Loading...
HomeMy WebLinkAbout20180398E003_Renton_ES_16_2022-08-23_FR_054 Kirkland | Tacoma | Mount Vernon 425-827-7701| www.aesgeo.com Date Mailed: Principal / PM: Bruce Guenzler, L.G., L.E.G. This document is considered a DRAFT until signed or initialed by an AESI Principal or Project Manager Page 1 of 2 v.7.20 FIELD REPORT Date Project Name Project No. Report No. 08/23/2022 Renton Elementary School 16 20180398E003 054 Location Municipality AESI Project Manager AESI Field Rep 1075 Duvall Ave NE Renton Bruce Guenzler, L.E.G. Gus Carlson, G.I.T. Permit No. Client/Owner Attn Requested By B21004604 Renton School District No. 403 Ed Thomson Contractor Engineer/Architect General Contractor Grading Contractor Weather CPL / Hutteball + Oremus Cornerstone/Kyle Continental Dirt Contractors/ Jerry Jr. Sunny, 60’s THE FOLLOWING WAS NOTED: Associated Earth Sciences Inc. (AESI) was onsite at 9:30am to observe compaction of backfill of a storm trench to the south of Detention Facility #1B. Upon arrival, we met with Jerry Jr. of CDC. Detention Facility #1B Backfill and compaction of fill material over the storm sewer had been completed prior to the arrival of the AESI representative. The trench was filled with on-site soils and compacted using a track mounted hoe pack. Using a nuclear densometer, AESI preformed compaction tests on the uppermost lift of the storm trench backfill. All tests were found to meet or exceed the minimum compaction of 95%. Jerry Jr. with CDC was informed of the passing results. Compaction test locations can be seen in Figure 1, compaction test results can be seen in Table 1. AESI plans to return to the site at the request of the contractor to continue structural backfill observation. Table 1: Compaction Test Results Test Number Test Location Thickness of fill over Aggregate (ft) Dry Density (pcf) % Moisture Proctor (pcf) / Optimum % Moisture % Proctor Pass/Fail 1 See Figure 1 3 121.1 5.5 126.9 / 10.5 96 Pass 2 See Figure 3 2 120.3 5.9 126.9 / 10.7 95 Pass 3 See Figure 4 2 120.8 6.9 126.9 / 10.8 95 Pass 16 Date Project Name Project No. Report No. 08/23/2022 Renton ES 16 20180398E003 054 Page 2 of 2 FIELD REPORT Figure 1: Site Plan, clip rom sheet C2.1. Approximate area of backfill observed today highlighted in blue. Approximate location of compaction tests noted in red. 3 2 1 N