Loading...
HomeMy WebLinkAboutAdden 1 I OCAG-64-765, A —dden #1 11 CITY OF RENTON & SOOS CREEK WATER AND SEWER DISTRICT ADDENDUM TO THE MARCH 27, 1964 CASCADE INTERCEPTOR AGREEMENT SUBJECT: REHABILITATION AND MAINTENANCE OF THE CASCADE INTERCEPTOR THIS ADDENDUM is entered into this 5th day of January, 2011, by and between SOOS CREEK WATER AND SEWER DISTRICT, a Washington municipal corporation, hereinafter referred to as "SODS CREEK", and the CITY OF RENTON, a Washington municipal corporation, hereinafter referred to as "RENTON", both being duly organized and existing under and by virtue of the laws of the State of Washington, WITNESSETH: WHEREAS, RENTON and SOOS CREEK (operating as Cascade Sewer District) entered into an agreement March 27, 1964 pertaining to the construction, operation and maintenance of a certain interceptor sewer line, hereinafter referred to as "Cascade Interceptor"; and WHEREAS, Some parts of the Cascade Interceptor are in need of immediate rehabilitation while other parts will potentially need rehabilitation in the near future; and WHEREAS, It is in the best interest of RENTON and SOOS CREEK to rehabilitate those portions of the Cascade Interceptor in immediate need and to perform additional maintenance and inspection on the Cascade Interceptor in order to extend the useful life of those portions not in immediate need of rehabilitation; now, therefore, IT IS HEREBY AGREED by and between the parties hereto as follows: 1. Rehabilitation of Portions of the Cascade Interceptor. RENTON will design, permit, bid and manage a project to rehabilitate the structures and sewer mains between manhole 5321-009 and 5321-015, as shown on "Exhibit A", an approximate distance of twelve hundred lineal feet. Rehabilitation will exclude that portion of the sewer main replaced during the emergency repair in 2010. The total cost of the rehabilitation (including design, construction, etc) is estimated at $200,000. The total cost shall be divided such that RENTON will pay twenty percent (20%) of the cost and SOOS CREEK will pay eighty percent (80%) of the cost. RENTON will invoice SOOS CREEK, at the conclusion of the project, eighty percent (80%) of the actual costs incurred by RENTON for the construction contract, staff costs for design and construction management. It is understood that RENTON may rehabilitate some sewer mains and / or manholes adjacent to the Cascade Interceptor. If done as part of the same project, the additional work will be identified as a separate h p schedule in the protect and SOOS CREEK will not be responsible for participation in this work. i 2. Additional Maintenance to Extend the Life of the Cascade Interceptor. Recognizing that hydrogen sulfide (H2S) is a problem within this system and is accelerating the degradation of the Cascade Interceptor, SOOS CREEK will introduce a chemical treatment at their Lift Station #5. The treatment will involve the use of BIOXIDE solution from Siemens. Alternate treatment product(s) may be utilized under agreement of both parties. SOOS CREEK will occasionally access the Cascade Interceptor, utilizing proper maintenance and safety procedures, at RENTON manhole 5321-013, 5321-014, or 5321- 015 to monitor H2S levels in the system to ensure proper dosing is occurring. The estimated cost of chemical for treatment is estimated to be $60,000 (2010 dollars) per year. RENTON will pay twenty-two percent (22%) of the invoiced cost of the chemical as RENTON's share of all costs incurred by SOOS CREEK. SOOS CREEK will invoice RENTON every six months. 3. Monitoring the condition of the Cascade Interceptor. RENTON will perform television inspection of the Cascade Interceptor approximately every two years. SOOS CREEK will pay eighty percent (80%) of the cost of the television inspection including the use of RENTON's television inspection equipment, staff, and any required uired e ui ment or q p methodology for reducing flow in the interceptor to allow proper visual inspection. RENTON will invoice SOOS CREEK at the conclusion of the inspection. 4. Obligations Intact. Nothing herein shall be construed to alter the rights, responsibilities, , liabilities, or obligations of either RENTON or SODS CREEK regarding provisions of sanitary sewer services to their customers pursuant to any agreements previously executed by the parties, except as specifically set forth herein. DATED this 18,14 day of , 20�_. Authorized by Resolution No. 1109'A of the City Council of the City of Renton, Washington, at its regular meeting held on /'y'µ day of , 20 CITY OF E TON Denis Law, Mayor Date ATTEST: y Bonnie I. Walton, City Clerk Date APPR D AS TO LEGAL FORM: Lawrence J. Warren, City Attorney t, v, a .. b•stf 9^.. Approved by Resolution No. 3271-S of the Board of Commissioners of SOOS CREEK WATER AND SEWER DISTRICT of King County, Washington, adopted at its regular meeting held on the 5th day of January, 2011. SOOS CREEK WATER AND SEWER DISTRICT C < 6K Ron TTSpeer, Dis r' Manger I I EXHIBIT "A" N ♦a 5321 010 5321 ,Q 009 O 5321 20. 008 5321 32 5321 O 200201 011 218 5321 5321 2 17 5321 5321 '� 20(6� ti �Y46-((( 321 202 5321 Q c0 � . 521 18 321 203 z 3 �. 5321 019 017 5321 'Sl 215 0291 �' 5321' 204 4 �, Z10 `�~ene Cir Sr: `o , 5321 <_ 5321 02131 532 co 03 205 �., -\211 5321 �.�,.{. V5321 53 0214 O 32 0 212 ,014 53Ty 321 532 23 /15 3 1 2-1 521 31 072 53 1 321 5121 32 025 5 1 0 3 321 028 02 0 6 8 5,21 21 532 7 G> 53 74 7 532 tir 533 0 1 1 321 53 X63 4 CJ 29 521 1 321 5321 t 532 1 5 2 2 2 061 5 1 65 5321 035 53,z1 557 56 2 53� 5761 7 5 C, 63 32 0 4 533 781 0 1 $32 5641 055 66 60 t S 532 21 6 53 1 32 5321 1151 5321 E fh C 2 5� 1 3�1 81 65 0 OS 0 10 5321 067 5391 114 '532 21 532 X 06 069 0 10 532 521 e 1 532 17 C 5321 1 5 6 8 6 Oi> 113 532 �o O 11 53?1 53 6 2� 107 88 d/ 8 321 6 9 11 1 1 ffj Ad O O 0 112 09 5321 82� 566 5 821 18 21 048 531 51 21 E 9 810 1 5321 t 321 5321 050 116 5 21 5321 1 :321 12 532 1 9 120 811 321 J S S T22 5321 h t r 1/j.O 117 5 241 5321 23 118 Legend PORTION OF INTERCEPTOR TO BE REHABILITATED