Minor Franchise Permit: MFP22004903
IVR Number: 22004903
Permit Information
Permit Name: Puget Sound Energy - Electric
Address/Location:09/14/2022Application Date:3343901680Parcel Number: 1400 ABERDEEN AVE NE
Permit Type:09/29/2022Issue Date:Franchise
Permit Work Class:09/29/2023Expiration Date:Minor Utility
Job Number: 101147812Franchise Type:Electric
Description: Puget Sound Energy Electric CREW TO REMOVE POLES AT P01, P02 AND P07. CREW TO INSTALL CONDUIT
AND UF CABLE. POTHOLE ALL EXISTING UTILITIES. RESTORATION PER CITY OF RENTON STANDARDS.
Contacts
Name Address PhoneTypeBilling
Corrie Rydberg
Puget Sound Energy
3702 71st Ave W
University Place, WA 98466
C: (253) 905-5031ApplicantX
Vicki Henson
Potelco Inc
8001 212th St S
Kent, WA 98032
B: (253) 863-0484Contractor
Business License Number: 5109Electrical Contractor: POTELI*344O4
Construction Contractor: POTELI*227PL
MAINVUE WA LLC 121 3RD AVE
KIRKLAND, WA 98033
Owner
Corrie Rydberg
Puget Sound Energy
3702 71st Ave W
University Place, WA 98466
C: (253) 905-5031Specialized
Billing
General Conditions & Signature
Permission is hereby given for the work described on this permit according to the conditions hereon and according to the
approved plans and specifications pertaining thereto, subject to compliance with the Ordinance of the City of Renton.
Ÿ
This permit and plans must be posted at the job site at all times.Ÿ
I hereby certify that no work is to be done except as described above and in approved plans, and that work is to conform to
Renton Trench Restoration and Street Overlay Requirements.
Ÿ
Call 425.430.7203 or go to: https://permitting.rentonwa.gov one working day in advance to schedule an inspections and for ANY
work in the Right of Way.
Ÿ
Call 8 1 1 to locate underground utilities at least two full business days prior to any excavation.Ÿ
In accordance with RCW 19.122.033(4) the permit holder is required to contact (Williams Northwest Pipeline at 425.868.1010)
(Olympic Pipeline at 425.235.7736) (Puget Sound Energy at 425.375.3397) to request a consultation with the transmission
pipeline company prior to performing any construction or excavation activities. This requirement to consult with the
transmission pipeline company is in addition to the requirement to Call before You Dig as required in RCW 19.122.
Ÿ
(Date)(Signature)
Page 1 of 1THIS PERMIT AND PLANS MUST BE POSTED AT THE JOB SITE AT ALL TIMES
Note: The Applicant is responsible for compliance with all codes and regulations, whether or not described in this document.
DEPARTMENT OF PUBLIC WORKS
Page 1 of 3 | Published: 10/27/2021
Transportation Division | 1055 South Grady Way, 5th Floor | Renton, WA 98057 | 425-430-7380
Website: rentonwa.gov
TRAFFIC CONTROL PLAN APPLICATION
Published: 10/27/2021
TRAFFIC CONTROL PLAN (TCP) MUST BE SUBMITTED TO PUBLIC WORKS TRANSPORTATION DIVISION
FOR REVIEW/APPROVAL AT LEAST FIVE (5) WORKING DAYS BEFORE THE DATE OF WORK.
The City of Renton requires any contractor, firm, corporation, or other public/private agency to prepare a traffic control
plan (TCP) and obtain city's approval of that plan when construction, repair, or maintenance work is to be conducted
within the city's right-of-way.
1. Fill out the Traffic Control Plan (TCP) Application form and prepare required submittal documents.
2. The following items are all required for submittal of the TCP Application:
☐Electronic Copy of the TCP Application
☐Electronic Copy of the TCP Layout, on 11” X 17” paper size format, which shall:
Include map(s) showing the location of the project and work area.
Be legible lettering and clear, contrasting, symbols of viewing or printing.
Must indicate street names, and north arrow and scale.
Types of plans required:
o Work hour plan – show all mobility impacts during construction hours.
o Non-work plan - show all mobility impacts after work hours when limited or no work is
happening in the right-of-way (ROW), if applicable.
o Changing construction phases – show construction sequence and each construction phase
change even if the traffic control is not modified, if applicable.
o Pedestrian access/detour plan, if applicable.
- Shall conform to the Washington State Traffic Control Flagger Certification handbook, by the
Evergreen Safety Council.
3. Submit Application via email to TCP@rentonwa.gov with the subject line “TCP Application – [Project Name].”
Project Name: Permit #:
Site Address:
Work Date: From _____________ To _____________ Work Time: Start ______________ End ______________
Construction Company:
Contact Name: Phone/Cell: _________________________
Business Address: City/State: Zip:
Description of Work:
Approval By: _________________________________________________ Date:____________________
Transportation Engineering
PLEASE SEE ATTACHED
POTELCO, INC
6905 S 228TH ST KENT, WA 98032
101147812
1400 ABERDEEN AVE NE
RANDY BLACKIE 425-457-2614
MFP22004903
Monday - Friday 8:00AM - 3:00PM
Scott Warlick CED 9/29/2022
Note: The Applicant is responsible for compliance with all codes and regulations, whether or not described in this document.
Page 2 of 3 | Published: 10/27/2021
PERMIT HOLDER AGREES TO ALL THE FOLLOWING:
Must have approved Traffic Control Plan (TCP) prior to commencing the work.
Maintain existing pedestrian access. The work on pedestrian facilities, shall be limited to one corner at a time,
with the least possible inconvenience or delay to pedestrians.
WORK TIME begins when any street or travel lane is fully or partially closed. This includes set up within the
traveled way.
Comply with all traffic regulations of the City of Renton and the State of Washington.
Prepare a traffic control plan and obtain City approval of that plan. That plan shall be implemented for all street
and lane closures, and the plan shall be performed in compliance with the Manual on Uniform Traffic Control
Devices.
Notify emergency services (253-852-2121) twenty-four (24) hours before any street or lane closures.
Contractor or entity must call Renton School District (425-204-4455) or any public/private agency, including public
transit, to be affected by a temporary lane or road closure a minimum of five business days (excluding weekends
and holidays) prior to starting any work.
Contractor or entity must notify King County Metro in writing at construction.coord@kingcounty.gov a minimum
of five business days (excluding weekends and holidays) prior to starting any work impacting bus stops, a
temporary lane or road closure. Work requiring removing a bus shelter or sign requires notification in writing a
minimum of 30 business days (excluding weekends and holidays). Please call King County Metro at 206-477-1140
with any questions.
Any lane or street closures not in conformance with the approved traffic control plan and/or without notification
of emergency services may result in receiving a citation for violation of R.C.W. 47.36.200 Signs or Flaggers at
thoroughfare work sites and R.C.W. 9A.36.050 Reckless Endangerment, and other applicable State and City codes.
Indemnify and hold harmless the City of Renton from any and all claims, actions, and judgments, including all
costs of defense and attorney’s fees incurred in defending against same, arising from and related to
implementation of the approved traffic control plans including claims arising from towing of private vehicles and
the acts of the Permit Holder’s agents and employees.
The City of Renton shall be entitled, in its reasonable discretion, to settle claims prior to suit or judgment, and in
such event shall indemnify and hold harmless the City for any such claims paid, including the City’s reasonable
attorney’s fees and litigation costs incurred resulting from such claim.
In the event any claim or suit is brought against City within the scope of this Agreement, Permit Holder will pay for
legal counsel chosen by the City to defend against same.
Flagger and sign placement are subject to revision by the City Inspector on site, if needed to address traffic or
pedestrian safety or travel.
All permit conditions shall be met.
NOTES:
Total road closure lasting more than twenty-four (24) hours is subject to the approval by the City Council.
Work Zone Traffic Control shall be in accordance with the Manual on Uniform Traffic Control Devices (MUTCD)
and shown by a traffic control plan layout or reference to WSDOT.
Approved Temporary Traffic Control Plan must be at the work site during work hours.
Complete assistance and accommodation shall be provided to all kinds of pedestrian traffic when sidewalk or
walkway is impeded to safely redirect pedestrians around a work zone.
Signage shall be used to warn motorcyclists/bicyclists of the potential hazards on any uneven surfaced or slippery
road conditions during work and non-work hours.
Any vehicle, equipment, barricade, or portable tow-away sign used within the work area must display a company
logo or any legally acceptable sign showing the company name, address, and telephone number at a conspicuous
place on the vehicle or equipment.
Note: The Applicant is responsible for compliance with all codes and regulations, whether or not described in this document.
Page 3 of 3 | Published: 10/27/2021
In the case of Temporary No Parking Zones, all the following apply in addition to previous:
Contractor must complete form to show limits of Temporary No Parking Zone identifying barricade locations for
vacate parking or curb lane usage.
Contractor must post notice of dates and time of Temporary No Parking Zone with at least two signs per block
seventy-two (72) hours in advance of effective date and time.
The cover sheet of this Traffic Control Plan form must be attached to each Temporary No Parking Sign on the
project site.
Temporary traffic control devices must be removed immediately when work is done or no construction activities
are going on. If deemed abandoned, City crews will remove and store them at the City’s maintenance shop (3555
NE 2nd Street).
I certify that the information on this application and within the submittal documents are accurate to the best of my
knowledge and I acknowledge all the requirements on this application.
Applicant’s Signature Date
Applicant’s Name (Print)
CORRIE RYDBERG
P03
P02
P01
ABERDEEN AVE NE10 10
10 10
W20-7AROAD
WORKAHEAD W20-1W20-4ONE LANE
ROADAHEAD200'200'200'STOP
FLAGGER
STOP
FLAGGERW20-7AROADWORKAHEADW20-1W20-4ONE LANEROADAHEAD200'200'200'NE 16TH ST
RESIDENT(S) - CLIENTS(S)
WILL BE INFORMED IN ADVANCE
OF TEMPORARY DRIVEWAY CLOSURE
PLACE SIGNS ALONG
WORK AREAFROMTOTOW AWAY AREAPHONE 888-9999INFRASOURCE LLC 000 0000000NO PARKINGNO-PARK28" TRAFFIC CONE
LEGEND
TRAFFIC FLOW
SIGN LOCATION
FLAGGER
STOP
POLE
WORK VEHICLE/
FLASHING LIGHTS
RIGHT OF WAY
SIGN SPACING
MPH
60/65
45/55
35/40
30
25
"X"
1000'
500'
350'
200'
100'
CHANNELIZATION
DEVICE SPACING
MPH
55/70
35/45
25/30
TAPER
40
30
20
TANGENT
80
60
40
TEMPORARY TRAFFIC CONTROL PLAN
N
Notes:
1. All signs and spacing to conform to the
MUTCD and City of Renton standards.
2. All sidewalks, driveways, exits and egresses
shall be completely clear unless otherwise indicated.
3. Channelizing devices are 28" traffic cones.
Use traffic drums (barrels) with steady burning
Type C lights on all State State Routes and Hwys.
4. Sign size can be a minimum of 36" x 36" and
shall not obstruct pedestrian access.
5. Crew is required to leave a minimum of 11' for
traveling lane width.
6. Alert affected residents and businesses.
7. Work to take place between 9 a.m. and 4 p.m
unless otherwise specified. All work for arterials
and major roadways will be from 9 a.m. to 3 p.m.
Project Address:
Page
PSE PUGETSOUNDENERGY
Designer:
Job #
REV
08/09/2022
512637211
1
1400 Aberdeen Ave NE, Renton, WA
Kali-Jamal Collins
425-424-6425
Kali-Jamal.Collins@pse.com
1 OF 3
Puget Sound Energy
Traffic Control Supervisor:
Gregory Harwood
Card No. 012238
Card Exp. 09/30/2023
gregory.harwood@pse.com
(425)424-6425
MFP22004903
P04
P01
ABERDEEN AVE NE10 10
10 10
W20-7AROAD
WORK
AHEAD W20-1W20-4ONE LANEROADAHEAD200'200'200'W20-7AROADWORKAHEADW20-1W20-4ONE LANEROADAHEAD200'200'200'STOP
FLAGGER
NE 16TH ST
RESIDENT(S) - CLIENTS(S)
WILL BE INFORMED IN ADVANCE
OF TEMPORARY DRIVEWAY CLOSURE
PLACE SIGNS ALONG
WORK AREAFROMTOTOW AWAY AREAPHONE 888-9999INFRASOURCE LLC 000 0000000NO PARKINGNO-PARKTEMPORARY TRAFFIC CONTROL PLAN
N
Notes:
1. All signs and spacing to conform to the
MUTCD and City of Renton standards.
2. All sidewalks, driveways, exits and egresses
shall be completely clear unless otherwise indicated.
3. Channelizing devices are 28" traffic cones.
Use traffic drums (barrels) with steady burning
Type C lights on all State State Routes and Hwys.
4. Sign size can be a minimum of 36" x 36" and
shall not obstruct pedestrian access.
5. Crew is required to leave a minimum of 11' for
traveling lane width.
6. Alert affected residents and businesses.
7. Work to take place between 9 a.m. and 4 p.m
unless otherwise specified. All work for arterials
and major roadways will be from 9 a.m. to 3 p.m.
28" TRAFFIC CONE
LEGEND
TRAFFIC FLOW
SIGN LOCATION
FLAGGER
STOP
POLE
WORK VEHICLE/
FLASHING LIGHTS
RIGHT OF WAY
SIGN SPACING
MPH
60/65
45/55
35/40
30
25
"X"
1000'
500'
350'
200'
100'
CHANNELIZATION
DEVICE SPACING
MPH
55/70
35/45
25/30
TAPER
40
30
20
TANGENT
80
60
40
Project Address:
Page
PSE PUGETSOUNDENERGY
Designer:
Job #
REV
08/09/2022
512637211
1
1400 Aberdeen Ave NE, Renton, WA
Kali-Jamal Collins
425-424-6425
Kali-Jamal.Collins@pse.com
2 OF 3
Puget Sound Energy
Traffic Control Supervisor:
Gregory Harwood
Card No. 012238
Card Exp. 09/30/2023
gregory.harwood@pse.com
(425)424-6425
MFP22004903
P06
P07
ABERDEEN AVE NE10 10
10 10
W20-7AROAD
WORK
AHEAD W20-1W20-4ONE LANEROADAHEAD200'200'200'STOP
FLAGGERW20-7AROADWORKAHEADW20-1W20-4ONE LANEROADAHEAD200'200'200'STOP
FLAGGER
NE 16TH ST
RESIDENT(S) - CLIENTS(S)
WILL BE INFORMED IN ADVANCE
OF TEMPORARY DRIVEWAY CLOSURE
PLACE SIGNS ALONG
WORK AREAFROMTOTOW AWAY AREAPHONE 888-9999INFRASOURCE LLC 000 0000000NO PARKINGNO-PAR
K
TEMPORARY TRAFFIC CONTROL PLAN
N
Notes:
1. All signs and spacing to conform to the
MUTCD and City of Renton standards.
2. All sidewalks, driveways, exits and egresses
shall be completely clear unless otherwise indicated.
3. Channelizing devices are 28" traffic cones.
Use traffic drums (barrels) with steady burning
Type C lights on all State State Routes and Hwys.
4. Sign size can be a minimum of 36" x 36" and
shall not obstruct pedestrian access.
5. Crew is required to leave a minimum of 11' for
traveling lane width.
6. Alert affected residents and businesses.
7. Work to take place between 9 a.m. and 4 p.m
unless otherwise specified. All work for arterials
and major roadways will be from 9 a.m. to 3 p.m.
28" TRAFFIC CONE
LEGEND
TRAFFIC FLOW
SIGN LOCATION
FLAGGER
STOP
POLE
WORK VEHICLE/
FLASHING LIGHTS
RIGHT OF WAY
SIGN SPACING
MPH
60/65
45/55
35/40
30
25
"X"
1000'
500'
350'
200'
100'
CHANNELIZATION
DEVICE SPACING
MPH
55/70
35/45
25/30
TAPER
40
30
20
TANGENT
80
60
40
Project Address:
Page
PSE PUGETSOUNDENERGY
Designer:
Job #
REV
08/09/2022
512637211
1
1400 Aberdeen Ave NE, Renton, WA
Kali-Jamal Collins
425-424-6425
Kali-Jamal.Collins@pse.com
3 OF 3
Puget Sound Energy
Traffic Control Supervisor:
Gregory Harwood
Card No. 012238
Card Exp. 09/30/2023
gregory.harwood@pse.com
(425)424-6425
MFP22004903
N
Vicinity Map
47.5051, -122.1908
Owner / Developer Contact Info
officeATTN:
MAINVUE WA, LLC
1110 112TH AVE NE, SUITE 202
BELLEVUE, WA 98004
SEAN DICKEY 425.754.6251
THIS SKETCH NOT TO BE RELIED UPON FOR EXACT LOCATION OF EXISTING FACILITIES
CALL (800) 424-5555
2 BUSINESS DAYS BEFORE YOU DIG
For contacts below dial 1-888-CALL PSE (225-5773)
PSE
No
No
No
Yes
Yes
Yes
No
YesDeveloper
"Flagging Required"
"Outages Required"
"Locates Required"
FOREMAN (CHECK BOX WHEN COMPLETED)
PSE Equipment LOCKED/SECURED & Work Area left in CLEAN/SAFE Condition.
Grid, Cable, and Switch numbers INSTALLED & VERIFIED.
Field Changes RED-LINED on As-built.
Indicate correct FUSE SIZE on As-built & VERIFY proper PHASE.
Foreman's Signature _______________________________________________
Print Name ___________________________________ Date ______________
Material VERIFIED and CHANGES noted on Paperwork.
Total PRIMARY Cable noted on As-built.
Company ID#'s RECORDED in correct location on As-built.
Deviations noted on the As-built and their reason.
I certify that the work performed meets PSE's standards and procedures
and that all quality requirements are met.
GAS
PHONE
CABLE TV
512637211 101147812
N/A 108139090
N/A 583070178
N/A 584
N/A 593245864
N/A 594
N/A N/A
N/A N/A
N/A N/A
PROJECT PHASE
PWR
NOTIF#ORDER#
Superior
Removal
OH XFMR
PM XFRM
OH Wire
UG Wire
Distribution
Service Stubs
HP Svc/MSA 101147812N/ADESIGNED BY
UTILITIES
CONTACT
PHONE#
COUNTY
1/4 SEC
U-MAP NO (POWER)
OP MAP
Emer Sect Gas Wk Ctr POWER WK CTR
PLAT MAP
JOINT FACILITIES ARRANGEMENTS
DRAWN BY
CHECKED BY
APPROVED BY
FOREMAN #1
FOREMAN #2
MAPPING
INCIDENT MAOP
Gas Order Elect Order
SCALE PAGE
ENGR - POWER
ENGR - GAS
FUNCTION
PROJECT MGR
PERMITREAL ESTATE/EASEMENT
2
1
REV#
3
DATE DESCRIPTIONBY
CONTACT PHONE NO DATE
OH CKT MAP CIRCUIT NOUG CKT MAP
R.BLACKIE 425.457.2614 .
E. ARCIAGA .----
----.----
E. ARCIAGA .----
REDT # ( RW-TBD )RENTON
BRENNON LANDING
SCH73 - OH TO UG CONVERSION
1400 ABERDEEN AVENUE NE, RENTON, WA 98056
PUGET SOUND ENERGY
N/A IP 088-60
N/A 101147812
N/A 1 OF 4
KING 088A CIKNC QCSOKE
05SE-T23N-R05E 204.080 205.083
2305E020 2305E040 2305E020 HIG-15
COMCAST
JAMES COHN
253.569.0636
LUMEN
AMY ALLISTON
206.794.8534
RIGHT OF WAY
ROW TBD
ROW TEL TBD
.
.
.
E-Mail:
Cell Phone:
Project Manager Contact Information:
Manager:RANDY BLACKIE
425.457.2614
randy.blackie@pse.com
x
xx
...
...
...
x
SEAN.DICKEY@MAINVUEHOMES.COM
SITE
GENERAL 1.
Pre-construction Notify appropriate City or County 48 to 72 hours or as required by
permitting agency before starting work on any right-of-way involving a permit.
Follow all requirements as outlined by the permitting agency.
Locate and mark all underground utilities prior to start of construction. If there is a
conflict with the intended trench route as shown on the site plan and existing utilities or
obstructions, trench route may need to be moved to opposite side of street.
Cooperation with Quality Inspector, Puget Sound Energy Contractor, City or County
authorities during Pre-construction meeting will determine the final trench route.
2. Existing Utilities
Hand excavate (pothole) all marked utility crossings to verify exact location and depth
at point of crossing. Protect underground utilities during excavation. Use hand
excavation methods if necessary to avoid damage. Fabricate and install adequate
temporary structures to support and protect underground utilities while exposed during
construction.
Maintain 6" minimum clearance at crossings between existing utilities and new duct
installations. Transition trench or tunnel profile gradually as required at crossings.
Maintain 24" minimum separation between new trench or tunnel and parallel existing
utilities or as required by the permit agency.
In the event of damage to an underground utility, notify Puget Sound Energy at once.
Contractor agrees to make work force and resources available at once to Puget Sound
Energy or municipal authorities to repair damage at no cost.
3. Work Drawings
Maintain on site, in good condition, a complete file of all work drawings. These
drawings shall be available at all times to a Puget Sound Energy representative.
Corrections and changes made during the job shall be recorded continuously on these
drawings. All underground electrical facilities shall have a minimum of 36 inches of
cover. Any change must be approved by the PSE engineer or project manager.
Furnish Puget Sound Energy a complete set of as built prints (foreman's copies) at the
end of the job.
4. Safety
Provide signs, barricades, and traffic control in conformance with local jurisdictions and
regulations. Provide flagging and or other vehicle traffic control as needed in
conformance with local regulations. (see SPM # 100.4000) Provide adequate signage
and protection to traffic during non-working hours. Maintain traffic flow as required by
permitting agency. Provide signs and barricades to warn pedestrians, motorcycles and
bicycles.
Install warning barricades at least every 50 feet along the trench route from the time the
trench is opened until the trenching is complete.
5. Existing Systems
Maintain existing electrical system in service until new system is complete, tested, and
ready for service. Disable existing system only to make cutovers and connections as
directed by Puget Sound Energy's representative.
Provide temporary wiring and connections to maintain existing systems in service during
construction; if a scheduled outage is not possible. When work must be performed on
energized equipment or circuits, use qualified personnel for such operations.
EARTHWORK
See Puget Sound Energy SPM 6800.4050
1. Back hoe, Hand Dug Excavations
Paved Surfaces
Cut the edges of the trench prior to digging. Use the narrowest bucket practical or plow
off the edge of paved surface far enough to minimize asphalt disturbance. Repair any
blow out areas (where edge has been broken) by sawing. The depth of the trench shall
be enough to allow 36" of cover . Backfill material shall be Controlled Density Fill (CDF)
cover or select fill (5/8" minus) to meet permit requirements.
Unpaved Surfaces
Conduit/cable trenches are to be excavated just off the existing road edge or in the
shoulder of the road behind the existing ditch line. Contractor shall use a back hoe with
the narrowest width bucket practical or plow. Trench shall be deep enough to allow a
minimum of 36" of cover over the top most cable. All ditch crossings shall have a
minimum of 36" cover from the lowest point within the existing ditch line.
Culverts; when installing facilities under a culvert, excavation must be filled with packed
crush rock. If any culvert is damaged it will be repaired or replaced in accordance with
permitting agency and contractors responsibility.
Spoils shall be removed quickly to minimize blocking of traffic. All spoils and wastes
become the property of the contractor immediately upon removal. Remove spoils and
wastes promptly to an approved disposal site. Remove spoils containing asphalt or
concrete to a disposal site specifically approved for such materials. Provide Puget
Sound Energy with a disposal receipt for all spoils.
2. Backfill
Unpaved Road Surfaces
Backfill for unpaved road crossings shall consist of 1-1/2" to 2-1/2" material compacted
to 95% density. Backfill for unpaved road sections shall consist of native material
compacted to 95% density.
At the end of each workday, backfill or plate all trench, remove all spoils and clean
roadway surface of large hazardous debris.
3. Surface Restoration
Unpaved Surfaces
Restore ground surface to original contour. Restore to original condition or better.
4. Landscaping
Arrange and perform work to minimize impact to existing landscaping. Restore
landscaping that has been disturbed during the course of work, including seeding of
banks and fills. Vaults set in bank areas may require re-sloping the surrounding land to
avoid sloughing. Leave area in its original state or better at the end of construction.
Hand dig if required to prevent damage to tree roots.
ELECTRICAL
1. Conduit
Conduit for installation in unpaved areas shall be 2", 3", 4", or 6" PVC DB120 direct burial.
Maintain 36" minimum cover above top conduit at all times or as required by the permitting
agency.
Where conduit is routed from road edge to vault location, maintain 36" minimum cover above top
conduit at all times or as required by the permitting agency. Bends shall be made with as long a
radius as possible (48" minimum). Avoid making sharp bends or kinks in conduit during
installation. Obtain exact location of conduit entrance into vault from Puget Sound Energy before
penetrating vault. Penetrate the vault using existing knockout or use core drilled holes. Stub the
4" or 6" PVC 2"-3" into vault interior and grout between the conduit and vault wall. Leave a 10'
minimum of extra pull rope in each end of installed conduit where 4" or 6" PVC is installed and
cap conduit to prevent the entry of dirt and moisture.
Arrange work so conduit plays directly off reel into trench. Place the conduit in the trench as
straight as possible. Avoid vertical and horizontal "snaking" of the conduit. Multiple conduit runs
may be stacked vertically. Where conduit must be pulled through a trench to allow a crossing
under an existing utility, cap conduit end before pulling to avoid contamination. If a kink occurs,
cut the conduit ahead of kink and splice to new conduit to continue run.
2. Underground Primary Cable
Primary cable shall be 1/O Alum Sol Jacketed Cable rated for 15 KV service with a polyethylene
jacket. Primary cable shall be 61 strand 750 MCM aluminum conductor rated for 15 KV service
with a copper tape neutral conductor and polyethylene jacket. A 4/0 copper neutral shall be run
with each 3 phase circuit of 750 MCM.
Install cable into existing or new conduit systems using approved installation equipment.
Approved equipment includes either cable pullers and/or cable pushers. Pulling socks shall be
non-conductive or similar material. Steel pulling socks are prohibited. Bare steel cable shall not
be used to pull cable. Cable pulling equipment (winches, hoist, driven reels, etc.) shall be
equipped with instrumentation to continually monitor and record peak tension encountered during
a pull. Before installing cable, obtain rated pulling tension for cable from Puget Sound Energy.
Do not exceed rating at any time during installation. Notify Puget Sound Energy immediately if
pulling tension equals or exceeds rating (828/1657lbs for 1/0 or 5000lbs for 750 .) Do not exceed
minimum bend radius of cable or impose kinks or sharp bends on cable during pulling operations.
Install cable directly off reel without dragging it on the ground. Apply Puget Sound Energy
approved lubricant to cable continually during pulling to reduce pulling tension and to permit future
removal.
Install adequate amounts of 3/4 " plywood on existing sidewalk areas to support pulling equipment
and prevent un-necessary damage to sidewalks.
Train and coil cables in vaults as required to form a smooth transition from conduit to termination.
if terminations are to be performed by others, coil 15' of cable in vault and cap end.
3. Terminations and Splices
Install approved terminations on cables in accordance with Puget Sound Energy SPM 2247.5115-
5119. Unless otherwise directed, approved terminations will be load break elbows in vaults and
cold shrink pin terminals on pole risers per Puget Sound Energy SPM 2247.9317.
Splice cable with approved splice kits in vaults, hand holes or similar enclosures. Do not splice
cables in runs between vaults. See Puget Sound Energy SPM 2233.2075-2076.
4. Concrete Vaults
Excavate, install base material, and compact base material in accordance with Puget Sound
Energy SPM 6775.0040.
Install and seal precast sections in accordance with Puget Sound Energy SPM 6775.0040. Use
precast neck and shaft sections to bring manhole entrance to proper elevation. Install manholes
plumb. Set the top of each manhole to finished elevation or no higher than 6" above existing road
elevation. Install hillholders as required on sketch or by construction notes.
5. Grounding
Install ground rod per Puget Sound Energy SPM 6275.6100 at each vault in which primary cable
is terminated. Locate rod in trench excavation wherever possible to obtain maximum driven depth
in undisturbed soil. Connect each ground individually to ground loop inside vault with bare no. 2
copper jumper or to Concentric neutral at each splice vault location. Minimum grounding
requirement is 4 grounds per mile.
6. Existing Underground Primary Cable (if applicable)
Abandon existing primary cable in place. Cut off old cable ends inside vault flush with wall.
Before cutting, pigtail concentric neutral strands and connect to ground loop inside vault. Return
scrap cable and existing cable tags to Puget Sound Energy. Remove or fill existing vaults as
required by permitting agency.
7. Traffic Control
All traffic control to comply with current specifications in M.U.T.C.D.
GENERAL OVERHEAD NOTES:
1. Poles, conductors, devices to be installed per PSE Standards & Specifications.
2. Poles are to be installed or relocated as staked.
3. All new poles set shall be the class indicated on the sketch or better.
4. Install ground plate assembly on all new poles.
5. Install grid numbers on all new and existing poles as shown on sketch.
6. Treat all field-drilled poles with copper Naphthenate wood preservative.
7. Customer/Developer to coordinate between utilities.
8. All new and relocated poles -locations- to be approved by City of Renton
BRENNON LANDING
SCHEDULE 73
OH TO UG CONVERSION
NOTE:
DEVELOPER TO PROVIDE ALL CIVIL WORK: TO AND INCLUDING
EXCAVATION, BACKFILL, SHORING, TRENCH MAINTENANCE,
SANDING FOR DUCT, SELECT 5/8" CRUSH FOR UNDER VAULTS,
COMPACTION, ALL HARDSURACE RESTORATION AND RELATED
LANDSCAPING RESTORATION. DEVELOPER TO PROVIDE
TEMPORARY EXCAVATION PLATING (IF REQUIRED).
& ANY ADDITIONAL LOCAL JURISDICITON REQUIREMENTS.
EROSION & SEDIMENT CONTROL SHALL BE PER PSE STANDARD PRACTICE
0150.3200 TECHNIQUES FOR TEMPORARY EROSION & SEDIMENT CONTROL
(LOCAL JURISDICTIONS MAY HAVE ADDITIONAL REQUIREMENTS INCLUDING
NOTES DETAILING WHERE EROSION OR SEDIMENT CONTROL STRUCTURES
EROSION & SEDIMENT CONTROL REQUIREMENTS
STRUCTURES, & SPECIAL REQUIREMENTS FOR WORK IN SENSITIVE AREAS.)
ARE TO BE INSTALLED, CROSS SECTION DETAILS OF THE TYPICAL EROSION
EXISTING PROPERTY LINE
EXISTING UG RISER
NEW UG RISER
J-BOX
NEW TRENCH LINE
EXISTING 3Ø WIRE
EXISTING CENTER LINE
CONDUCTOR TO BE REMOVED
DISCONNECT - FUSED
EXISTING 1Ø WIRE
EXISTING RIGHT OF WAY
PULL VAULT
EXISTING POLE
DOWN GUY
EXISTING SECONDARY SERVICE LINE
DISCONNECT - UNFUSED
STREETLIGHT
NEW POLE
NEW PADMOUNT TRANSFORMER
EXISTING PADMOUNT TRANSFORMER
NEW HANDHOLE
P
ELECTRIC SYMBOLS LEGEND
OVERHEAD CIRCUIT MAP - EXISTING (2305E040)
SCALE: 6" = 1 MILE
JOB
SITE
MFP22004903
DESIGNED BY
UTILITIES
CONTACT
PHONE#
COUNTY
1/4 SEC
U-MAP NO (POWER)
OP MAP
Emer Sect Gas Wk Ctr POWER WK CTR
PLAT MAP
JOINT FACILITIES ARRANGEMENTS
DRAWN BY
CHECKED BY
APPROVED BY
FOREMAN #1
FOREMAN #2
MAPPING
INCIDENT MAOP
Gas Order Elect Order
SCALE PAGE
ENGR - POWER
ENGR - GAS
FUNCTION
PROJECT MGR
PERMITREAL ESTATE/EASEMENT
2
1
REV#
3
DATE DESCRIPTIONBY
CONTACT PHONE NO DATE
OH CKT MAP CIRCUIT NOUG CKT MAP
R.BLACKIE 425.457.2614 .
E. ARCIAGA .----
----.----
E. ARCIAGA .----
REDT # ( RW-TBD )RENTON
BRENNON LANDING
SCH73 - OH TO UG CONVERSION
1400 ABERDEEN AVENUE NE, RENTON, WA 98056
PUGET SOUND ENERGY
N/A IP 088-60
N/A 101147812
AS SHOWN 2 OF 4
KING 088A CIKNC QCSOKE
05SE-T23N-R05E 204.080 205.083
2305E020 2305E040 2305E020 HIG-15
COMCAST
JAMES COHN
253.569.0636
LUMEN
AMY ALLISTON
206.794.8534
RIGHT OF WAY
ROW TBD
ROW TEL TBD
.
.
.
...
...
...
CUSTOMER APPROVAL
I approve the location of the trench, including road crossings,
and all electrical equipment as shown on print.
________________________
Customer's Signature
________________________
Print Name/Date
THIS SKETCH NOT TO BE RELIED UPON FOR EXACT LOCATION OF EXISTING FACILITIES
CALL (800) 424-5555
2 BUSINESS DAYS BEFORE YOU DIG
For contacts below dial 1-888-CALL PSE (225-5773)
UNIVERSAL MAP - EXISTING (2305E020)
SCALE: 1:50
SCALE: 1:100
UNDERGROUND CIRCUIT MAP - EXISTING (2305E020)
MFP22004903
1401
1409
1328
1330
1417
1413
2007
ABERDEEN AVE NENE 15TH ST
NE 16TH ST
REMOVE
REMOVE
ROAD AFEEDHIG
15 #6CUBN#6CUBNBNBNBN#6CU
TO REMAIN
NEW POLE
REMOVE
TO REMAIN
1333
1323
1325
1319 1317
1309
1233
1302
1316
1324
TRANSFER
TRANSFER
#6CUBNFUSE @ 40T
SW#T87571
FUSE @ 65T
SW#T87570
FUT: 1-6"
FUT: 1-4"
FUT: 1-2"
'A'
1" = 50'
DESIGNED BY
UTILITIES
CONTACT
PHONE#
COUNTY
1/4 SEC
U-MAP NO (POWER)
OP MAP
Emer Sect Gas Wk Ctr POWER WK CTR
PLAT MAP
JOINT FACILITIES ARRANGEMENTS
DRAWN BY
CHECKED BY
APPROVED BY
FOREMAN #1
FOREMAN #2
MAPPING
INCIDENT MAOP
Gas Order Elect Order
SCALE PAGE
ENGR - POWER
ENGR - GAS
FUNCTION
PROJECT MGR
PERMITREAL ESTATE/EASEMENT
2
1
REV#
3
DATE DESCRIPTIONBY
CONTACT PHONE NO DATE
OH CKT MAP CIRCUIT NOUG CKT MAP
R.BLACKIE 425.457.2614 .
E. ARCIAGA .----
----.----
E. ARCIAGA .----
REDT # ( RW-TBD )RENTON
BRENNON LANDING
SCH73 - OH TO UG CONVERSION
1400 ABERDEEN AVENUE NE, RENTON, WA 98056
PUGET SOUND ENERGY
N/A IP 088-60
N/A 101147812
1" = 50'3 OF 4
KING 088A CIKNC QCSOKE
05SE-T23N-R05E 204.080 205.083
2305E020 2305E040 2305E020 HIG-15
COMCAST
JAMES COHN
253.569.0636
LUMEN
AMY ALLISTON
206.794.8534
RIGHT OF WAY
ROW TBD
ROW TEL TBD
.
.
.
SITE PLAN
CIRCUIT LOADING TABLE
AS OF
EXIST. PEAK LOAD
EST. NEW LOAD
TOTAL
CIRCUIT:
A PHASE B PHASE C PHASE
HIG-15
06.11.21
171 158 125
N/A 0 N/A
171 167 125
...
...
...
CIRCUIT FEET REMOVED: 475 FT
CIRCUIT FEET ADDED: 675 FT
THIS SKETCH NOT TO BE RELIED UPON FOR EXACT LOCATION OF EXISTING FACILITIES
CALL (800) 424-5555
2 BUSINESS DAYS BEFORE YOU DIG
For contacts below dial 1-888-CALL PSE (225-5773)
→SEE PSE HANDBOOKS←
SEE 1218 (SF),1220 (MF), 6080,
FOR TRENCH SEE 3061, 2809
FAULT CURRENT TABLE
1Ø PM TRANSFORMERS (240/120V)
120V WINDINGS 240V WINDINGS
LOCATION SIZE R/X MIN.
%Z
FAULT
CURRENT
MIN.
%Z
FAULT
CURRENT
V01 100kVA 0.5 2.43 57,300 AMPS 1.90 36,600 AMPS
H1A -----10,942 AMPS
H1B -----12,472 AMPS
Removed at site:
Grid Number:
kVA Rating:
Foreman to redline the following information
TRANSFORMER REMOVAL
Company ID#:
Primary phase connected to:
Tested Secondary Voltage
P01
318720-166480
25
Removed at site:
Grid Number:
kVA Rating:
Foreman to redline the following information
TRANSFORMER REMOVAL
Company ID#:
Primary phase connected to:
Tested Secondary Voltage
P02
318705-166479
50
SITE SPECIFIC NOTES
AT P01 (318720-166480) 2011 CLASS 3 - 45'
-POLE TO BE REMOVED
-REMOVE EX. OH 25kVA TRANSFORMER
-REMOVE POLE AND ALL OTHER PSE RELATED FACILITIES
AT P02 (318705-166479) 1962 CLASS 1 - 40'
-POLE TO BE REMOVED
-REMOVE EX. OH 50kVA TRANSFORMER
-REMOVE ST. LIGHT (SLAH4937), RETURN TO YARD
-REMOVE POLE AND ALL OTHER PSE RELATED FACILITIES
AT SP1
-INTERCEPT & RETAIN EX. UG TPX SERVICE (ADDRESS 1328)
-REROUTE EX. CABLE AND CONDUIT TO H1B, RETAIN CABLE IN RISER
AT SP2
-INTERCEPT & RETAIN EX. UG TPX SERVICE (ADDRESS 1330)
-REROUTE EX. CABLE AND CONDUIT TO H1B, RETAIN CABLE IN RISER
AT P03 (318690-166479) 1972 CLASS 1 - 40'
-POLE TO REMAIN
-INSTALL 1Ø ARM-MOUNT DEAD END (S) (DE0115A) 6031.3011, #6CU DE
(2223000)
-INSTALL 1Ø TERM ON FIBERGLASS ARM W/ LOAD INTERRUPTER CUTOUT
& SURGE ARRESTOR (TSU1L1) 6043.1000
-STIRRUP (2254200)
-ALUM "H" CONNECTOR (2168000)
-FUSE @ 40T (3412500), TAP 'B' PHASE
-INSTALL SWITCH# T87571
-ROTATE EX. OH TRANSFORMER TO (S) FACE OF POLE
-INSTALL 2" PRI. RISER ON NEW STANDOFF BRACKETS (RIS2CSS) 6042.1000
-INSTALL 4" PARTIAL RISER ON NEW STANDOFF BRACKETS (RIS4CSS)
6042.1000
-CAP RISER 10' UP POLE
-INSTALL 6" PRI RISER ON NEW STANDOFF BRACKETS (RIS6CSS) 6042.1000
-CAP RISER 10' UP POLE
-INSTALL 3/8" PRIMARY DOWN GUY (N) (GYD3SA) 6013.0100
-INSTALL 3/8" NEUTRAL DOWN GUY (N) (GYD3SAN) 6013.0100
-INSTALL SINGLE HELIX 10" ANCHOR (ANDH1) 6012.1000 (L=10', N)
AT P04 (318734-166480) 1973 CLASS 4 - 40'
-POLE TO REMAIN
-INSTALL 1Ø ARM-MOUNT DEAD END (N) (DE0115A) 6031.3011, #6CU DE
(2223000)
-INSTALL 1Ø TERM ON FIBERGLASS ARM W/ LOAD INTERRUPTER CUTOUT
& SURGE ARRESTOR (TSU1L1) 6043.1000
-STIRRUP (2254200)
-ALUM "H" CONNECTOR (2168000)
-FUSE @ 65T (3412600), TAP 'B' PHASE
-INSTALL SWITCH# T87570
-ROTATE EX. OH TRANSFORMER TO THE NORTH FACE OF POLE
-INSTALL 2" PR. RISER ON NEW STANDOFF BRACKETS (RIS2CSS) 6042.1000
-INSTALL 4" PARTIAL RISER ON NEW STANDOFF BRACKETS (RIS4CSS)
6042.1000
-CAP RISER 10' UP POLE
-INSTALL 6" PARTIAL RISER ON NEW STANDOFF BRACKETS (RIS6CSS)
6042.1000
-CAP RISER 10' UP POLE
-INSTALL 3/8" PRIMARY DOWN GUY (S) (GYD3SA) 6013.0100
-INSTALL 3/8" NEUTRAL DOWN GUY (S) (GYD3SAN) 6013.0100
-INSTALL SINGLE HELIX 10" ANCHOR (ANDH1) 6012.1000 (L=7', S)
AT P05 (318720-166465) 2011 CLASS 2 - 35'
-POLE TO REMAIN
AT P06 DEVELOPER TO STAKE CENTER OF POLE
-INSTALL NEW 35' CL3 POLE (PS353), DEEP SET 1 FOOT - 6010.1100
-INSTALL 4" RIGID CLEVIS (SOUTH)
-INSTALL 4" RIGID CLEVIS (INDNRC) WEST
-INSTALL 3" SEC. RISER (RIS3CSS) 6042.1000
-INSTALL NEW GRID (318728-166471)
AT P07 (318706-166473) 2016 CLASS 1 - 35'
-POLE TO BE REMOVED
-REMOVE POLE AND ALL PSE RELATED FACILITIES
AT SP3
-INTERCEPT & RETAIN EX. UG CABLE FROM P08
-REROUTE EX. CABLE AND CONDUIT TO H1A, RETAIN CABLE IN RISER
SPAN NOTES
P01 TO P02
REMOVE ± 165' #6 CU OH PRI.( )' #6 CU
REMOVE ± 165' #6 CU OH NEUT.( )' #6 CU
P01 TO P04
REMOVE ± 185' #6 CU OH PRI. ( )' #6 CU
REMOVE ± 185' #6 CU OH NEUT. ( )' #6 CU
P02 TO P03
REMOVE ± 125 ' #6 CU OH PRI.( )' #6CU
REMOVE ± 125' #6 CU OH NEUT. ( )' #6CU
P01 TO P05
TRANSFER (2) EX. 1/O OH SEC. TPX TO P07
REMOVE ± 100' 1/O TPX ( )' 1/O TPX
P02 TO P07
REMOVE ± 70' 1/O OH SEC. TPX ( )' 1/O TPX
1417 TO P01
TRANSFER EX. 1/O OH TPX SERVICE TO P07
REMOVE ± 30' 1/O TPX ( )' 1/O TPX
RETIREMENT POLE TABLE
SITE
#
POLE DATA POLE TRANSFERS REMARKS
GRID #HEIGHT CLASS YEAR XFMR CO.
ID#TOPPED RMVD TEL TV FIBER ST. LIGHT (ADDITIONAL INFORMATION)
P01 318720-166480 45'3 2011 LUMEN TECH/COMCAST
P02 318705-166479 40'1 1962 LUMEN TECH/COMCAST
P07 318706-166473 35'1 2016 LUMEN TECH
POLE TABLE (NEW)
Site
#
Pole Data
Grid #Height Class Year Remarks / Location Ref.
P06 318728-166471 35 3 2022 PSE Equip #
CROSSING CONDUIT TABLE
X-ING
#
LOCATION POWER
XING
LENGTH
ASBUILT
LOCATION
TYPE OF CROSSING
(Feeder, Primary, Secondary, etc.)FROM TO
SIZE
(IN)TYPE QTY
X01 LOT 1 P06 3 SCH80 1 60 ( )'NCL SECONDARY
X02 LOT 1 LOT 8
2 SCH80 1 80
( )'ECL
PRIMARY
3 SCH80 1 80 SECONDARY
4 SCH80 1 80 PRIMARY
6 SCH80 1 80 FEEDER
X03 LOT 8 H1A 3 SCH80 1 60 ( )'SCL SECONDARY
X04 P02 P03
2 SCH80 1 120
( )'ECL
PRIMARY
4 SCH80 1 120 PRIMARY
6 SCH80 1 120 FEEDER
X05 P04 'A'
2 SCH80 1 80
( )'ECL
PRIMARY
4 SCH80 1 80 PRIMARY
6 SCH80 1 80 FEEDER
2" SCH80 GREY PVC = 280 FT 2" PVC PLUG /CAPS = 6
3" SCH80 GREY PVC = 200 FT 3" PVC PLUG /CAPS = 6
4" SCH80 GREY PVC = 280 FT 4" PVC PLUG /CAPS = 6
6" SCH80 GREY PVC = 280 FT 6" PVC PLUG /CAPS = 6
Lock Cover
Captive L-Bolt
service
Customer's
conductors
Set handhole flush
to final grade
Side View
17"
Approx
30"
Approx
2"
18"
Captive L-Bolt
Lock Cover, 10 lbs
40-1/2"27-1/4"
Conductors enter from
beneath and shall be
folded back with handhole
SINGLE PHASE SECONDARY HANDHOLE @ H1A
NOT TO SCALE
@ H1B
SHALL BE STAGGERED
CONNECTOR BARS
IN THE FRONT
NEUTRALS SHALL BE 18"
16"
13"
12"10"
2"
10"
Pedestal will accept up to six 3" conduits
SEALED WITH FOAM
CONDUIT SHALL BE
120 PVC CONDUIT ELBOWS
TYPICAL 24" RADIUS DB
SIDE VIEW WITH CONDUIT
10"
18"
16"
13"
10"
2"
36"
FRONT VIEW WITH CONDUIT
SECONDARY PEDESTAL DETAIL
NOT TO SCALE
Utility Pole Erosion Control
UTILITY POLE EROSION CONTROL DETAIL
NOT TO SCALE Drainage ditches or Dry vegetated sites
TOP VIEW
DRY DRAINAGE DITCH or DRY VEGETATED SITE
SLOPE
Place gravel bags for
Sediment Trap
Place straw mulch
on disturbed areaExcavated or
Augered Hole
Pole
SLOPE
MFP22004903
POTHOLE ALL EXISTING UTILITIES
RESTORATION PER CITY OF RENTON STANDARDS
FEEDHIG
15 #6CUBN#6CUBNFUSE @ 40T
SW#T87571
FUSE @ 65T
SW#T87570
NEW 1/O AL
EIB674-BØ
NEW 1/O AL
EIB675-BØ
DESIGNED BY
UTILITIES
CONTACT
PHONE#
COUNTY
1/4 SEC
U-MAP NO (POWER)
OP MAP
Emer Sect Gas Wk Ctr POWER WK CTR
PLAT MAP
JOINT FACILITIES ARRANGEMENTS
DRAWN BY
CHECKED BY
APPROVED BY
FOREMAN #1
FOREMAN #2
MAPPING
INCIDENT MAOP
Gas Order Elect Order
SCALE PAGE
ENGR - POWER
ENGR - GAS
FUNCTION
PROJECT MGR
PERMITREAL ESTATE/EASEMENT
2
1
REV#
3
DATE DESCRIPTIONBY
CONTACT PHONE NO DATE
OH CKT MAP CIRCUIT NOUG CKT MAP
R.BLACKIE 425.457.2614 .
E. ARCIAGA .----
----.----
E. ARCIAGA .----
REDT # ( RW-TBD )RENTON
BRENNON LANDING
SCH73 - OH TO UG CONVERSION
1400 ABERDEEN AVENUE NE, RENTON, WA 98056
PUGET SOUND ENERGY
N/A IP 088-60
N/A 101147812
AS SHOWN 4 OF 4
KING 088A CIKNC QCSOKE
05SE-T23N-R05E 204.080 205.083
2305E020 2305E040 2305E020 HIG-15
COMCAST
JAMES COHN
253.569.0636
LUMEN
AMY ALLISTON
206.794.8534
RIGHT OF WAY
ROW TBD
ROW TEL TBD
.
.
.
...
...
...
NEW PRIMARY UNDERGROUND CIRCUIT ONE-LINE DIAGRAM
NOT TO SCALE
THIS SKETCH NOT TO BE RELIED UPON FOR EXACT LOCATION OF EXISTING FACILITIES
CALL (800) 424-5555
2 BUSINESS DAYS BEFORE YOU DIG
For contacts below dial 1-888-CALL PSE (225-5773)
PRIMARY CABLE & CONDUIT TABLE
LOCATION CONDUIT CABLE ASBUILT INFORMATION - FOREMAN COMPLETE CONDUIT TYPE (DB120, HDPE, SCH80), FEEDER CABLE TYPE (TAPE, CN, #4/O NEU)
FROM TO SIZE
(IN)QTY.
DESIGN
LENGTH
(FT)
BENDS PULL
(LBS)
PULL
REV
(LBS)
CABLE
SIZE
DESIGN
LENGTH
(FT)
PHASE - ID TAG RECORD RECORD PHASE TAPPED & ACTUAL FOOTAGES & TYPES INSTALLED LUBRICANT (Gal.)
90°45°22°11°A B C MANUFACTURER COMPOUND YEAR NOTES CONDUIT TYPE CABLE TYPE EST.ACTUAL
P04 P03 6 1 210 -2 2 -CONDUIT ONLY ----SCH80 .
P04 P03 4 1 210 -2 2 -CONDUIT ONLY ---
P04 V01 2 1 120 -1 2 -59 123 1/0 AL JKT 325 -EIB674 --SCH80 1.0
V01 P03 2 1 90 -1 2 -178 80 1/0 AL JKT 250 -EIB675 -
SCH80 2" PVC TOTAL (ft) =210 0 2 4 0 1/0 AL JKT TOTAL (ft) =575 TTL 2.9
SCH80 4" PVC TOTAL (ft) =210 0 2 2 0
SCH80 6" PVC TOTAL (ft) =210 0 2 2 0
NOT TO SCALE
NEW CONDUIT DIAGRAM
FEEDER 6"
CONDUIT LEGEND
SECONDARY 3"
PRIMARY 2"
VAULT & EQUIPMENT TABLE
SITE #GRID #
VAULT SIZE &
COVER
TYPE & SIZE
EQUIPMENT IN
VAULT
PRIMARY
BUSHINGS TRANSFORMER ID NUMBERS
(COMPANY ID)
AS-BUILT INFORMATION
LB DC FOREMAN: INCLUDE PHASE TAPPED
V01 318720
166478
4'x6'x3'6"
Combo Vault
Matid: 7664000
Cover: 9997174
100kVA MP TRF
120/240
Matid: 6247200
3 3 CMBO15RL 6045.1050 BØ
ELB10J 6041.1000
CAP (7630600)
SECONDARY HH/PEDESTAL TABLE
Site
Pedestal
or
Handhole
Number of
Positions
Required
Remarks
H1A HANDHOLE 2 - HH16350 6050.2000
H1B PEDESTAL 3 - SEPS4 6050.1000
SECONDARY CABLE & CONDUIT TABLE
LOCATION
CABLE CONDUIT VOLTAGE ASBUILT INFORMATION
SIZE LENGTH ASSUMED SIZE LENGTH BENDS DROP FLICKER Foreman - Complete
FROM TO (1/O,4/O,350)Design (ft)Lot Corner to Meter
(ft)(in)Design (ft)90°45°22°11°(Percent)(Percent)Actual Amount Installed Cable Conduit
V01 P06 350 190 .3 25 2 ---2.4 1.5 (PRE. 1.5,3.8)
V01 H1A 350 130 .3 70 3 ---2.7 1.7 (PRE. 1.0,2.8)
V01 H1B 350 100 .3 100 2 ---2.2 1.5 (PRE. 0.8,2.2)
350 UG TRIPLEX TOTAL (ft) =420 SCH80 3" PVC TTL (ft)=195 7 0 0 0 0.7
TOTAL QTS OF GLUE 0.7
JOINT TRENCH DETAIL
ROAD SIDE
NATIVE
SECONDARY POWER
PEDESTAL
MATERIAL
P/L
Power
Secondary
Power
Primary
Conduit
Tel. & TV
12" Min
12" Sand
Cover when
gas line is in
trench
Sand
6" or 12"
4" Sand Bedding
1'
36"
Cover
42"
Gas
12"
18"
Lower 2"
10"
Pedestal
PSE 10' FRONTAGE
EASEMENT
1'
Cover
ROAD SIDE
MINIPAD
MINIPAD
FIELD SIDE
VAULT
6" of crushed rock
(base for vault)
P/L
Power
Secondary
Power
Primary
Gas
12" Min Horizontal Separation
Communications
42" Min
21"1'
Feeder
38"
2"
4" Sand Bedding
12" Sand
Cover
36"
Cover
4" Sand Bedding
42"
6" Additional depth when
Feeder is required
PSE 10' FRONTAGE EASEMENT
1'
TRANSFORMER
Final
Backfill
Initial
Backfill
Trench Depth
42" - 48"
MINIMUM CLEARANCES FOR PSE EQUIPMENT
NOT TO SCALE
OIL-FILLED EQUIPMENT
TRANSFORMER
APPROVED
AREA
COMBUSTIBLE BUILDING WALLS & ROOF10'
10'
10'
JOINT TRENCH DETAIL
NOTES:
1. If the final backfill contains rocks greater than 8 inches in diameter, install 12 inches compacted sand shading across the full width of the trench. *
If the final backfill contains rocks 8 inches in diameter or smaller, install 6 inches compacted sand shading across the full width of the trench. *
2. Rocks greater than 10 inches diameter are not permitted in the final backfill.
3. Sand bedding is required under PSE gas pipe. Bedding is not required for the full width of the trench; it shall extend from the
side of the trench nearest to where the gas main/service is installed to a minimum of 6 inches on the opposite side of the gas line.
4. Utilities shall not be stacked over the gas line in the trench.
5. If wet utilities will be included in the trench, please contact PSE or local power company directly for clearance requirements.
6. Reduced clearance of 4 inches between power and communication, must have approval of the communications companies.
* Alternatives to full-width trench shading require PSE approval.
Primary & Secondary-Mainline Gas & Communications (NTS)
Primary
Dirt Pile
Final Grade
24" Min
36"
Min Cover
Over Power 48"
Max
Depth
Final Backfill
Gas
4" Sand Bedding
Property Line
intercept (depth varies).
SidewalkCurb
Location of roof drain
48" Typical
Width may vary per
Number of Utilities
and Conduits
6" or 12" Min Sand Shading
Over Gas after Compaction
12" Min
R/W or
Excavated
12" Typical
Power
Secondary
Power
TV & TEL
12" Min
12" Min
Separation
4,5
1,2
1
3
6
6" or 12" Min Sand Shading
Over Power after Compaction1
COOLING
5' MIN
5' MIN
10' MIN
5'
MIN
FINS
ACCESS
CONCRETE PAD
MINIMUM CLEARANCES FOR PSE EQUIPMENT
NOT TO SCALE
CURB OR EDGE OF PAVEMENT
CURB OR EDGE OF PAVEMENT
5' MIN
ROAD OR
PARKING AREA
TYP. PAD
& TRANS-
FORMER
3'
MIN
3' MIN
DOOR
ACCESS
DOOR
REQUIRED
WORK SPACE
AREA
3' MIN
Standoff Bracket
15" Min Length
Conduit Clamp
Conduit Field Face
Quadrant
Climbing
SpaceRoad Face
Quadrant
Climbing
Space
5" Min
CL LCDirection of Vehicular Traffic
CONDUIT RISER PLACEMENT DETAIL
TOP VIEW
NOT TO SCALE
NOT TO SCALE
ANCHOR DETAIL - SINGLE HELIX
Single Helix
6" to 12"
Under Normal
Conditions
40" Min for Single Helix
65" Min for Triple Helix
POST CONSTRUCTION POWER QUALITY
CALCULATIONS INCLUDES FUTURE 8 LOT
PLAT DEVELOPMENT AND FUTURE 2 LOT SP
PRIMARY 4"
Excavation - 11-1/4 cubic yards
SIDE VIEW
Rock
Crushed
6"
4'-4"
2"
4'-0"6'-0"
6"6'-7"
3'-6"
4'-0"
7'
10'
TOP VIEW
NOT TO SCALE
VAULT DETAIL @ V01
MFP22004903