Loading...
HomeMy WebLinkAboutAddendum - 1  AMENDMENTNO.1TOAGREEMENTFORARCHITECTURAL SERVICES   THISAMENDMENT,datedforreferencepurposesonlyasOctober18,2022isbyandbetween theCityofRenton(the“City”),aWashingtonmunicipalcorporation,andMackenzie (“Consultant”).TheCityandtheConsultantarereferredtocollectivelyinthisAmendmentasthe “Parties.”OncefullyexecutedbytheParties,thisAmendmentiseffectiveasofthelastdate signedbybothparties.  Whereas,theCityengagedtheservicesoftheConsultantunderAgreementCAGͲ22Ͳ047,dated 02/03/2022,toprovidenecessaryservicesforprofessionaldesignservices(referredtohereinas the“Agreement”);  Whereas,thePartieswishtoamendtheAgreementtorevisethescope,scheduleandfeesper Exhibit1ͲA.  NOWTHEREFORE,ItismutuallyagreeduponthatCAGͲ22Ͳ047isamendedasfollows:  1.ScopeofWork:Section1,ScopeofWork,isamendedtorevisethescopeofworkas specifiedinExhibit1ͲA,whichisattachedandincorporatedherein.  2.TimeofPerformance:Section3,AllWorkshallbeperformedbynolaterthanDecember 31,2023.  3.Compensation:Section4,Compensation,isamendedsothatthemaximumamountof compensationpayabletoConsultantisincreasedby$24,980.00from$187,572.00to $212,552.00,plusanyapplicablestateandlocalsalestaxes.Theadditionalcompensation shallbepaidbaseduponWorkactuallyperformedaccordingtotheamountsspecifiedin Exhibit1ͲAwhichisattachedandincorporatedherein.  4.AlltermsoftheAgreementnotexplicitlymodifiedhereinshallremaininfullforceand effectandsuchtermsshallapplytoWorkperformedaccordingtothisAmendmentasif fullysetforthherein.  INWITNESSWHEREOF,thePartieshavevoluntarilyenteredintothisAmendmentasofthedate lastsignedbythePartiesbelow.            CAG-22-047, Adden #1-22  PAGE2OF2  CITYOFRENTON   By:_____________________________ CONSULTANT   By:____________________________ MartinPastucha PublicWorks,Adminstrator KimberlyDoyle ProjectManager  _____________________________ Date  _____________________________ Date Attest   _____________________________ JasonA.Seth CityClerk  ApprovedastoLegalForm   By:__________________________ ShaneMoloney CityAttorney  ContractTemplateUpdated06/17/2021 October 18, 2022           N/A Approved by Cheryl Beyer via 10/20/2022 email ADDITIONAL SERVICE AGREEMENT Between Client and Mackenzie This ADDITIONAL SERVICE AGREEMENT is made as of the 30th day of September in the year 2022, by and between the following parties, for services in connection with the Project identified below: Client:City of Renton Russ Woodruff 1055 S. Grady Way, 5th Floor Renton, WA 98057 Mackenzie:500 Union Street, Suite 410 Seattle, WA 98101 Project:Renton: HR TI Redesign Mackenzie Project Number:2210142.05 Client and Mackenzie agree as follows: 1. BASIS OF DESIGN 1.1 In accordance with our phone conversation, we will perform the tasks outlined below for subject project. It is agreed that these tasks will be provided as Additional Services in accordance with our original agreement for this project, dated November 30, 2021. All terms and conditions, including assumptions and exclusions, of the original agreement remain in effect unless modified in this Additional Service. 1.2 The International Existing Building Code defines a "Dangerous Building" as a significant risk of collapse, detachment or dislodgement of any portion, member, appurtenance of the building/structure under service loads. Many existing facilities are likely to be in this "Dangerous Building" category, and if identified during Mackenzie's scope of services could require modification or further analysis of the existing structure beyond what is defined in the scope of services. Accordingly, Client acknowledges and agrees that Mackenzie expressly excludes any services necessary to address these types of differing code and law interpretation issues from Mackenzie's scope of services, and that such services (including any necessary redesign services) will, upon Client's approval, be performed by Mackenzie as an additional service. 2. SCOPE OF SERVICES 2.1 Perform redesign of 7th floor human resources tenant improvement space to include reduced build out items. Scope of services to include revisions to permit/bid set and cost estimate (to be performed by Roen Associates). ADDITIONAL SERVICE AGREEMENT Between Client and Mackenzie This ADDITIONAL SERVICE AGREEMENT is made as following parties, for services in connection with Client: Mackenzie: Project: ackenzie P sign versation, we will perform the tasks ou will be provided as Additional Services i dated November 30, 2021. All terms and co ginal agreement remain in effect unless modifie isting Building Code defines a "Dangerous Building" islodgement of any portion, member, appurtenance o Many existing facilities are likely to be in this "Dangerous Bu kenzie's scope of services could require modification or f beyond what is defined in the scope of services. Accordingly, C ackenzie expressly excludes any services necessary to address these rpretation issues from Mackenzie's scope of services, and that such s edesign services) will, upon Client's approval, be performed by Mackenz 2.SCOPE OF SERVICES 2.1 Perform redesign of 7th floor human resources tenant improvement spa items.Scope of services to include revisions to permit/bid set and cost est Associates). as of the 30th day of September in the year 2022, by and between the th the Project identified below: City of Renton Russ Woodruff 1055 S. Grady Way, 5th Floor Renton, WA 98057 500 Union Street,Suite 410 Seattle, WA 98101 Pr Renton: HR TI Redesig Mackenzie Project Number:2210142.05 Client and Mackenzie agree as follows: 1.BASIS OF DESIGN 1.1 In accordance with our phone conversation, we will perform the tasks outlined below for subject project. It is agreed that these tasks will be provided as Additional Services in accordance with our original agreement for this project, dated November 30, 2021. All terms and conditions, including assumptions and exclusions, of the origin d in this Additional Service. 1.2 The International Existing Building Code defines a "Dangerous Building" as a significant risk of collapse, detachment or dislodgement of any portion, member, appurtenance of the building/structure under service loads. Many existing facilities are likely to be in this "Dangerous Building" category, and if identified during Mackenzie's scope of services could require modification or further analysis of the existing structure be Client acknowledges and agrees that Mackenzie expressly excludes any services necessary to address these types of differing code and law interpretation issues from Mackenzie's scope of services, and that such services (including any necessary redesign services) will, upon Client's approval, be performed by Mackenzie as an additional service. ace to include reduced build out timate (to be performed by Roen P 2 06.749 .9993 F 5 03.228.1285 W M C KNZE.COM Logan Building , 500 Union Streett, #410, Seattle, WA 98101 ARCHITECTURE INTERIORS STRUCTURAL ENGINEERING CIVIL ENGINEERING LAND USE PLANNING TRANSPORRTATI ON PLANNING LANDSCAPE ARCHITECTURE Portland, Oregon Vancouver, Washington Seattle, Washington džŚŝďŝƚϭͲ        ADDITIONAL SERVICE AGREEMENT Renton: HR TI Redesign Project Number 2210142.05 September 30, 2022 Page 2 __________ 2.2 Revised floor plan to included break room, secure storage, reception desk, copy area, and partial height wall. Finishes will be replaced throughout (carpet, paint, LVT, rubber base, and ceiling tiles (ceiling grid to remain). 3. EXCLUSIONS 3.1 No services are included in this agreement other than those specifically set forth in the Scope of Services. In addition to any Exclusions outlined within the project proposal (if attached), items which are specifically excluded from the Scope of Services include, but are not limited to the following: 3.2 Client-Provided Consultant Services 3.2.a Coordination of Client-provided consultants not identified at the date of this proposal. 3.3 Land Use Process/Permitting 3.3.a Appeals, variances, public hearings, land use approvals, conditional use reviews, or any required adjustments other than as specifically outlined within our Scope of Services above. 3.3.b Meetings with public agencies or other meetings other than those specifically identified in Scope of Services above. 3.3.c Formal Building code interpretation requests and/or appeals. 3.3.d Permits other than those identified within the proposal identified above (e.g., phase permitting, trade permits, separate demolition permit, any other special permits). 3.4 Standard Design Items 3.4.a Square footage calculations beyond those required to confirm compliance with building and zoning code requirements. (Calculation of gross, net, and rentable square footages, such as BOMA calculations, are not included.) 3.4.b Any redesign efforts, including any revisions to the Documents, related to value engineering (VE) or other process(es) to reduce the construction cost (estimated, bid or actual) of the Work from that which is depicted in the Documents. Any redesign and subsequent revision to the Documents related to VE or other processes to reduce the construction cost (estimated, bid or actual) of the Work, shall be via Additional Services Agreement approved by Client in writing prior to the execution of such services by Mackenzie and/or our consultants. 3.5 Other Design Disciplines 3.5.a Acoustical engineering design and/or services. ADDITIONAL SERVICE AGREEMENT Renton: HR TI Redesign Project Number 2210142.05 September 30, 2022 Page 2 __________ 2.2 Revised floor plan to included break room, secu wall. Finishes will be replaced throughout (ca remain). 3.EXCLUSIONS 3.1 No services are included in this a In addition to any Exclusions o excluded from the Scope of 3.2 Client-Provided Consu 3.2.a Coordinat 3.3 Land Use Pro 3.3.a ed at the approvals, condition ined within our Scope er meetings other than thos tation requests and/or appeals. e identified within the proposal identifie te demolition permit, any other special perm tage calculations beyond those required to confirm ode requirements. (Calculation of gross, net, and rentable ations, are not included.) Any redesign efforts, including any revisions to the Documents, r or other process(es) to reduce the construction cost (estimated, that which is depicted in the Documents. Any redesign and subseq related to VE or other processes to reduce the construction cost Work, shall be via Additional Services Agreement approved by execution of such services by Mackenzie and/or our consultants. 3.5 Other Design Disciplines 3.5.a Acoustical engineering design and/or services. cure storage, reception desk, copy area,and partial height carpet, paint, LVT, rubber base,and ceiling tiles (ceiling grid to s agreement other than those specifically set forth in the Scope of Services. outlined within the project proposal (if attached), items which are specifically of Services include, but are not limited to the following: ultant Services ation of Client-provided consultants not identified at the date of this proposal. Process/Permitting Appeals, variances, public hearings, land use approvals, conditional use reviews, or any required adjustments other than as specifically outlined within our Scope of Services above. 3.3.b Meetings with public agencies or other meetings other than those specifically identified in Scope of Services above. 3.3.c Formal Building code interpreta 3.3.d Permits other than those identified within the proposal identified above (e.g., phase permitting, trade permits, separate mits). 3.4 Standard Design Items 3.4.a Square footage calculations beyond those required to confirm compliance with building and zoning code requirements. (Calculation of gross, net, and rentable square footages, such as BOMA calculati 3.4.b Any redesign efforts, including any revisions to the Documents, related to value engineering (VE) bid or actual) of the Work from quent revision to the Documents (estimated, bid or actual) of the y Client in writing prior to the        ADDITIONAL SERVICE AGREEMENT Renton: HR TI Redesign Project Number 2210142.05 September 30, 2022 Page 3 __________ 3.6 Unique Design services 3.6.a Furniture selection, specifications, requirements and all related coordination. 3.7 Expense/Billing 3.7.a Reimbursable expenses. 3.7.b Special billing requirements required by Client outside of Mackenzie's standard billing procedures. 3.7.c Building permit fees, design review fees, or any other fees paid to public bodies having jurisdiction over the project. 3.8 For additional exclusions related to the Scope of Services of our retained consultant(s), refer to their attached proposals. 4. TERMS AND CONDITIONS 4.1 Mackenzie may have consultants perform such portions of its services as it feels advisable in its professional opinion and discretion. 4.2 The purpose of our services will be to assist you, our Client, in making certain decisions regarding the building above described. Our discussion will be based on a limited field observation to assess the general physical status of the existing improvements, and our opinions will be based on the experience and judgment of our office staff. Our analysis will be based on current use of the building and assumes no change in occupancy. Although certain problem areas may be noted, it is expressly understood that an exhaustive review will not be performed and that other concealed problems may exist. No material inspection or material testing, soils investigation, asbestos investigation, hazardous waste investigation or other work for hidden conditions will be accomplished. 4.3 Due to limitations caused by visual inaccessibility to every structural detail or member, our office will not assume responsibility for the structural integrity of the building as related to the original design assumptions and construction practices. Our office will not assume responsibility for the original designer's assumptions or decisions, nor will we assume responsibility for the structure's theoretical ability to meet current code or the code applicable at the time of construction. Our employees, agents and consultants are not guarantors or insurers of the adequacy or sufficiency of the plans and specifications or in-place construction, and our services will be rendered as a consultant. This review in no way relieves any of the design professionals of record or contractors from their responsibilities. 4.4 Inasmuch as the remodeling and/or rehabilitation of an existing building requires that certain assumptions be made regarding existing conditions, and because some of these assumptions may not be verifiable without expending additional sums of money, or destroying otherwise adequate or serviceable portions ADDITIONAL SERVICE AGREEMENT Renton: HR TI Redesign Project Number 2210142.05 September 30, 2022 Page 3 __________ 3.6 Unique Design services 3.6.a Furniture selection, specifications, 3.7 Expense/Billing 3.7.a Reimbursable expenses. 3.7.b Special billing requir 3.7.c Building permit fees, design review fees, or any other fees paid to over the pro 3.8 For additional exclusions related to the Scope of Services of our retain attached pro TERMS AND CO Mackenzie may have consultants perform such portions of its servic assist you, our Client, in making on will be based on a limited field o provements, and our opinions will be r analysis will be based on current use o gh certain problem areas may be noted, it t be performed and that other concealed pr esting, soils investigation, asbestos investigation den conditions will be accomplished. ns caused by visual inaccessibility to every structural deta onsibility for the structural integrity of the building as ns and construction practices. Our office will not assume r's assumptions or decisions, nor will we assume responsibility y to meet current code or the code applicable at the time of const d consultants are not guarantors or insurers of the adequacy or specifications or in-place construction, and our services will be rendered no way relieves any of the design professionals of record or contractors f 4.4 Inasmuch as the remodeling and/or rehabilitation of an existing building r e be made regarding existing conditions, and because some of these ass without expending additional sums of money, or destroying otherwise a s, requirements and all related coordination. s. uirements required by Client outside of Mackenzie's standard billing procedures. mit fees, design review fees, or any other fees paid to public bodies having jurisdiction roject. al exclusions related to the Scope of Services of our retained consultant(s), refer to their roposals. 4.TERMS AND CONDITIONS 4.1 Mackenzie may have consultants perform such portions of its services as it feels advisable in its professional opinion and discretion. 4.2 The purpose of our services will be to assist you, our Client, in making certain decisions regarding the building above described. Our discussion will be based on a limited field observation to assess the general physical status of the existing improvements, and our opinions will be based on the experience and judgment of our office staff. Our analysis will be based on current use of the building and assumes no change in occupancy. Although certain problem areas may be noted, it is expressly understood that an exhaustive review will not be performed and that other concealed problems may exist. No material inspection or material testing, soils investigation, asbestos investigation, hazardous waste investigation or other work for hidde 4.3 Due to limitations caused by visual inaccessibility to every structural detail or member, our office will not assume responsibility for the structural integrity of the building as related to the original design assumptions responsibility for the original designer's assumptions or decisions, nor will we assume responsibility for the structure's theoretical ability t truction. Our employees, agents and consultants are not guarantors or insurers of the adequacy or sufficiency of the plans and sp d as a consultant. This review in from their responsibilities. equires that certain assumptions umptions may not be verifiable dequate or serviceable portions        ADDITIONAL SERVICE AGREEMENT Renton: HR TI Redesign Project Number 2210142.05 September 30, 2022 Page 4 __________ of the building, Client agrees that, except for negligence on the part of Mackenzie, Client will hold harmless, defend and indemnify Mackenzie from and against any and all claims, damages, awards, and costs of defense, including attorney's fees, arising out of Mackenzie's reliance on such assumptions. 4.5 The Scope of Services includes Mackenzie's assistance in applying for and obtaining permits and approvals normally required by law. The Scope of Services does not include, however, the fees for permits and approvals or Mackenzie's services for the preparation of research studies, special documentation, or special tests necessary for obtaining permits and approvals. Client is responsible for payment of all governmental fees (Building Permit fees, Design Review fees, or any other fees paid to public agencies having jurisdiction over the project). In some instances, in order to expedite the project, Mackenzie may pay such fees on behalf of the Client. In such cases, Client agrees to pay Mackenzie for such fees at cost plus 12%. 4.6 Subject to the applicable Standard of Care, Mackenzie will design the Project in accordance with applicable laws, including current Federal ADA Accessibility Standards and as required by the Authority Having Jurisdiction (AHJ) for Building Permit per the AHJ's current edition of the governing building code, and by reference therein ANSI ICC/A117.1 ("Building Code") for new construction. Notwithstanding the foregoing sentence, the Client acknowledges that various governmental codes and regulations, including without limitation the ADA and FHA, are subject to varying and sometimes contradictory interpretation and that the ADA is not a detailed building code. In the case of such conflicts or differing interpretations, Mackenzie will notify the Client thereof and will endeavor to design to the most stringent interpretation acceptable to the AHJ. 4.7 All other provisions of our original agreement for this project apply to these services. 5. PAYMENT 5.1 Contract Fee will be Lump Sum Fixed Fee of $24,980. Any services performed beyond the scope of services set forth above shall be for additional fees. 5.2 Consultants' fees are included in the Contract Fee. Consultants' fees will be billed at cost plus 12%. 5.3 All fees and costs are due 30 days after they are billed, and accrue service charges of 1.5% per month beginning 45 days from date of invoice. It is specifically understood that Mackenzie may cease providing services if accounts remain unpaid 45 days from date of invoice. It is agreed that Mackenzie will not be responsible for damages which arise from such cessation of services. If payment is not timely made, Client will reimburse Mackenzie for all costs or expenses reasonably incurred by Mackenzie in collecting sums due Mackenzie, including, without limitation, attorneys' fees. ADDITIONAL SERVICE AGREEMENT Renton: HR TI Redesign Project Number 2210142.05 September 30, 2022 Page 4 __________ of the building, Client agrees that, except for harmless, defend and indemnify Mackenzie f costs of defense, including attorney's fees, 4.5 The Scope of Services includes Macken normally required by law. The Sco approvals or Mackenzie's servic special tests necessary for o governmental fees (Buildin having jurisdiction over t pay such fees on beha plus 12%. 4.6 Subject to the laws, includ Jurisdictio referen sent li ed pay sign the Proje ards and as req ent edition of the for new construction governmental codes and ying and sometimes contr e case of such conflicts or diffe eavor to design to the most stri l agreement for this project apply to the mp Sum Fixed Fee of $24,980. Any services perform be for additional fees. es are included in the Contract Fee. Consultants' fees will b nd costs are due 30 days after they are billed, and accrue serv ng 45 days from date of invoice. It is specifically understood that ces if accounts remain unpaid 45 days from date of invoice. It is agr esponsible for damages which arise from such cessation of services. If pa will reimburse Mackenzie for all costs or expenses reasonably incurred b due Mackenzie, including, without limitation, attorneys' fees. or negligence on the part of Mackenzie, Client will hold e from and against any and all claims, damages, awards, and es, arising out of Mackenzie's reliance on such assumptions. kenzie's assistance in applying for and obtaining permits and approvals cope of Services does not include, however, the fees for permits and vices for the preparation of research studies, special documentation, or obtaining permits and approvals. Client is responsible for payment of all ding Permit fees, Design Review fees, or any other fees paid to public agencies r the project). In some instances, in order to expedite the project, Mackenzie may half of the Client. In such cases, Client agrees to pay Mackenzie for such fees at cost he applicable Standard of Care, Mackenzie will design the Project in accordance with applicable uding current Federal ADA Accessibility Standards and as required by the Authority Having ction (AHJ) for Building Permit per the AHJ's current edition of the governing building code, and by rence therein ANSI ICC/A117.1 ("Building Code") for new construction. Notwithstanding the foregoing entence, the Client acknowledges that various governmental codes and regulations, including without limitation the ADA and FHA, are subject to varying and sometimes contradictory interpretation and that the ADA is not a detailed building code. In the case of such conflicts or differing interpretations, Mackenzie will notify the Client thereof and will endeavor to design to the most stringent interpretation acceptable to the AHJ. 4.7 All other provisions of our original agreement for this project apply to these services. 5.PAYMENT 5.1 Contract Fee will be Lump Sum Fixed Fee of $24,980. Any services performed beyond the scope of services set forth above shall be 5.2 Consultants' fees be billed at cost plus 12%. 5.3 All fees and costs are due 30 days after they are billed, and accrue service charges of 1.5% per month beginning 45 days from date of invoice. It is specifically understood that Mackenzie may cease providing services if accounts remain unpaid 45 days from date of invoice. It is agreed that Mackenzie will not be responsible for damages which arise from such cessation of services. If payment is not timely made, Client w by Mackenzie in collecting sums        ADDITIONAL SERVICE AGREEMENT Renton: HR TI Redesign Project Number 2210142.05 September 30, 2022 Page 5 __________ This ADDITIONAL SERVICE AGREEMENT is entered into as of the day and year first written above between Client and Mackenzie. CLIENT(Signature) MACKENZIE(Signature) Kimberly Doyle (Printed Name) (Printed Name) Project Manager (Title) (Title) (Date Executed) (Date Executed) Enclosure(s): Exhibit A ̶Reimbursable Billing Rates Schedule Exhibit B ̶BCE Engineering, Inc. Proposal dated September 22, 2022 Exhibit C ̶Roen Associates Fee Quote Estimating Services Proposal dated September 29, 2022 c: Accounting Department ADDITIONAL SERVICE AGREEMENT Renton: HR TI Redesign Project Number 2210142.05 September 30, 2022 Page 5 __________ This ADDITIONAL SERVICE AGREEMENT is entered into as of t Mackenzie. CLIENT(Signature) (Printed Name) (Title) Executed)d) E e ated September 22, 2022 stimating Services Proposal date f the day and year first written above between Client and MACKENZIE(Signature) Kimberly Doyle (Printed Name) Project Manager (Title) (Date Ex (Date Executed) Enclosure(s):Exhibit A ̶Reimbursable Billing Rates Schedule Exhibit B ̶BCE Engineering, Inc. Proposal dat Exhibit C ̶Roen Associates Fee Quote Esti ed September 29, 2022 c:Accounting Department October 3, 2022        O:\WP\WP Library\ADMIN-GENERAL OFFICE\Rate and Reimbursable Schedules\Reimbursables-SEA.docx April 2018 REIMBURSABLE CHARGES Mackenzie will charge the following standard, cost-based rates for in-house reimbursable items listed below: IN-HOUSE PRINTING Scanning – Black & White Small Format: $0.25/sheet (8-1/2 x 11 - 11 x 17) Large Format: $1.00/sheet (Including Half Size) Scanning –Color Small Format: $0.50/sheet (8-1/2 x 11 - 11 x 17) Large Format: $3.00/sheet (Including Half Size) Printing/Copying – All Sizes Black & White: $0.21/sq. ft. Full Color: $4.00/sq. ft. Fax Local: $1.00/sheet Long distance: $1.30/sheet OTHER IN-HOUSE REIMBURSABLE ITEMS Digital Photo Documentation $15.00/download Check Generation Fee $25.00 Automobile Mileage Billed according to IRS guidelines Delivery Service Fixed rates: $7.75 to $54.40 (depending on mileage) Data Supplies CD documentation: $15.00 DVD documentation: $30.00 Report Binder Without tabs: $3.00/book With tabs: $4.00/book Foamcore:$4.25/sheet O:\WP\WP Library\ADMIN-GENERAL OFFICE\Rate and Reimbursable Schedules\Reimbursables-SEA.docx REIMBURSABLE Mackenzie will charge the following standard, cost below: IN Scanning –Black & White Small Format: $0 (8-1/2 x 11 -11 x Large Forma (Including Scanning – Sm : cal: Long distance: HOUSE REIMBURSABLE ITEMS d Mileage Billed according to IRS guidelines ery Service Fixed rates:$7.75 to $54.40 (depending on mileage) Data Supplies CD documentat DVD document Report Binder Without tabs: With tabs: Foamcore: April 2018 E CHARGES st-based rates for in-house reimbursable items listed IN-HOUSE PRINTING $0.25/sheet 1 x 17) mat:$1.00/sheet ng Half Size) –Color Small Format: $0.50/sheet (8-1/2 x 11 -11 x 17) Large Format:$3.00/sheet (Including Half Size) Printing/Copyinggg –All Sizes Black & White:$0.21/sq. ft. Full Color:$4.00/sq. ft. Fax Local $1.00/sheet Lo $1.30/sheet OTHER IN-HO Digital Photo Documentation $15.00/download Check Generation Fee $25.00 Automobile Mil Bil Delivery tion:$15.00 ation:$30.00 $3.00/book $4.00/book $4.25/sheet Exhibit A       Exhibit B Page 1 of 2       Exhibit B Page 2 of 2       500 Union Street, Suite 927Seattle, WA 98101Fee Quote Estimating ServicesEstimator Role HoursHourly RateExtension Estimator Role HoursHourly RateExtensionTotalSchematic DesignRoger Roen Principal145$ -$ WA Botting Mechanical145$ -$ EstimateMatt Wiggins Lead Estimator145$ -$ Gummer Csltg Electrical145$ -$ Dan Demonaz Estimator145$ -$ Subtotal Fee - Schematic Estimate-$ -$ -$ Design DevelopmentRoger Roen Principal1 145$ 145$ WA Botting Mechanical4 145$ 580$ EstimateMatt Wiggins Lead Estimator12 145$ 1,740$ Gummer Csltg Electrical4 145$ 580$ Dan Demonaz Estimator8 145$ 1,160$ Subtotal Fee - Design Development Estimate3,045$ 1,160$ 4,205$ Construction DocumentsRoger Roen Principal1 145$ 145$ WA Botting Mechanical4 145$ 580$ EstimateMatt Wiggins Lead Estimator8 145$ 1,160$ Gummer Csltg Electrical4 145$ 580$ Dan Demonaz Estimator8 145$ 1,160$ Subtotal Fee - Construction Documents Estimate2,465$ 1,160$ 3,625$ Bid Set DocumentsRoger Roen Principal1 145$ 145$ WA Botting Mechanical4 145$ 580$ EstimateMatt Wiggins Lead Estimator8 145$ 1,160$ Gummer Csltg Electrical4 145$ 580$ Dan Demonaz Estimator8 145$ 1,160$ Subtotal Fee - Bid Set Documents Estimate2,465$ 1,160$ 3,625$ Total Fee Quote11,455$ 1. Estimates are for construction costs only2. Fees include one round of review and modifications with design team for each estimate3. Includes one review meeting with the City at each phase4. SD estimate is not includedRenton 7th Floor TI Project Estimating FeesMacKenzie ArchitectsDivisions 1 - 14, 31-33Divisions 21-23, 26-289/29/2022Exhibit C2210142.05