Loading...
HomeMy WebLinkAbout238.10PLAN INLET PIPE (FLOW THROUGH) OUTLET PIPE OPTIONAL PARALLEL TANK ACCESS RISERS, SEE NOTE 6 ACCESS RISERS PER STD. PLAN 235.10 ACCESS MANHOLE WITH 24" BOLT LOCKING RING AND COVER PER STD. PLANS 204.40 AND 204.50 CLEAN DRAIN ROCK (1-1/2" - 3") TO TOP OF TANK, 2' MIN., 5' MAX. BEYOND EDGES, SEE NOTE 4 SETTLING VAULT OR TYPE 2 CATCH BASIN (CB) IF REQUIRED SECTION A INFILTRATION TANK (SIZE AS REQUIRED) 1" HOLES AS REQUIRED, SEE NOTE 10 CLEAN DRAIN ROCK (1-1/2" - 3") TO TOP OF TANK, 2' MIN., 5' MAX. BEYOND EDGES, 1' MIN. BELOW BOTTOM, SEE NOTE 4 TYPE 2 CB OR SETTLING VAULT IF REQUIRED 2" MIN. DIA AIR VENT PIPE WELDED TO TANK (REQUIRED IF NO ACCESS RISER ON TANK) OVERFLOW RISER FOR INFILTRATION ONLY. FOR DETENTION/RETENTION SEE STD. PLAN 235.00 OVERFLOW STRUCTURE, 54" MIN. DIA TYPE 2 CB GEOTEXTILE (TOP ONLY), SEE NOTE 4 2' MAX. 50' MAX.100' MAX.50' MAX. 2' MIN.4' MIN. 36" MIN. DIA (TYP.) NOTES: 1.THIS DETAIL IS A SCHEMATIC REPRESENTATION ONLY. ACTUAL CONFIGURATION WILL VARY DEPENDING ON SPECIFIC SITE CONSTRAINTS AND APPLICABLE DESIGN CRITERIA. 2.MINIMUM TANK DIAMETER IS 36 INCHES. 3.METAL PARTS PREFERRED TO BE STAINLESS STEEL, ALUMINIZED STEEL, OR ALUMINUM. ALL OTHER STEEL PARTS MUST BE GALVANIZED WITH TREATMENTS 1, 2, OR 5. 4.GEOTEXTILE FOR UNDERGROUND DRAINAGE, CLASS A, TO BE PLACED OVER CLEAN DRAIN ROCK, PER WSDOT STANDARD SPECIFICATIONS SECTION 9-33.2(1). 5.THE PROPOSED BOTTOM SHALL BE AT LEAST 3 FEET ABOVE THE SEASONAL HIGH WATER LEVEL AND HAVE AT LEAST 3 FEET OF PERMEABLE SOIL BENEATH THE BOTTOM. 6.ACCESS RISERS REQUIRED WITHIN 50 FEET FROM ANY LOCATION IN THE INFILTRATION TANK AND WITHIN 5 FEET OF EACH TERMINAL END. ANY LOCATION WITHIN THE INFILTRATION TANK SHALL HAVE A DIRECT LINE OF SIGHT FROM AN ACCESS POINT, UNOBSTRUCTED BY ANY RESTRICTIONS SUCH AS A WALL OR BAFFLE. 7.H-20 LIVE LOADS MUST BE ACCOMMODATED FOR TANKS LYING UNDER PARKING AREAS, ROADWAYS, AND ACCESS ROADS. 8.PIPE MATERIAL, JOINTS, AND PROTECTIVE TREATMENT FOR TANKS SHALL BE IN ACCORDANCE WITH SECTIONS 7-04 AND 9-05 OF THE WSDOT/APWA STANDARD SPECIFICATIONS. 9.ALL TANK ACCESS OPENINGS MUST BE READILY ACCESSIBLE BY MAINTENANCE VEHICLES. 10.THE NUMBER AND SPACING OF THE HOLES SHOULD BE SUFFICIENT TO ALLOW COMPLETE UTILIZATION OF THE AVAILABLE INFILTRATION CAPACITY OF THE SOILS WITH A SAFETY FACTOR OF 2.0 WITHOUT JEOPARDIZING THE STRUCTURAL INTEGRITY OF THE TANK. 11.WHEN CONNECTING TO A NEW PIPE, USE A FLEXIBLE CONNECTOR (KOR-N-SEAL BOOT WITH CORRUGATED PIPE ADAPTER OR APPROVED EQUAL). WHEN CONNECTING TO AN EXISTING PIPE, USE A FABRICATED SAND COLLAR OF THE SAME MATERIAL AS THE CONNECTING PIPE. 12.SEE CONSTRUCTION PLANS FOR SPECIFIC PROJECT REQUIREMENTS. A 2' MIN. SEE NOTE 11 (TYP.) 6" MIN. SEE NOTE 11 (TYP.) FINISH GRADE 6" 2' MIN. 36" MIN. 36" MIN. "FLOW-THROUGH" SYSTEM SHOWN SOLID. DESIGNS FOR "FLOW BACKUP" SYSTEM AND PARALLEL TANKS SHOWN DASHED CLOSED BOTTOM SAME SIZE AS INLET PIPE, 12" MIN. DIA. 5' MAX. TERMINAL END TYPICAL INFILTRATION TANK STD. PLAN - 238.10 PUBLIC WORKS DEPARTMENT APPROVED: DATEMartin Pastucha Public Works Administrator UNLESS OTHERWISE NOTED, DRAWING IS NOT TO SCALE (NTS) DocuSign Envelope ID: E212B987-C626-4330-A5D4-D055A0107AF9 10/19/2022 | 2:52 PM PDT