HomeMy WebLinkAboutMFP22005312.pdfDEPARTMENT OF COMMUNITY
AND ECONOMIC DEVELOPMENT
Minor Franchise Permit: MFP22005312
IVR Number: 22005312
Permit Information
Permit Name: Puget Sound Energy - Electric
Address/Location:10/06/2022Application Date:3294700330Parcel Number: 701 HIGH AVE S
Permit Type:10/19/2022Issue Date:Franchise
Permit Work Class:10/19/2023Expiration Date:Minor Utility
Job Number: 101152032Franchise Type:Electric
Description: Puget Sound Energy Electric Install OH TO UG perm svc AND upgrade XFMR At P01. 3" riser at P01 (317591
166260) 35' east along s 7th st to bore pit, then bore south across S 7th St Approx. 45'. Pothole all existing utilities.
Restoration per City of Renton standards.
Contacts
Name Address PhoneTypeBilling
Corrie Rydberg
Puget Sound Energy
3702 71st Ave W
University Place, WA 98466
C: (253) 905-5031ApplicantX
Vicki Henson
Potelco Inc
8001 212th St S
Kent, WA 98032
B: (253) 863-0484Contractor
Business License Number: 5109Electrical Contractor: POTELI*344O4
Construction Contractor: POTELI*227PL
Puget Sound Energy Inc 10885 NE 4th Street, PSE08-N08
Bellevue, WA 98009
B: (888) 225-5773Emergency
Contact
GILROY PAUL & DEBORA 1316 S 10TH ST
RENTON , WA 98057
Owner
Corrie Rydberg
Puget Sound Energy
3702 71st Ave W
University Place, WA 98466
C: (253) 905-5031Specialized
Billing
General Conditions & Signature
Permission is hereby given for the work described on this permit according to the conditions hereon and according to the
approved plans and specifications pertaining thereto, subject to compliance with the Ordinance of the City of Renton.
Ÿ
This permit and plans must be posted at the job site at all times.Ÿ
I hereby certify that no work is to be done except as described above and in approved plans, and that work is to conform to
Renton Trench Restoration and Street Overlay Requirements.
Ÿ
Call 425.430.7203 or go to: https://permitting.rentonwa.gov one working day in advance to schedule an inspections and for ANY
work in the Right of Way.
Ÿ
Call 8 1 1 to locate underground utilities at least two full business days prior to any excavation.Ÿ
In accordance with RCW 19.122.033(4) the permit holder is required to contact (Williams Northwest Pipeline at 425.868.1010)
(Olympic Pipeline at 425.235.7736) (Puget Sound Energy at 425.375.3397) to request a consultation with the transmission
pipeline company prior to performing any construction or excavation activities. This requirement to consult with the
transmission pipeline company is in addition to the requirement to Call before You Dig as required in RCW 19.122.
Ÿ
(Date)(Signature)
Page 1 of 1THIS PERMIT AND PLANS MUST BE POSTED AT THE JOB SITE AT ALL TIMES
Note: The Applicant is responsible for compliance with all codes and regulations, whether or not described in this document.
DEPARTMENT OF PUBLIC WORKS
Page 1 of 3 | Published: 10/27/2021
Transportation Division | 1055 South Grady Way, 5th Floor | Renton, WA 98057 | 425-430-7380
Website: rentonwa.gov
TRAFFIC CONTROL PLAN APPLICATION
Published: 10/27/2021
TRAFFIC CONTROL PLAN (TCP) MUST BE SUBMITTED TO PUBLIC WORKS TRANSPORTATION DIVISION
FOR REVIEW/APPROVAL AT LEAST FIVE (5) WORKING DAYS BEFORE THE DATE OF WORK.
The City of Renton requires any contractor, firm, corporation, or other public/private agency to prepare a traffic control
plan (TCP) and obtain city's approval of that plan when construction, repair, or maintenance work is to be conducted
within the city's right-of-way.
1. Fill out the Traffic Control Plan (TCP) Application form and prepare required submittal documents.
2. The following items are all required for submittal of the TCP Application:
☐Electronic Copy of the TCP Application
☐Electronic Copy of the TCP Layout, on 11” X 17” paper size format, which shall:
Include map(s) showing the location of the project and work area.
Be legible lettering and clear, contrasting, symbols of viewing or printing.
Must indicate street names, and north arrow and scale.
Types of plans required:
o Work hour plan – show all mobility impacts during construction hours.
o Non-work plan - show all mobility impacts after work hours when limited or no work is
happening in the right-of-way (ROW), if applicable.
o Changing construction phases – show construction sequence and each construction phase
change even if the traffic control is not modified, if applicable.
o Pedestrian access/detour plan, if applicable.
- Shall conform to the Washington State Traffic Control Flagger Certification handbook, by the
Evergreen Safety Council.
3. Submit Application via email to TCP@rentonwa.gov with the subject line “TCP Application – [Project Name].”
Project Name: Permit #:
Site Address:
Work Date: From _____________ To _____________ Work Time: Start ______________ End ______________
Construction Company:
Contact Name: Phone/Cell: _________________________
Business Address: City/State: Zip:
Description of Work:
Approval By: _________________________________________________ Date:____________________
Transportation Engineering
PLEASE SEE ATTACHED
POTELCO, INC
6905 S 228TH ST KENT, WA 98032
101152032
701 HIGH AVE S
MICHELE ABLEMAN 206-794-4202
MFP22005312
Monday - Friday 8:00AM - 3:00PM
Scott Warlick CED 10/19/2022
Note: The Applicant is responsible for compliance with all codes and regulations, whether or not described in this document.
Page 2 of 3 | Published: 10/27/2021
PERMIT HOLDER AGREES TO ALL THE FOLLOWING:
Must have approved Traffic Control Plan (TCP) prior to commencing the work.
Maintain existing pedestrian access. The work on pedestrian facilities, shall be limited to one corner at a time,
with the least possible inconvenience or delay to pedestrians.
WORK TIME begins when any street or travel lane is fully or partially closed. This includes set up within the
traveled way.
Comply with all traffic regulations of the City of Renton and the State of Washington.
Prepare a traffic control plan and obtain City approval of that plan. That plan shall be implemented for all street
and lane closures, and the plan shall be performed in compliance with the Manual on Uniform Traffic Control
Devices.
Notify emergency services (253-852-2121) twenty-four (24) hours before any street or lane closures.
Contractor or entity must call Renton School District (425-204-4455) or any public/private agency, including public
transit, to be affected by a temporary lane or road closure a minimum of five business days (excluding weekends
and holidays) prior to starting any work.
Contractor or entity must notify King County Metro in writing at construction.coord@kingcounty.gov a minimum
of five business days (excluding weekends and holidays) prior to starting any work impacting bus stops, a
temporary lane or road closure. Work requiring removing a bus shelter or sign requires notification in writing a
minimum of 30 business days (excluding weekends and holidays). Please call King County Metro at 206-477-1140
with any questions.
Any lane or street closures not in conformance with the approved traffic control plan and/or without notification
of emergency services may result in receiving a citation for violation of R.C.W. 47.36.200 Signs or Flaggers at
thoroughfare work sites and R.C.W. 9A.36.050 Reckless Endangerment, and other applicable State and City codes.
Indemnify and hold harmless the City of Renton from any and all claims, actions, and judgments, including all
costs of defense and attorney’s fees incurred in defending against same, arising from and related to
implementation of the approved traffic control plans including claims arising from towing of private vehicles and
the acts of the Permit Holder’s agents and employees.
The City of Renton shall be entitled, in its reasonable discretion, to settle claims prior to suit or judgment, and in
such event shall indemnify and hold harmless the City for any such claims paid, including the City’s reasonable
attorney’s fees and litigation costs incurred resulting from such claim.
In the event any claim or suit is brought against City within the scope of this Agreement, Permit Holder will pay for
legal counsel chosen by the City to defend against same.
Flagger and sign placement are subject to revision by the City Inspector on site, if needed to address traffic or
pedestrian safety or travel.
All permit conditions shall be met.
NOTES:
Total road closure lasting more than twenty-four (24) hours is subject to the approval by the City Council.
Work Zone Traffic Control shall be in accordance with the Manual on Uniform Traffic Control Devices (MUTCD)
and shown by a traffic control plan layout or reference to WSDOT.
Approved Temporary Traffic Control Plan must be at the work site during work hours.
Complete assistance and accommodation shall be provided to all kinds of pedestrian traffic when sidewalk or
walkway is impeded to safely redirect pedestrians around a work zone.
Signage shall be used to warn motorcyclists/bicyclists of the potential hazards on any uneven surfaced or slippery
road conditions during work and non-work hours.
Any vehicle, equipment, barricade, or portable tow-away sign used within the work area must display a company
logo or any legally acceptable sign showing the company name, address, and telephone number at a conspicuous
place on the vehicle or equipment.
Note: The Applicant is responsible for compliance with all codes and regulations, whether or not described in this document.
Page 3 of 3 | Published: 10/27/2021
In the case of Temporary No Parking Zones, all the following apply in addition to previous:
Contractor must complete form to show limits of Temporary No Parking Zone identifying barricade locations for
vacate parking or curb lane usage.
Contractor must post notice of dates and time of Temporary No Parking Zone with at least two signs per block
seventy-two (72) hours in advance of effective date and time.
The cover sheet of this Traffic Control Plan form must be attached to each Temporary No Parking Sign on the
project site.
Temporary traffic control devices must be removed immediately when work is done or no construction activities
are going on. If deemed abandoned, City crews will remove and store them at the City’s maintenance shop (3555
NE 2nd Street).
I certify that the information on this application and within the submittal documents are accurate to the best of my
knowledge and I acknowledge all the requirements on this application.
Applicant’s Signature Date
Applicant’s Name (Print)
CORRIE RYDBERG
S 7TH STGRANT AVE S
P01701HIGH AVE SM01M
18181717
17171818
111114141313RESIDENT(S) - CLIENTS(S) WILL BE INFORMED IN ADVANCEOF TEMPORARY DRIVEWAY CLOSUREFROM TO
TOW AWAY AREA
PHONE 888-9999
INFRASOURCE LLC 000 0000000
NO PARKING
NO-PARKFROMTOTOW AWAY AREAPHONE 888-9999INFRASOURCE LLC 000 0000000NO PARKINGNO-PARKSTOP
FLAGGER
STOP
FLAGGERSTOP
FLAGGER STOP
FLAGGER
W20-7AW20-4ONE LANEROADAHEAD100'100'100'ROAD
WORK
AHEAD W20-1BEACON WAY SJONES AVE S
W20-7AROADWORKAHEADW20-1 BEPREPAREDTOSTOPW3-4 100'100'100'W20-7AROADWORKAHEADW20-1BEPREPAREDTOSTOPW3-4100'100'100'W20-7AROADWORKAHEADW20-1BEPREPAREDTOSTOPW3-4100'100'100'
W20-7AROADWORKAHEADW20-1 BEPREPAREDTOSTOPW3-4 100'100'100'W20-7AW20-4ONE LANEROADAHEAD100'100'100'ROADWORKAHEADW20-1FLAGGERS SHALL STOP TRAFFICIN ALL DIRECTIONS (SHORT DURATION:APPROX 10 MINUTES) FOR LINE DROP.OTHER SIDE
S/W CLOSED CROSS HERESIDEWALK CLOSEDAHEADX'X'PLACE W20-1 SIGNS ON ALLADJACENT STREETS WITHIN FEET OF WORK AREAROADWORKAHEADW20-1 ROADWORKAHEADW20-1300receiving pitGRANT AVE S
HIGH AVE SS 7TH STTEMPORARY TRAFFIC CONTROL PLANWORK PIT28" TRAFFIC CONELEGENDTRAFFIC FLOWSIGN LOCATIONFLAGGERSTOPWORK VEHICLE/FLASHING LIGHTSRIGHT OF WAYBORE MACHINESIGN SPACINGMPH60/6545/5535/403025"X"1000'500'350'200'100'CHANNELIZATIONDEVICE SPACINGMPH55/7035/4525/30TAPER403020TANGENT806040Notes:1. All signs and spacing to conform to theMUTCD and City of Renton standards.2. All sidewalks, driveways, exits and egressesshall be completely clear unless otherwise indicated.3. Channelizing devices are 28" traffic cones.Use traffic drums (barrels) with steady burningType C lights on all State State Routes and Hwys.4. Sign size can be a minimum of 36" x 36" andshall not obstruct pedestrian access.5. Crew is required to leave a minimum of 11' fortraveling lane width.6. Alert affected residents and businesses.7. Work to take place between 9 a.m. and 4 p.munless otherwise specified. All work for arterialsand major roadways will be from 9 a.m. to 3 p.m.NProject Address:PagePSEPUGETSOUNDENERGYDesigner:Job #REV09/23/2022 5120048360 701 HIGH AVE SOUTH, RENTON, WA 98057.Jason Bisenius425-424-7316jason.bisenius@pse.com1 OF 2Puget Sound EnergyTraffic Control Supervisor:Gregory HarwoodCard No. 012238Card Exp. 09/30/2023gregory.harwood@pse.com(425)424-6425MFP22005312
S 7TH STGRANT AVE S
P01701HIGH AVE SM01M
18181717
17171818
111114141313RESIDENT(S) - CLIENTS(S) WILL BE INFORMED IN ADVANCEOF TEMPORARY DRIVEWAY CLOSUREFROM TO
TOW AWAY AREA
PHONE 888-9999
INFRASOURCE LLC 000 0000000
NO PARKING
NO-PARKFROMTOTOW AWAY AREAPHONE 888-9999INFRASOURCE LLC 000 0000000NO PARKINGNO-PARK
STOP
FLAGGER
STOP
FLAGGER
STO
P
FLAGGER
STO
P
FLAGGER
W20-7AW20-4ONE LANEROADAHEAD100'100'100'ROAD
WORK
AHEAD W20-1BEACON WAY SJONES AVE S
W20-7AROADWORKAHEADW20-1 BEPREPAREDTOSTOPW3-4 100'100'100'W20-7AROADWORKAHEADW20-1BEPREPAREDTOSTOPW3-4100'100'100'W20-7AROADWORKAHEADW20-1BEPREPAREDTOSTOPW3-4100'100'100'
W20-7AROADWORKAHEADW20-1 BEPREPAREDTOSTOPW3-4 100'100'100'W20-7AW20-4ONE LANEROADAHEAD100'100'100'ROADWORKAHEADW20-1OTHER SIDE
S/W CLOSEDCROSS HERESIDEWALK CLOSEDAHEADX'X'PLACE W20-1 SIGNS ON ALLADJACENT STREETS WITHIN FEET OF WORK AREAROADWORKAHEADW20-1 ROADWORKAHEADW20-1300GRANT AVE S
HIGH AVE SS 7TH STNotes:1. All signs and spacing to conform to theMUTCD and City of Renton standards.2. All sidewalks, driveways, exits and egressesshall be completely clear unless otherwise indicated.3. Channelizing devices are 28" traffic cones.Use traffic drums (barrels) with steady burningType C lights on all State State Routes and Hwys.4. Sign size can be a minimum of 36" x 36" andshall not obstruct pedestrian access.5. Crew is required to leave a minimum of 11' fortraveling lane width.6. Alert affected residents and businesses.7. Work to take place between 9 a.m. and 4 p.munless otherwise specified. All work for arterialsand major roadways will be from 9 a.m. to 3 p.m.NProject Address:PagePSEPUGETSOUNDENERGYDesigner:Job #REV09/23/2022 5120048360 701 HIGH AVE SOUTH, RENTON, WA 98057.Jason Bisenius425-424-7316jason.bisenius@pse.com2 OF 2Puget Sound EnergyTraffic Control Supervisor:Gregory HarwoodCard No. 012238Card Exp. 09/30/2023gregory.harwood@pse.com(425)424-6425TEMPORARY TRAFFIC CONTROL PLANWORK PIT28" TRAFFIC CONELEGENDTRAFFIC FLOWSIGN LOCATIONFLAGGERSTOPWORK VEHICLE/FLASHING LIGHTSRIGHT OF WAYBORE MACHINESIGN SPACINGMPH60/6545/5535/403025"X"1000'500'350'200'100'CHANNELIZATIONDEVICE SPACINGMPH55/7035/4525/30TAPER403020TANGENT806040MFP22005312
90°
R=48"
CUST. PROVIDED
4' X 4' WORKPIT
CUST. PROVIDED
3/4 CU. YD. OF SAND
CUST. PROVIDED
4' X 4' RECEIVING PIT
CUST. PROVIDED
4' X 8' BORING PIT
CUST. PROVIDED
4' X 4' WORKPIT
±35'±45'±75'CUST. PROVIDED AND INST.
3" REDPOLY CONDUIT ±45'
PSE TO INST. 1-RUN 4/O UG TPLX, ±185' IN CUST.
PROVIDED & INST. 3" CONDUIT IN CUST. TRENCH
CUST. PROVIDED AND INST. 3" SCH'L 40
PVC CONDUIT ±45'1400
1410
14031401
712
1416
627
1422
704
712
709
GRA
16
S/W
"701"GARAGE317576-166279
25 kVA (C)
317602-166278
25 kVA (C)
336.4 MCMACSR CBA317591-166260
10 kVA 120/240V (A)
25 kVA 120/240V (A)
SLAG6862
℄℄℄ROW 60'317591-166277
UNK (100T)
SLAG6863
N
Vicinity Map
N/A
Owner / Developer Contact Info
officeATTN:
Mike Gilroy
701 High Ave South
Renton, WA 98057
Mike Gilroy 253-495-0514
CUSTOMER-SUPPLIED SERVICE TRENCH
Superior
ORDER#NOTIF#
PWR
PROJECT PHASE
FOREMAN (CHECK BOX WHEN COMPLETED)
PSE Equipment LOCKED/SECURED & Work Area left in CLEAN/SAFE Condition.
Grid, Cable, and Switch numbers INSTALLED & VERIFIED.
Field Changes RED-LINED on As-built.
Indicate correct FUSE SIZE on As-built & VERIFY proper PHASE.
Foreman's Signature _______________________________________________
Print Name ___________________________________ Date ______________
Material VERIFIED and CHANGES noted on Paperwork.
Total PRIMARY Cable noted on As-built.
Company ID#'s RECORDED in correct location on As-built.
Deviations noted on the As-built and their reason.
I certify that the work performed meets PSE's standards and procedures
and that all quality requirements are met.
PSE
No
No
No
Yes
Yes
Yes
No
YesDeveloper
"Flagging Required"
"Outages Required"
"Locates Required"101152032THIS SKETCH NOT TO BE RELIED UPON FOR EXACT LOCATION OF EXISTING FACILITIES
CALL 811 TWO BUSINESS DAYS BEFORE YOU DIG
For contacts below dial 1-888-CALL PSE (225-5773)
101152032512004836
TV & TEL Electric Service Cable in 3" Conduit
Excavated Dirt Pile
Final Grade
24" Min
24" Min
to
36" Max
Cover Separation
12" Min
20" Min
JOINT TRENCH DETAIL
Electric Service Cable in Conduit (NTS)
To Excavated Dirt Pile
36" MINIMUM COVER
IN RIGHT OF WAY
Backfill for Conduit
Free of rocks
larger than 8"
in diameter)
Backfill for In Conduit - The backfill layer shall be soil that is free from construction debris,
glass, sharp rocks, frozen clods, and rocks larger than 8" in diameter.
OVERHEAD CIRCUIT MAP
SCALE: 6" = 1 MILE
ARE TO BE INSTALLED, CROSS SECTION DETAILS OF THE TYPICAL EROSION
STRUCTURES, & SPECIAL REQUIREMENTS FOR WORK IN SENSITIVE AREAS.)
EROSION & SEDIMENT CONTROL REQUIREMENTS
NOTES DETAILING WHERE EROSION OR SEDIMENT CONTROL STRUCTURES
(LOCAL JURISDICTIONS MAY HAVE ADDITIONAL REQUIREMENTS INCLUDING
0150.3200 TECHNIQUES FOR TEMPORARY EROSION & SEDIMENT CONTROL
EROSION & SEDIMENT CONTROL SHALL BE PER PSE STANDARD PRACTICE
& ANY ADDITIONAL LOCAL JURISDICTION REQUIREMENTS.
CIRCUIT LOADING TABLE
AS OF
EXIST. PEAK LOAD
EST. NEW LOAD
TOTAL
CIRCUIT:
A PHASE B PHASE C PHASE
GRA-16
7/2022
144 162 144
1 --
145 162 144
UTILITIES
CONTACT
PHONE#
COUNTY
1/4 SEC
U-MAP NO (POWER)
OP MAP
Emer Sect Gas Wk Ctr POWER WK CTR
PLAT MAP
JOINT FACILITIES ARRANGEMENTS
DRAWN BY
CHECKED BY
APPROVED BY
FOREMAN #1
FOREMAN #2
MAPPING
INCIDENT MAOP
Gas Order Elect Order
SCALE PAGE
ENGR - POWER
FUNCTION
PROJECT MGR
PERMITREAL ESTATE/EASEMENT
2
1
REV#
3
DATE DESCRIPTIONBY
CONTACT PHONE NO DATE
OH CKT MAP CIRCUIT NOUG CKT MAP
SIGNATURE
M. ABLEMAN 206-794-4202 7/17/22
D. BRINKMANN 206-794-8599 7/20/22
D. BRINKMANN -7/20/22
RW-127157 RENTON
GILROY OH CONVERSION
OH XMFR UPGRADE & SERVICE CONVERSION
701 HIGH AVE SOUTH, RENTON 98057
N/A N/A
N/A 101152032
AS NOTED 1/1
KING COUNTY N/A N/A CSPSKEPM
T23N.R05E.SW17 N/A N/A
2305E067 2305E088 2305E067 GRA-16
CenturyLink
N/A
N/A
Comcast/Xfinity
N/A
N/A
PSE - Gas
N/A
N/A
N/A
N/A
N/A
N/A N/A N/A
N/A N/A N/A
N/A N/A N/A
SCALE: NONE
CABLE & CONDUIT DIAGRAM
SITE SPECIFIC NOTES:
P01 - EXISTING #317591-166260
-EXISTING 50' UNK (1950) DISTRIBUTION POLE TO REMAIN
-REMOVE (1) OH 10 kVA 120/240 XFMR
-INSTALL OH 1Ø 25 kVA 120/240v XFMR, TAP A PHASE (MID: 6211300)
-INSTALL L/B C/O, FUSE @ 10T (MID:3412300)
-INSTALL STIRRUP & HOT CLAMP
-INST. NEW 1-3" RISER ON EXISTING S/O BRACKETS, ±25 6042.1000 (RIS3SCC)
-TRANSFER EXISTING SERVICES
M01 - EXISTING METER BASE
- PSE TO CONNECT SERVICE CONVERSION
SPAN NOTE:
-SEE SITE PLAN, ONE-LINE DIAGRAMS, & TABLES FOR INSTALL
DEVELOPER & CUSTOMER NOTES:
A PRE CONSTRUCTION MEETING IS REQUIRED WITH YOUR PROJECT MANAGER PRIOR TO STARTING ANY SITE WORK.
CUSTOMER IS RESPONSIBLE FOR ALL TRENCHING, SELECT BACKFILL, COMPACTION & RESTORATION PER PUGET
SOUND ENERGY STANDARDS & LOCAL MUNICIPALITY.
**DEVELOPER NEEDS TO FOLLOW ALL TRENCH DETAILS ON SELECT BACKFILL**
CUSTOMER IS RESPONSIBLE FOR THE FOLLOWING:
BORING
-BORING FOR CROSSINGS MAY NOT BE ALLOWED PER LOCAL MUNICIPALITY PERMIT AGENCY.
-CROSSINGS IN RIGHT OF WAY MUST BE SCHEDULED WITH PROJECT MANAGER PRIOR TO CONSTRUCTION.
-PROJECT MANAGER OR DESIGNATED REPRESENTATIVE MUST BE ON SITE DURING CONSTRUCTION WORK IN RIGHT
OF WAY.
-EXCAVATION CONTRACTOR MUST BE LICENSED AND BONDED TO PERFORM WORK IN RIGHT OF WAY.
VAULTS & WORK PITS
-PROVIDE A 4' X 4' WORK PIT AT P01.
-PROVIDE A 4' X 4' WORK PIT & 2/3 CU. YD. OF SAND AT M01.
-PROVIDE A 4' X 8' BORING PIT AT
-PROVIDE A 4' X 4' RECEIVING PIT AT
TRENCHING & CONDUIT
-INSTALL ±90' OF 1-3" SCH'L 80 GRAY PVC CONDUIT FROM V01 TO M01.
-REQUIRED TO PROVIDE AND INSTALL A 3/8" NON-POLY PULL ROPE IN ALL OF THE CONDUITS.
JOB SITE READINESS
-JOB SITE NEEDS TO BE 100% READY FOR INSPECTION 5 BUSINESS DAYS PRIOR TO CONSTRUCTION DATE.
-ALL WORK IN RIGHT OF WAY MUST BE COORDINATED WITH PROJECT MANAGER AND LOCAL MUNICIPALITY.
-ALL TRENCH, AND LOCAL ELECTRICAL MUNICIPALITIES AKA "L&I, CITY", INSPECTIONS MUST BE COMPLETED 5
BUSINESS DAYS PRIOR TO SCHEDULED CONSTRUCTION DATE.
-REQUIRED TO OPERATE AND PROVIDE EQUIPMENT TO PUMP OUT WATER FOR WORK PITS, VAULTS & TRENCH AT
ALL TIMES.
-REQUIRED TO HAVE EXCAVATION EQUIPMENT AND BE ON SITE THE DAY OF CONSTRUCTION TO COMPLETE
BACKFILLING.
-IF A SECOND INSPECTION IS REQUIRED, ADDITIONAL FEE'S WILL BE APPLIED.
-PLEASE REVIEW THE CITY OR KING COUNTY TRENCHING REQUIREMENTS UNDER THE PERMIT.
-IF A PRE-CON IS REQUIRED BY THE CITY, COUNTY OR WSDOT, A PSE PROJECT MANAGER WILL SET-UP AND
SCHEDULE A MEETING WITH THE MUNICIPALITY BEFORE ANY EXCAVATION OR INSTALLATION BEGINS .
CIRCUIT FEED ADDED: 0'
LRC:
% V. Drop:
% Flicker:
Sq. Footage:
Panel Size:
Heat Type:
Est. Demand:
900 SQ.
200AMPS
GAS
7.3 kW
65A
1.9%
2.5%
00 1"2"
00 50'100'
FLOW DIRECTION
LAY 8" BOTTOM SKIRT ON TOP OF NATIVE SOIL,
SECURE WITH PEA GRAVEL BAGS (MID 9995692).
6'
3'
8"
TECHNIQUES FOR EROSION AND SEDIMENT CONTROL
SILT FENCE DETAIL
Not to Scale 0150.3200
583070248N/A
N/AN/A
101152033N/A
108139530N/A
N/AN/A
Field Face
Quadrant
Climbing
Space
Road Face
Quadrant
Climbing
Space
5" Min
CL
LC
Direction of Vehicular Traffic
TOP VIEW
Standoff Bracket
15" Min Length
Conduit Clamp
Conduit
CONDUIT RISER PLACEMENT DETAIL (P01)
SCALE: NONE
4'x4' Work Pit
E-Mail:
Cell Phone:
Project Manager Contact Information:
Manager:
Michele.Ableman@pse.com
(206) 794-4202
Michele Ableman
Installed at site:
Grid Number:
kVA Rating:
TRANSFORMER INSTALLATION (OH)
Company ID#:
Primary phase connected to:
Tested Secondary Voltage
Material ID#:
Foreman to redline the following information
25kVA 120/240v
6211250
P01
317591-166260Removed at site:
Grid Number:
kVA Rating:
Foreman to redline the following information
TRANSFORMER REMOVAL
Company ID#:
Primary phase connected to:
Tested Secondary Voltage
P01
317591-166260
10kVA
SITE PLAN
SCALE: 1" = 50'
Top View
24" Min
PERMANENT METER DETAIL AT M01
NOT TO SCALE4'3'4'
24"
32"
Typical
Min.Gas Meter
Relief Vent
To Trench
Property Line
Electric & Joint Utility
Work Pit Dimensions
BuildingWall
Elec. Mtr.
Permanent Detail Detail:
Not to Scale
Elec. Mtr BaseElec. Mtr Utility
Provided
2.5" Conduit Service
Riser Customer Provided
Drainage Pipe12" Minimum
Clearance from GasService Lines
Conduit Stakes
Gas ServiceLine Conduit
Conduit Depth
24" to 36" Max.
SealConduitEndsClosed 48"
48"
24" Min.
36" Typical
36"
Min.
Gas Meter AssemblyUtility Provided
Regulator Vent
24"-36"
24"-36"
CALL (800) 424-5555 UTILITY NOTIFICATION CENTER A MINIMUM OF 2 BUSINESS DAYS
BEFORE BEGINNING ANY EXCAVATION TO PREVENT DAMAGE TO UNDERGROUND
FACILITIES & AVOID BODILY INJURY.
PSE/POTELCO REPRESENTIVE MUST BE ONSITE FOR DURATION OF BORE
POTHOLING IS REQUIRED PRIOR TO BORE. ALL OTHER UTILITIES SHALL HAVE THEIR
ALIGNMENTS AND PROFILES MAPPED. BORING CONTRACTOR SHALL PREPARE A
PROPOSED BORING ALIGNMENT AND PROFILE ON SITE AND PROVIDE IT TO THE
PSE/POTELCO REPRESENTATIVE FOR APPROVAL BEFORE COMMENCING ANY WORK
BORING CONTRACTOR SHALL USE CONDUIT AND MATERIALS PROVIDED ONLY BY
PSE/POTELCO WHEN OPERATING IN PUBLIC RIGHT OF WAY
NEW CONDUIT SHALL BE INSTALLED PER PSE STANDARDS AND ADHERE TO ALL
JURISCITION REQUIREMENTS. NEW CONDUIT SHALL BE INSTALLED AT 36" MINIMUM
COVERAGE. LOCAL JURISIDICTIONS MAY HAVE DIFFERENT REQUIREMENTS FOR
MINIMUM COVERAGE IN PUBLIC RIGHT OF WAY.
NEW CONDUIT SHALL MAINTAIN MINIMUM 1-FOOT VERTICAL CLEARANCE BETWEEN
OUTER SURFACES OF EXISTING UTILITIES AND STRUCTRES. IT SHALL ALSO MAINTAIN A
MINIMUM 5-FOOT HORIZONTAL SEPARATION OF WATER MAIN, STORM DRAIN AND
5-FOOT OF SEWER STRUCTURE. LOCAL JURSIDICTION MAY REQUIRE A DIFFERENT
MINIUM SEPARATION.
TYPICAL BORE NOTE
POWER GENERAL NOTES - RESIDENTAL PROJECT
1.ALL MATERIALS TO BE INSTALLED IN ACCORDANCE WITH PUGET SOUND ENERGY'S (PSE) STANDARDS. ANY
DEVIATION FROM THIS WORK SKETCH MUST BE AUTHORIZED BY PSE'S PROJECT MANAGER AND NOTED ON
THE FOREMANS' COPY.
2.ALL SWITCHING ARRANGEMENTS AND/OR OUTAGE ARRANGEMENTS ARE TO BE MADE WITH THE PROJECT
MANAGER AT LEAST THREE (3) WORKING DAYS IN ADVANCE.
3.CONTACT THE UTILITIES UNDERGROUND LOCATION CENTER (1-800-424-5555) AT LEAST 48 HOURS PRIOR TO
COMMENCING WORK TO GET THE UNDERGROUND FACILITIES LOCATED.
4.STAKING: THE CUSTOMER WILL PROVIDE ALL STAKING (TRANSFORMER, HANDHOLE, TRENCH, GRADE, LOT,
POLE, SIDEWALK, ETC.). SEE SKETCH AND DETAILS FOR LOCATIONS. EQUIPMENT LOCATIONS MUST BE
APPROVED BY THE PROJECT MANAGER.
5.SITE PREPARATION: THE WORK AREA WILL BE AT OR NEAR FINISHED GRADE, CLEAR OF TRENCH SPOILS OR
CONSTRUCTION MATERIALS WHICH WOULD RESTRICT CONSTRUCTION AND/OR EQUIPMENT ACCESS,
BEFORE WORK CAN BEGIN.
6.ROADS SHALL BE PAVED OR HAVE A COMPACTED , CRUSHED ROCK BASE IN PLACE.
7.CLEARANCES: TRANSFORMERS REQUIRE A MINIMUM OF 6 FEET FROM FIRE FIGHTING EQUIPMENT, 10 FEET
FROM COMBUSTIBLE WALLS, OVERHANGS, DOORS, AND WINDOWS, AND A MINIMUM OF 5 FEET FROM THE
BACK OF CURB (OR GUARD POSTS WILL BE REQUIRED PER PSE STANDARDS). ALL CONDUITS AND VAULTS
ARE TO BE AT LEAST 5 FEET AWAY FROM WATER, STORM AND SEWER LINES WHEN PARALLELING THEM IN
THE RIGHT OF WAY, AND AT LEAST 1 FOOT WHEN CROSSING THEM, OR AS REQUIRED BY YOUR LOCAL
MUNICIPALITY.
8.ALL WORK IS TO BE DONE IN ACCORDANCE WITH LOCAL MUNICIPAL AND COUNTY PERMIT REQUIREMENTS
AS APPLICABLE.
9.INCLEMENT WEATHER CONDITIONS MAY CAUSE DELAYS IN CONSTRUCTION TIMES AND DATES.
10.EXCAVATION: THE CUSTOMER IS TO PROVIDE ALL TRENCHING, BACKFILL, VAULT EXCAVATIONS,
COMPACTION AND RESTORATION PER THIS SKETCH AND PER PSE STANDARDS. A MINIMUM PROTECTIVE
COVER OF 36" IS REQUIRED OVER PSE'S PRIMARY VOLTAGE EQUIPMENT AND 24" IS REQUIRED OF PSE'S
SECONDARY VOLTAGE EQUIPMENT. THE CUSTOMER WILL PROVIDE ANY AND ALL SHORING OR THEY WILL
SIDE SLOPE THE TRENCH TO 1:1.
JOB SITE
JOB SITE
Superior
UG Perm Service
OH Service Removal
WIRE REMOVAL TABLE
Work
Location Wire Size & Type Quantity
Length
(per
conductor)
Remarks
From To
P01 M01 SEC #2 OH TPX 1 110'
SECONDARY CABLE & CONDUIT TABLE
Work
Location
Cable
Assumed
Lot Corner
Conduit
Voltage
Drop
Voltage
Flicker
As Built Information
Size Length
Design
(ft)
Size Length
Design
(ft)
Bends Foreman - Complete
FROM TO (1/0,4/0,350)to Meter(ft)(in)90°45°22°11°(Percent)(Percent)Actual Amount Installed (Conduit & Cable)
P01 M01 SEC 4/0 UG
TPX 185'25 3"140'1 0 0 0 1.9%2.5%
TYPICAL BORE COVER36" MIN.DEPTHFINAL GRADE
WILL MAINTAIN 36" MIN. DEPTH WHILE
DIRECTIONAL DRILLING
Jason Feller 09/27/2022
POTHOLE ALL EXISTING UTILITIES
RESTORATION PER CITY OF RENTON STANDARDS