Loading...
HomeMy WebLinkAboutCOR_STD_PLAN_H0304 xg� 3 YMBO%ate U IeQE t 910Wp (SEE TABlE Ma10. . FOR C10zmtsEr 3. @ISmN9) 0 ASSEMBLYDETAIL rsovmecv LAP OB PLOD NOTES 1. The Insert pipe Is 1' nominal diameter, Stlredule 40 steel piped as Micao oil ether pipe shown on this plan is 1 1M' nominal diameter, Schedule 40 steel pipe. AO pipe, cauplhgs, and eInaws shay be gaNanked In accordance with ASTM A 153. 2. The vertical support may be cast In e concrete foundation, or bored to a U- hamrei past (sae PLACEMENT DETAIL, Sheet 2). Avold placing Bre vertical Supportin the Box fore o1 a ditch. 3. The pipe angles reAulmd In this design may be achieved by using pipe Ridings, or by bending the pipes. See DETAIL. W. Sheet 2. 4. Coat the 1' Nam. pipe with grease (Paholemn) before siding the 1 IW slam. pipe (tanblover arm) amo it to aid rotation and to guard against corrosion. 5. Math the edge of the maRm platoun to the end of the horizontal pipe mount Corder the mallboa on the platform to ensues space for the mailbag door to open and to eflow space or Vaogog lire fasteners. Spacng of maM mn moungng hdes varies among manuocWmm. Atachmem of the moilboa to the plat arm may require dATM additional holes trough the manooao Tdtheplatform. SeeALIGNMENT13ETAIL- 5. Attach a newspaper boa to the pipe with two 1 3x4' muB6r camps spaced 4' Spar. Ne Paper boxes most not extend beyond the from of the mailbox when the mOimoa door Is closed. gpEJ _._ laEE fIOIE M. __ IrA¢aoa �' YABHOfa YOUNmla MOlE 11m.) - w 1 [fr[BEAoora; Exo) ell tl2� 3Ya � rxoe.wwio - i � i�6 olsEE'runmrE�S7 6 ADmn0l ALWAlilffJ6 AfitL E0T0 f1tLaAP DYPJ ,W4921L CIAYP '1WAPE+2WIDNO 2Mp(lYPW 2LOL1OArfa 1ttPJ I1WYaAem1 (RaiFADDMEND) B['�} AS'ELaOW Y�E� VHtn0Al6UPVORf M01t¢OMKNWM 1 WP6'E IEN6ax A9 aEOUNED 1,Y'PD'E tnpuAo calx ENOsI mouAtIA IENOp ora: EtID) 12d END): ASSEMBLYDETAIL rsovmecv LAP OB PLOD NOTES 1. The Insert pipe Is 1' nominal diameter, Stlredule 40 steel piped as Micao oil ether pipe shown on this plan is 1 1M' nominal diameter, Schedule 40 steel pipe. AO pipe, cauplhgs, and eInaws shay be gaNanked In accordance with ASTM A 153. 2. The vertical support may be cast In e concrete foundation, or bored to a U- hamrei past (sae PLACEMENT DETAIL, Sheet 2). Avold placing Bre vertical Supportin the Box fore o1 a ditch. 3. The pipe angles reAulmd In this design may be achieved by using pipe Ridings, or by bending the pipes. See DETAIL. W. Sheet 2. 4. Coat the 1' Nam. pipe with grease (Paholemn) before siding the 1 IW slam. pipe (tanblover arm) amo it to aid rotation and to guard against corrosion. 5. Math the edge of the maRm platoun to the end of the horizontal pipe mount Corder the mallboa on the platform to ensues space for the mailbag door to open and to eflow space or Vaogog lire fasteners. Spacng of maM mn moungng hdes varies among manuocWmm. Atachmem of the moilboa to the plat arm may require dATM additional holes trough the manooao Tdtheplatform. SeeALIGNMENT13ETAIL- 5. Attach a newspaper boa to the pipe with two 1 3x4' muB6r camps spaced 4' Spar. Ne Paper boxes most not extend beyond the from of the mailbox when the mOimoa door Is closed. gpEJ _._ laEE fIOIE M. __ IrA¢aoa �' YABHOfa YOUNmla MOlE 11m.) -