DocuSign Envelope ID: 6EECF5B6-602A-4E4A-B436-A317AA638878
TOP OF FABRIC T
BELT 1
TOP 8"
DIAGONAL ATTACHMENT
DOUBLES STRENGTH
ATTACHMENT DETAILS:
I 1. GATHER FABRIC AT POSTS, IF NEEDED.
2. UTILIZE THREE TIES PER POST, ALL WITHIN TOP 8" OF
FABRIC.
3. POSITION EACH TIE DIAGONALLY, PUNCTURING HOLES
VERTICALLY A MINIMUM OF 1" APART.
4. HANG EACH TIE ON A POST NIPPLE AND TIGHTEN
SECURELY. USE CABLE TIES (50 LBS) OR SOFT WIRE.
�- OPERATION
E GROUND
SLICIN(
Imm
")
HORIZONTAL CHISEL POINT (
NOTES:
1. POST SPACING: T MAX. ON OPEN RUNS 4MAX. ON POOLING AREAS.
2. POST DEPTH: AS MUCH BELOW GROUND AS FABRIC ABOVE GROUND.
3. PONDING HEIGHT 24" MAX. ATTACH FABRIC TO UPSTREAM SIDE OF POST.
4. DRIVE OVER EACH SIDE OF SILT FENCE 2 TO 4 TIMES WITH DEVICE EXERTING 60 P.S.I. OR GREATER.
5. NO MORE THAN 24" OF A 36" FABRIC ROLL IS ALLOWED ABOVE GROUND.
6. VIBRATORY PLOW IS NOT ACCEPTABLE BECAUSE OF HORIZONTAL COMPACTION.
UNLESS OTHERWISE NOTED, DRAWING IS NOT TO SCALE (NTS)
PUBLIC WORKS ED
STD.
URI PLAN - 214.10
DEPARTMENT SILT FENCE INSTALLATION BY SLICING GAZ 9/28/2018 1
P"ebcworksA ,strato, DATE
N0.
:45
DocuSign Envelope ID: 6EEC F5B6-602A-4E4A-B436-A317AA638878
R=25'MIN
INSTALL DRIVEWAY CULVERT
IF THERE IS A ROADSIDE
DITCH PRESENT, AS PER CITY
ROAD STANDARDS
�X1S�\NG ROp,O
4"-8" QUARRY SPALLS
GEOTEXTILE
12" MIN. THICKNESS
CONSTRUCTION ENTRANCE NOTES:
1. DRIVEWAYS SHALL BE PAVED TO
THE EDGE OF THE RIGHT-OF-WAY
RI
PRIOR TO INSTA-LATION OF THE
CONSTRUCTION ENTRANCE TO
AVOID DAMAGING OF THE
ROADWAY.
\
2. IT IS RECOMMENDED THAT THE
ENTRANCE BE CROWNED SO THAT
RUNOFF DRAINS OFF THE PAD
100' MIN.
15' MIN.
PROVIDE FULL WIDTH OF
INGRESS/EGRESS AREA
NOTES:
1. CONDITION OF USE
1.1. CONSTRUCTION ENTRANCE SHALL BE STABILIZED WHEREVER TRAFFIC WILL BE LEAVING A CONSTRUCTION SITE AND TRAVELING ON PAVED ROADS OR OTHER
PAVED AREAS WITHIN 1,000 FEET OF THE SITE.
1.2. FOR RESIDENTIAL CONSTRUCTION PROVIDE STABILIZED CONSTRUCTION ENTRANCES FOR EACH RESIDENCE IN ADDITION TO THE MAIN SUBDIVISION
ENTRANCE. STABILIZED SURFACES SHALL BE OF SUFFICIENT LENGTH/WIDTH TO PROVIDE VEHICLE ACCESS/PARKING, BASED ON LOT SIZE/CONFIGURATION.
2. DESIGN AND INSTALLATION SPECIFICATIONS
2.1. A SEPARATION GEOTEXTILE SHALL BE PLACED UNDER THE SPALLS TO PREVENT FINE SEDIMENT FROM PUMPING UP INTO THE ROCK PAD. THE GEOTEXTILE
SHALL MEET THE FOLLOWING STANDARDS:
GRAB TENSILE STRENGTH (ASTM D4032)
200 LBS. MIN.
GRAB TENSILE ELONGATION (ASTM D4632)
30% MAX. (WOVEN)
CBR PUNCTURE STRENGTH (ASTM 1
495 LBS. MIN.
AOS (ASTM D4751)
20-45 (U.S. STANDARD SIEVE SIZE)
2.2. DO NOT USE CRUSHED CONCRETE, CEMENT, OR CALCIUM CHLORIDE FOR CONSTRUCTION ENTRANCE STABILIZATION BECAUSE THESE PRODUCTS RAISE I
LEVELS IN STORMWATER AND CONCRETE DISCHARGE TO SURFACE WATERS OF THE STATE IS PROHIBITED.
2.3. HOG FUEL (WOOD BASED MULCH) MAY BE SUBSTITUTED FOR OR COMBINED WITH QUARRY SPALLS IN AREAS THAT WILL NOT BE USED FOR PERMANENT ROADS.
HOG FUEL IS NOT RECOMMENDED FOR ENTRANCE STABILIZATION IN URBAN AREAS. THE INSPECTOR MAY AT ANY TIME REQUIRE THE USE OF QUARRY SPALLS
IF THE HOG FUEL IS NOT PREVENTING SEDIMENT FROM BEING TRACKED ONTO PAVEMENT OR IF THE HOG FUEL IS BEING CARRIED ONTO PAVEMENT.
2.4. FENCING SHALL BE INSTALLED AS NECESSARY TO RESTRICT TRAFFIC TO THE CONSTRUCTION ENTRANCE.
2.5. WHENEVER POSSIBLE, THE ENTRANCE SHALL BE CONSTRUCTED ON A FIRM, COMPACTED SUBGRADE. THIS CAN SUBSTANTIALLY INCREASE THE
EFFECTIVENESS OF THE PAD AND REDUCE THE NEED FOR MAINTENANCE.
3. MAINTENANCE STANDARDS
3.1. QUARRY SPALLS SHALL BE ADDED IF THE PAD IS NO LONGER IN ACCORDANCE WITH THE SPECIFICATIONS.
3.2. IF THE ENTRANCE IS NOT PREVENTING SEDIMENT FROM BEING TRACKED ONTO PAVEMENT, THEN ALTERNATIVE MEASURES TO KEEP THE STREETS FREE OF
SEDIMENT SHALL BE USED. THIS MAY INCLUDE STREET SWEEPING, AN INCREASE IN THE DIMENSIONS OF THE ENTRANCE, OR THE INSTALLATION OF A WHEEL
WASH. IF WASHING IS USED, IT SHALL BE DONE ON AN AREA COVERED WITH CRUSHED ROCK, AND WASH WATER SHALL DRAIN TO A SEDIMENT TRAP OR POND.
3.3. ANY SEDIMENTTHAT IS TRACKED ONTO PAVEMENT SHALL BE REMOVED IMMEDIATELY BY SWEEPING. THE SEDIMENT COLLECTED BY SWEEPING SHALL BE
REMOVED OR STABILIZED ON SITE. THE PAVEMENT SHALL NOT BE CLEANED BY WASHING DOWN THE STREET, EXCEPT WHEN SWEEPING IS INEFFECTIVE AND
THERE IS A THREAT TO PUBLIC SAFETY IF IT IS NECESSARY TO WASH THE STREETS, A SMALL SUMP MUST BE CONSTRUCTED. THE SEDIMENT WOULD THEN BE
WASHED INTO THE SUMP WHERE IT CAN BE CONTROLLED AND DISCHARGED APPROPRIATELY. WASH WATER MUST BE PUMPED BACK ONTO THE SITE AND
CANNOT DISCHARGE TO SYSTEMS TRIBUTARY TO SURFACE WATERS.
3.4. ANY QUARRY SPALLS THAT ARE LOOSENED FROM THE PAD AND END UP ON THE ROADWAY SHALL BE REMOVED IMMEDIATELY.
3.5. IF VEHICLES ARE ENTERING OR EXITING THE SITES AT POINTS OTHER THAN THE CONSTRUCTION ENTRANCE(S), FENCING SHALL BE INSTALLED TO CONTROL
TRAFFIC.
UNLESS OTHERWISE NOTED, DRAWING IS NOT TO SCALE (NTS)
STD. PLAN - 215.10
.� PUBLIC WORKS APPROVED:
DEPARTMENT STABILIZED CONSTRUCTION ENTRANCE GAZ 9/28/2018 1
PeEkc works Adl ,strator DATE
REVISION
SURVEYED: SCALE:
WHP/NV5
DESIGNED:
DRAWN:
CHECKED:
BY I DATE I APPR I APPROVED:
ONE INCH
AT FULL SCALE
IF NOT ONE INCH
SCALE ACCORDINGLY
: 4 5
DocuSign Envelope ID: 6EECF5B6-602A-4E4A-B436-A317AA638878
5' MAX.
DRAINAGE GRATE TRIM
GRATE FRAME _
C- OVERFLOW BYPASS
a
BELOW INLET GRATE DEVICE
SEDIMENT AND DEBRIS
FILTERED
U
WATER
SECTION VIEW
DRAINAGE GRATE
(RECTANGULAR GRATE SHOWN) RETRIEVAL SYSTEM (TYP.)
Q
OVERFLOW BYPASS (TYP.)
BELOW INLET GRATE DEVICE
ISOMETRIC VIEW
NOTES:
1. PROTECTION SHALL BE PROVIDED FOR ALL STORM DRAIN INLETS DOWNSLOPE AND WITHIN 500 FEET OF A DISTURBED OR
CONSTRUCTION AREA, UNLESS THE RUNOFF THAT ENTERSTHE CATCH BASIN WILL BE CONVEYED TO A SEDIMENT POND OR TRAP.
2. INLET PROTECTION SHALL BE USED TO PROTECT THE DRAINAGE SYSTEM.
3. THE CONTRIBUTING DRAINAGE AREA MUST NOT BE LARGER THAN ONE ACRE.
4. SIZE THE BELOW INLET GRATE DEVICE (BIGD) FOR THE STORMWATER STRUCTURE IT WILL SERVICE.
5. THE BIGD SHALL HAVE A BUILT-IN HIGH -FLOW RELIEF SYSTEM (OVERFLOW BYPASS).
6. THE RETRIEVAL: SYSTEM MUST ALLOW REMOVAL OF THE BIGD WITHOUT SPILLING THE COLLECTED MATERIAL.
7. PERFORM MAINTENANCE IN ACCORDANCE WITH STANDARD SPECIFICATION B-01.3(15).
8. ANY SEDIMENT IN THE CATCH BASIN INSERT SHALL BE REMOVED WHEN THE SEDIMENT HAS FILLED ONE-THIRD OF THE AVAILABLE
STORAGE. THE FILTER MEDIA FOR THE INSERT SHALL BE CLEANED OR REPLACED AT LEAST MONTHLY.
UNLESS OTHERWISE NOTED, DRAWING 15 NOT TO SCALE (NTS)
STD. PLAN - 216.30
PUBLIC WORKS APPR ED
DEPARTMENT CATCH BASIN INSERT GAZ 9/28/2018 1
Public Works Adm ,strator DATE
.C1 lc
AN N V 5 COMPANY
19201 120th Ave NE, Suite 201
Bothell, WA 98011
425-951-4800 www.NV5.com
VERTICAL: NAVD 1988
HORIZONTAL: NAD 1983/1991
DAT U M
%�T.
O WAS
0�
DIGIT D BY
JUA R EZ
2022.0 . 7-07'00'
41691
4'
1P0�� �EGI STEg���1��'�
SSIONAL E�
C TY OF
RENTON
Plan ning/Building/Public Works Dept.
:45
R-422808
IN COMPLIANCE WITH CITY OF RENTON STANDARDS
DEVELOPMENT ENGINEERING "
Michael Sippo 11/04/2022
SWA2 AMAZON
CITY OF RENTON
EROSION CONTROL DETAILS
DATE:
9-27-2022
FIELDBOOK:
PAGE:
DRAWING
NO:
C4.3
SHEET:
OF:
08 36
Ln
M
It
It
O
O
N
N
�,
M
CM
N
O
0
T
N
a
J
'T^^
IN
0
0
0
N
N
I..L