HomeMy WebLinkAboutMFP22005412DEPARTMENT OF COMMUNITY
AND ECONOMIC DEVELOPMENT
Major Franchise Permit: MFP22005412
IVR Number: 22005412
Permit Information
Permit Name: Puget Sound Energy - Electric
Address/Location:10/11/2022Application Date:3223059075Parcel Number: 18809 116TH AVE SE
Permit Type:10/28/2022Issue Date:Franchise
Permit Work Class:10/30/2023Expiration Date:Major Utility
Job Number: 101153649Franchise Type:Electric
Description: Puget Sound Energy Electric CREW TO DISCONNECT AND DEENERGIZE EXISTING P01 (316133 166566)
NO HS CUTS.
Contacts
Name Address PhoneTypeBilling
Corrie Rydberg
Puget Sound Energy
3702 71st Ave W
University Place, WA 98466
C: (253) 905-5031ApplicantX
Kristina TestContact
Puget Sound Energy Inc 10885 NE 4th Street, PSE08-N08
Bellevue, WA 98009
B: (888) 225-5773Emergency
Contact
JSHK INVESTMENTS LLC 9329 S 200TH ST
KENT , WA 98031
Owner
Corrie Rydberg
Puget Sound Energy
3702 71st Ave W
University Place, WA 98466
C: (253) 905-5031Specialized
Billing
General Conditions & Signature
Permission is hereby given for the work described on this permit according to the conditions hereon and according to the
approved plans and specifications pertaining thereto, subject to compliance with the Ordinance of the City of Renton.
Ÿ
This permit and plans must be posted at the job site at all times.Ÿ
I hereby certify that no work is to be done except as described above and in approved plans, and that work is to conform to
Renton Trench Restoration and Street Overlay Requirements.
Ÿ
Call 425.430.7203 or go to: https://permitting.rentonwa.gov one working day in advance to schedule an inspections and for ANY
work in the Right of Way.
Ÿ
Call 8 1 1 to locate underground utilities at least two full business days prior to any excavation.Ÿ
In accordance with RCW 19.122.033(4) the permit holder is required to contact (Williams Northwest Pipeline at 425.868.1010)
(Olympic Pipeline at 425.235.7736) (Puget Sound Energy at 425.375.3397) to request a consultation with the transmission
pipeline company prior to performing any construction or excavation activities. This requirement to consult with the
transmission pipeline company is in addition to the requirement to Call before You Dig as required in RCW 19.122.
Ÿ
(Date)(Signature)
Page 1 of 1THIS PERMIT AND PLANS MUST BE POSTED AT THE JOB SITE AT ALL TIMES
Note: The Applicant is responsible for compliance with all codes and regulations, whether or not described in this document.
DEPARTMENT OF PUBLIC WORKS
Page 1 of 3 | Published: 10/27/2021
Transportation Division | 1055 South Grady Way, 5th Floor | Renton, WA 98057 | 425-430-7380
Website: rentonwa.gov
TRAFFIC CONTROL PLAN APPLICATION
Published: 10/27/2021
TRAFFIC CONTROL PLAN (TCP) MUST BE SUBMITTED TO PUBLIC WORKS TRANSPORTATION DIVISION
FOR REVIEW/APPROVAL AT LEAST FIVE (5) WORKING DAYS BEFORE THE DATE OF WORK.
The City of Renton requires any contractor, firm, corporation, or other public/private agency to prepare a traffic control
plan (TCP) and obtain city's approval of that plan when construction, repair, or maintenance work is to be conducted
within the city's right-of-way.
1. Fill out the Traffic Control Plan (TCP) Application form and prepare required submittal documents.
2. The following items are all required for submittal of the TCP Application:
☐Electronic Copy of the TCP Application
☐Electronic Copy of the TCP Layout, on 11” X 17” paper size format, which shall:
Include map(s) showing the location of the project and work area.
Be legible lettering and clear, contrasting, symbols of viewing or printing.
Must indicate street names, and north arrow and scale.
Types of plans required:
o Work hour plan – show all mobility impacts during construction hours.
o Non-work plan - show all mobility impacts after work hours when limited or no work is
happening in the right-of-way (ROW), if applicable.
o Changing construction phases – show construction sequence and each construction phase
change even if the traffic control is not modified, if applicable.
o Pedestrian access/detour plan, if applicable.
- Shall conform to the Washington State Traffic Control Flagger Certification handbook, by the
Evergreen Safety Council.
3. Submit Application via email to TCP@rentonwa.gov with the subject line “TCP Application – [Project Name].”
Project Name: Permit #:
Site Address:
Work Date: From _____________ To _____________ Work Time: Start ______________ End ______________
Construction Company:
Contact Name: Phone/Cell: _________________________
Business Address: City/State: Zip:
Description of Work:
Approval By: _________________________________________________ Date:____________________
Transportation Engineering
PLEASE SEE ATTACHED
POTELCO, INC
6905 S 228TH ST KENT, WA 98032
101153649
18809 116TH AVE SE
JENNY CHAU 253-208-9480
MFP22005412
Monday - Friday
Scott Warlick CED 10/20/2022
9:00am 3:00pm
Note: The Applicant is responsible for compliance with all codes and regulations, whether or not described in this document.
Page 2 of 3 | Published: 10/27/2021
PERMIT HOLDER AGREES TO ALL THE FOLLOWING:
Must have approved Traffic Control Plan (TCP) prior to commencing the work.
Maintain existing pedestrian access. The work on pedestrian facilities, shall be limited to one corner at a time,
with the least possible inconvenience or delay to pedestrians.
WORK TIME begins when any street or travel lane is fully or partially closed. This includes set up within the
traveled way.
Comply with all traffic regulations of the City of Renton and the State of Washington.
Prepare a traffic control plan and obtain City approval of that plan. That plan shall be implemented for all street
and lane closures, and the plan shall be performed in compliance with the Manual on Uniform Traffic Control
Devices.
Notify emergency services (253-852-2121) twenty-four (24) hours before any street or lane closures.
Contractor or entity must call Renton School District (425-204-4455) or any public/private agency, including public
transit, to be affected by a temporary lane or road closure a minimum of five business days (excluding weekends
and holidays) prior to starting any work.
Contractor or entity must notify King County Metro in writing at construction.coord@kingcounty.gov a minimum
of five business days (excluding weekends and holidays) prior to starting any work impacting bus stops, a
temporary lane or road closure. Work requiring removing a bus shelter or sign requires notification in writing a
minimum of 30 business days (excluding weekends and holidays). Please call King County Metro at 206-477-1140
with any questions.
Any lane or street closures not in conformance with the approved traffic control plan and/or without notification
of emergency services may result in receiving a citation for violation of R.C.W. 47.36.200 Signs or Flaggers at
thoroughfare work sites and R.C.W. 9A.36.050 Reckless Endangerment, and other applicable State and City codes.
Indemnify and hold harmless the City of Renton from any and all claims, actions, and judgments, including all
costs of defense and attorney’s fees incurred in defending against same, arising from and related to
implementation of the approved traffic control plans including claims arising from towing of private vehicles and
the acts of the Permit Holder’s agents and employees.
The City of Renton shall be entitled, in its reasonable discretion, to settle claims prior to suit or judgment, and in
such event shall indemnify and hold harmless the City for any such claims paid, including the City’s reasonable
attorney’s fees and litigation costs incurred resulting from such claim.
In the event any claim or suit is brought against City within the scope of this Agreement, Permit Holder will pay for
legal counsel chosen by the City to defend against same.
Flagger and sign placement are subject to revision by the City Inspector on site, if needed to address traffic or
pedestrian safety or travel.
All permit conditions shall be met.
NOTES:
Total road closure lasting more than twenty-four (24) hours is subject to the approval by the City Council.
Work Zone Traffic Control shall be in accordance with the Manual on Uniform Traffic Control Devices (MUTCD)
and shown by a traffic control plan layout or reference to WSDOT.
Approved Temporary Traffic Control Plan must be at the work site during work hours.
Complete assistance and accommodation shall be provided to all kinds of pedestrian traffic when sidewalk or
walkway is impeded to safely redirect pedestrians around a work zone.
Signage shall be used to warn motorcyclists/bicyclists of the potential hazards on any uneven surfaced or slippery
road conditions during work and non-work hours.
Any vehicle, equipment, barricade, or portable tow-away sign used within the work area must display a company
logo or any legally acceptable sign showing the company name, address, and telephone number at a conspicuous
place on the vehicle or equipment.
Note: The Applicant is responsible for compliance with all codes and regulations, whether or not described in this document.
Page 3 of 3 | Published: 10/27/2021
In the case of Temporary No Parking Zones, all the following apply in addition to previous:
Contractor must complete form to show limits of Temporary No Parking Zone identifying barricade locations for
vacate parking or curb lane usage.
Contractor must post notice of dates and time of Temporary No Parking Zone with at least two signs per block
seventy-two (72) hours in advance of effective date and time.
The cover sheet of this Traffic Control Plan form must be attached to each Temporary No Parking Sign on the
project site.
Temporary traffic control devices must be removed immediately when work is done or no construction activities
are going on. If deemed abandoned, City crews will remove and store them at the City’s maintenance shop (3555
NE 2nd Street).
I certify that the information on this application and within the submittal documents are accurate to the best of my
knowledge and I acknowledge all the requirements on this application.
Applicant’s Signature Date
Applicant’s Name (Print)
CORRIE RYDBERG
P01
SE 188TH ST1616
10 10
10 10 10RIGHT LANECLOSEDAHEADW20-5RW20-7A100'100'100'ROADWORKAHEADW20-1LEFTKEEPR4-8BSTOP
FLAGGER
W20-7AROAD
WORK
AHEAD W20-1W20-4ONE LANE
ROADAHEAD100'100'100'W20-7AROADWORKAHEADW20-1W20-4ONE LANEROADAHEAD100'100'100'
STOP
FLAGGER
STOP
FLAGGER
BENSON HILL ELEMENTARY
SCHOOL ENTRANCE 116TH AVE SE28" TRAFFIC CONE
LEGEND
TRAFFIC FLOW
SIGN LOCATION
FLAGGER
STOP
POLE
WORK VEHICLE/
FLASHING LIGHTS
RIGHT OF WAY
SIGN SPACING
MPH
60/65
45/55
35/40
30
25
"X"
1000'
500'
350'
200'
100'
CHANNELIZATION
DEVICE SPACING
MPH
55/70
35/45
25/30
TAPER
40
30
20
TANGENT
80
60
40
TEMPORARY TRAFFIC CONTROL PLAN
N
Notes:
1. All signs and spacing to conform to the
MUTCD and City of Renton standards.
2. All sidewalks, driveways, exits and egresses
shall be completely clear unless otherwise indicated.
3. Channelizing devices are 28" traffic cones.
Use traffic drums (barrels) with steady burning
Type C lights on all State State Routes and Hwys.
4. Sign size can be a minimum of 36" x 36" and
shall not obstruct pedestrian access.
5. Crew is required to leave a minimum of 11' for
traveling lane width.
6. Alert affected residents and businesses.
7. Work to take place between 9 a.m. and 4 p.m
unless otherwise specified. All work for arterials
and major roadways will be from 9 a.m. to 3 p.m.
Project Address:
Page
PSE PUGETSOUNDENERGY
Designer:
Job #
REV
09/22/2022
513075876
0
18809 116th Ave SE, Renton, WA
Kali-Jamal Collins
425-424-6425
Kali-Jamal.Collins@pse.com
1 OF 1
Puget Sound Energy
Traffic Control Supervisor:
Gregory Harwood
Card No. 012238
Card Exp. 09/30/2023
gregory.harwood@pse.com
(425)424-6425
MFP22005412
18809
SE 188TH ST(PRIVATE ROAD)116TH AVE SE123
4
5
6
316133-166541
25 kVA (A)
75 kVA 120/240V (A)ACAC#4ACS
R
-
A
#6CU
-
C
CUSTOMER OWNED, INSTALLED &
MAINTAINED 2-RUN OF 3/0 SVC CABLE
316133-166556
UNK (40T)
UNK (100T)
SLAR8520
PAN
15
R/W
60'
SITE PLAN
N
Vicinity Map
47.4341, -122.187
Owner / Developer Contact Info
officeATTN:
Enersys
14323 32nd ST E
Sumner WA. 98390
Jeff Johnson 206-450-0711
Xmfr Removal
Superior
ORDER#NOTIF#
PWR
PROJECT PHASE
FOREMAN (CHECK BOX WHEN COMPLETED)
PSE Equipment LOCKED/SECURED & Work Area left in CLEAN/SAFE Condition.
Grid, Cable, and Switch numbers INSTALLED & VERIFIED.
Field Changes RED-LINED on As-built.
Indicate correct FUSE SIZE on As-built & VERIFY proper PHASE.
Foreman's Signature _______________________________________________
Print Name ___________________________________ Date ______________
Material VERIFIED and CHANGES noted on Paperwork.
Total PRIMARY Cable noted on As-built.
Company ID#'s RECORDED in correct location on As-built.
Deviations noted on the As-built and their reason.
I certify that the work performed meets PSE's standards and procedures
and that all quality requirements are met.
LRC:
% V. Drop:
% Flicker:
Sq. Footage:
Panel Size:
Heat Type:
Est. Demand:
242
400A
ELECTRIC
38.94KW
134A
4.5%
1.7%
E-Mail:
Cell Phone:
Project Manager Contact Information:
Manager:Jenny Chau
253-208-9480
jenny.chau@pse.com
SCALE: 1" = 50'101153649THIS SKETCH NOT TO BE RELIED UPON FOR EXACT LOCATION OF EXISTING FACILITIES
CALL 811 TWO BUSINESS DAYS BEFORE YOU DIG
For contacts below dial 1-888-CALL PSE (225-5773)
101153649
UTILITIES
CONTACT
PHONE#
COUNTY
1/4 SEC
U-MAP NO (POWER)
OP MAP
Emer Sect Gas Wk Ctr POWER WK CTR
PLAT MAP
JOINT FACILITIES ARRANGEMENTS
DRAWN BY
CHECKED BY
APPROVED BY
FOREMAN #1
FOREMAN #2
MAPPING
INCIDENT MAOP
Gas Order Elect Order
SCALE PAGE
ENGR - POWER
ENGR - GAS
FUNCTION
PROJECT MGR
PERMITREAL ESTATE/EASEMENT
2
1
REV#
3
DATE DESCRIPTIONBY
CONTACT PHONE NO DATE
OH CKT MAP CIRCUIT NOUG CKT MAP
Jenny Chau 253-208-9480 7/20/2022
Ray Reynolds 253-262-7409 7/20/2022
N/A N/A N/A
Ray Reynolds -7/20/2022
RW-_____RENTON
COMAST KENT VISTA
REPL B/O POLE, UPGRADE XFMR CONNECT NEW SVC
18809 166TH AVE SE RENTON, WA. 98058
N/A N/A
N/A 101153649
AS NOTED 1 OF 1
KING N/A N/A CSPSKEPM
se---N/A N/A
2305E128 2305E136 2305E128 PAN-15
N/A
N/A
N/A
N/A
N/A
N/A
N/A
N/A
N/A
N/A
N/A
N/A
N/A N/A N/A
N/A N/A N/A
N/A N/A N/A
513075876
SITE SPECIFIC NOTES
P01 EXISTING 316133-166556:
-EXISTING 1976 80' POLE TO REMAIN
-OPEN 40T CUTOUTS TO DE-ENERGIZE WIRE
P02 REPLACE 316133-166541:
-REMOVE B.O. 1965 40' POLE
-REMOVE EXISTING 25kVA 120/240V XFMR RETURN TO YARD
-INSTALL NEW 45' CL-3 POLE 6010.1000(PD453)
-INSTALL 2-PHASE DOUBLE PIN 6032.1020(ANG215)
-INSTALL NEW 3/8" PRIM GUY SOUTH 6013.0100(GYD3SA)
-REUSE EXISTING ANCHOR
-INSTALL 4"-RIGID CLEVIS
-INSTALL 75 KVA 120/240V OH XFMR 6025.1000(TRFSXF)
-INSTALL L/B C/O ON C/O BRACKET, FUSE @25T
-INSTALL STIRRUP TAP A PHASE
-INSTALL 3" SEC RISER ON S/O BRACKETS 6042.1000(RIS3CSS)
-RECONNECT SVC's
-INSTALL GRID#
HH1 EXISTING:
-EXISTING 17" X 30" HH TO REMAIN
-REMOVE EXISTING (3) 4-POS CONNECTOR BARS
-INSTALL NEW(3) 6-POS CONNECTOR BARS( 7651006)
-RECONNECT SVC's
-CONNECT CUSTOMER OWNED, INSTALLED & MAINTAINED 2-RUN OF 3/0 SVC CABLE
M01 EXISTING:
-LOCATED IN FENCED YARD
-REMOVE EXISTING METER
M02 NEW:
-LOCATED IN FENCED YARD
-INSTALL NEW METER ON 400A PANEL
SPAN SPECIFIC NOTES
SEE SITE PLAN AND TABLES FOR INSTALL
CIRCUIT FEET ADDED: 0'
UTILITY POLE EROSION CONTROL DETAIL
TOP VIEW
FLOWING DITCH or BODY OD WATER
SLOPE
Secure bottom of fence
with gravel bags
Place straw mulch
on disturbed areaExcavated or
Augered Hole
Pole
SLOPE
Not to scale Adjacent to flowing ditches or bodies of water
Install silt fence around
pole excavation
Removed at site:
Grid Number:
kVA Rating:
Foreman to redline the following information
TRANSFORMER REMOVAL
Company ID#:
Primary phase connected to:
Tested Secondary Voltage
P02
316133-166541
25kVA
SCALE: 6" = 1 MILE
OVERHEAD CIRCUIT MAP
POWER GENERAL NOTES - RESIDENTIAL PROJECT
1.All materials to be installed in accordance with Puget Sound Energy's (PSE) standards. Any deviation
from this work sketch must be AUTHORIZED by PSE's Project Manager and NOTED on the Foreman's
Copy.
2.All switching arrangements and/or outage arrangements are to be made with the Project Manager at least
three (3) working days in advance.
CUSTOMER NOTES
Customer is responsible for all trenching, select backfill, compaction & restoration per Puget Sound Energy
Standards & Local Municipality (See PSE Electric Service Handbook for more details).
1.Contact the Utilities Underground Location Center (1-800-424-5555) at least 48 hours prior to
commencing work to get the underground facilities located.
2.STAKING: The customer will provide all staking (transformer, handhole, trench, grade, lot, pole,
sidewalk, etc.). See sketch and details for locations. Equipment locations must be approved by the
Project Manager.
3.SITE PREPARATION: The work area will be at or near finished grade, clear of trench spoils or
construction materials which would restrict construction and/or equipment access, before work can begin.
4.Roads shall be paved or have a compacted , crushed rock base in place.
5.CLEARANCES: Transformers require a minimum of 6 feet from fire fighting equipment, 10 feet from
combustible walls, overhangs, doors, and windows, and a minimum of 5 feet from the back of curb (or
guard posts will be required per PSE standards). All conduits and vaults are to be at least 5 feet away
from water, storm and sewer lines when paralleling them in the right of way, and at least 1 foot when
crossing them.
6. All work is to be done in accordance with local municipal and county permit requirements as applicable.
7.Inclement weather conditions may cause delays in construction times and dates.
8.EXCAVATION: The customer is to provide all trenching, backfill, vault excavations, compaction and
restoration per this sketch and per PSE standards. A minimum protective cover of 36" is required over
PSE's primary voltage equipment and 24" is required of PSE's secondary voltage equipment. The
customer will provide any and all shoring or they will side slope the trench to 1:1.
9.EROSION & SEDIMENT CONTROL: Erosion & sediment control shall be per PSE standard practice
0150.3200 techniques for temporary erosion & sediment control & any additional local jurisdiction
requirements. (Local jurisdiction may have additional requirements including notes detailing where
erosion or sediment control structures are to be installed, cross section details of the typical erosion
structures, & special requirements for work in sensitive areas.)
10.Customer is required to have meter inspected and approved by L&I/City prior to construction.
Installed at site:
Grid Number:
kVA Rating:
TRANSFORMER INSTALLATION (OH)
Company ID#:
Primary phase connected to:
Tested Secondary Voltage
Material ID#:
Foreman to redline the following information
75kVA 120/240v
6211400
P02
316133-166541
583070781
594151790
101153650
PSE Locates Req'd
Developer Locates Req'd Yes
No
Yes
NoFlagging Req'd
Outages Req'd
Field Face
Quadrant
Climbing
Space
Road Face
Quadrant
Climbing
Space
5" Min
CL
LC
Direction of Vehicular Traffic
TOP VIEW
CONDUIT RISER PLACEMENT DETAIL (P01)
SCALE: NONE
4' x 4' Work Pit
(Pole Butt Must Be Exposed)
POLE RETIREMENT TABLE TEMP TRANSFERS ST. LIGHT TRANSFERS
Wk
Loc
Pole Data Pole
TEL TV FIBER TRAN RMVD ID NUMBER
Grid #Length Class Year TOPPED RMVD
P02 316133-166541 40 UNK 1965
POLE TABLE (NEW)
Work
Location
Pole Data
Grid #Height Class Year Remarks / Location Ref.
P02 316133-166541 45 CL-3
CUSTOMER DEVELOPMENT NOTES:
A PRE CONSTRUCTION MEETING IS REQUIRED WITH YOUR PROJECT MANAGER PRIOR TO STARTING ANY SITE
WORK.
CUSTOMER IS RESPONSIBLE FOR ALL TRENCHING, SELECT BACKFILL, COMPACTION & RESTORATION PER PUGET
SOUND ENERGY STANDARDS & LOCAL MUNICIPALITY.
**DEVELOPER NEEDS TO FOLLOW ALL TRENCH DETAILS ON SELECT BACKFILL**
CUSTOMER IS RESPONSIBLE FOR THE FOLLOWING:
VAULTS & WORK PITS.
-PROVIDE A 4' X 4' WORK PIT AT HH1.
JOB SITE READINESS.
-JOB SITE NEEDS TO BE 100% READY FOR INSPECTION 5 BUSINESS DAYS PRIOR TO
CONSTRUCTION DATE.
-ALL WORK IN RIGHT OF WAY MUST BE COORDINATED WITH PROJECT MANAGER AND LOCAL
MUNICIPALITY.
-ALL TRENCH, AND LOCAL ELECTRICAL MUNICIPALITIES AKA "L&I, CITY", INSPECTIONS MUST BE
COMPLETED 5 BUSINESS DAYS PRIOR TO SCHEDULED CONSTRUCTION DATE.
-REQUIRED TO OPERATE AND PROVIDE EQUIPMENT TO PUMP OUT WATER FOR WORK PITS, VAULTS &
TRENCH AT ALL TIMES.
-REQUIRED TO HAVE EXCAVATION EQUIPMENT AND BE ON SITE THE DAY OF CONSTRUCTION TO COMPLETE
BACKFILLING.
- IF A SECOND INSPECTION IS REQUIRED, ADDITIONAL FEE'S WILL BE APPLIED.
-PLEASE REVIEW THE CITY OR KING COUNTY TRENCHING REQUIREMENTS UNDER THE PERMIT.
-IF A PRE-CON IS REQUIRED BY THE CITY, COUNTY OR W.S. DOT A PSE PROJECT MANAGER WILL SET-UP AND
SCHEDULE A MEETING WITH THE MUNICIPALITY BEFORE ANY EXCAVATION OR INSTALLATION BEGINS .
JOB SITE
JOB SITE
CIRCUIT LOADING TABLE
AS OF
EXIST. PEAK LOAD
EST. NEW LOAD
TOTAL
CIRCUIT:
A PHASE B PHASE C PHASE
PAN-15
6/11/2021
239 212 207
3 --
242 207 219
FAULT CURRENT TABLE
1Ø OH TRANSFORMERS (240Y/120V)
120V WINDINGS 240V WINDINGS
LOCATION SIZE R/X MIN.
%Z
FAULT
CURRENT
MIN.
%Z
FAULT
CURRENT
P02 75KVA 0.5 2.34 26,700 AMPS 1.8%17,400 AMPS
UG Misc
B.O. Pole Replce
Pole Removal 108140845
Misc. OH 593247046
Perm. Service 513332509 587034876
513332620 3002026262
MFP22005412
POTHOLE ALL EXISTING UTILITIES
RESTORATION PER CITY OF RENTON STANDARDS