HomeMy WebLinkAboutAddendum No. 3Rainier Ave S Corridor Improvements – Phase 4 Addendum No. 3
Page 1 of 2
RAINIER AVE S CORRIDOR IMPROVEMENTS - PHASE 4
(S 3RD ST TO NW 3RD PL)
ADDENDUM NO. 3
Federal Aid Number: STPUL-1615(005)
TIB Number: 8-1-102(038)-1
City Project Number: TED4003813
CAG 22-163
DATE OF ADDENDUM ISSUE: October 5, 2022
DUE DATE FOR BIDS: October 18, 2022 (CHANGED FROM DATE IN CALL FOR BIDS)
DATE OF BID OPENING: October 20, 2022 (CHANGED FROM DATE IN CALL FOR BIDS)
NOTE TO ALL PLANHOLDERS:
This Addendum No. 3, containing the following revisions, additions, deletions, and/or clarifications, is
hereby made a part of the Plans and Contract Provisions (Contract Documents) for the above-named
project. Bidders shall take this Addendum into consideration when preparing and submitting their bids.
Bidders shall acknowledge receipt and acceptance of this Addendum No. 3 in the space provided on the
Proposal Signature Page or by signing in the space provided below and submitting the signed addendum
with the bid package. Failure to provide this written acknowledge may result in disqualification of the Bidder’s
submittal.
CALL FOR BIDS
1. Bid Due Date and Bid Opening Date:
Sealed bids will be received until 1:00 p.m., Tuesday, October 18, 2022, at the lobby Renton
City Hall, 1055 South Grady Way, Renton, WA 98057. All supplemental documents, that are
allowed to be submitted after this date and time, shall be received at the lobby of Renton City
Hall. Sealed bids will be opened and publicly read via Zoom videoconferencing web
application at 1:00 p.m., Thursday, October 20, 2022. Any bids received after the published
bid submittal time cannot be considered and will not be accepted.
BID PROPOSAL
2. DELETE Bid Proposal – Schedule D and REPLACE with attached Bid Proposal D. Revisions
include:
Revisions to JUT quantities (Items D19, D21, D23, D34, D38, and D41).
Rainier Ave S Corridor Improvements – Phase 4 Addendum No. 3
Page 2 of 2
PLANS
3.DELETE Plan Sheets 124, 128 and REPLACE with attached Plan Sheet 124, 128. Revisions
include:
Remove construction note #5 from polypig station notes.
4.DELETE Plan Sheets 146 and REPLACE with attached Plan Sheet 146. Revisions include:
Update structure description CL09.
5.DELETE Plan Sheets 200-209 and REPLACE with attached Plan Sheets 200-209. Revisions
include:
Revisions to illumination plan sheets luminaire schedules and illumination notes.
ALL OTHER REQUIREMENTS OF THE CONTRACT DOCUMENTS REMAIN IN EFFECT.
Sincerely,
Robert M. Hanson, P.E.
Transportation Design Manager
City of Renton
Receipt acknowledged, and conditions agreed to this _____ day of ________, 2020
Bidder _______________________________
Signature
for
Item
No.
Spec.
Section Description Quantity Unit Unit Price* Amount
D1 1-04 Minor Change for Joint Utility Trench 1 EST 64,000.00$ 64,000.00$
D2 1-05 Roadway Surveying 1 LS LUMP SUM $
D3 1-09 Mobilization 1 LS LUMP SUM $
D4 2-02 Remove/Abandon Existing Gas Main 960 LF $ $
D5 2-03 Unsuitable Foundation Excavation Incl. Haul 110 CY $ $
D6 2-03 Gravel Borrow Incl. Haul 2700 CY $ $
D7 2-05
Petroleum Contaminated Excavation and Disposal
Including Haul 1 EST 53,000.00$ 53,000.00$
D8 2-09
Structure Excavation Class B Incl. Haul for Joint
Utility Trench 4110 CY $ $
D9 7-08
Shoring or Extra Excavation Class B for Joint Utility
Trench 1 LS LUMP SUM $
D10 8-26 Resolution of Utility Conflicts for Joint Utility Trench 1 EST 42,000.00$ 42,000.00$
D11 8-35 Removal of Structure and Obstruction 1 LS LUMP SUM $
D12 8-35 Franchise Utility Coordination 1 LS LUMP SUM $
D13 8-35 Sand Bedding Incl. Haul for Joint Utility Trench 1900 TN $ $
D14 8-35
Controlled Density Fill Incl. Haul, for Joint Utility
Trench 290 CY $ $
D15 8-35 Install 2" Diameter Conduit - PSE Power 210 LF $ $
D16 8-35 Install 3" Diameter Conduit - PSE Power 1700 LF $ $
D17 8-35 Install 4" Diameter Conduit - PSE Power 8000 LF $ $
D18 8-35 Install 6" Diameter Conduit - PSE Power 5200 LF $ $
D19 8-35 Install Handhole (32"x44") - PSE 4 EA $ $
D20 8-35 Install Handhole (30"x30") - PSE 1 EA $ $
D21 8-35 Install Handhole (23.25"X32.75") - PSE 3 EA $ $
D22 8-35 Install Minipad Transformer (48"x42") - PSE 2 EA $ $
PROPOSAL (BID SCHEDULE D - JOINT UTILITY TRENCH IMPROVEMENTS)
Rainier Ave S Corridor Improvements - Phase 4 (S 3rd St to NW 3rd PL)
ALL ENTRIES SHALL BE WRITTEN IN INK OR TYPED TO VALIDATE BID
Note: Unit prices for all items, all extensions, and total amount of Bid shall be shown. Enter unit prices in numerical figures
only in dollars and cents, i.e. to two (2) decimal places (including for whole dollar amounts). All figures must be clearly
legible. Bids with illegible figures in the Unit Price column will be rejected as unresponsive. Where conflict occurs
between the unit price and the total amount specified for any item, the unit price shall prevail, and totals shall be corrected
to conform thereto.
Contract Documents
Rainier Ave S Corridor Improvements - Phase 4
Page 23
August 2022
Item
No.
Spec.
Section Description Quantity Unit Unit Price* Amount
PROPOSAL (BID SCHEDULE D - JOINT UTILITY TRENCH IMPROVEMENTS)
Rainier Ave S Corridor Improvements - Phase 4 (S 3rd St to NW 3rd PL)
ALL ENTRIES SHALL BE WRITTEN IN INK OR TYPED TO VALIDATE BID
Note: Unit prices for all items, all extensions, and total amount of Bid shall be shown. Enter unit prices in numerical figures
only in dollars and cents, i.e. to two (2) decimal places (including for whole dollar amounts). All figures must be clearly
legible. Bids with illegible figures in the Unit Price column will be rejected as unresponsive. Where conflict occurs
between the unit price and the total amount specified for any item, the unit price shall prevail, and totals shall be corrected
to conform thereto.
D23 8-35 Install Three Phase Transformer (70"X136") - PSE 4 EA $ $
D24 8-35 Install Three Phase Transformer (56"X66") - PSE 1 EA $ $
D25 8-35 Install Three Phase Junction Box - PSE 9 EA $ $
D26 8-35 Install Three Phase Underground Transformer 1 EA $ $
D27 8-35 Install Pull Vault - PSE 4 EA $ $
D28 8-35 Install Fiber Vault (27"X62.5") - PSE 3 EA $ $
D29 8-35 Install 2" Diameter Conduit - Comcast 970 LF $ $
D30 8-35 Install 4" Diameter Conduit - Comcast 8200 LF $ $
D31 8-35 Install Handhole - Comcast 1 EA $ $
D32 8-35 Install 14"x21" Vault - Comcast 1 EA $ $
D33 8-35 Install 17"x30" Vault - Comcast 7 EA $ $
D34 8-35 Install 24"x36" Vault - Comcast 17 EA $ $
D35 8-35 Install 24"x24" Pedestal - Comcast 1 EA $ $
D36 8-35 Install 4" Diameter Conduit - Century Link 24200 LF $ $
D37 8-35 Install 3048 Handhole - Century Link 2 EA $ $
D38 8-35 Install 25-TA Vault - Century Link 5 EA $ $
D39 8-35 Install 264-TA Vault - Century Link 3 EA $ $
D40 8-35 Install 467-TA Vault - Century Link 5 EA $ $
D41 8-35 Install 38Y-612 Base-Military Vault - Century Link 1 EA $ $
D42 8-35 Install 96-612-7-TA Vault - Century Link 1 EA $ $
D43 8-35 Install Pro 6 Pedestal - Century Link 1 EA $ $
Schedule D Subtotal $
Contract Documents
Rainier Ave S Corridor Improvements - Phase 4
Page 24
August 2022
Item
No.
Spec.
Section Description Quantity Unit Unit Price* Amount
PROPOSAL (BID SCHEDULE D - JOINT UTILITY TRENCH IMPROVEMENTS)
Rainier Ave S Corridor Improvements - Phase 4 (S 3rd St to NW 3rd PL)
ALL ENTRIES SHALL BE WRITTEN IN INK OR TYPED TO VALIDATE BID
Note: Unit prices for all items, all extensions, and total amount of Bid shall be shown. Enter unit prices in numerical figures
only in dollars and cents, i.e. to two (2) decimal places (including for whole dollar amounts). All figures must be clearly
legible. Bids with illegible figures in the Unit Price column will be rejected as unresponsive. Where conflict occurs
between the unit price and the total amount specified for any item, the unit price shall prevail, and totals shall be corrected
to conform thereto.
Schedule D Sales Tax (10.1%)$
Schedule D (Joint Utility Trench Improvements)*$
* The Contractor shall collect from the Contracting Agency retail sales tax on the Schedule D Contract price per Section 1-
07.2(2) and WAC 458-20-170.
Contract Documents
Rainier Ave S Corridor Improvements - Phase 4
Page 25
August 2022
SW VICTORIA STHAY
E
S
PL
S
W
RAINIER AVE S
WATSON SECURITY
WEST WIND MOTEL ROYAL ORCHID
FORMULA 1 FAST LUBE
TOMMY'S CAFE
BROWN
BEAR
CAR
WASH
GENERAL WATER NOTES
CONSTRUCTION NOTES
CORRESPONDING SHEETS
LEGEND
NUMBER BY APP.REVISION DESCRIPTION
DRAWN BY:
DESIGN BY:
CHECK BY:
PROJ MGR:
FILE:BY:DATE:
APPROVED FOR CONSTRUCTION
DATE
DRAWING NO.
PROJECT NO.
FED AID NO.
DATE:
SHEET NO.OF
SURVEYED:
14087A-WTR01.dwg
BID
DOCUMENT
Public Works Department
CITY OF RENTON
Tacoma Wenatchee KPG.com
Seattle
3131 Elliott Avenue, Suite 400
Seattle, WA 98121 206.286.1640
7 -13-2022R
EGIST E R E D NOTGNI
HSAWFOETAT
SERN EPRFO
E NNALIO
E
S IGS
21036793JUSTIN R A Y MO
N
D WUJF
KPG
(S 3RD ST TO NW 3RD PL)
RAINIER AVE S CORRIDOR IMPROVEMENTS - PHASE 4
124 285
JULY 2022
14087A
124
STA 22+50 TO STA 27+00
WATER PLAN
PLAN
JRW
WRE
WRE
STP(UL) -1615(005)
ADDENDUM #3 - WATER REVISION, DELETE AIR&VAC ASSEMBLY JRW KPF 10/4/2022
RAINIER AVE N
JUDO BOXING
GERBER COLLISION
& GLASS
ADVANCE
AUTO TUNE
NW 3RD PLN
E
L
S
O
N
P
L
N
W
GENERAL WATER NOTES
CONSTRUCTION NOTES
CORRESPONDING SHEETS
LEGEND
NUMBER BY APP.REVISION DESCRIPTION
DRAWN BY:
DESIGN BY:
CHECK BY:
PROJ MGR:
FILE:BY:DATE:
APPROVED FOR CONSTRUCTION
DATE
DRAWING NO.
PROJECT NO.
FED AID NO.
DATE:
SHEET NO.OF
SURVEYED:
14087A-WTR02.dwg
BID
DOCUMENT
Public Works Department
CITY OF RENTON
Tacoma Wenatchee KPG.com
Seattle
3131 Elliott Avenue, Suite 400
Seattle, WA 98121 206.286.1640
7 -13-2022R
EGIST E R E D NOTGNI
HSAWFOETAT
SERNEPRFO
E NNALIO
E
S IGS
21036793JUSTIN R A YMO
N
D WUPLAN
JF
KPG
(S 3RD ST TO NW 3RD PL)
RAINIER AVE S CORRIDOR IMPROVEMENTS - PHASE 4
128 285
JULY 2022
14087A
128
STA 39+00 TO STA 43+50
WATER PLAN
JRW
WRE
WRE
STP(UL) -1615(005)
ADDENDUM #3 - WATER REVISION, DELETE AIR&VAC ASSEMBLY JRW KPF 10/4/2022
RAINIER AVE S
S 2ND STBIG ISLAND POKE
METRO PCS SOUTH LAKE
EUROPEAN
AUTOZONE
TACO
TIME
VACANT
BUDDY'S HOME
FURNISHING
RENTON
VETERINARY
HOSPITAL
GRAVITY
SPORTS
CORRESPONDING SHEETS
FRANCHISE UTILITY STRUCTURE SCHEDULE
FRANCHISE UTILITY STRUCTURE SCHEDULE
GENERAL NOTES
CONSTRUCTION NOTES
CONSTRUCTION NOTES
NUMBER BY APP.REVISION DESCRIPTION
DRAWN BY:
DESIGN BY:
CHECK BY:
PROJ MGR:
FILE:BY:DATE:
APPROVED FOR CONSTRUCTION
DATE
DRAWING NO.
PROJECT NO.
FED AID NO.
DATE:
SHEET NO.OF
SURVEYED:
14087A-JUT01.dwg
BID
DOCUMENT
Public Works Department
CITY OF RENTON
R
EGIST E R E D NOTGNI
HSAWFOETAT
SERN EPRFO
E NNALIO
E
S IGS
47649KARINA P . FRA
N
ADATacoma Wenatchee KPG.com
Seattle
3131 Elliott Avenue, Suite 400
Seattle, WA 98121 206.286.1640
7 -13-2022JF
KPG
(S 3RD ST TO NW 3RD PL)
RAINIER AVE S CORRIDOR IMPROVEMENTS - PHASE 4
146 285
JULY 2022
14087A
146
STA 18+25 TO STA 22+50
JOINT UTILITY TRENCH PLAN
PLAN
DPY
KPF
KPF
STP(UL) -1615(005)
RAINIER AVE S SW SUNSET BLVDS 3RD ST GENERAL NOTES CONSTRUCTION NOTES
LEGEND
LUMINAIRE SCHEDULE
WIRE NOTES
PLAN
NUMBER BY APP.REVISION DESCRIPTION
DRAWN BY:
DESIGN BY:
CHECK BY:
PROJ MGR:
FILE:BY:DATE:
APPROVED FOR CONSTRUCTION
DATE
DRAWING NO.
PROJECT NO.
FED AID NO.
DATE:
SHEET NO.OF
SURVEYED:
14087A-ILL01.dwg
BID
DOCUMENT
Public Works Department
CITY OF RENTON
REGIST E R E D NOTGNI
HSAWFOETATS
ERNEPRFO
E NNALIO
E
S IGS
39324JAN C IGANI
K
Tacoma Wenatchee KPG.com
Seattle
3131 Elliott Avenue, Suite 400
Seattle, WA 98121 206.286.1640
7 -13-2022ILLUMINATION AND INTERCONNECT PLAN
STA 11+00 TO STA 15+00
200
14087A
JULY 2022
285200
RAINIER AVE S CORRIDOR IMPROVEMENTS - PHASE 4
(S 3RD ST TO NW 3RD PL)
KPG
JF
EH
DE
JC
STP(UL) -1615(005)
RAINIER AVE S
GENERAL NOTES CONSTRUCTION NOTES
LEGEND
LUMINAIRE SCHEDULE WIRE NOTES
NUMBER BY APP.REVISION DESCRIPTION
DRAWN BY:
DESIGN BY:
CHECK BY:
PROJ MGR:
FILE:BY:DATE:
APPROVED FOR CONSTRUCTION
DATE
DRAWING NO.
PROJECT NO.
FED AID NO.
DATE:
SHEET NO.OF
SURVEYED:
14087A-ILL01.dwg
BID
DOCUMENT
Public Works Department
CITY OF RENTON
REGIST E R E D NOTGNI
HSAWFOETATS
ERNEPRFO
E NNALIO
E
S IGS
39324JAN C IGANI
K
Tacoma Wenatchee KPG.com
Seattle
3131 Elliott Avenue, Suite 400
Seattle, WA 98121 206.286.1640
7 -13-2022JF
KPG
(S 3RD ST TO NW 3RD PL)
RAINIER AVE S CORRIDOR IMPROVEMENTS - PHASE 4
201 285
JULY 2022
14087A
201
STA 15+00 TO STA 18+25
ILLUMINATION AND INTERCONNECT PLANJC
PLAN
STP(UL) -1615(005)
EH
DE
RAINIER AVE S
S 2ND ST CONSTRUCTION NOTES
LUMINAIRE SCHEDULE
GENERAL NOTES
LEGEND
WIRE NOTES
NUMBER BY APP.REVISION DESCRIPTION
DRAWN BY:
DESIGN BY:
CHECK BY:
PROJ MGR:
FILE:BY:DATE:
APPROVED FOR CONSTRUCTION
DATE
DRAWING NO.
PROJECT NO.
FED AID NO.
DATE:
SHEET NO.OF
SURVEYED:
14087A-ILL01.dwg
BID
DOCUMENT
Public Works Department
CITY OF RENTON
REGIST E R E D NOTGNI
HSAWFOETATS
ERNEPRFO
E NNALIO
E
S IGS
39324JAN C IGANI
K
Tacoma Wenatchee KPG.com
Seattle
3131 Elliott Avenue, Suite 400
Seattle, WA 98121 206.286.1640
7 -13-2022JF
KPG
(S 3RD ST TO NW 3RD PL)
RAINIER AVE S CORRIDOR IMPROVEMENTS - PHASE 4
202 285
JULY 2022
14087A
202
STA 18+25 TO STA 22+50
ILLUMINATION AND INTERCONNECT PLANJC
PLAN
STP(UL) -1615(005)
EH
DE
RAINIER AVE S SW VICTORIA STHAY
E
S
P
L
S
W
LEGEND
LUMINAIRE SCHEDULE
GENERAL NOTES
WIRE NOTES
CONSTRUCTION NOTES
NUMBER BY APP.REVISION DESCRIPTION
DRAWN BY:
DESIGN BY:
CHECK BY:
PROJ MGR:
FILE:BY:DATE:
APPROVED FOR CONSTRUCTION
DATE
DRAWING NO.
PROJECT NO.
FED AID NO.
DATE:
SHEET NO.OF
SURVEYED:
14087A-ILL01.dwg
BID
DOCUMENT
Public Works Department
CITY OF RENTON
REGIST E R E D NOTGNI
HSAWFOETATS
ERNEPRFO
E NNALIO
E
S IGS
39324JAN C IGANI
K
Tacoma Wenatchee KPG.com
Seattle
3131 Elliott Avenue, Suite 400
Seattle, WA 98121 206.286.1640
7 -13-2022JF
KPG
(S 3RD ST TO NW 3RD PL)
RAINIER AVE S CORRIDOR IMPROVEMENTS - PHASE 4
203 285
JULY 2022
14087A
203
STA 22+50 TO STA 27+00
ILLUMINATION AND INTERCONNECT PLAN
PLAN
JC
DE
EH
STP(UL) -1615(005)
RAINIER AVE S
S TOBIN ST CONSTRUCTION NOTES
LEGEND
GENERAL NOTES
LUMINAIRE SCHEDULE
WIRE NOTES
NUMBER BY APP.REVISION DESCRIPTION
DRAWN BY:
DESIGN BY:
CHECK BY:
PROJ MGR:
FILE:BY:DATE:
APPROVED FOR CONSTRUCTION
DATE
DRAWING NO.
PROJECT NO.
FED AID NO.
DATE:
SHEET NO.OF
SURVEYED:
14087A-ILL02.dwg
BID
DOCUMENT
Public Works Department
CITY OF RENTON
REGIST E R E D NOTGNI
HSAWFOETATS
ERNEPRFO
E NNALIO
E
S IGS
39324JAN C IGANI
K
Tacoma Wenatchee KPG.com
Seattle
3131 Elliott Avenue, Suite 400
Seattle, WA 98121 206.286.1640
7 -13-2022PLAN
ILLUMINATION AND INTERCONNECT PLAN
STA 27+00 TO STA 31+00
204
14087A
JULY 2022
285204
RAINIER AVE S CORRIDOR IMPROVEMENTS - PHASE 4
(S 3RD ST TO NW 3RD PL)
KPG
JF
EH
DE
JC
STP(UL) -1615(005)
RENTON AVENUE
EXT
RAINIER AVE N
AIRPORT WAYRAINIER AVE S
CONSTRUCTION NOTES
LUMINAIRE SCHEDULE
LUMINAIRE SCHEDULE
WIRE NOTES
NUMBER BY APP.REVISION DESCRIPTION
DRAWN BY:
DESIGN BY:
CHECK BY:
PROJ MGR:
FILE:BY:DATE:
APPROVED FOR CONSTRUCTION
DATE
DRAWING NO.
PROJECT NO.
FED AID NO.
DATE:
SHEET NO.OF
SURVEYED:
14087A-ILL02.dwg
BID
DOCUMENT
Public Works Department
CITY OF RENTON
REGIST E R E D NOTGNI
HSAWFOETATS
ERNEPRFO
E NNALIO
E
S IGS
39324JAN C IGANI
K
Tacoma Wenatchee KPG.com
Seattle
3131 Elliott Avenue, Suite 400
Seattle, WA 98121 206.286.1640
7 -13-2022PLAN
JF
KPG
(S 3RD ST TO NW 3RD PL)
RAINIER AVE S CORRIDOR IMPROVEMENTS - PHASE 4
205 285
JULY 2022
14087A
205
STA 31+00 TO STA 35+50
ILLUMINATION AND INTERCONNECT PLANJC
DE
EH
FOR LEGEND AND
GENERAL NOTES, SEE
SHEET 204
STP(UL) -1615(005)
RAINIER AVE N
CONSTRUCTION NOTES
LEGEND
GENERAL NOTES
LUMINAIRE SCHEDULE
WIRE NOTES
NUMBER BY APP.REVISION DESCRIPTION
DRAWN BY:
DESIGN BY:
CHECK BY:
PROJ MGR:
FILE:BY:DATE:
APPROVED FOR CONSTRUCTION
DATE
DRAWING NO.
PROJECT NO.
FED AID NO.
DATE:
SHEET NO.OF
SURVEYED:
14087A-ILL02.dwg
BID
DOCUMENT
Public Works Department
CITY OF RENTON
REGIST E R E D NOTGNI
HSAWFOETATS
ERNEPRFO
E NNALIO
E
S IGS
39324JAN C IGANI
K
Tacoma Wenatchee KPG.com
Seattle
3131 Elliott Avenue, Suite 400
Seattle, WA 98121 206.286.1640
7 -13-2022PLAN
JF
KPG
(S 3RD ST TO NW 3RD PL)
RAINIER AVE S CORRIDOR IMPROVEMENTS - PHASE 4
206 285
JULY 2022
14087A
206
STA 35+50 TO STA 39+00
ILLUMINATION AND INTERCONNECT PLANJC
DE
EH
STP(UL) -1615(005)
RAINIER AVE NNW 3RD PLNE
L
S
O
N
P
L
N
W
CONSTRUCTION NOTES
LEGEND
GENERAL NOTES
LUMINAIRE SCHEDULE
WIRE NOTES
NUMBER BY APP.REVISION DESCRIPTION
DRAWN BY:
DESIGN BY:
CHECK BY:
PROJ MGR:
FILE:BY:DATE:
APPROVED FOR CONSTRUCTION
DATE
DRAWING NO.
PROJECT NO.
FED AID NO.
DATE:
SHEET NO.OF
SURVEYED:
14087A-ILL02.dwg
BID
DOCUMENT
Public Works Department
CITY OF RENTON
REGIST E R E D NOTGNI
HSAWFOETATS
ERNEPRFO
E NNALIO
E
S IGS
39324JAN C IGANI
K
Tacoma Wenatchee KPG.com
Seattle
3131 Elliott Avenue, Suite 400
Seattle, WA 98121 206.286.1640
7 -13-2022PLAN
JF
KPG
(S 3RD ST TO NW 3RD PL)
RAINIER AVE S CORRIDOR IMPROVEMENTS - PHASE 4
207 285
JULY 2022
14087A
STA 39+00 TO STA 43+50
ILLUMINATION AND INTERCONNECT PLAN
207
JC
DE
EH
STP(UL) -1615(005)
S 3RD ST
CONSTRUCTION NOTES
LEGEND
LUMINAIRE SCHEDULE
GENERAL NOTES
WIRE NOTES
NUMBER BY APP.REVISION DESCRIPTION
DRAWN BY:
DESIGN BY:
CHECK BY:
PROJ MGR:
FILE:BY:DATE:
APPROVED FOR CONSTRUCTION
DATE
DRAWING NO.
PROJECT NO.
FED AID NO.
DATE:
SHEET NO.OF
SURVEYED:
14087A-ILL03.dwg
BID
DOCUMENT
Public Works Department
CITY OF RENTON
REGIST E R E D NOTGNI
HSAWFOETATS
ERNEPRFO
E NNALIO
E
S IGS
39324JAN C IGANI
K
Tacoma Wenatchee KPG.com
Seattle
3131 Elliott Avenue, Suite 400
Seattle, WA 98121 206.286.1640
7 -13-2022PLAN
JF
KPG
(S 3RD ST TO NW 3RD PL)
RAINIER AVE S CORRIDOR IMPROVEMENTS - PHASE 4
208 285
JULY 2022
14087A
208
STA 201+50 TO STA 205+00
ILLUMINATION AND INTERCONNECT PLAN
EH
DE
JC
STP(UL) -1615(005)
AIRPORT WAY
LAKE AVE S CONSTRUCTION NOTES
LUMINAIRE SCHEDULE
LEGEND
GENERAL NOTES
WIRE NOTES
NUMBER BY APP.REVISION DESCRIPTION
DRAWN BY:
DESIGN BY:
CHECK BY:
PROJ MGR:
FILE:BY:DATE:
APPROVED FOR CONSTRUCTION
DATE
DRAWING NO.
PROJECT NO.
FED AID NO.
DATE:
SHEET NO.OF
SURVEYED:
14087A-ILL03.dwg
BID
DOCUMENT
Public Works Department
CITY OF RENTON
REGIST E R E D NOTGNI
HSAWFOETATS
ERNEPRFO
E NNALIO
E
S IGS
39324JAN C IGANI
K
Tacoma Wenatchee KPG.com
Seattle
3131 Elliott Avenue, Suite 400
Seattle, WA 98121 206.286.1640
7 -13-2022PLAN
JF
KPG
(S 3RD ST TO NW 3RD PL)
RAINIER AVE S CORRIDOR IMPROVEMENTS - PHASE 4
209 285
JULY 2022
14087A
209
STA 601+50 TO STA 605+50
ILLUMINATION AND INTERCONNECT PLANJC
DE
EH
STP(UL) -1615(005)
POLE ELEVATION
FOUNDATION SHALL SUPPORT
POLE SHOWN IN STANDARD PLAN
117.1A
FOUNDATION, AND ANCHOR BOLT
DETAILS PER STANDARD PLAN
117.1A
j
jjDocuSign Envelope ID: 9D9B0DA8-0385-4664-AE66-57BFF1561D7F
7/27/2022 | 5:44 PM PDT
FOUNDATION DETAILS
POLE ELEVATION
POLE CHAMBER DETAIL
jj
jDocuSign Envelope ID: 9D9B0DA8-0385-4664-AE66-57BFF1561D7F
7/27/2022 | 5:44 PM PDT
BASE COVER DETAIL
CABINET TOP PLATE DETAIL
CABINET BOTTOM PLATE DETAIL
CABINET CHAMBER DETAIL
DocuSign Envelope ID: 9D9B0DA8-0385-4664-AE66-57BFF1561D7F
7/27/2022 | 5:44 PM PDT
LUMINAIRE ARM DETAILS LUMINAIRE ARM MOUNTING BRACKET
DETAILS
DocuSign Envelope ID: 9D9B0DA8-0385-4664-AE66-57BFF1561D7F
7/27/2022 | 5:44 PM PDT
DocuSign Envelope ID: 9D9B0DA8-0385-4664-AE66-57BFF1561D7F
7/27/2022 | 5:44 PM PDT
DocuSign Envelope ID: 9D9B0DA8-0385-4664-AE66-57BFF1561D7F
7/27/2022 | 5:44 PM PDT