Loading...
HomeMy WebLinkAboutMFP22005881.pdfDEPARTMENT OF COMMUNITY AND ECONOMIC DEVELOPMENT Minor Franchise Permit: MFP22005881 IVR Number: 22005881 Permit Information Permit Name: Puget Sound Energy - Electric Address/Location:11/06/2022Application Date:3628600007Parcel Number: 1207 N 37TH ST Permit Type:11/28/2022Issue Date:Franchise Permit Work Class:11/28/2023Expiration Date:Minor Utility Job Number: 105101845Franchise Type:Electric Description: Puget Sound Energy Electric AT EXISTING P01 (319451 166208) CREW TO INSTAL NEW 3" RISER AND REPLACE EXISTING TRANSFORMER. CREW TO RUN APPROX 170' OF 350UG TPX IN NEW 3" CONDUIT. POTHOLE ALL EXISTING UTILITIES. RESTORATION PER CITY OF RENTON STANDARDS. Contacts Name Address PhoneTypeBilling Corrie Rydberg Puget Sound Energy 3702 71st Ave W University Place, WA 98466 C: (253) 905-5031ApplicantX Vicki Henson Potelco Inc 8001 212th St S Kent, WA 98032 B: (253) 863-0484Contractor Business License Number: 5109Electrical Contractor: POTELI*344O4 Construction Contractor: POTELI*227PL Puget Sound Energy Inc 10885 NE 4th Street, PSE08-N08 Bellevue, WA 98009 B: (888) 225-5773Emergency Contact RIVENDELL HOMES LLC 11007 SLATER AVE NE KIRKLAND , WA 98033 Owner Corrie Rydberg Puget Sound Energy 3702 71st Ave W University Place, WA 98466 C: (253) 905-5031Specialized Billing General Conditions & Signature Permission is hereby given for the work described on this permit according to the conditions hereon and according to the approved plans and specifications pertaining thereto, subject to compliance with the Ordinance of the City of Renton. Ÿ This permit and plans must be posted at the job site at all times.Ÿ I hereby certify that no work is to be done except as described above and in approved plans, and that work is to conform to Renton Trench Restoration and Street Overlay Requirements. Ÿ Call 425.430.7203 or go to: https://permitting.rentonwa.gov one working day in advance to schedule an inspections and for ANY work in the Right of Way. Ÿ Call 8 1 1 to locate underground utilities at least two full business days prior to any excavation.Ÿ In accordance with RCW 19.122.033(4) the permit holder is required to contact (Williams Northwest Pipeline at 425.868.1010) (Olympic Pipeline at 425.235.7736) (Puget Sound Energy at 425.375.3397) to request a consultation with the transmission pipeline company prior to performing any construction or excavation activities. This requirement to consult with the transmission pipeline company is in addition to the requirement to Call before You Dig as required in RCW 19.122. Ÿ (Date)(Signature) Page 1 of 1THIS PERMIT AND PLANS MUST BE POSTED AT THE JOB SITE AT ALL TIMES Note: The Applicant is responsible for compliance with all codes and regulations, whether or not described in this document. DEPARTMENT OF PUBLIC WORKS Page 1 of 3 | Published: 10/27/2021 Transportation Division | 1055 South Grady Way, 5th Floor | Renton, WA 98057 | 425-430-7380 Website: rentonwa.gov TRAFFIC CONTROL PLAN APPLICATION Published: 10/27/2021 TRAFFIC CONTROL PLAN (TCP) MUST BE SUBMITTED TO PUBLIC WORKS TRANSPORTATION DIVISION FOR REVIEW/APPROVAL AT LEAST FIVE (5) WORKING DAYS BEFORE THE DATE OF WORK. The City of Renton requires any contractor, firm, corporation, or other public/private agency to prepare a traffic control plan (TCP) and obtain city's approval of that plan when construction, repair, or maintenance work is to be conducted within the city's right-of-way. 1. Fill out the Traffic Control Plan (TCP) Application form and prepare required submittal documents. 2. The following items are all required for submittal of the TCP Application: ☐Electronic Copy of the TCP Application ☐Electronic Copy of the TCP Layout, on 11” X 17” paper size format, which shall: Include map(s) showing the location of the project and work area. Be legible lettering and clear, contrasting, symbols of viewing or printing. Must indicate street names, and north arrow and scale. Types of plans required: o Work hour plan – show all mobility impacts during construction hours. o Non-work plan - show all mobility impacts after work hours when limited or no work is happening in the right-of-way (ROW), if applicable. o Changing construction phases – show construction sequence and each construction phase change even if the traffic control is not modified, if applicable. o Pedestrian access/detour plan, if applicable. - Shall conform to the Washington State Traffic Control Flagger Certification handbook, by the Evergreen Safety Council. 3. Submit Application via email to TCP@rentonwa.gov with the subject line “TCP Application – [Project Name].” Project Name: Permit #: Site Address: Work Date: From _____________ To _____________ Work Time: Start ______________ End ______________ Construction Company: Contact Name: Phone/Cell: _________________________ Business Address: City/State: Zip: Description of Work: Approval By: _________________________________________________ Date:____________________ Transportation Engineering PLEASE SEE ATTACHED POTELCO, INC 6905 S 228TH ST KENT, WA 98032 105101845 1207 N 37TH ST DAVE FLORES 425-449-6019 MFP22005881 Monday - Friday 8:00AM - 3:00PM Scott Warlick CED 11/22/2022 Note: The Applicant is responsible for compliance with all codes and regulations, whether or not described in this document. Page 2 of 3 | Published: 10/27/2021 PERMIT HOLDER AGREES TO ALL THE FOLLOWING: Must have approved Traffic Control Plan (TCP) prior to commencing the work. Maintain existing pedestrian access. The work on pedestrian facilities, shall be limited to one corner at a time, with the least possible inconvenience or delay to pedestrians. WORK TIME begins when any street or travel lane is fully or partially closed. This includes set up within the traveled way. Comply with all traffic regulations of the City of Renton and the State of Washington. Prepare a traffic control plan and obtain City approval of that plan. That plan shall be implemented for all street and lane closures, and the plan shall be performed in compliance with the Manual on Uniform Traffic Control Devices. Notify emergency services (253-852-2121) twenty-four (24) hours before any street or lane closures. Contractor or entity must call Renton School District (425-204-4455) or any public/private agency, including public transit, to be affected by a temporary lane or road closure a minimum of five business days (excluding weekends and holidays) prior to starting any work. Contractor or entity must notify King County Metro in writing at construction.coord@kingcounty.gov a minimum of five business days (excluding weekends and holidays) prior to starting any work impacting bus stops, a temporary lane or road closure. Work requiring removing a bus shelter or sign requires notification in writing a minimum of 30 business days (excluding weekends and holidays). Please call King County Metro at 206-477-1140 with any questions. Any lane or street closures not in conformance with the approved traffic control plan and/or without notification of emergency services may result in receiving a citation for violation of R.C.W. 47.36.200 Signs or Flaggers at thoroughfare work sites and R.C.W. 9A.36.050 Reckless Endangerment, and other applicable State and City codes. Indemnify and hold harmless the City of Renton from any and all claims, actions, and judgments, including all costs of defense and attorney’s fees incurred in defending against same, arising from and related to implementation of the approved traffic control plans including claims arising from towing of private vehicles and the acts of the Permit Holder’s agents and employees. The City of Renton shall be entitled, in its reasonable discretion, to settle claims prior to suit or judgment, and in such event shall indemnify and hold harmless the City for any such claims paid, including the City’s reasonable attorney’s fees and litigation costs incurred resulting from such claim. In the event any claim or suit is brought against City within the scope of this Agreement, Permit Holder will pay for legal counsel chosen by the City to defend against same. Flagger and sign placement are subject to revision by the City Inspector on site, if needed to address traffic or pedestrian safety or travel. All permit conditions shall be met. NOTES: Total road closure lasting more than twenty-four (24) hours is subject to the approval by the City Council. Work Zone Traffic Control shall be in accordance with the Manual on Uniform Traffic Control Devices (MUTCD) and shown by a traffic control plan layout or reference to WSDOT. Approved Temporary Traffic Control Plan must be at the work site during work hours. Complete assistance and accommodation shall be provided to all kinds of pedestrian traffic when sidewalk or walkway is impeded to safely redirect pedestrians around a work zone. Signage shall be used to warn motorcyclists/bicyclists of the potential hazards on any uneven surfaced or slippery road conditions during work and non-work hours. Any vehicle, equipment, barricade, or portable tow-away sign used within the work area must display a company logo or any legally acceptable sign showing the company name, address, and telephone number at a conspicuous place on the vehicle or equipment. Note: The Applicant is responsible for compliance with all codes and regulations, whether or not described in this document. Page 3 of 3 | Published: 10/27/2021 In the case of Temporary No Parking Zones, all the following apply in addition to previous: Contractor must complete form to show limits of Temporary No Parking Zone identifying barricade locations for vacate parking or curb lane usage. Contractor must post notice of dates and time of Temporary No Parking Zone with at least two signs per block seventy-two (72) hours in advance of effective date and time. The cover sheet of this Traffic Control Plan form must be attached to each Temporary No Parking Sign on the project site. Temporary traffic control devices must be removed immediately when work is done or no construction activities are going on. If deemed abandoned, City crews will remove and store them at the City’s maintenance shop (3555 NE 2nd Street). I certify that the information on this application and within the submittal documents are accurate to the best of my knowledge and I acknowledge all the requirements on this application. Applicant’s Signature Date Applicant’s Name (Print) CORRIE RYDBERG N 37TH STPARK AVE N PARK AVE N111111111212 RESIDENT(S) WILL BE INFORMEDOF POSSIBLE TEMPORARYDRIVEWAY CLOSUREPLACE SIGNSBOTH SIDES OFWORK AREAFROMTOTOW AWAY AREAPHONE 888-9999INFRASOURCE LLC 000 0000000NO PARKINGNO-PARKFROM TO TOW AWAY AREA PHONE 888-9999 INFRASOURCE LLC 000 0000000 NO PARKING NO-PARK STOP FLAGGER STOP FLAGGER W20-7AROADWORKAHEADW20-1 BEPREPAREDTOSTOPW3-4100'100'100'W20-7AROADWORKAHEADW20-1BEPREPAREDTOSTOPW3-4100'100'100'W20-7AROADWORKAHEADW20-1W20-4ONE LANEROADAHEAD100'100'100'X'X'PLACE W20-1 SIGNS ON ALLADJACENT STREETS WITHIN FEET OF WORK AREAROADWORKAHEADW20-1 ROADWORKAHEADW20-1P011207TEMPORARY TRAFFIC CONTROL PLANNSIGN SPACINGMPH60/6545/5535/403025"X"1000'500'350'200'100'CHANNELIZATIONDEVICE SPACINGMPH55/7035/4525/30TAPER403020TANGENT806040Notes:1. All signs and spacing to conform to theMUTCD and City of Renton standards.2. All sidewalks, driveways, exits and egressesshall be completely clear unless otherwise indicated.3. Channelizing devices are 28" traffic cones.Use traffic drums (barrels) with steady burningType C lights on all State State Routes and Hwys.4. Sign size can be a minimum of 36" x 36" andshall not obstruct pedestrian access.5. Crew is required to leave a minimum of 11' fortraveling lane width.6. Alert affected residents and businesses.7. Work to take place between 9 a.m. and 4 p.munless otherwise specified. All work for arterialsand major roadways will be from 9 a.m. to 3 p.m.8. Work area will be 143' WCL of Park Ave N & 25'NCL of N 37th St.Project Address:PagePSEPUGETSOUNDENERGYDesigner:Job #REV10/19/2022 5131499150 1207 N 37th St, Renton, WA.Ina Ustemchuk425-398-6063Ina.ustemchuk@pse.com1 OF 2Puget Sound EnergyTraffic Control Supervisor:Ina UstemchukCard No. 010768Card Exp.06/30/2021ina.ustemchuk@pse.com(425)398-6063TRENCH28" TRAFFIC CONELEGENDTRAFFIC FLOWSIGN LOCATIONFLAGGERSTOPWORK VEHICLE/FLASHING LIGHTSRIGHT OF WAYMFP22005881 N 37TH STPARK AVE N PARK AVE N111111111212 RESIDENT(S) WILL BE INFORMEDOF POSSIBLE TEMPORARYDRIVEWAY CLOSUREPLACE SIGNSBOTH SIDES OFWORK AREAFROMTOTOW AWAY AREAPHONE 888-9999INFRASOURCE LLC 000 0000000NO PARKINGNO-PARK FROM TO TOW AWAY AREA PHONE 888-9999 INFRASOURCE LLC 000 0000000 NO PARKING NO-PARK STOP FLAGGER STOP FLAGGER W20-7AROADWORKAHEADW20-1 BEPREPAREDTOSTOPW3-4100'100'100'W20-7AROADWORKAHEADW20-1BEPREPAREDTOSTOPW3-4100'100'100'W20-7AROADWORKAHEADW20-1W20-4ONE LANEROADAHEAD100'100'100'X'X'PLACE W20-1 SIGNS ON ALLADJACENT STREETS WITHIN FEET OF WORK AREAROADWORKAHEADW20-1 ROADWORKAHEADW20-1P011207Notes:1. All signs and spacing to conform to theMUTCD and City of Renton standards.2. All sidewalks, driveways, exits and egressesshall be completely clear unless otherwise indicated.3. Channelizing devices are 28" traffic cones.Use traffic drums (barrels) with steady burningType C lights on all State State Routes and Hwys.4. Sign size can be a minimum of 36" x 36" andshall not obstruct pedestrian access.5. Crew is required to leave a minimum of 11' fortraveling lane width.6. Alert affected residents and businesses.7. Work to take place between 9 a.m. and 4 p.munless otherwise specified. All work for arterialsand major roadways will be from 9 a.m. to 3 p.m.8. Work area will be:143' WCL of Park Ave N & 22' SCL of N 37th St;187' WCL of Park Ave N & 24' SCL of N 37th St.Project Address:PagePSEPUGETSOUNDENERGYDesigner:Job #REV10/19/2022 5131499150 1207 N 37th St, Renton, WA.Ina Ustemchuk425-398-6063Ina.ustemchuk@pse.com2 OF 2Puget Sound EnergyTraffic Control Supervisor:Ina UstemchukCard No. 010768Card Exp.06/30/2021ina.ustemchuk@pse.com(425)398-6063TEMPORARY TRAFFIC CONTROL PLANNSIGN SPACINGMPH60/6545/5535/403025"X"1000'500'350'200'100'CHANNELIZATIONDEVICE SPACINGMPH55/7035/4525/30TAPER403020TANGENT806040TRENCH28" TRAFFIC CONELEGENDTRAFFIC FLOWSIGN LOCATIONFLAGGERSTOPWORK VEHICLE/FLASHING LIGHTSRIGHT OF WAYMFP22005881 3713 12081202 1201 3712 3700 3701 3711 1213 3619 3610 N 37TH ST PARK AVE NROW60'1207 319451-166208 25 kVA 120/240V (B) 50 kVA 120/240V (B)319437-166190 37.5 kVA (B) 319459-166225 37.5 kVA (B) 319444-166225 SLAH4821 HAZ 15 #4ACSR B#4ACSR 319451-166208 25 kVA 120/240V (B) 50 kVA 120/240V (B) 4' X 4' WORK PIT CUSTOMER SUPPLIED 1 CUBIC YARD 5/8" CRUSHED ROCKCUSTOMER SUPPLIED 4' X 4' WORK PIT CUSTOMER SUPPLIED 3/4" CUBIC YARD SANDCUSTOMER SUPPLIED 45° R=30"45° R=30"47'55'28'PSE INST. 1-RUN 350 UG TPX ± 170' CUSTOMER SUPPLIED 1-3" SCH'L 40 DISCONTINUOUS PVC CONDUIT ± 130'ROW60'34'EOPEOP EOP EOP EOP EOP EOP 319451-166208 25 kVA 120/240V (B) 50 kVA 120/240V (B) SIDEWALK 12'5'9'4'Removed at site: Grid Number: kVA Rating: Foreman to redline the following information TRANSFORMER REMOVAL Company ID#: Primary phase connected to: Tested Secondary Voltage P01 319451-166208 25kVA Installed at site: Grid Number: kVA Rating: Foreman to redline the following information TRANSFORMER INSTALLATION Company ID#: Primary phase connected to: Tested Secondary Voltage Material ID#: P01 319451-166208 50kVA 6211350 METER DETAIL @ M01 SCALE: NONE 32" Typical 24"Min 24"-36" 4'Top View Electric & Joint Utility Work Pit Dimensions 36" Min Drainage Pipe 12" Minimum Clearance from Gas Service Lines Conduit Depth 24" to 36" Max Regulator Gas Meter Assembly 48" 4'8" Service (Permanent Detail:) Not to Scale ConduitEndsClosed 4'8" 24" Min 36" Typical 3' To Trench Property Line Conduit Stakes Customer Provided 3" Schedule 40 Grey PVC Power Cable Conduit Customer Provided Gas Service Line Conduit 3" Conduit Service Riser Customer Provided Elec. Mtr Base Elec Mtr utility provided Gas Meter Relief Vent Building Wall Elec. Mtr Vent Utility Provided Seal 24"-36" SITE SPECIFIC NOTES AT P01: 319451-166208 -EXISTING POLE TO REMAIN -INSTALL (1) STIRRUP, BOLTED & HOT CLAMP #4-4/0 & TAP BØ (MID: 2254000 & 2153100) -REMOVE (1) EX. 25kVA TRF -INSTALL (1) 50kVA OH TRF 120/240v W/ LB C/O (FUSE @ 15T) PER STD 6025.1000 (TRFRXF) -INSTALL (1) 3" SEC RISER ON NEW STANDOFF BRACKETS PER STD 6042.1000 (RIS3CSS) ± 30' ___' ACTUAL M01 AT "1207": NEW METER BASE -INSTALL 320A METER SPAN SPECIFIC NOTES P01 TO M01: -INSTALL 1-RUN 350 UG TPX, ±170’ ___' ACTUAL ___ ___ TV & TEL Electric Service Cable in Conduit 3" Schedule 40 Grey PVC Excavated Dirt Pile Final Grade 24" Min 24" Min to 36" Max Cover Backfill for Conduit Free of rocks larger than 8" in diameter Separation 12" Min in Conduit Schedule 40 Yellow PVC Gas Service Line 32" Typical (Power, Gas, Phone & Cable) Separation 12" Min 12" Min Separation 36" MINIMUM COVER IN RIGHT OF WAY JOINT TRENCH DETAIL Joint Service Line in Conduit (NTS) To Excavated Dirt Pile Backfill for In Conduit - The backfill layer shall be soil that is free from construction debris, glass, sharp rocks, frozen clods, and rocks larger than 8" in diameter. UTILITY POLE EROSION CONTROL DETAIL TOP VIEW DRY DRAINAGE DITCH or DRY VEGETATED SITE SLOPE Place gravel bags for Sediment Trap Place straw mulch on disturbed areaExcavated or Augered Hole Pole SLOPE Not to scale Drainage ditches or Dry vegetated sites FLOW DIRECTION LAY 8" BOTTOM SKIRT ON TOP OF NATIVE SOIL, SECURE WITH PEA GRAVEL BAGS. 6' 3' 8" TECHNIQUES FOR EROSION AND SEDIMENT CONTROL SILT FENCE DETAIL Not to Scale 0150.3200 Field Face Quadrant Climbing Space Road Face Quadrant Climbing Space 5" Min CL LC Direction of Vehicular Traffic TOP VIEW Standoff Bracket 15" Min Length Conduit Clamp Conduit CONDUIT RISER PLACEMENT DETAIL (P01) SCALE: NONE 4'x4' Work Pit 00 1"2" 00 50'100' SITE PLAN SCALE: 1" = 50' POWER GENERAL NOTES - RESIDENTIAL PROJECT 7. 6. 5. 4. 3. 2. 1.All materials to be installed in accordance with Puget Sound Energy's (PSE) standards. Any deviation from this work sketch must be AUTHORIZED by PSE's Project Manager and NOTED on the Foremans' Copy. All switching arrangements and/or outage arrangements are to be made with the Project Manager at least three (3) working days in advance. Contact the Utilities Underground Location Center (1-800-424-5555) at least 48 hours prior to commencing work to get the underground facilities located. STAKING: The customer will provide all staking (transformer, handhole, trench, grade, lot, pole, sidewalk, etc.). See sketch and details for locations. Equipment locations must be approved by the Project Manager. SITE PREPARATION: The work area will be at or near finished grade, clear of trench spoils or construction materials which would restrict construction and/or equipment access, before work can begin. Roads shall be paved or have a compacted , crushed rock base in place. CLEARANCES: Transformers require a minimum of 6 feet from fire fighting equipment, 10 feet from combustible walls, overhangs, doors, and windows, and a minimum of 5 feet from the back of curb (or guard posts will be required per PSE standards). All conduits and vaults are to be at least 5 feet away from water, storm and sewer lines when paralleling them in the right of way, and at least 1 foot when crossing them, or as required by your local municipality. All work is to be done in accordance with local municipal and county permit requirements as applicable. Inclement weather conditions may cause delays in construction times and dates. 8. 9. CUSTOMER DEVELOPMENT NOTES: A PRE CONSTRUCTION MEETING IS REQUIRED WITH YOUR PROJECT MANAGER PRIOR TO STARTING ANY SITE WORK. CUSTOMER IS RESPONSIBLE FOR ALL TRENCHING, SELECT BACKFILL, COMPACTION & RESTORATION PER PUGET SOUND ENERGY STANDARDS & LOCAL MUNICIPALITY. **DEVELOPER NEEDS TO FOLLOW ALL TRENCH DETAILS ON SELECT BACKFILL** CUSTOMER IS RESPONSIBLE FOR THE FOLLOWING: CROSSING/BORING. -OPEN TRENCH OR BORING FOR CROSSINGS ARE ALLOWED PER LOCAL MUNICIPALITY PERMIT REQUIREMENTS. -CROSSINGS IN RIGHT OF WAY MUST BE SCHEDULED WITH PROJECT MANAGER PRIOR TO CONSTRUCTION. -PROJECT MANAGER OR DESIGNATED REPRESENTATIVE MUST BE ON SITE DURING CONSTRUCTION WORK IN RIGHT OF WAY. -EXCAVATION CONTRACTOR MUST BE LICENSED AND BONDED TO PERFORM WORK IN RIGHT OF WAY. VAULTS & WORK PITS. -REQUIRED TO PROVIDE 4' X 4' WORK PIT & 1 CUBIC YARD 5/8" CRUSHED ROCK AT P01 -REQUIRED TO PROVIDE 4’ X 4’ WORK PIT & 3/4 CUBIC YARD OF SAND AT M01 TRENCHING & CONDUIT. -INSTALL ± 170' OF 1-3" SCH'L 40 GREY PVC CONDUIT FROM P01 TO M01. -REQUIRED TO PROVIDE AND INSTALL A 3/8" NON-POLY PULL ROPE IN ALL OF THE CONDUITS. JOB SITE READINESS. -JOB SITE NEEDS TO BE 100% READY FOR INSPECTION 5 BUSINESS DAYS PRIOR TO CONSTRUCTION DATE. -ALL WORK IN RIGHT OF WAY MUST BE COORDINATED WITH PROJECT MANAGER AND LOCAL MUNICIPALITY. -ALL TRENCH, AND LOCAL ELECTRICAL MUNICIPALITIES AKA "L&I, CITY", INSPECTIONS MUST BE COMPLETED 5 BUSINESS DAYS PRIOR TO SCHEDULED CONSTRUCTION DATE. -REQUIRED TO OPERATE AND PROVIDE EQUIPMENT TO PUMP OUT WATER FOR WORK PITS, VAULTS & TRENCH AT ALL TIMES. -REQUIRED TO HAVE EXCAVATION EQUIPMENT AND BE ON SITE THE DAY OF CONSTRUCTION TO COMPLETE BACKFILLING. - IF A SECOND INSPECTION IS REQUIRED, ADDITIONAL FEE'S WILL BE APPLIED. -PLEASE REVIEW THE CITY OR KING COUNTY TRENCHING REQUIREMENTS UNDER THE PERMIT. -IF A PRE-CON IS REQUIRED BY THE CITY, COUNTY OR W.S. DOT A PSE PROJECT MANAGER WILL SET-UP AND SCHEDULE A MEETING WITH THE MUNICIPALITY BEFORE ANY EXCAVATION OR INSTALLATION BEGINS . N Vicinity Map N/A ARE TO BE INSTALLED, CROSS SECTION DETAILS OF THE TYPICAL EROSION STRUCTURES, & SPECIAL REQUIREMENTS FOR WORK IN SENSITIVE AREAS.) EROSION & SEDIMENT CONTROL REQUIREMENTS NOTES DETAILING WHERE EROSION OR SEDIMENT CONTROL STRUCTURES (LOCAL JURISDICTIONS MAY HAVE ADDITIONAL REQUIREMENTS INCLUDING 0150.3200 TECHNIQUES FOR TEMPORARY EROSION & SEDIMENT CONTROL EROSION & SEDIMENT CONTROL SHALL BE PER PSE STANDARD PRACTICE & ANY ADDITIONAL LOCAL JURISDICTION REQUIREMENTS. FOREMAN (CHECK BOX WHEN COMPLETED) PSE Equipment LOCKED/SECURED & Work Area left in CLEAN/SAFE Condition. Grid, Cable, and Switch numbers INSTALLED & VERIFIED. Field Changes RED-LINED on As-built. Indicate correct FUSE SIZE on As-built & VERIFY proper PHASE. Foreman's Signature _______________________________________________ Print Name ___________________________________ Date ______________ Material VERIFIED and CHANGES noted on Paperwork. Total PRIMARY Cable noted on As-built. Company ID#'s RECORDED in correct location on As-built. Deviations noted on the As-built and their reason. I certify that the work performed meets PSE's standards and procedures and that all quality requirements are met. JOB SITE ASPLUNDH CONSTRUCTION CORP. - QA/QC T. MYER PSE No No No Yes Yes Yes No YesDeveloper "Flagging Required" "Outages Required" "Locates Required"THIS SKETCH NOT TO BE RELIED UPON FOR EXACT LOCATION OF EXISTING FACILITIES CALL 811 TWO BUSINESS DAYS BEFORE YOU DIG For contacts below dial 1-888-CALL PSE (225-5773) NEW CABLE & CONDUIT DIAGRAM NOT TO SCALE 10.EXCAVATION: The customer is to provide all trenching, backfill, vault excavations, compaction and restoration per this sketch and per PSE standards. A minimum protective cover of 36" is required over PSE's primary voltage equipment and 24" is required of PSE's secondary voltage equipment. The customer will provide any and all shoring or they will side slope the trench to 1:1. PARTIAL PLAN DETAIL SCALE: 1" = 20' NOT TO SCALE CROSS SECTION - N 37TH ST LOOKING WEST N 60' ROW CL S JOB SITE CIRCUIT LOADING TABLE AS OF EXIST. PEAK LOAD EST. NEW LOAD TOTAL CIRCUIT: A PHASE B PHASE C PHASE HAZ-15 06/2020 188.00 224.00 208.00 0.00 4.97 0.00 188.00 228.97 208.00 UTILITIES CONTACT PHONE# COUNTY 1/4 SEC U-MAP NO (POWER) OP MAP Emer Sect Gas Wk Ctr POWER WK CTR PLAT MAP JOINT FACILITIES ARRANGEMENTS DRAWN BY CHECKED BY APPROVED BY FOREMAN #1 FOREMAN #2 MAPPING INCIDENT MAOP Gas Order Elect Order SCALE PAGE ENGR - POWER ENGR - GAS FUNCTION PROJECT MGR PERMITREAL ESTATE/EASEMENT 2 1 REV# 3 DATE DESCRIPTIONBY CONTACT PHONE NO DATE OH CKT MAP CIRCUIT NOUG CKT MAP D. FLORES 425-449-6019 10/24/22 D. FLORES 425-449-6019 10/24/22 E. SCHOTT 714-893-2405 10/24/22 N/A RENTON MY PRECIOUS PERMIT, UPGRADE XFMR, OH TO UG SVC, CUSTOMER PRELIM BLOCKS NEEDED 1207 N 37TH ST, RENTON, WA 98057 N/A N/A N/A 105101845 AS NOTED 1 OF 1 KING N/A N/A CSPSKEPM NW 32-24N-05E N/A N/A 2405E126 2405E136 2405E126 HAZ-15 N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A E-Mail: Cell Phone: Project Manager Contact Information: Manager:DAVID FLORES 425-449-6019 DAVID.FLORES@PSE.COM GAS PHONE CABLE TV PROJECT PHASE PWR NOTIF#ORDER#105101845SCALE: 6" = 1 MILE OVERHEAD CIRCUIT MAP 2405E136 Owner / Developer Contact Info officeATTN: BENSON MAXWELL LLC 11007 SLATER AVE NE KIRKLAND, WA 98033 PAUL GOERTZ 206-960-9324 CIRCUIT FEET ADDED: SQ. FOOTAGE: PANEL SIZE: HEAT TYPE: EST. DEMAND: LRC: % V. DROP: % FLICKER: 0' 3,730 SQ FT 320A ELECTRIC 34kW 140A 3.2% 2.8% 513149915 583071074 105101845 Dist OH Operations Superior N 37TH ST MFP22005881 All new conduit in the ROW shall be schedule 80 or equivalent. POTHOLE ALL EXISTING UTILITIES RESTORATION PER CITY OF RENTON STANDARDS