Loading...
HomeMy WebLinkAbout300.3EXISTING WATER LINE TESTING DETAIL Jm� PLAN VIEW EXISTING WATER LINE FINAL CONNECTION DETAIL EXISTING WATER LINE TICAL CROSS(MJxFL) FOR POLYPIGGING BLIND FLANGE ON TOP WITH 2"TAP & 2`PLUG BLIND FLANGE ON BOTTOM (MJ) PLUG WITH 2" TAP & 2" TEMPORARY BLOW -OFF )ORARY BLOCK -INGS AFTER ALL TESTING, CLEANING BY POLYPIG, AND DISINFECTION, REMOVE TEMP. BLOCK & BLOW -OFF & CONNECT WITH SLEEVE CMJ) & D.L SPOOLS FINAL CONNECTION BY CITY FORCES 'SY + as �PUBLIC WORKS CONNECTION TO WATER MAIN CUT STD. PLAN — 300.3 6� , DEPARTMENT IN—LINE TEE & TWO VALVES �N,tp MARCH 2010