Loading...
HomeMy WebLinkAboutRS_WSADA_Preliminary_TIR_221028_v1 Washington State Auto Dealers Association Addition and Improvements Technical Information Report Prepared for: Washington State Auto Dealers Association 621 Southwest Grady Way Renton, WA 98057 Contact: Vicki Fabrè Phone: (206) 433-6300 Prepared by: Sitts & Hill Engineers, Inc. 4815 Center Street Tacoma, Washington 98409 Contact: Don Davis Phone: (253) 474-9449 October 2022 Job Number 19,682 Washington State Auto Dealers Association Technical Information Report Prepared for: Washington State Auto Dealers Association 621 Southwest Grady Way Renton, WA 98057 Contact: Vicki Fabrè Phone: (206) 433-6300 Prepared by: Sitts & Hill Engineers, Inc. 4815 Center Street Tacoma, Washington 98409 Contact: Don Davis, P.E. Phone: (253) 474-9449 IN COMPLIANCE WITH CITY OF RENTON STANDARDS October, 2022 Job Number 19,682 PRELIMINARY Washington State Auto Dealers Association – Technical Information Report 1 TABLE OF CONTENTS TABLE OF CONTENTS ............................................................................................................................. 1 1.0 PROJECT OVERVIEW ........................................................................................................................ 3 1.1 Scope ................................................................................................................................................. 3 1.2 Existing Conditions ......................................................................................................................... 3 1.3 Proposed Conditions ...................................................................................................................... 5 2.0 CONDITIONS AND REQUIREMENTS SUMMARY........................................................................ 7 2.1 Discussion of Core and Special Requirements .......................................................................... 7 2.1.1 Core Requirement #1: Discharge at the Natural Location .................................................. 7 2.1.2 Core Requirement #2: Off-site Analysis.................................................................................. 7 2.1.3 Core Requirement #4: Conveyance System ........................................................................... 7 2.1.4 Core Requirement #5: Erosion and Sediment Control ......................................................... 7 2.1.5 Core Requirement #6: Maintenance and Operations ........................................................... 7 2.1.6 Core Requirement #7: Financial Guarantees and Liability ................................................... 7 2.1.7 Special Requirement #4: Source Control ................................................................................ 7 2.1.8 Special Requirement #6: Aquifer Protection Areas .............................................................. 7 3.0 OFF-SITE ANALYSIS ........................................................................................................................ 12 3.1 Define and Map the Study Area ................................................................................................. 12 3.2 Resource Review ........................................................................................................................... 14 3.3 Field Inspection ............................................................................................................................. 14 3.4 Drainage System Description and Problem Descriptions ..................................................... 14 3.5 Mitigation of Existing or Potential Problems .......................................................................... 14 4.0 FLOW CONTROL, LID, AND WATER QUALITY FACILITY ANALYSIS AND DESIGN ......... 15 4.1 Existing Site Hydrology ............................................................................................................... 15 4.2 Developed Site Hydrology .......................................................................................................... 15 4.3 Performance Standards ............................................................................................................... 15 4.4 Flow Control System .................................................................................................................... 16 4.5 Water Quality ................................................................................................................................ 16 5.0 CONVEYANCE SYSTEM ANALYSIS AND DESIGN .................................................................... 18 6.0 SPECIAL REPORTS AND STUDIES ............................................................................................... 19 7.0 OTHER PERMITS .............................................................................................................................. 20 8.0 CSWPPP ANALYSIS AND DESIGN ................................................................................................ 21 9.0 BOND QUANTITIES AND R/D FACILITY SUMMARIES ............................................................ 22 9.1 Bond Quantities ............................................................................................................................ 22 9.2 Facility Summaries ........................................................................................................................ 22 10.0 OPERATIONS AND MAINTENANCE MANUAL ....................................................................... 23 Washington State Auto Dealers Association – Technical Information Report 2 10.1 Purpose ........................................................................................................................................ 23 10.2 Permanent Facilities Description ............................................................................................ 23 10.3 Discussion of Maintenance ....................................................................................................... 23 10.4 Maintenance Frequency ............................................................................................................ 24 10.5 Annual Cost Estimate ................................................................................................................ 24 TABLE OF APPENDICES A.1 TIR Worksheet A.2 Bond Quantity Worksheet A.3 Existing and Proposed Surface Coverage Exhibits A.4 Site Historical Aerial Photography A.5 Stormwater Engineering Calculations A.6 Geotechnical Engineering Report Washington State Auto Dealers Association – Technical Information Report 3 1.0 PROJECT OVERVIEW 1.1 Scope This Technical Information Report (TIR) addresses site improvements associated with the proposed addition to the existing Washington State Auto Dealers Association (WSADA) building located at 621 SW Grady Way, Renton, WA (Parcel No. 3340404730). Please see Figure 1 – Site Location Map for the location of the proposed building addition. The purpose of this project is to improve the function of spaces within the existing WSADA building. This project will add a stairway, elevator, restrooms, and storage for improved access to the second floor of the building, where WSADA regularly holds training classes. This Technical Information Report has been prepared in accordance with the 2017 City of Renton Stormwater Design Manual (SWDM). A copy of the TIR Worksheet, which provides basic information about the scope of this project, is included with this report in Appendix A.1. 1.2 Existing Conditions The subject site is zoned as Commercial Arterial (CA), with an area of 0.75 acres. The site was originally developed by WSADA in 2013 as offices for their employees, and as a training facility for area auto dealers. The existing building, which is situated on the westerly extent of the site, includes a first story of approximately 6,300 SF and a second story of approximately 2,700 SF. The easterly two thirds of the parcel is asphalt paved for vehicular circulation and parking of employees and trainees. The site can be accessed from SW Grady Way to the north, or from the alley between Grady and 12th St SW to the south. An auxiliary parking lot is located on the opposite side of the alley to the south of the WSADA site. This parking lot was constructed in 2019 to accommodate for additional parking of trainees, which occurs on weekdays near midday. Storm drainage for the majority of the site is currently collected in catch basins, and conveyed through a Contech Stormceptor pretreatment device and Contech Stormfilter water quality device into a modular detention facility comprised of Stormtech SC-740 units. This system is discharged via a control structure into the public stormwater system in the alley south of the site. The entire building is currently tributary to this system, which is tightlined directly into the detention system from the west. A smaller area at the westerly extent of the site, including runoff from the east side of Raymond Avenue, is tributary via surface flow to a bioretention cell located off the southwest corner of the existing building. After treatment in the bioretention cell, the stormwater is discharged to a 48”Φ detention tank, where it is also released into the public stormwater system in the alley to the south of the site. Based upon our review of available information from the City of Renton, we are not aware of any capacity problems with the existing drainage facilities adjacent to this area. The City of Renton’s Public Works Maps combined with King County GIS together indicate the site is not located within or near any critical areas. In addition, it is located within the Peak Rate Flow Control Standard Zone. Washington State Auto Dealers Association – Technical Information Report 4 Figure 1 – Site Location Map – Proposed Building Washington State Auto Dealers Association – Technical Information Report 5 1.3 Proposed Conditions The primary purpose of this project is to improve the spaces already existing within the WSADA building. The upper floor is currently used for training sessions, which occur regularly for area dealer representatives. Access to the second story is limited, and WSADA would like to improve the accessibility to this floor by adding a supplementary stairway and an elevator. The addition will also provide restrooms and storage within the expanded building footprint. The building addition will encompass a 695 SF footprint (1,390 SF total additional floor area among the two floors). The new addition will largely replace an existing concrete patio located at the northwest corner of the existing building, resulting in minimal new hard surface. Site improvements are strictly limited to accommodation of the proposed expansion. The roof drainage system for the original building will need to be shifted to accommodate the building expansion. The bioretention cell and associated detention tank located near the southwest corner of the building will also need to be renovated to accommodate the building expansion. See Table 1 for a description of existing and proposed surface conditions for the addition. Over 50% of the stormwater generated on-site will be from a pollution-generating surface in a commercial area and thus stormwater runoff generated will be subject to enhanced basic water quality treatment before being conveyed to the conveyance system located within the City’s right-of-way. Treatment for the proposed building will be provided by an Oldcastle BioPod Biofilter. Stormwater from the proposed addition will follow existing flow paths to the west to existing treatment. All proposed surfacing on-site is considered new or replaced impervious surface. Please see Appendix A.5 for the sub-basin exhibit as it outlines the tributary area for each catch basin. Please see Appendix A.3 for Existing and Proposed Surface Coverage Exhibits. Washington State Auto Dealers Association – Technical Information Report 6 Table 1. Existing and Developed Condition Description – Proposed Addition Description On-site Off-site Total Existing Conditions Total Project Area (ft2) 33,558 0 33,558 Existing hard surface (ft2) 26,024 0 26,024 Existing landscaping/lawn area (ft2) 7,534 0 7,534 Developed Conditions Total Project Area (ft2) 33,558 0 33,558 Amount of new hard surface (ft2) 140 0 140 Amount of new pollution generating hard surface (PGHS) (ft2) 0 0 0 Amount of replaced hard surface (ft2) 0 0 0 Amount of replaced PGHS (ft2) 0 0 0 Amount of new plus replaced hard surface (ft2) 624 0 624 Amount of new plus replaced PGHS (ft2) 0 0 0 Amount of existing hard surfaces converted to vegetation/ landscaping (ft2) 14 0 14 Amount of Land Disturbed (ft2) 11,761 0 11,761 Native Vegetation to Pasture (acres) 0 0 0 Existing vegetation area to remain (ft2) 7,253 0 7,253 Existing hard surface to remain unaltered (ft2) 18,223 0 18,223 Value of proposed improvements ($) $1.23M 0 $1.23M Amount to be Graded/Approx. FILL (C.Y.) ±40 0 ±40 Washington State Auto Dealers Association – Technical Information Report 7 2.0 CONDITIONS AND REQUIREMENTS SUMMARY 2.1 Discussion of Core and Special Requirements This project will be subject to a Category 2 Targeted Drainage Review. This type of drainage review will require compliance with Core Requirements 1, 2, 4, 5, 6, and 7 and Special Requirements 4 and 6 of the 2022 City of Renton Stormwater Design Manual (SWDM). See Figure 2, Figure 3, and Figure 4 and at the end of this Section for determination of drainage review requirements per the SWDM flow charts. Below is a description of each core requirement and how the project proposes to satisfy each requirement. 2.1.1 Core Requirement #1: Discharge at the Natural Location This requirement will be met by collecting and conveying stormwater to existing private stormwater networks, which discharge into public stormwater networks, ultimately terminating at Springbrook Creek and the Black River. 2.1.2 Core Requirement #2: Off-site Analysis The Off-Site Analysis included in Section 3.0 of this TIR will satisfy this Core Requirement. 2.1.3 Core Requirement #4: Conveyance System Please see Section 5.0 of this TIR for the conveyance system analysis and design. Calculations are provided which demonstrate the sizing and slope of pipes to reroute the existing roof drain pipe around the proposed addition. We have also included calculations to demonstrate the sizing of proposed roof drain pipes to the modified detention tank located near the southwest corner of the existing building. 2.1.4 Core Requirement #5: Erosion and Sediment Control A temporary Erosion and Sediment Control Plan (TESC) will be prepared and included in the construction plan set. Additionally, a CSWPPP under a separate cover, will be provided to satisfy this requirement. 2.1.5 Core Requirement #6: Maintenance and Operations Please see Section 10.0 of this TIR for the Operations and Maintenance Manual, prepared to satisfy this Core Requirement. WSADA will be responsible for maintenance and operation of the proposed on-site stormwater facilities upon completion. The City of Renton will continue to be responsible for operation and maintenance of stormwater systems in the right-of-way. 2.1.6 Core Requirement #7: Financial Guarantees and Liability We anticipate that WSADA will be required to provide a Construction Bond to the City of Renton prior to issuance of the permit. The contractor/owner will be responsible for all erosion and maintenance liabilities during construction. 2.1.7 Special Requirement #4: Source Control WSADA shall implement Operational and Structural Source Control BMPs that include the maintenance of stormwater drainage and treatment systems as described in the Operations and Maintenance Manual, included in Section 10.0 of this report. 2.1.8 Special Requirement #6: Aquifer Protection Areas This project is not located within an Aquifer Protection Area per COR Maps. Washington State Auto Dealers Association – Technical Information Report 8 Figure 2 – Drainage Review Flow Chart Washington State Auto Dealers Association – Technical Information Report 9 Figure 3 - Drainage Review Requirements Washington State Auto Dealers Association – Technical Information Report 10 Figure 4 - Drainage Review Requirements (cont.) Washington State Auto Dealers Association – Technical Information Report 11 Figure 5 – FEMA Map Washington State Auto Dealers Association – Technical Information Report 12 3.0 OFF-SITE ANALYSIS Per City of Renton SWDM Section 1.2.2, this project must provide an off-site analysis report that assesses potential off-site drainage and water quality impacts associated with the redevelopment of the project site. The level of analysis required depends on the specific site and downstream conditions. In accordance with Section 1.2.2.1, a Level 1 Downstream Analysis has been performed. 3.1 Define and Map the Study Area Based on the current topographic survey and our observations of the site, the site is mostly tributary to existing, private conveyance systems on-site. The easterly two thirds of the site and the building are tributary to a proprietary stormwater treatment and modular detention system. The westerly third of the site, as well as a portion of the drainage from Raymond Avenue, are tributary to an existing bioretention cell and detention pipe. Both of these on-site stormwater management systems discharge via control structures into the public drainage network in the alley south of the WSADA property. Once in the right-of-way, the stormwater is conveyed north across Grady Way, and then westerly to Spring Brook Creek on the north side of Grady Way. The downstream conveyance system is comprised of pipes ranging in diameter from 12-inch to 66-inch. Springbrook Creek eventually discharges into the Black River, and then on to the Duwamish River. See Figure 6 for an illustration of the downstream flowpath from the project site to the Black River. Figure 6 - Downstream Flowpath See Figure 7 for a partial topographic survey of the project site. Washington State Auto Dealers Association – Technical Information Report 13 Figure 7 – Topographic Survey Washington State Auto Dealers Association – Technical Information Report 14 3.2 Resource Review A thorough review of the resources provided by the City of Renton Maps has been completed for the study area. Research conducted on 10/25/2022 has shown that there are not any adopted basin plans available for the study area. According to the FEMA Map presented in Figure 5 of this report, the project sites lie within Zone X, which is defined as areas outside the 500-year floodplain. The site is located within the Duwamish – Green River Watershed, the Black River Basin, and the Springbrook Creek Sub Basin. Based on the City of Renton GIS, the project area has not been defined as a sensitive area. To our knowledge, there have not been any reported road drainage problems associated with the roads surrounding the site. It was also found that the site does not have a migrating river study, a 303d listing, or an adopted stormwater compliance plan available. A geotechnical report completed by Migizi Group can be found in Appendix A.6. 3.3 Field Inspection During field inspections, the system appeared to be working sufficiently with no obvious clogs or flooding. We do not anticipate any future problems with the proposed stormwater system. Stormwater flows on the site of the proposed building are expected to increase marginally due to an increase in impervious surface. The control structure for the detention pipe system will not be altered, therefore, the renovated detention pipe system will be designed to accommodate the slight increase in stormwater durations and volumes. Please see Section A.5 for the modeled areas in the predeveloped and mitigated scenarios for both sites. Since it has been determined that there are no anticipated stormwater problems associated with this project, Level 2 and Level 3 downstream analyses are not required. No problems were found related to constrictions, capacity deficiencies, flooding, scouring, overtopping hazards, sedimentation or erosion, aquatic organisms or their habitation. Land use associated with the study area includes commercial/industrial land applications. In addition, the study area includes utilities and roadways. Existing impervious surfaces located within the study area include commercial businesses, paved parking lots, paved driveways, and the paved public right-of-way. Based on existing site topography, stormwater runoff is captured within the on-site stormwater system, treated, detained, and released via control structures to the City’s right-of-way. It is ultimately tributary to the Black River via Springbrook Creek. 3.4 Drainage System Description and Problem Descriptions No drainage system problems were observed during the field inspection. 3.5 Mitigation of Existing or Potential Problems The proposed project area does not have any existing or anticipated drainage problems as outlined in Section 1.2.2.1.1 of the City of Renton SWDM. Washington State Auto Dealers Association – Technical Information Report 15 4.0 FLOW CONTROL, LID, AND WATER QUALITY FACILITY ANALYSIS AND DESIGN 4.1 Existing Site Hydrology The project site was previously developed in 2013 by WSADA, with all of the current site features, including a two-story building, asphalt paved parking lot and driveways, concrete walks, landscaping, and utilities. Stormwater from the easterly two thirds of the site is collected in catch basins and conveyed to a pretreatment device, stormwater quality device, and a series of modular detention tanks located along the southerly margin of the site. The building is also tributary to this detention system, although it bypasses the treatment functions. Stormwater from the westerly third of the site, as well as a portion of the Raymond Avenue road surface, is tributary to a bioretention cell and detention pipe located near the southwest corner of the existing building. Stormwater from both detention facilities currently discharge through independent flow control structures which were sized to match predeveloped conditions. The control structures discharge to the existing public stormwater system in the alley between SW Grady Way and SW 12th Street, immediately south of the WSADA property. This public stormwater system conveys the stormwater across and westerly along Grady Way, discharging into Springbrook Creek, and eventually the Black River. 4.2 Developed Site Hydrology This project includes a two-story building addition at the northwest corner of the existing WSADA building. The footprint of the building will be 624 SF, and will replace the concrete plaza currently situated at this location. Additional new/replaced surfaces will include a new concrete walkway connection to the sidewalk alongside Grady Way or Raymond Ave (TBD). It is anticipated that the total new/replaced hard surfaces for this project will be less than 1,000 SF. Areas surrounding the new building and sidewalk, as well as all disturbed surfaces adjacent to the bioretention cell and detention tank improvements, will be restored with landscaping similar to existing conditions at the perimeter of the building. The existing concrete plaza at the northwest corner of the building is graded drain via surface flow to the existing bioretention cell and detention pipe system. We are proposing to mimic this drainage scheme with the proposed building addition. The new roof drains will be conveyed directly to the detention pipe, which will be resized (shortened with an increased diameter) to accommodate the building expansion. 4.3 Performance Standards The project site is within the Peak Rate Flow Control Standards (Existing Site Conditions) Area, as illustrated in Figure 8, which requires matching the existing site conditions 2-, 10-, and 100- year peak flows. The predeveloped site is comprised of rooftop surfacing, asphalt pavement, concrete walks, and landscaping. The proposed conditions include a slightly higher quantity of impervious surface than the existing conditions. In areas where conveyance features are required, they have been designed in accordance with Section 1.2.4 of the SWDM. Stormwater from the new roof will be conveyed directly to the detention facility. Downstream of the storage structure is a control structure that is set to Washington State Auto Dealers Association – Technical Information Report 16 match the 2, 10, and 100-year flow conditions prior to development to the WSADA building in 2013. 4.4 Flow Control System Although this project is exempt from Core Requirement #3 (flow control facilities), the stormwater from the proposed building will be routed through an existing detention system. We are not proposing to alter the control structure, however, the downstream pipe network will experience slightly higher durations and volumes of stormwater due to the slight increase of impervious surface. 4.5 Water Quality This project is exempt from Core Requirement #8 (water quality facilities). Washington State Auto Dealers Association – Technical Information Report 17 Figure 8- City of Renton Flow Control Application Map Washington State Auto Dealers Association – Technical Information Report 18 5.0 CONVEYANCE SYSTEM ANALYSIS AND DESIGN Proposed conveyance elements include the existing 8” CPEP conveyance piping and a revised storage pipe to accommodate the new addition. The graph below was created with the use of WWHM, using a 15-minute time step to determine the expected 25 year peak flow that would be experienced by the site. Figure 9 - WWHM Using Manning’s Equation: 1.49 Where A = 0.349ft2 for a 7” pipe, n = 13 for PVC or CPEP, and S = 1% to represent the shallowest designed slope, yields a flow, Q, of 1.212cfs. This is above the 25 year peak flow rate of 0.0664cfs. The design of the proposed conveyance systems is discussed in more detail in Appendix A.5. Washington State Auto Dealers Association – Technical Information Report 19 6.0 SPECIAL REPORTS AND STUDIES We are not aware of any site characteristics that are particularly sensitive to stormwater runoff. A geotechnical report by Migizi Group can be found in Appendix A.6 of this report. Washington State Auto Dealers Association – Technical Information Report 20 7.0 OTHER PERMITS In addition to the Civil Construction permit, we anticipate that Site Plan Review, Environmental (SEPA), and Building permits will be required for this project. Washington State Auto Dealers Association – Technical Information Report 21 8.0 CSWPPP ANALYSIS AND DESIGN The Construction Stormwater Pollution Prevention Plan report will be included under separate cover, at the time of application for the Civil Construction Permit. Washington State Auto Dealers Association – Technical Information Report 22 9.0 BOND QUANTITIES AND R/D FACILITY SUMMARIES 9.1 Bond Quantities See Appendix A.2 for a copy of the City of Renton bond report. 9.2 Facility Summaries The project will implement catch basins, conveyance piping, and a new detention pipe. Washington State Auto Dealers Association – Technical Information Report 23 10.0 OPERATIONS AND MAINTENANCE MANUAL 10.1 Purpose The purpose of this manual is to provide guidelines for maintaining the storm drainage system as a part of the construction for the WSADA building addition. The site address is 621 SW Grady Way are 201 SW 12th Street and 215 SW 12th Street, Renton, WA 98055. Storm utility improvements that have been proposed as a part of the projects include: o Storm Drainage Piping o Catch Basins o Detention Pipe Each portion of the system has to be maintained in good working condition for the system to function properly. After construction, operations and maintenance of the private drainage system will be the responsibility of WSADA. Vicki Giles Fabré is the contact person. Her contact information is: Vicki Giles Fabré Executive Vice President Washington State Auto Dealers Association 621 SW Grady Way, Renton, WA 98057 (206) 433-6300 The City of Renton will continue to be responsible for the Operation and Maintenance of public improvements. 10.2 Permanent Facilities Description Existing rooftop conveyance systems will be realigned with new catch basins and piping. Runoff from the proposed building addition will be conveyed to a new detention pipe located near the southwest corner of the existing building. The detention pipe must be renovated to accommodate the new building. The new detention pipe will be shorter with an increased diameter relative to the existing detention pipe. The control structure for the existing detention system will not be altered, however, due to the increased impervious surface, we expect the durations and volumes of stormwater discharged from the site to increase slightly. The project does not propose to alter downstream flow paths and will maintain ultimate discharge to the Black River. 10.3 Discussion of Maintenance Any buildup of sediment, debris, vegetation, or trash that impedes the catch basins will reduce the storm system capacity. As a result, care must be taken to keep all inlets clear of debris. The applicable maintenance checklists and excerpts from the 2022 SWDM have been included with the Operations and Maintenance Manual for review during routine maintenance inspections. Washington State Auto Dealers Association – Technical Information Report 24 10.4 Maintenance Frequency Following construction of the project, the storm drainage system shall be inspected and maintained according to their respective maintenance checklists included at the end of this manual. Facilities will be inspected annually, or after every significant storm event where the precipitation is greater than or equal to one inch in 24 hours When deficiencies are noted, the problems are to be corrected as soon as possible. Any spill of hazardous material (e.g. fuel, lubricant, herbicide, etc.) shall be cleaned up immediately and shall be reported to the Division of Emergency Management (1-800-523-5044). Contaminated material will be disposed of properly. Any questions about the existence of a problem should be directed to a Professional Engineer. 10.5 Annual Cost Estimate Annual maintenance costs for the proposed building addition stormwater conveyance system is expected to increase the current cost private stormwater system maintenance by $1 for every linear foot of new piping. Existing stormwater infrastructure (including the detention pipe) is already accommodated Annual maintenance costs for the proposed stormwater conveyance system on-site for the proposed addition is expected to increase the current costs of maintaining the private stormwater system by $1 for every linear foot of new piping. Approximately 80 linear feet of new pipe will increase the annual cost of maintenance by $80. Washington State Auto Dealers Association – Technical Information Report 25 Cover Sheet for Inspection Forms Name of Inspector: _____________________________________________________________ Date of Inspection: _____________________________________________________________ Number of Sheets Attached: _____________________________________________________________ Inspector’s Signature: _____________________________________________________________ Washington State Auto Dealers Association – Technical Information Report 26 Maintenance Log Action Taken Name Date How Procedure Was Performed Problems Encountered Additional Actions Recommended o Washington State Auto Dealers Association – Technical Information Report 27 A.1 TIR Worksheet Washington State Auto Dealers Association – Technical Information Report 28 Washington State Auto Dealers Association – Technical Information Report 29 Washington State Auto Dealers Association – Technical Information Report 30 Washington State Auto Dealers Association – Technical Information Report 31 Washington State Auto Dealers Association – Technical Information Report 32 Washington State Auto Dealers Association – Technical Information Report 33 Washington State Auto Dealers Association – Technical Information Report 34 A.2 Bond Quantity Worksheet The Bond Quantity Worksheet will be included under separate cover at the time of application for the civil construction permit. Washington State Auto Dealers Association – Technical Information Report 35 A.3 Existing and Proposed Surface Coverage Exhibits Washington State Auto Dealers Association – Technical Information Report 36 Washington State Auto Dealers Association – Technical Information Report 37 Washington State Auto Dealers Association – Technical Information Report 38 A.4 Site Historical Aerial Photography Washington State Auto Dealers Association – Technical Information Report 39 Washington State Auto Dealers Association – Technical Information Report 40 Washington State Auto Dealers Association – Technical Information Report 41 A.5 Stormwater Engineering Calculations As previously mentioned, although this site is exempt from additional flow control requirements, the proposed site will be draining through an existing detention pipe facility that will need to be modified to accommodate the building. The existing detention pipe will need to rotated counterclockwise about the existing control structure in order to provide clearance for the proposed building addition. Also, the pipe will need to be shortened, and increased in diameter to provide the necessary storage volume. We are not proposing to alter the control structure of the existing detention system, as such, the durations and volumes of stormwater released from the site will be slightly increased, due to the increase in impervious surface tributary to the detention pipe. The following calculations illustrate the predeveloped and developed conditions of the detention system (existing and proposed detention pipes, respectively). Predeveloped Conditions: Based on aerial photographs, included in Section A.4, the site had previously been a forested lot before the development of the WSADA office building. As this project is introducing less than 2,000SF, and is modifying an existing stormwater feature, the present WSADA office and coverage will be used as ‘predeveloped conditions’ to demonstrate the modified system will meet the needs of the existing system. See the following excerpt from WWHM indicating the assumptions used in the “Predeveloped” Condition: Washington State Auto Dealers Association – Technical Information Report 42 Mitigated Conditions: The mitigated site coverage is comprised of almost identical surfacing to the existing site coverage, with the exception of the addition covering a slightly larger area than the concrete patio it is replacing. See the following excerpt from WWHM indicating the assumptions used in the “Mitigated” Condition: Washington State Auto Dealers Association – Technical Information Report 43 Flow Frequency Results: As mentioned in Section 4.3, this project does not require flow control and the control structure is not being changed. However, the flow frequency table included below has been included to demonstrate that the modified stormwater detention system does not greatly change the discharge rate for the design storm events. Detention System Modifications: In order to accommodate the proposed building addition, while also matching the existing stormwater discharge characteristics of the current site, we are proposing to replace the existing 35 linear foot segment of 48” diameter detention pipe with a shorter 60” diameter detention pipe. The proposed 24 linear foot 60” diameter detention pipe will provide an equivalent volume. The control structure will also need to be modified since detained water within the 60” pipe will attain a higher pressure head than the 48” pipe. The calculations on the following page illustrate the characteristics of the existing and proposed detention pipe and control structure. The graph indicates that the proposed detention pipe will maintain or slightly reduce stormwater discharges from the site relative to existing conditions. Washington State Auto Dealers Association – Technical Information Report 44 Water Quality: A biofiltration cell currently treats stormwater for this portion of the site. The addition will impact its footprint, requiring the cell to be modified. After modification, the biofiltration cell will maintain the same treatment area. While the addition is increasing the amount of impervious surface flowing to the biofiltration cell, it is also replacing pollution generating impervious surface coverage with non-pollution generating impervious surface coverage. Washington State Auto Dealers Association – Technical Information Report 45 Washington State Auto Dealers Association – Technical Information Report A.6 Geotechnical Engineering Report The Geotechnical Report, prepared by Migizi Group, Inc, dated September 26, 2022, is included under a separate cover.