Loading...
HomeMy WebLinkAbout300.1w z J W I- Q Z TESTING DETAIL x 18 FT W a 0 NEW D.I. WATER LINE TAPPING TEE (MJxFL) VERTICAL CROSS(MJxFL) FOR POLYPIGGING TAPPING GATE VALVE (FL XMJ) 1—BLIND FLANGE ON TOP WITH 2" TAP AND 2" PLUG TEMPORARY PLUG (MJ) WITH 2—INCH TAP 1—BLIND FLANGE ON BOTTOM AND 2—INCH BLOW—OFF ASSEMBLY 1—PLUG(MJ) WITH 2"TAP & 2" BLOW—OFF CONCRETE BLOCKING TEMPORARY BLOCK w z J K w H a 0 c� FINAL CONNECTION DETAIL z X w W -ALA-- �@ENEW D.I. WATER LINE AFTER ALL CLEANING BY POLYPIG, PRESSURE TESTING AND DISINFECTION, REMOVE TEMPORAY BLOCK & BLOW—OFF AND CONNECT TO VALVE WITH D.I. SLEEVE (MJ) & D.I. SPOOLS FINAL CONNECTION BY CITY FORCES NOTES: 1. TAPPING TEES SHALL BE MADE OF CAST IRON, DUCTILE IRON OR EPDXY—COATED STEEL. BOLTS AND NUTS SHAL BE COR—TEN. ALL TEES AND VALVES SHALL BE WATER TESTED BEFORE TAP 2. NO SIZE ON SIZE TAPS ON CAST—IRON WATER LINES. TAP SHALL BE AT LEAST 2" SMALLER DIAMETER THAN THE EXISTING MAIN. 3. NO WET TAP ON ASBESTOS CEMENT LINE OR STEEL LINE 4, WET—TAPPING OF EXISTING CITY OF RENTON WATER MAINS WILL BE DONE BY SPEER TAP OR SUPERIOR TAPPING INC. 5. CONTRACTOR SHALL POTHOLE AND VERIFY THE HORIZONTAL AND VERTICAL ALIGNMENT OF EXISTING LINE OR STUB AND SHALL START LAYING THE NEW LINE AT THE SAME HORIZONTAL AND VERTICAL ALIGNMENT OF THE EXISTING STUB. 6. CITY FORCES WILL PERFORM THE FINAL CONNECTION FROM THE WATER LINE TO THE TAPPING VALVE WITH D.I. SLEEVE AND D.I. SPOOL. �Y STD. PLAN — 300.1 as �+ PUBLIC WORKS CONNECTION TO WATER MAIN WITH DEPARTMENT TAPPING TEE & VALVE �N,�p MARCH 2010