Loading...
HomeMy WebLinkAboutAdden 1AMENDMENT NO. 1 TO AGREEMENT FOR CONSTRUCTION  MANAGEMENT SERVICES FOR BRONSON WAY BRIDGE‐SEISMIC  RETROFIT AND PAINTING PROJECT CAG‐22‐255  THIS AMENDMENT, dated for reference purposes only as  Oct 15, 2022, is by and between the  City of Renton (the “City”), a Washington municipal corporation, and TranTech Engineering, LLC  (“Consultant”), a Washington corporation. The City and the Consultant are referred to collectively  in this Amendment as the “Parties.” Once fully executed by the Parties, this Amendment is  effective as of the last date signed by both parties.  Whereas, the City engaged the services of the Consultant under Agreement CAG‐22‐255, dated  September 15, 2022, to provide necessary services for the completion of Construction Phase 1  for the Bronson Way Bridge – Seismic Retrofit and Painting Project  (referred to herein as the  “Agreement”);  Whereas, the Parties wish to amend the Agreement to change the scope of work and change the  compensation in order to complete Construction Phases 2 and 3 for the Bronson Way Bridge –  Seismic Retrofit and Painting Project.  NOW THEREFORE, It is mutually agreed upon that CAG‐22‐255 is amended as follows:  1.Scope of Work: Section 1, Scope of Work, is amended to modify the Work as specified in Exhibit A‐1, which is attached and incorporated herein. 2.Compensation: Section 4, Compensation, is amended so that the maximum amount of compensation payable to Consultant is increased by $225,100 from $34,900 to $260,000, plus any applicable state and local sales taxes. The additional compensation shall be paid based upon Work actually performed according to the rate(s) or amounts specified in Exhibit D‐1, which is attached and incorporated herein. 3.All terms of the Agreement not explicitly modified herein shall remain in full force and effect and such terms shall apply to Work performed according to this Amendment as if fully set forth herein. IN WITNESS WHEREOF, the Parties have voluntarily entered into this Amendment as of the date  last signed by the Parties below.  CAG-22-255, Adden #1-22 PAGE 2 OF 2 CITY OF RENTON  By:_____________________________  CONSULTANT  By:____________________________  Armondo Pavone  Mayor  Mo Sheikhizadeh  Project Manager  _____________________________  Date  _____________________________  Date  Attest  _____________________________  Jason A. Seth  City Clerk  Approved as to Legal Form  By: __________________________  Shane Moloney  City Attorney  Contract Template Updated 06/17/2021 October 6, 202211-22-20221 Approved by Cheryl Beyer via 10/6/2022 email     Page 1 of 2                                       EXHIBIT A‐1  SCOPE OF WORK    CONTRACT: CAG‐22‐255  PROJECT: BRONSON WAY BRIDGE – SEISMIC RETROFIT AND PAINTING  CONSULTANT: TRANTECH ENGINEERING, LLC    A.  PROJECT DESCRIPTION:  No change from original contract.   B.  PURPOSE:  No change from original contract.   C.  STANDARDS AND PROCEDURES:  No change from original contract.   D.  GENERAL ASSUMPTIONS:  No change from original contract.   E.  INVOICING:  No change from original contract.   F.  SCHEDULE:  Project construction is to be conducted in two phases by mutual understanding between the AGENCY  and Contractor. The first phase consists of bridge cleaning and painting with an anticipated duration  of up to 6 weeks. Upon completion of the first phase, the project will be in suspension for several  months. The second phase consists of bridge jacking, bearing replacement, expansion joint  replacement, deck repairs, grind and overlay of bridge deck with new asphalt wearing course. The  second phase is anticipated to begin in late winter/early spring for a duration of up to 6 weeks. Both  phases are anticipated to be constructed under a full bridge closure.    G.  SCOPE OF WORK:  TASK 1 – CM SERVICES   No change from original contract.   TASK S1 – PUBLIC OUTREACH SERVICES   No change from original contract.   ADDITIONAL SERVICES  The AGENCY will require additional services of the CONSULTANT for future construction phases of  this project. Section B summarizes the future construction phases and describes the work anticipated  for each.       Page 2 of 2                                         The CONTRACT Scope of Work for additional services will be determined based on anticipated or  unanticipated project needs or other considerations at the sole discretion of the AGENCY. This work  may include items identified in the current task authorizations as well other items, which may  include, but are not necessarily limited to the following:     Additional Construction Management Services   Additional Inspection Services   Additional Documentation Services   Additional Materials Testing Services   Additional Public Outreach Services   Other services not specifically referenced this CONTRACT Scope of Work.    These services will be authorized under future supplemental agreements to this CONTRACT. The  CONSULTANT shall not proceed with the work until the AGENCY has authorized the work and issued  a notice to proceed.      CONTRACT: CAG‐22‐255 PROJECT: BRONSON WAY BRIDGE ‐ SEISMIC RETROFIT AND PAINTING PRIME CONSULTANT: TRANTECH ENGINEERING, LLC DIRECT (RAW) LABOR (DL): Classification DL HOURS TOTAL Principal $106.65 x 0 = $0 Construction Manager $92.40 x 40 = $3,696 Resident Engineer $92.40 x 160 = $14,784 Inspector $50.40 x 720 = $36,288 Documentation Specialist $47.30 x 280 = $13,244 Admin $38.50 x 12 = $462 DL Subtotal = 1,212 $68,474 INDIRECT COST RATE (ICR) DL x ICR of 130.57% x $68,474 =$89,407 FEE (PROFIT) DL x FEE 30.00% x $68,474 =$20,542 DL + ICR + FEE =$178,423 DIRECT NON‐SALARY COSTS (DNSC) Mileage 4000 x $0.625 = $2,500 Materials Testing = $5,500 SUBTOTAL =$8,000 TOTAL FOR PRIME = $186,423 TOTAL FOR PRIME (ROUNDED)=$186,500 SUBCONSULANTS  Public Outreach = $38,600 TOTAL FOR SUBCONSULTANTS = $38,600 TOTAL FOR SUBCONSULTANTS (ROUNDED)=$38,600  TOTAL =$225,100 EXHIBIT D‐1 PRIME CONSULTANT COST COMPUTATIONS SUMMARY NEGOTIATED HOURLY RATE Page 1 of 2 CONTRACT: CAG‐22‐255 PROJECT: BRONSON WAY BRIDGE ‐ SEISMIC RETROFIT AND PAINTING PRIME CONSULTANT: TRANTECH ENGINEERING, LLC "Doc. "Inspector" Specialist" Principal Const Resident Const. Sen. Office Admin 2/3 Manager Engineer Inspector Engineer $106.65 $92.40 $92.40 $50.40 $47.30 $38.50 TASK 1 ‐ CONSTRUCTION MANAGEMENT SERVICES Construction Phases 2 and 3 0 40 160 720 280 12 $68,474 Total 0 40 160 720 280 12 $68,474 Indirect Cost Rate (ICR) ICR = DL x ICR% ICR% = 130.57%ICR = $89,407 Fee (Profit) FEE = DL x FEE% FEE% = 30.00%FEE = $20,542 Direct Non‐Salary Cost (DNSC) Mileage = 4000 Rate = $0.625 DNSC = $2,500 Materials Testing = $5,500.00 Materials Testing = $5,500 Total DNSC = $8,000 Task 1 Total = $186,423 Task 1 Total (Rounded) = $186,500 Total Hours = 0 40 160 720 280 12 Total Mileage = 4000 Total DL = $68,474 Total ICR = $89,407 Total FEE = $20,542 Total DNSC = $8,000 TOTAL = $186,423 TOTAL (ROUNDED) = $186,500 Direct Labor (DL) EXHIBIT D‐1 PRIME CONSULTANT ‐ COST ESTIMATE DETAIL  Task Description Total  Page 2 of 2 CONTRACT: CAG‐22‐255 PROJECT: BRONSON WAY BRIDGE ‐ SEISMIC RETROFIT AND PAINTING SUBCONSULTANT: STEPHERSON AND ASSOCIATES COMMUNICATIONS, INC. Principal Senior Senior Assoc. Assoc. Assoc. Project Project Graphics Assoc. 2 Assoc. 1321AdminCoord $76.80 $85.00 $85.00 $51.93 $41.00 $32.94 $57.50 $28.61 $45.50 TASK S2 ‐ PUBLIC OUTREACH SERVICES Construction Phases 2 and 3 800816160161608$12,818 Total 800816160161608$12,818 Indirect Cost Rate (ICR) ICR = DL x ICR% ICR% = 166.91%ICR = $21,394 Fee (Profit) FEE = DL x FEE% FEE% = 30.00%FEE = $3,845 Direct Non‐Salary Cost (DNSC) Item Rate per  item Quantity Cost Total DNSC = $512 Mileage $0.63 300 $187.50 Printing $0.60 500 $300.00 Hotline $14.00 10 $24.00 Task S2 Total = $38,569 Total $512 Task S2 Total (Rounded) = $38,600 Total Hours = 800816160161608 Total Mileage = 300 Total DL = $12,818 Total ICR = $21,394 Total FEE = $3,845 Total DNSC = $512 TOTAL = $38,569 TOTAL (ROUNDED) = $38,600 Direct Non‐Salary Cost (DNSC) EXHIBIT E1‐1 SUBCONSULTANT ‐ COST ESTIMATE DETAIL  Task Description Direct Labor (DL) Total  Page 1 of 1