Loading...
HomeMy WebLinkAboutMFP22006137.pdfDEPARTMENT OF COMMUNITY AND ECONOMIC DEVELOPMENT Minor Franchise Permit: MFP22006137 IVR Number: 22006137 Permit Information Permit Name: Puget Sound Energy - Electric Address/Location:11/22/2022Application Date:1723059011Parcel Number: 1101 BRONSON WAY N Permit Type:12/07/2022Issue Date:Franchise Permit Work Class:12/07/2023Expiration Date:Minor Utility Job Number: 101134714Franchise Type:Electric Description: Puget Sound Energy Electric EMERGENCY AFTER THE FACT LINE CREW PULLED 3PHASE PRIMARY FROM P01 (317909 166262) TO V01 (317917 166234). RESTORATION PER CITY OF RENTON STANDARDS. Contacts Name Address PhoneTypeBilling Corrie Rydberg Puget Sound Energy 3702 71st Ave W University Place, WA 98466 C: (253) 905-5031ApplicantX Vicki Henson Potelco Inc 8001 212th St S Kent, WA 98032 B: (253) 863-0484Contractor Business License Number: 5109Electrical Contractor: POTELI*344O4 Construction Contractor: POTELI*227PL Puget Sound Energy Inc 10885 NE 4th Street, PSE08-N08 Bellevue, WA 98009 B: (888) 225-5773Emergency Contact RENTON CITY OF 1055 S GRADY WAY RENTON , WA 98057 Owner Corrie Rydberg Puget Sound Energy 3702 71st Ave W University Place, WA 98466 C: (253) 905-5031Specialized Billing General Conditions & Signature Permission is hereby given for the work described on this permit according to the conditions hereon and according to the approved plans and specifications pertaining thereto, subject to compliance with the Ordinance of the City of Renton. Ÿ This permit and plans must be posted at the job site at all times.Ÿ I hereby certify that no work is to be done except as described above and in approved plans, and that work is to conform to Renton Trench Restoration and Street Overlay Requirements. Ÿ Call 425.430.7203 or go to: https://permitting.rentonwa.gov one working day in advance to schedule an inspections and for ANY work in the Right of Way. Ÿ Call 8 1 1 to locate underground utilities at least two full business days prior to any excavation.Ÿ In accordance with RCW 19.122.033(4) the permit holder is required to contact (Williams Northwest Pipeline at 425.868.1010) (Olympic Pipeline at 425.235.7736) (Puget Sound Energy at 425.375.3397) to request a consultation with the transmission pipeline company prior to performing any construction or excavation activities. This requirement to consult with the transmission pipeline company is in addition to the requirement to Call before You Dig as required in RCW 19.122. Ÿ (Date)(Signature) Page 1 of 1THIS PERMIT AND PLANS MUST BE POSTED AT THE JOB SITE AT ALL TIMES Note: The Applicant is responsible for compliance with all codes and regulations, whether or not described in this document. DEPARTMENT OF PUBLIC WORKS Page 1 of 3 | Published: 10/27/2021 Transportation Division | 1055 South Grady Way, 5th Floor | Renton, WA 98057 | 425-430-7380 Website: rentonwa.gov TRAFFIC CONTROL PLAN APPLICATION Published: 10/27/2021 TRAFFIC CONTROL PLAN (TCP) MUST BE SUBMITTED TO PUBLIC WORKS TRANSPORTATION DIVISION FOR REVIEW/APPROVAL AT LEAST FIVE (5) WORKING DAYS BEFORE THE DATE OF WORK. The City of Renton requires any contractor, firm, corporation, or other public/private agency to prepare a traffic control plan (TCP) and obtain city's approval of that plan when construction, repair, or maintenance work is to be conducted within the city's right-of-way. 1. Fill out the Traffic Control Plan (TCP) Application form and prepare required submittal documents. 2. The following items are all required for submittal of the TCP Application: ☐Electronic Copy of the TCP Application ☐Electronic Copy of the TCP Layout, on 11” X 17” paper size format, which shall: Include map(s) showing the location of the project and work area. Be legible lettering and clear, contrasting, symbols of viewing or printing. Must indicate street names, and north arrow and scale. Types of plans required: o Work hour plan – show all mobility impacts during construction hours. o Non-work plan - show all mobility impacts after work hours when limited or no work is happening in the right-of-way (ROW), if applicable. o Changing construction phases – show construction sequence and each construction phase change even if the traffic control is not modified, if applicable. o Pedestrian access/detour plan, if applicable. - Shall conform to the Washington State Traffic Control Flagger Certification handbook, by the Evergreen Safety Council. 3. Submit Application via email to TCP@rentonwa.gov with the subject line “TCP Application – [Project Name].” Project Name: Permit #: Site Address: Work Date: From _____________ To _____________ Work Time: Start ______________ End ______________ Construction Company: Contact Name: Phone/Cell: _________________________ Business Address: City/State: Zip: Description of Work: Approval By: _________________________________________________ Date:____________________ Transportation Engineering PLEASE SEE ATTACHED POTELCO, INC 6905 S 228TH ST KENT, WA 98032 101134714 1101 BRONSON WAY N CORRIE RYDBERG 253-905-5031 MFP22006137 Monday - Friday 8:00AM - 3:00PM Scott Warlick CED 12/7/2022 Note: The Applicant is responsible for compliance with all codes and regulations, whether or not described in this document. Page 2 of 3 | Published: 10/27/2021 PERMIT HOLDER AGREES TO ALL THE FOLLOWING: Must have approved Traffic Control Plan (TCP) prior to commencing the work. Maintain existing pedestrian access. The work on pedestrian facilities, shall be limited to one corner at a time, with the least possible inconvenience or delay to pedestrians. WORK TIME begins when any street or travel lane is fully or partially closed. This includes set up within the traveled way. Comply with all traffic regulations of the City of Renton and the State of Washington. Prepare a traffic control plan and obtain City approval of that plan. That plan shall be implemented for all street and lane closures, and the plan shall be performed in compliance with the Manual on Uniform Traffic Control Devices. Notify emergency services (253-852-2121) twenty-four (24) hours before any street or lane closures. Contractor or entity must call Renton School District (425-204-4455) or any public/private agency, including public transit, to be affected by a temporary lane or road closure a minimum of five business days (excluding weekends and holidays) prior to starting any work. Contractor or entity must notify King County Metro in writing at construction.coord@kingcounty.gov a minimum of five business days (excluding weekends and holidays) prior to starting any work impacting bus stops, a temporary lane or road closure. Work requiring removing a bus shelter or sign requires notification in writing a minimum of 30 business days (excluding weekends and holidays). Please call King County Metro at 206-477-1140 with any questions. Any lane or street closures not in conformance with the approved traffic control plan and/or without notification of emergency services may result in receiving a citation for violation of R.C.W. 47.36.200 Signs or Flaggers at thoroughfare work sites and R.C.W. 9A.36.050 Reckless Endangerment, and other applicable State and City codes. Indemnify and hold harmless the City of Renton from any and all claims, actions, and judgments, including all costs of defense and attorney’s fees incurred in defending against same, arising from and related to implementation of the approved traffic control plans including claims arising from towing of private vehicles and the acts of the Permit Holder’s agents and employees. The City of Renton shall be entitled, in its reasonable discretion, to settle claims prior to suit or judgment, and in such event shall indemnify and hold harmless the City for any such claims paid, including the City’s reasonable attorney’s fees and litigation costs incurred resulting from such claim. In the event any claim or suit is brought against City within the scope of this Agreement, Permit Holder will pay for legal counsel chosen by the City to defend against same. Flagger and sign placement are subject to revision by the City Inspector on site, if needed to address traffic or pedestrian safety or travel. All permit conditions shall be met. NOTES: Total road closure lasting more than twenty-four (24) hours is subject to the approval by the City Council. Work Zone Traffic Control shall be in accordance with the Manual on Uniform Traffic Control Devices (MUTCD) and shown by a traffic control plan layout or reference to WSDOT. Approved Temporary Traffic Control Plan must be at the work site during work hours. Complete assistance and accommodation shall be provided to all kinds of pedestrian traffic when sidewalk or walkway is impeded to safely redirect pedestrians around a work zone. Signage shall be used to warn motorcyclists/bicyclists of the potential hazards on any uneven surfaced or slippery road conditions during work and non-work hours. Any vehicle, equipment, barricade, or portable tow-away sign used within the work area must display a company logo or any legally acceptable sign showing the company name, address, and telephone number at a conspicuous place on the vehicle or equipment. Note: The Applicant is responsible for compliance with all codes and regulations, whether or not described in this document. Page 3 of 3 | Published: 10/27/2021 In the case of Temporary No Parking Zones, all the following apply in addition to previous: Contractor must complete form to show limits of Temporary No Parking Zone identifying barricade locations for vacate parking or curb lane usage. Contractor must post notice of dates and time of Temporary No Parking Zone with at least two signs per block seventy-two (72) hours in advance of effective date and time. The cover sheet of this Traffic Control Plan form must be attached to each Temporary No Parking Sign on the project site. Temporary traffic control devices must be removed immediately when work is done or no construction activities are going on. If deemed abandoned, City crews will remove and store them at the City’s maintenance shop (3555 NE 2nd Street). I certify that the information on this application and within the submittal documents are accurate to the best of my knowledge and I acknowledge all the requirements on this application. Applicant’s Signature Date Applicant’s Name (Print) CORRIE RYDBERG RR RR RR HOUSER WAY NHOUS E R W A Y N HOUSER WAY NCE D A R R I V E R P A R K D R1010 1 4 1 4 11 11 11 11 11111111 M6-2LIBERTY PARK WILL BE INFORMED OF POSSIBLE TEMPORARY DRIVEWAY CLOSURE R O A D W O R K A H E A D W20-1100'100'100'W4-2RLEF T L A N E CLO S E D AH E A DW20-5LROADWORKAHEADW20-1100' THE CREW SHALL CEASE WORK FOR A FLAGGER/SPOTTER TO ESCORT PEDESTRIANS AROUND THE WORK AREA CHANNELIZATION DEVICE SPACING MPH 55/70 35/45 25/30 TAPER 40 30 20 TANGENT 80 60 40 N RESTORATION TRAFFIC CONTROL PLANPuget Sound Energy Traffic Control Supervisor: Gregory Harwood Card No. 012238 Card Exp. 09/30/2023 gregory.harwood@pse.com (425)424-6425 PSE PUGETSOUNDENERGY -OB101134714 1414 HOUSER WAY N, RENTON 01/15/2021 FLAVIANA.NUNES@PSE.COM 425-424-7809 SHEET 1 of 1 RESTORATION AREA 28" TRAFFIC CONE LEGEND TRAFFIC FLOW SIGN LOCATION WORK VEHICLE/ FLASHING LIGHTS RIGHT OF WAY Notes: 1. All signs and spacing to conform to the MUTCD and Renton standards. 2. All sidewalks, driveways, exits and egresses shall be completely clear unless otherwise indicated. 3. Channelizing devices are 28" traffic cones. Use traffic drums (barrels) with steady burning Type C lights on all State State Routes and Hwys. 4. Sign size can be a minimum of 30" x 30" and shall not obstruct pedestrian access. 5. Crew is required to leave a minimum of 11' for traveling lane width. 6. Alert affected residents and businesses. 7. Work to take place between 9 a.m. and 4 p.m unless otherwise specified. All work for arterials and major roadways will be from 9 a.m. to 3 p.m. MFP22006137 HOUSER WAY NAØ10778BØ10779CØ10780 (105017412) 300kVA 277/480v 336.4 MCMACSR336.4 MCMACSRABC ABC GPS GPS GPS GPS D 317938-166213 317917-166234 317922-166267 317909-166262T18/15 AØ10778BØ10779CØ10780 D2305E088, R2305E066SE, A2305E066No gas grid information available The information on the attached maps is subject to change without notice. Puget Sound Energy makes no warranty, expressed or implied, concerningthe suitability of this information for any purpose. Recipient agrees to not disclose this confidential information to any other person or entity,unless authorized in writing by Puget Sound Energy. This map is not to be used for determining the actual location of any PSE facilities (call 811).“ 12-15-2020 Scale 1:675 Lat\Long=47.483, -122.1995 P01 V01 11729755/101134714/108125240 ADDRESS: 1101 BRONSON WAY N RENTON P01 317909-166262 TO V01 317917-166234 -LINE CREW TO PULL 3 PHASE 1/0 UG PRIMARY INTO 4" DB120 CONDUIT. *CONDUIT IS IN READY FOR WIRE. NEED: FLAGGING EMERGENCY PERMIT RENTON MFP22006137 CONFIRMING WORKSKETCH FROM TO 10778 10631767 317917- 166234 317909- 166262 274 N/A N/A YES 10779 UNKNOWN 317917- 166234 317909- 166262 274 YES 10780 UNKNOWN 317917- 166234 317909- 166262 274 YES 274 COUNTY Emer Sect Gas Wk Ctr POWER WK CTR 1/4 SEC OP MAP PLAT MAP APPROVED BY FOREMAN #1 U-MAP NO (POWER)OH Ckt Map UG Ckt Map CIRCUIT NO FOREMAN #2 2305E088 2305E066SE Incident #MAOP: Gas Order Page 1 /1 USE UMAP FROM "MAPVIEWER" ONLY SAP W.O. 101134714SITE NOTES: LOCATIONS CABLE (LF) EST EXISTING CABLE MFG NAME NEW CABLE NUMBER PULL IN 274' NEW RUN UG CABLE EIC795, EIC796, EIC797 FROM VAULT 317917-166234 TO POLE 317909-166262. ABANDONED OLD CABLES AT THEIR LOCATION -APPROX 35FT FROM C/L EIC795-A THIS SKETCH NOT TO BE RELIED UPON FOR EXACT LOCATION OF FACILITIES TOTAL CIRCUIT FEET ABANDONED / REMOVE / REPLACED CABLE CABLE NO EIC796-B EIC797-C CABLE REPLACED? EXISTING CABLE MFG DATE SAP EQUIP 4/1/2021 PERMIT JURISDICTION NA DATEFUNCTIONNAMEPHONE NO KING QCSOKE CHECKED BY DRAWN BY S HENDERSON 1414 HOUSER WAY N, RENTON 101134714 CREW2 O#657836 Elect Order KRAMER 12/15/2020 2305E066 GRA-17 MAPPING MFP22006137 RESTORATION PER CITY OF RENTON STANDARDS