROVEMENTS) Rainier Ave S Corridor Improvements - Phase 4 (S 3rd St to NW 3rd PL) ALL ENTRIES SHALL BE WRITTEN IN INK OR TYPED TO VALIDATE BID A26 2-12 Construction Geotextile for Separation 16560 SY $ $ A27 4-04 Crushed Surfacing Base Course 9070 TON $ $ A28 5-04 Commercial HMA 960 TON $ $ A29 5-04 Fiber Reinforced HMA Cl. 1/2" PG 64-22 8650 TON $ $ A30 5-04 HMA for Shared-Use Path Cl. 1/2" PG 64-22 250 TON $ $ A31 5-04 HMA Cl. 1/2" PG 70-22 6300 TON $ $ A32 5-04 HMA for Preleveling Cl. 1/2" PG 70-22 1200 TON $ $ A33 5-04 Planing Bituminous Pavement 23100 SY $ $ A34 5-04 Temporary Pavement 2860 TON $ $ A35 5-04 Asphalt Price Cost Adjustment 1 CALC 199,200.00$ 199,200.00$ A36 5-05 Reinforced Cement Concrete Pavement 110 CY $ $ A37 5-05 Cement Concrete Pavement for Driveway 50 CY $ $ A38 5-05 River Rock Treatment 360 SY $ $ A39 6-02 Cement Conc. Switchback Ramp 1 LS $ $ A40 6-11 Cement Concrete Fill Wall 10 CY $ $ A41 6-11 Concrete Cast in Place Wall 10 CY $ $ A42 6-13 Modular Block Wall 790 SF $ $ A43 6-21 Pedestrian Railing 80 LF $ $ A44 6-32 Handrail 100 LF $ $ A45 7-01 Underdrain Pipe 8 In. Diam. 140 LF $ $ A46 7-04 Ductile Iron Storm Sewer Pipe 8 In. Diam. 110 LF $ $ A47 7-04 Ductile Iron Storm Sewer Pipe 12 In. Diam. 680 LF $ $ A48 7-04 PVC Storm Sewer Pipe 6 In. Diam. 280 LF $ $ A49 7-04 PVC Storm Sewer Pipe 8 In. Diam. 150 LF $ $ A50 7-04 Polypropylene Storm Sewer Pipe 12 In. Diam. 3570 LF $ $ Contract Documents Rainier Ave S Corridor Improvements - Phase 4 Page 14 August 2022 Item No. Spec. Section Description Quantity Unit Unit Price* Amount Note: Unit prices for all items, all extensions, and total amount of Bid shall be shown. Enter unit prices in numerical figures only in dollars and cents, i.e. to two (2) decimal places (including for whole dollar amounts). All figures must be clearly legible. Bids with illegible figures in the Unit Price column will be rejected as unresponsive. Where conflict occurs between the unit price and the total amount specified for any item, the unit price shall prevail, and totals shall be corrected to conform thereto. PROPOSAL (BID SCHEDULE A - ROADWAY IMPROVEMENTS) Rainier Ave S Corridor Improvements - Phase 4 (S 3rd St to NW 3rd PL) ALL ENTRIES SHALL BE WRITTEN IN INK OR TYPED TO VALIDATE BID A51 7-04 Polypropylene Storm Sewer Pipe 18 In. Diam. 1110 LF $ $ A52 7-04 Polypropylene Storm Sewer Pipe 24 In. Diam. 360 LF $ $ A53 7-04 Bank Run Gravel for Trench Backfill Storm 7970 TON $ $ A54 7-04 Temporary Stormwater Diversion 1 LS $ $ A55 7-05 Catch Basin Type 1 40 EA $ $ A56 7-05 Catch Basin Type 1 With Beehive Grate 2 EA $ $ A57 7-05 Catch Basin Type 1L 9 EA $ $ A58 7-05 Catch Basin Type 2 48 In. Diam. 43 EA $ $ A59 7-05 Catch Basin Type 2 54 In. Diam. 2 EA $ $ A60 7-05 Catch Basin Type 2 60 In. Diam. 1 EA $ $ A61 7-05 Catch Basin Type 2 72 In. Diam. 2 EA $ $ A62 7-05 Storm Round Frame and Cover 26 EA $ $ A63 7-05 Storm Rectangular Solid Metal Cover 6 EA $ $ A64 7-05 Adjust Storm Drainage Structure 21 EA $ $ A65 7-05 Connect to Existing Drainage Structures 11 EA $$ A66 7-06 Filterra Unit 12 EA $ $ A67 7-06 Filterra Unit with Internal Bypass 2 EA $ $ A68 7-06 Filterra Unit with Peak Diversion 1 EA $ $ A69 7-08 Shoring or Extra Excavation Class B for Storm 1 LS $ $ A70 7-08 Dewatering 1 EST 800,000.00$ 800,000.00$ A71 7-08 Television Inspection 1 LS $ $ A72 7-10 Bioretention Planter 800 SF $ $ A73 8-01 Erosion/Water Pollution Control 1 EST 120,000.00$ 120,000.00$ A74 8-02 Topsoil Type A 1710 CY $ $ A75 8-02 Bark or Wood Chip Mulch 340 CY $ $ Contract Documents Rainier Ave S Corridor Improvements - Phase 4 Page 15 August 2022 Item No. Spec. Section Description Quantity Unit Unit Price* Amount Note: Unit prices for all items, all extensions, and total amount of Bid shall be shown. Enter unit prices in numerical figures only in dollars and cents, i.e. to two (2) decimal places (including for whole dollar amounts). All figures must be clearly legible. Bids with illegible figures in the Unit Price column will be rejected as unresponsive. Where conflict occurs between the unit price and the total amount specified for any item, the unit price shall prevail, and totals shall be corrected to conform thereto. PROPOSAL (BID SCHEDULE A - ROADWAY IMPROVEMENTS) Rainier Ave S Corridor Improvements - Phase 4 (S 3rd St to NW 3rd PL) ALL ENTRIES SHALL BE WRITTEN IN INK OR TYPED TO VALIDATE BID A76 8-02 Coarse Compost 40 CY $ $ A77 8-02 Bioretention Media 190 CY $ $ A78 8-02 Seeded Lawn Installation 2310 SY $ $ A79 8-02 PS Tilia tomentosa 'PNI 6051'/ Green Mountain Linden; 2.5" Cal., 12'-14' Ht.13 EA $ $ A80 8-02 PS Quercus frainetto 'Schmidt'/ Forest Green Oak; 2.5" Cal., 12'-14' Ht.11 EA $ $ A81 8-02 PS Parrotia persica 'Inge's Ruby Vase'/ Ruby Vase Persian Ironwood; 2.5" Cal., 12'-14' Ht.11 EA $ $ A82 8-02 PS Nyssa sylvatica 'David Odom'/ Afterburner Tupelo; 2.5" Cal., 12'-14' Ht.21 EA $ $ A83 8-02 PS Cercidiphyllum japonicum/ Katsura Tree; 2.5" Cal., 12'-14' Ht.2 EA $ $ A84 8-02 PS Acer Triflorum/ Foughbark Maple; 2" Cal., 10'- 12' Ht. 1 EA $ $ A85 8-02 PS Malus 'Golden Raindrops'/ Golden Raindrops Crabapple; 2" Cal., 10'-12' Ht. 6 EA $ $ A86 8-02 PS Calocedrus decurrens/ Incense Cedar; 7'-8' Ht.3 EA $ $ A87 8-02 PS Cornus kousa x nuttallii ' KN4-43'/ Starlight Dogwood; 2" Cal., 10'-12' Ht. 11 EA $ $ A88 8-02 PS Berberis thunbergii 'Royal Cloak'/ Royal Cloak Japanese Barberry; 2 Gal, Cont. 188 EA $ $ A89 8-02 PS Cistus hybridus/ White Rockrose; 2 Gal. Cont. 176 EA $ $ A90 8-02 PS Spiraea betulifolia 'Tor'/ Tor Birchleaf Spirea; 2 Gal. Cont. 138 EA $ $ A91 8-02 PS Euonymus japonicus 'Microphyllus'/ Boxleaf Euonymus; 2 Gal. Cont. 435 EA $ $ A92 8-02 PS Ilex crenata 'Helleri''/ Helleri Holly; 2 Gal. Cont. 147 EA $ $ A93 8-02 PS Cornus sericea 'Kelseyii'/ Dwarf Redtwig Dogwood; 2 Gal. Cont. 539 EA $ $ A94 8-02 PS Rosa x 'NOATRAUM'/ Flower Carpet Pink Groundcover Rose; 2 Gal. Cont. 26 EA $ $ A95 8-02 PS Nassella tenuissima/ Mexican Feather Grass; 1 Gal Cont.554 EA $ $ A96 8-02 PS Calamagrostis x acutiflora 'Karl Foerster'/ Karl Foerster Feather Reed Grass; 1 Gal. Cont. 39 EA $ $ A97 8-02 PS Hemericalis 'Stella de Oro'/ Stella de Oro Daylily; 1 Gal. Cont. 341 EA $ $ A98 8-02 PS Mahonia nervosa/ Dwarf Oregon Grape; 1 Gal. Cont. 413 EA $ $ A99 8-02 PS Polystichum munitum/ Western Sword Fern; 1 Gal. Cont. 192 EA $ $ A100 8-02 PS Cotoneaster dammeri 'Eichholz'/ Eichholz Coteoneater; 1 Gal. Cont. 35 EA $ $ Contract Documents Rainier Ave S Corridor Improvements - Phase 4 Page 16 August 2022 Item No. Spec. Section Description Quantity Unit Unit Price* Amount Note: Unit prices for all items, all extensions, and total amount of Bid shall be shown. Enter unit prices in numerical figures only in dollars and cents, i.e. to two (2) decimal places (including for whole dollar amounts). All figures must be clearly legible. Bids with illegible figures in the Unit Price column will be rejected as unresponsive. Where conflict occurs between the unit price and the total amount specified for any item, the unit price shall prevail, and totals shall be corrected to conform thereto. PROPOSAL (BID SCHEDULE A - ROADWAY IMPROVEMENTS) Rainier Ave S Corridor Improvements - Phase 4 (S 3rd St to NW 3rd PL) ALL ENTRIES SHALL BE WRITTEN IN INK OR TYPED TO VALIDATE BID A101 8-02 PS Epimedium x perralchicum 'Frohnleiten'/ Frohnleiten Barrenwort; 1 Gal. Con. 1285 EA $ $ A102 8-02 PS Veronica peduncularis 'Georgia Blue'/ Georgia Blue Speedwell; 1 Gal. Cont. 380 EA $ $ A103 8-02 PS Juncus ensifolius/ Dagger-Leaf Rush; 1 Gal. Cont. 210 EA $ $ A104 8-02 PS Juncus 'Blue Dart'/ Blue Dart Rush; 1 Gal. Cont. 210 EA $ $ A105 8-02 PS Iris douglasiana/ Douglas Iris; 1 Gal. Cont. 50 EA $ $ A106 8-02 Protection of Private Property and Tree Protection 1 LS $ $ A107 8-02 Root Barrier 950 LF $ $ A108 8-02 Property Restoration 1 EST 50,000.00$ 50,000.00$ A109 8-02 Plant Establishment - 1 Year 1 LS LUMP SUM $ A110 8-03 Automatic Irrigation System, Complete 1 LS LUMP SUM $ A111 8-04 Cement Conc. Traffic Curb and Gutter 7550 LF $$ A112 8-04 Modified Cement Concrete Extruded Curb, Type 6 3980 LF $ $ A113 8-04 Extruded Curb 2420 LF $ $ A114 8-05 Wheel Stop 44 EA $ $ A115 8-06 Cement Conc. Driveway Entrance 2060 SY $ $ A116 8-07 Precast Dual Faced Sloped Mountable Curb 1220 LF $ $ A117 8-09 Raised Pavement Marker Type 1 42 HUND $ $ A118 8-09 Raised Pavement Marker Type 2 11 HUND $ $ A119 8-10 Curb Mounted Delineator Post 330 LF $ $ A120 8-13 Adjust Monument Case and Cover 6 EA $ $ A121 8-14 Cement Conc. Sidewalk 5260 SY $ $ A122 8-14 Thickened Edge Sidewalk 320 LF $ $ A123 8-14 Cement Conc. Curb Ramp, Type Perpendicular A 17 EA $ $ A124 8-14 Cement Conc. Curb Ramp, Type Perpendicular B 4 EA $ $ A125 8-14 Cement Conc. Curb Ramp, Type Parallel A 2 EA $$ Contract Documents Rainier Ave S Corridor Improvements - Phase 4 Page 17 August 2022 Item No. Spec. Section Description Quantity Unit Unit Price* Amount Note: Unit prices for all items, all extensions, and total amount of Bid shall be shown. Enter unit prices in numerical figures only in dollars and cents, i.e. to two (2) decimal places (including for whole dollar amounts). All figures must be clearly legible. Bids with illegible figures in the Unit Price column will be rejected as unresponsive. Where conflict occurs between the unit price and the total amount specified for any item, the unit price shall prevail, and totals shall be corrected to conform thereto. PROPOSAL (BID SCHEDULE A - ROADWAY IMPROVEMENTS) Rainier Ave S Corridor Improvements - Phase 4 (S 3rd St to NW 3rd PL) ALL ENTRIES SHALL BE WRITTEN IN INK OR TYPED TO VALIDATE BID A126 8-14 Cement Conc. Curb Ramp, Type Single Direction A 1 EA $ $ A127 8-14 Cement Conc. Curb Ramp, Type Combination 1 EA $ $ A128 8-14 Detectable Warning Surface 460 SF $ $ A129 8-14 Decorative Concrete Finish 400 SY $ $ A130 8-14 Smooth Cement Conc. Band 80 LF $ $ A131 8-14 Bus Shelter Foundation 2 EA $ $ A132 8-19 Adjust Gas Valve 11 EA $ $ A133 8-20 Modification of Existing Traffic Signal and Illumination System at Rainier Avenue S & S 3rd Street Intersection, Complete 1 LS LUMP SUM $ A134 8-20 Replacement of Existing Traffic Signal and Illumination System at Rainier Avenue S & S 2nd Street Intersection, Complete 1 LS LUMP SUM $ A135 8-20 Portable Temporary Traffic Signal System with Mast Arm 1 LS LUMP SUM $ A136 8-20 Pedestrian Hybrid Beacon Traffic Signal and Illumination System at Rainier Avenue S & SW Victoria Street, Complete 1 LS LUMP SUM $ A137 8-20 Replacement of Existing Traffic Signal and Illumination System at Rainier Avenue S & Airport Way Intersection, Complete 1 LS LUMP SUM $ A138 8-20 Pedestrian Hybrid Beacon Traffic Signal and Illumination System at Rainier Avenue N & NW 3rd Place, Complete 1 LS LUMP SUM $ A139 8-20 Decorative Illumination System, Complete 1 LS LUMP SUM $ A140 8-20 Fiber Optic Interconnect System, Complete 1 LS LUMP SUM $ A141 8-20 5G Small Cell Network Conduit System, Complete 1 LS LUMP SUM $ A142 8-20 PTZ Camera Systems, Complete 1 LS LUMP SUM $ A143 8-21 Permanent Signing 1 LS LUMP SUM $ A144 8-22 Plastic Stop Line 90 LF $ $ A145 8-22 Plastic Crosswalk Line 3250 SF $ $ A146 8-22 Plastic Traffic Arrow 72 EA $ $ A147 8-22 Plastic Traffic Letter 12 EA $ $ Contract Documents Rainier Ave S Corridor Improvements - Phase 4 Page 18 August 2022 Item No. Spec. Section Description Quantity Unit Unit Price* Amount Note: Unit prices for all items, all extensions, and total amount of Bid shall be shown. Enter unit prices in numerical figures only in dollars and cents, i.e. to two (2) decimal places (including for whole dollar amounts). All figures must be clearly legible. Bids with illegible figures in the Unit Price column will be rejected as unresponsive. Where conflict occurs between the unit price and the total amount specified for any item, the unit price shall prevail, and totals shall be corrected to conform thereto. PROPOSAL (BID SCHEDULE A - ROADWAY IMPROVEMENTS) Rainier Ave S Corridor Improvements - Phase 4 (S 3rd St to NW 3rd PL) ALL ENTRIES SHALL BE WRITTEN IN INK OR TYPED TO VALIDATE BID A148 8-22 Bicycle Lane Symbol 6 EA $ $ A149 8-22 Plastic Line, 4 In.1250 LF $ $ A150 8-22 Paint Line, 4 In.5680 LF $ $ A151 8-22 Removing Existing Pavement Markings 1 LS LUMP SUM $ A152 8-23 Temporary Pavement Marking 59000 LF $ $ A153 8-24 Rock Wall 60 SF $ $ A154 8-26 Resolution of Utility Conflicts for Storm Drainage 1 EST 145,000.00$ 145,000.00$ A155 8-26 Utility Potholing 220 EA $ $ A156 8-27 Gateway Trellis Relocation 1 LS LUMP SUM $ A157 8-28 Tree Grate 3 EA $ $ A158 8-30 Waste Receptacle 3 EA $ $ A159 8-31 Bench 2 EA $ $ A160 8-32 Gateway Wall A & B 1 LS $ $ A161 8-33 Bollard 7 EA $ $ Total Schedule A (Roadway Improvements)*$ * All applicable sales tax shall be included in the unit and lump sum Bid price per Section 1-07.2(1) and WAC 458-20-171. Contract Documents Rainier Ave S Corridor Improvements - Phase 4 Page 19 August 2022 RAINIER AVE S SW SUNSET BLVDS 3RD ST GENERAL NOTES CONSTRUCTION NOTES LEGEND LUMINAIRE SCHEDULE WIRE NOTES PLAN NUMBER BY APP.REVISION DESCRIPTION DRAWN BY: DESIGN BY: CHECK BY: PROJ MGR: FILE:BY:DATE: APPROVED FOR CONSTRUCTION DATE DRAWING NO. PROJECT NO. FED AID NO. DATE: SHEET NO.OF SURVEYED: 14087A-ILL01.dwg BID DOCUMENT Public Works Department CITY OF RENTON REGIST E R E D NOTGNI HSAWFOETATS ERNEPRFO E NNALIO E S IGS 39324JAN C IGANI K Tacoma Wenatchee KPG.com Seattle 3131 Elliott Avenue, Suite 400 Seattle, WA 98121 206.286.1640 7 -13-2022ILLUMINATION AND INTERCONNECT PLAN STA 11+00 TO STA 15+00 200 14087A JULY 2022 285200 RAINIER AVE S CORRIDOR IMPROVEMENTS - PHASE 4 (S 3RD ST TO NW 3RD PL) KPG JF EH DE JC STP(UL) -1615(005) RAINIER AVE S GENERAL NOTES CONSTRUCTION NOTES LEGEND LUMINAIRE SCHEDULE WIRE NOTES NUMBER BY APP.REVISION DESCRIPTION DRAWN BY: DESIGN BY: CHECK BY: PROJ MGR: FILE:BY:DATE: APPROVED FOR CONSTRUCTION DATE DRAWING NO. PROJECT NO. FED AID NO. DATE: SHEET NO.OF SURVEYED: 14087A-ILL01.dwg BID DOCUMENT Public Works Department CITY OF RENTON REGIST E R E D NOTGNI HSAWFOETATS ERNEPRFO E NNALIO E S IGS 39324JAN C IGANI K Tacoma Wenatchee KPG.com Seattle 3131 Elliott Avenue, Suite 400 Seattle, WA 98121 206.286.1640 7 -13-2022JF KPG (S 3RD ST TO NW 3RD PL) RAINIER AVE S CORRIDOR IMPROVEMENTS - PHASE 4 201 285 JULY 2022 14087A 201 STA 15+00 TO STA 18+25 ILLUMINATION AND INTERCONNECT PLANJC PLAN STP(UL) -1615(005) EH DE RAINIER AVE S S 2ND ST CONSTRUCTION NOTES LUMINAIRE SCHEDULE GENERAL NOTES LEGEND WIRE NOTES NUMBER BY APP.REVISION DESCRIPTION DRAWN BY: DESIGN BY: CHECK BY: PROJ MGR: FILE:BY:DATE: APPROVED FOR CONSTRUCTION DATE DRAWING NO. PROJECT NO. FED AID NO. DATE: SHEET NO.OF SURVEYED: 14087A-ILL01.dwg BID DOCUMENT Public Works Department CITY OF RENTON REGIST E R E D NOTGNI HSAWFOETATS ERNEPRFO E NNALIO E S IGS 39324JAN C IGANI K Tacoma Wenatchee KPG.com Seattle 3131 Elliott Avenue, Suite 400 Seattle, WA 98121 206.286.1640 7 -13-2022JF KPG (S 3RD ST TO NW 3RD PL) RAINIER AVE S CORRIDOR IMPROVEMENTS - PHASE 4 202 285 JULY 2022 14087A 202 STA 18+25 TO STA 22+50 ILLUMINATION AND INTERCONNECT PLANJC PLAN STP(UL) -1615(005) EH DE RAINIER AVE S SW VICTORIA STHAY E S P L S W LEGEND LUMINAIRE SCHEDULE GENERAL NOTES WIRE NOTES NUMBER BY APP.REVISION DESCRIPTION DRAWN BY: DESIGN BY: CHECK BY: PROJ MGR: FILE:BY:DATE: APPROVED FOR CONSTRUCTION DATE DRAWING NO. PROJECT NO. FED AID NO. DATE: SHEET NO.OF SURVEYED: 14087A-ILL01.dwg BID DOCUMENT Public Works Department CITY OF RENTON REGIST E R E D NOTGNI HSAWFOETATS ERNEPRFO E NNALIO E S IGS 39324JAN C IGANI K Tacoma Wenatchee KPG.com Seattle 3131 Elliott Avenue, Suite 400 Seattle, WA 98121 206.286.1640 7 -13-2022JF KPG (S 3RD ST TO NW 3RD PL) RAINIER AVE S CORRIDOR IMPROVEMENTS - PHASE 4 203 285 JULY 2022 14087A 203 STA 22+50 TO STA 27+00 ILLUMINATION AND INTERCONNECT PLAN PLAN JC DE EH STP(UL) -1615(005) RAINIER AVE S S TOBIN ST CONSTRUCTION NOTES LEGEND GENERAL NOTES LUMINAIRE SCHEDULE WIRE NOTES NUMBER BY APP.REVISION DESCRIPTION DRAWN BY: DESIGN BY: CHECK BY: PROJ MGR: FILE:BY:DATE: APPROVED FOR CONSTRUCTION DATE DRAWING NO. PROJECT NO. FED AID NO. DATE: SHEET NO.OF SURVEYED: 14087A-ILL02.dwg BID DOCUMENT Public Works Department CITY OF RENTON REGIST E R E D NOTGNI HSAWFOETATS ERNEPRFO E NNALIO E S IGS 39324JAN C IGANI K Tacoma Wenatchee KPG.com Seattle 3131 Elliott Avenue, Suite 400 Seattle, WA 98121 206.286.1640 7 -13-2022PLAN ILLUMINATION AND INTERCONNECT PLAN STA 27+00 TO STA 31+00 204 14087A JULY 2022 285204 RAINIER AVE S CORRIDOR IMPROVEMENTS - PHASE 4 (S 3RD ST TO NW 3RD PL) KPG JF EH DE JC STP(UL) -1615(005) RENTON AVENUE EXT RAINIER AVE N AIRPORT WAYRAINIER AVE S CONSTRUCTION NOTES LUMINAIRE SCHEDULE LUMINAIRE SCHEDULE WIRE NOTES NUMBER BY APP.REVISION DESCRIPTION DRAWN BY: DESIGN BY: CHECK BY: PROJ MGR: FILE:BY:DATE: APPROVED FOR CONSTRUCTION DATE DRAWING NO. PROJECT NO. FED AID NO. DATE: SHEET NO.OF SURVEYED: 14087A-ILL02.dwg BID DOCUMENT Public Works Department CITY OF RENTON REGIST E R E D NOTGNI HSAWFOETATS ERNEPRFO E NNALIO E S IGS 39324JAN C IGANI K Tacoma Wenatchee KPG.com Seattle 3131 Elliott Avenue, Suite 400 Seattle, WA 98121 206.286.1640 7 -13-2022PLAN JF KPG (S 3RD ST TO NW 3RD PL) RAINIER AVE S CORRIDOR IMPROVEMENTS - PHASE 4 205 285 JULY 2022 14087A 205 STA 31+00 TO STA 35+50 ILLUMINATION AND INTERCONNECT PLANJC DE EH FOR LEGEND AND GENERAL NOTES, SEE SHEET 204 STP(UL) -1615(005) RAINIER AVE N CONSTRUCTION NOTES LEGEND GENERAL NOTES LUMINAIRE SCHEDULE WIRE NOTES NUMBER BY APP.REVISION DESCRIPTION DRAWN BY: DESIGN BY: CHECK BY: PROJ MGR: FILE:BY:DATE: APPROVED FOR CONSTRUCTION DATE DRAWING NO. PROJECT NO. FED AID NO. DATE: SHEET NO.OF SURVEYED: 14087A-ILL02.dwg BID DOCUMENT Public Works Department CITY OF RENTON REGIST E R E D NOTGNI HSAWFOETATS ERNEPRFO E NNALIO E S IGS 39324JAN C IGANI K Tacoma Wenatchee KPG.com Seattle 3131 Elliott Avenue, Suite 400 Seattle, WA 98121 206.286.1640 7 -13-2022PLAN JF KPG (S 3RD ST TO NW 3RD PL) RAINIER AVE S CORRIDOR IMPROVEMENTS - PHASE 4 206 285 JULY 2022 14087A 206 STA 35+50 TO STA 39+00 ILLUMINATION AND INTERCONNECT PLANJC DE EH STP(UL) -1615(005) RAINIER AVE NNW 3RD PLNE L S O N P L N W CONSTRUCTION NOTES LEGEND GENERAL NOTES LUMINAIRE SCHEDULE WIRE NOTES NUMBER BY APP.REVISION DESCRIPTION DRAWN BY: DESIGN BY: CHECK BY: PROJ MGR: FILE:BY:DATE: APPROVED FOR CONSTRUCTION DATE DRAWING NO. PROJECT NO. FED AID NO. DATE: SHEET NO.OF SURVEYED: 14087A-ILL02.dwg BID DOCUMENT Public Works Department CITY OF RENTON REGIST E R E D NOTGNI HSAWFOETATS ERNEPRFO E NNALIO E S IGS 39324JAN C IGANI K Tacoma Wenatchee KPG.com Seattle 3131 Elliott Avenue, Suite 400 Seattle, WA 98121 206.286.1640 7 -13-2022PLAN JF KPG (S 3RD ST TO NW 3RD PL) RAINIER AVE S CORRIDOR IMPROVEMENTS - PHASE 4 207 285 JULY 2022 14087A STA 39+00 TO STA 43+50 ILLUMINATION AND INTERCONNECT PLAN 207 JC DE EH STP(UL) -1615(005) S 3RD ST CONSTRUCTION NOTES LEGEND LUMINAIRE SCHEDULE GENERAL NOTES WIRE NOTES NUMBER BY APP.REVISION DESCRIPTION DRAWN BY: DESIGN BY: CHECK BY: PROJ MGR: FILE:BY:DATE: APPROVED FOR CONSTRUCTION DATE DRAWING NO. PROJECT NO. FED AID NO. DATE: SHEET NO.OF SURVEYED: 14087A-ILL03.dwg BID DOCUMENT Public Works Department CITY OF RENTON REGIST E R E D NOTGNI HSAWFOETATS ERNEPRFO E NNALIO E S IGS 39324JAN C IGANI K Tacoma Wenatchee KPG.com Seattle 3131 Elliott Avenue, Suite 400 Seattle, WA 98121 206.286.1640 7 -13-2022PLAN JF KPG (S 3RD ST TO NW 3RD PL) RAINIER AVE S CORRIDOR IMPROVEMENTS - PHASE 4 208 285 JULY 2022 14087A 208 STA 201+50 TO STA 205+00 ILLUMINATION AND INTERCONNECT PLAN EH DE JC STP(UL) -1615(005) AIRPORT WAY LAKE AVE S CONSTRUCTION NOTES LUMINAIRE SCHEDULE LEGEND GENERAL NOTES WIRE NOTES NUMBER BY APP.REVISION DESCRIPTION DRAWN BY: DESIGN BY: CHECK BY: PROJ MGR: FILE:BY:DATE: APPROVED FOR CONSTRUCTION DATE DRAWING NO. PROJECT NO. FED AID NO. DATE: SHEET NO.OF SURVEYED: 14087A-ILL03.dwg BID DOCUMENT Public Works Department CITY OF RENTON REGIST E R E D NOTGNI HSAWFOETATS ERNEPRFO E NNALIO E S IGS 39324JAN C IGANI K Tacoma Wenatchee KPG.com Seattle 3131 Elliott Avenue, Suite 400 Seattle, WA 98121 206.286.1640 7 -13-2022PLAN JF KPG (S 3RD ST TO NW 3RD PL) RAINIER AVE S CORRIDOR IMPROVEMENTS - PHASE 4 209 285 JULY 2022 14087A 209 STA 601+50 TO STA 605+50 ILLUMINATION AND INTERCONNECT PLANJC DE EH STP(UL) -1615(005) NUMBER BY APP.REVISION DESCRIPTION DRAWN BY: DESIGN BY: CHECK BY: PROJ MGR: FILE:BY:DATE: APPROVED FOR CONSTRUCTION DATE DRAWING NO. PROJECT NO. FED AID NO. DATE: SHEET NO.OF SURVEYED: 14087A-SIG01.dwg BID DOCUMENT Public Works Department CITY OF RENTON REGIST E R E D NOTGNI HSAWFOETATS ERNEPRFO E NNALIO E S IGS 39324JAN C I GANI K Tacoma Wenatchee KPG.com Seattle 3131 Elliott Avenue, Suite 400 Seattle, WA 98121 206.286.1640 7 -13-2022VALUE VALUE SIGNALIZATION PLAN RAINIER AVE S & S 3RD ST NOTES 213 14087A JULY 2022 285213 RAINIER AVE S CORRIDOR IMPROVEMENTS - PHASE 4 (S 3RD ST TO NW 3RD PL) KPG EH DE JC JF CONSTRUCTION NOTESGENERAL NOTES STP(UL) -1615(005) WIRE NOTES SIGNAL POLE EQUIPMENT SCHEDULE PUSH BUTTON SCHEDULE SIGN SCHEDULE Rainier Ave S NUMBER BY APP.REVISION DESCRIPTION DRAWN BY: DESIGN BY: CHECK BY: PROJ MGR: FILE:BY:DATE: APPROVED FOR CONSTRUCTION DATE DRAWING NO. PROJECT NO. FED AID NO. DATE: SHEET NO.OF SURVEYED: 14087A-SIG02.dwg BID DOCUMENT Public Works Department CITY OF RENTON REGIST E R E D NOTGNI HSAWFOETATS ERNEPRFO E NNALIO E S IGS 39324JAN C I GANI K Tacoma Wenatchee KPG.com Seattle 3131 Elliott Avenue, Suite 400 Seattle, WA 98121 206.286.1640 7 -13-2022VALUE VALUE SIGNALIZATION PLAN RAINIER AVE S & S 2ND ST NOTES 216 14087A JULY 2022 285216 RAINIER AVE S CORRIDOR IMPROVEMENTS - PHASE 4 (S 3RD ST TO NW 3RD PL) KPG EH DE JC JF SIGN SCHEDULE CONSTRUCTION NOTES STP(UL) -1615(005) WIRE NOTES SIGNAL POLE EQUIPMENT SCHEDULE PUSH BUTTON SCHEDULE LEGEND ONE WAYONEWAY DO NOT ENTER ONLY INTERSTATE 405 TO CROSSWALK USE CROSSWALK USE S 2nd St Rainier Ave S RAINIER AVE S SW VICTORIA STHAY E S P L S W NUMBER BY APP.REVISION DESCRIPTION DRAWN BY: DESIGN BY: CHECK BY: PROJ MGR: FILE:BY:DATE: APPROVED FOR CONSTRUCTION DATE DRAWING NO. PROJECT NO. FED AID NO. DATE: SHEET NO.OF SURVEYED: 14087A-SIG03.dwg BID DOCUMENT Public Works Department CITY OF RENTON REGIST E R E D NOTGNI HSAWFOETATS ERNEPRFO E NNALIO E S IGS 39324JAN C IGANI K Tacoma Wenatchee KPG.com Seattle 3131 Elliott Avenue, Suite 400 Seattle, WA 98121 206.286.1640 7 -13-2022JF KPG (S 3RD ST TO NW 3RD PL) RAINIER AVE S CORRIDOR IMPROVEMENTS - PHASE 4 218 285 JULY 2022 14087A 218 RAINIER AVE S & SW VICTORIA ST SIGNALIZATION PLAN PLAN EH DE JC EVPE SCHEDULE LEGEND CONSTRUCTION NOTES CROSSWALK STOP ON RED STOP ON FLASHING IF NO THEN PROCEED STP(UL) -1615(005) WIRE NOTES SIGN SCHEDULE CITY OF RENTON STANDARD PLAN NOTES PUSH BUTTON SCHEDULE NUMBER BY APP.REVISION DESCRIPTION DRAWN BY: DESIGN BY: CHECK BY: PROJ MGR: FILE:BY:DATE: APPROVED FOR CONSTRUCTION DATE DRAWING NO. PROJECT NO. FED AID NO. DATE: SHEET NO.OF SURVEYED: 14087A-SIG04_PHASECHANGE.dwg BID DOCUMENT Public Works Department CITY OF RENTON REGIST E R E D NOTGNI HSAWFOETATS ERNEPRFO E NNALIO E S IGS 39324JAN C IGANI K Tacoma Wenatchee KPG.com Seattle 3131 Elliott Avenue, Suite 400 Seattle, WA 98121 206.286.1640 7 -13-2022SIGN SCHEDULE CONSTRUCTION NOTESWIRE NOTES 900 RAINIER AVE S & AIRPORT WAY NOTESVALUE 221 14087A VALUE SIGNALIZATION PLAN JULY 2022 RAINIER AVE S CORRIDOR IMPROVEMENTS - PHASE 4 285221 (S 3RD ST TO NW 3RD PL)DE EH JC JF STP(UL) -1615(005) SIGNAL POLE EQUIPMENT SCHEDULE PUSH BUTTON SCHEDULE GENERAL NOTES LEGEND CONCURRENT PHASE SCHEDULE EVPE SCHEDULE SCHEDULE VIDEO DETECTION Rainier Ave S Renton Ave ExtAirport Way Airport WayRenton Ave Ext RAINIER AVE NNW 3RD PLNUMBER BY APP.REVISION DESCRIPTION DRAWN BY: DESIGN BY: CHECK BY: PROJ MGR: FILE:BY:DATE: APPROVED FOR CONSTRUCTION DATE DRAWING NO. PROJECT NO. FED AID NO. DATE: SHEET NO.OF SURVEYED: 14087A-SIG05.dwg BID DOCUMENT Public Works Department CITY OF RENTON REGIST E R E D NOTGNI HSAWFOETATS ERNEPRFO E NNALIO E S IGS 39324JAN C IGANI K Tacoma Wenatchee KPG.com Seattle 3131 Elliott Avenue, Suite 400 Seattle, WA 98121 206.286.1640 7 -13-2022JF KPG (S 3RD ST TO NW 3RD PL) RAINIER AVE S CORRIDOR IMPROVEMENTS - PHASE 4 223 285 JULY 2022 14087A 223 RAINIER AVE N & NW 3RD PL SIGNALIZATION PLAN EH DE JC STP(UL) -1615(005) EVPE SCHEDULE CROSSWALK STOP ON RED STOP ON IF NO THEN PROCEED SIGN SCHEDULE CONSTRUCTION NOTES PLAN WIRE NOTES FLASHING CITY OF RENTON STANDARD PLAN NOTES LEGEND PUSH BUTTON SCHEDULE RAINIER AVE S CORRESPONDING SHEETS CONSTRUCTION NOTES CONSTRUCTION NOTES GENERAL NOTES GENERAL NOTES TREE GRATE SCHEDULE NUMBER BY APP.REVISION DESCRIPTION DRAWN BY: DESIGN BY: CHECK BY: PROJ MGR: FILE:BY:DATE: APPROVED FOR CONSTRUCTION DATE DRAWING NO. PROJECT NO. FED AID NO. DATE: SHEET NO.OF SURVEYED: 14087A-URB01.dwg BID DOCUMENT Public Works Department CITY OF RENTONPHUONG N. NGU Y E NNO. 1 493 EXP. 0 9 /1 6 /2022STATE O F W A SHIN GTONLAND S CAPE A R C H ITECTTacoma Wenatchee KPG.com Seattle 3131 Elliott Avenue, Suite 400 Seattle, WA 98121 206.286.1640 7 -13-2022JF KPG (S 3RD ST TO NW 3RD PL) RAINIER AVE S CORRIDOR IMPROVEMENTS - PHASE 4 251 285 JULY 2022 14087A 251 STA 15+00 TO STA 18+25 URBAN DESIGN PLAN PLAN HF PN PN STP(UL) -1615(005) SW VICTORIA STHAY E S PL S W RAINIER AVE S CORRESPONDING SHEETS CONSTRUCTION NOTES CONSTRUCTION NOTES GENERAL NOTES GENERAL NOTES TREE GRATE SCHEDULE NUMBER BY APP.REVISION DESCRIPTION DRAWN BY: DESIGN BY: CHECK BY: PROJ MGR: FILE:BY:DATE: APPROVED FOR CONSTRUCTION DATE DRAWING NO. PROJECT NO. FED AID NO. DATE: SHEET NO.OF SURVEYED: 14087A-URB01.dwg BID DOCUMENT Public Works Department CITY OF RENTONPHUONG N. NGU Y E NNO. 1 493 EXP. 0 9 /1 6 /2022STATE O F W A SHIN GTONLAND S CAPE A R C H ITECTTacoma Wenatchee KPG.com Seattle 3131 Elliott Avenue, Suite 400 Seattle, WA 98121 206.286.1640 7 -13-2022JF KPG (S 3RD ST TO NW 3RD PL) RAINIER AVE S CORRIDOR IMPROVEMENTS - PHASE 4 253 285 JULY 2022 14087A 253 STA 22+50 TO STA 27+00 URBAN DESIGN PLAN PLAN JS PN PN STP(UL) -1615(005) CORRESPONDING SHEETS S TOBIN STRAINIER AVE S CONSTRUCTION NOTES GENERAL NOTES TREE GRATE SCHEDULE PLAN NUMBER BY APP.REVISION DESCRIPTION DRAWN BY: DESIGN BY: CHECK BY: PROJ MGR: FILE:BY:DATE: APPROVED FOR CONSTRUCTION DATE DRAWING NO. PROJECT NO. FED AID NO. DATE: SHEET NO.OF SURVEYED: 14087A-URB02.dwg BID DOCUMENT Public Works Department CITY OF RENTONPHUONG N. NGU Y E NNO. 1 493 EXP. 0 9 /1 6 /2022STATE O F W A SHIN GTONLAND S CAPE A R C H ITECTTacoma Wenatchee KPG.com Seattle 3131 Elliott Avenue, Suite 400 Seattle, WA 98121 206.286.1640 7 -13-2022URBAN DESIGN PLAN STA 27+00 TO STA 31+00 254 14087A JULY 2022 285254 RAINIER AVE S CORRIDOR IMPROVEMENTS - PHASE 4 (S 3RD ST TO NW 3RD PL) KPG JF JS PN PN STP(UL) -1615(005) Special Provisions – BID DOCUMENT SP-153 Rainier Ave S Corridor Improvements – Phase 4 September 2022 Payment will be made in accordance with Section 1-04.1 for the following Bid item included in the Proposal: “Underdrain Pipe, 8 In. Diam.”, per linear foot. The unit Contract price per linear foot for storm sewer pipe of any kind and size specified shall be full pay for all labor, tools, materials, and equipment necessary to provide and install the item complete including removal, hauling, and disposing of pavement; Structure excavation including haul; backfilling with native material; bedding materials; compaction; and cleaning (flushing), connection to new or existing storm sewer or drainage structures, surface restoration. 7-04 STORM SEWERS 7-04.2 Materials Ductile Iron Storm Sewer Pipe shall conform to the requirements of Section 9-05.13 of the Standard Specifications. Ductile Iron Storm Sewer Pipe with Polywrap shall conform to the requirements of Section 9- 05.13 shall conform to the requirements of Section 9-05.13 of the Standard Specification except the pipe shall be Special Thickness Class 52 and shall be wrapped with 8-mil black, tube-type, polyethylene plastic per AWWA C105 standards. PVC pipe for Storm Sewer shall conform to the requirements of Section 9-05.12(1) of the Standard Specifications. The second paragraph of Section 7-04.2 is supplemented as follows: The Contractor shall require pipe suppliers to furnish certificates signed by their authorized representative, stating the specifications to which the materials or products were manufactured. The Contractor shall provide 2 copies of these certifications to the Engineer for approval. Certificates showing nonconformance with the Contract shall be sufficient evidence for rejection. Approval of certificates shall be considered only as tentative acceptance of the materials and products, and such action by Engineer will not relieve Contractor of his/her responsibility to perform field tests and to replace or repair faulty materials, equipment, and/or workmanship and Contractor’s own expense. Section 7-04.2 is supplemented with the following: Dense foam shall be 6.0 pounds per cubic foot closed cell Polyethylene foam. Bank Run Gravel for Trench Backfill Storm shall conform to Section 9-03.19. Direct Pipe Tee Connections: Special Provisions – BID DOCUMENT SP-271 Rainier Ave S Corridor Improvements – Phase 4 September 2022 existing cables, the new vault will need to be bottomless to allow the existing conduit and cables to be routed into the new vault. · All mounting equipment shall be included with the small cable vault. Cable Racking in Small Cable Vaults Cables shall be racked and secured with nylon ties. Nylon ties shall not be over-tightened. Identification or warning tags shall be securely attached to the cables in at least two locations in each small cable vault. All coiled cable shall be protected to prevent damage to the cable and fibers. Racking shall include securing cables to brackets (racking hardware) that extend from the sidewalls of the small cable vault. 8-20.3(8) Wiring Section 8-20.3(8) is supplemented with the following: The Contractor shall provide all the fiber optic cabling and associated equipment. Installation including splicing and labeling shall be done by the Contractor. All illumination circuits shall be labeled with a PVC marking sleeve bearing the circuit number at each junction box whether splices are present or not. Terminal strips in cabinets, or when used as a connection device between conductors, shall bear the circuit numbers. All stranded wires terminated at a terminal block shall have an open end, crimp style solderless terminal connector, and all solid wires terminated at a terminal block shall have an open end soldered terminal connector. All terminals shall be installed with a tool designed for the installation of the correct type of connector and crimping with pliers, wire cutters, etc., will not be allowed. All wiring inside the controller cabinet shall be trimmed and cabled together to make a neat, clean appearing installation. No splicing of any traffic signal conductor shall be permitted unless otherwise indicated on the Plans. All conductor runs shall be attached to appropriate signal terminal boards with pressure type binding posts. Field Wiring Chart 501 AC+ Input 521-540 Spare 502 AC- Input 541-580 Coordination 503-510 Control-Display 581-592 Emergency Pre-emp 511-515 Sign Lights 593-599 Spare 516-520 Railroad Pre-empt Movement 1 2 3 4 5 6 7 8 9 Number ____________________________________________________________________________ Vehicle Heads Special Provisions – BID DOCUMENT SP-296 Rainier Ave S Corridor Improvements – Phase 4 September 2022 8-28 TREE GRATE (NEW SECTION) 8-28.1 Description This work shall consist of providing and installing Tree Grate, grate frames, mounting attachments and pea gravel in locations as shown on the Plans and as specified herein. 8-28.2 Materials Materials shall meet the requirements of the following sections as applicable unless noted: Aggregates 9-03.12(4) Structural Steel and related materials 9-06 Pea gravel under tree grate as noted on Plans shall be in accordance with Section 9-03.12(4) gravel backfill for drains of the Standard Specifications. Tree Grate shall be approximately 4’x6’ as detailed on Plans. Tree Grate shall be rectangular grate with a 15.5” diameter single tree opening, cast in 4 pieces, pattern as shown in the Plans. Material shall be cast ductile iron, ASTM A53 6 Grade 65-45-12 with baked on oil finish. Tree grate and mounting attachments shall be steel angle frames and bolts by same manufacturer as the Tree Grate, size frame to accommodate Tree Grate as shown in the Plans. 8-28.3 Construction Requirements Tree Grate and frames shall typically require 8 to 10 weeks lead time prior to delivery and installation on site. Contractor shall break center opening to accommodate tree root flare from new street trees as needed. Contractor shall carefully ensure proper care around trees and avoid further damage to tree during installation. Install Tree Grate per manufacturer’s instructions and as approved by Engineer. Install in locations and details per Plans. Contractor shall field verify all Tree Grate location with Engineer’s approval prior to installation. Submittals The Contractor shall submit tree grate product cut sheets including model and name, dimensions and descriptions of pea gravel supplier, Tree Grate, grate frames and mounting attachments for Engineer’s approval. Contractor shall provide shop drawings of Tree Grate including all dimensions, sections, plans, colors, materials, finishes, pea gravel, mounting attachments, grate frame, fabrication methodology and installation requirements for Engineer’s approval.