Loading...
HomeMy WebLinkAboutD_Duvall_Office_FINALDEPARTMENT OF COMMUNITY AND ECONOMIC DEVELOPMENT Project Location Map D_Duvall_Office_FINAL A.ADMINISTRATIVE MODIFICATION REPORT & DECISION Decision: APPROVED APPROVED SUBJECT TO CONDITIONS DENIED Report Date: December 12, 2022 Project File Number: PR19-000471 Project Name: Duvall and 17th LLC Office Land Use File Number: LUA22-000374, ECF, MOD Project Manager: Jill Ding, Senior Planner Owner: 1625 Duvall Realty Investors LLC, 15309 SE 49th Pl, Bellevue, WA 98006 Applicant: Kevin Broderick, Broderick Architects, 55 S Atlantic St, Suite 301, Seattle, WA 98134 Contact: Shawn Keenan, Broderick Architects, 55 S Atlantic St, Suite 301, Seattle, WA 98134 Project Location: 1625 Duvall Ave NE, Renton, WA 98059 Project Summary: The applicant is requesting a Minor Site Plan Modification and Environmental (SEPA) Review for a 3,155 sq. ft. general office building (249 sq. ft. ground floor plus 2,906 sq. ft. upper floor) and 12 parking spaces. The proposal would modify the previously approved Site Plan, Environmental (SEPA) Review, two (2) street standards Modifications, and a refuse and recycling Modification (LUA19-000300) for the Duvall and 17th Dental Office. The proposed changes include an increase in the upper floor building footprint from 2,647 sq. ft. to 2,906 sq. ft., an increase of 259 sq. ft. or 7%. The proposal would result in an increase in building lot coverage, from 2,982 sq. ft. to 3,233 sq. ft., an increase of 251 SF or 8%. The proposal would also result in a decrease in impervious surface coverage, from 5,587 sq. ft. to 4,944 sq. ft., a decrease of 643 sq. ft. or 9%. In addition, a reduction in the 15-foot setback required along NE 17th Street has been requested, the proposed setback would be 0 feet. The project site totals 8,417 square feet and is located within the Commercial Arterial (CA) zoning designation and Urban Design District D. An existing building is proposed for removal. Access to the site is proposed via driveway access off of NE 17th St. Frontage improvements including curb and gutter, a landscape strip and sidewalk are proposed along the site's Duvall Ave NE and NE 17th St street frontages in accordance with the previously approved street standards modification. Sensitive Slopes are mapped on the project site. Site Area: 0.19 acres DocuSign Envelope ID: A9DF7815-B3DD-446A-A307-4426D38E96D5 City of Renton Department of Community & Economic Development Duvall and 17th LLC Office Administrative Modification Report & Decision LUA22-000374, ECF, MOD Report of December 12, 2022 Page 2 of 8 D_Duvall_Office_FINAL B.EXHIBITS: Exhibits 1-12 ERC Report and Exhibits Exhibit 13: Administrative Modification Decision Exhibit 14: LUA19-000300 Hearing Examiner Decision Exhibit 15: Project Narrative Exhibit 16: Comment Email from the Duwamish Tribe and City Response Exhibit 17: Extension of Site Plan Approval C.FINDINGS OF FACT (FOF): 1.The Planning Division of the City of Renton accepted the above master application for review on November 2, 2022 and determined the application complete on November 7, 2022. The project complies with the 120-day review period. 2.The applicant’s submittal materials comply with the requirements necessary to process the modification request (Exhibits 1-16). 3.The previous site plan approval and modificationsapproved under LUA19-000300 are adopted as a part of this decision. An extension of the original site plan approval was granted on August 12, 2022 (Exhibit 17). Additional analysis below is provided for the requested setback reduction and compliance with the Tree Retention Regulations, as changes to these regulations were adopted after the approval of the original Duvall and 17th LLC Dental Office and a complete building permit application had not been received. 4.The project site is located at 1625 Duvall Ave NE, Renton, WA 98059. 5.The subject property is currently developed with an existing residence, which was converted to an office, and is proposed for removal. 6.Access to the site would be provided via a curb cut off of NE 17th St. 7.The property is located within the Commercial Mixed-Use (CMU) Comprehensive Plan land use designation. 8.The site is located within the Commercial Arterial (CA) zoning classification. 9.There are no trees on the project site. There are three (3) off-site Douglas Firs located to the west of the property line, which are proposed to be protected. There are three (3) off-site Douglas Firs located on the neighboring lot south of the property line which are proposed to be removed as a result of excavations for the new building. 10.The site is mapped with sensitive slopes. 11.The applicant is proposing to begin construction in May 2023 and end in December 2023. 12.Comments were received from the Duwamish Tribe (Exhibit 16) during the 14-day public comment period. No other public or agency comments were received. 13.Pursuant to the City of Renton's Environmental Ordinance and SEPA (RCW 43.21C, 1971 as amended), on December 12, 2022 the Environmental Review Committee issued a Determination of Non-Significance (DNS) for the Duvall and 17th LLC Office (Exhibit 1). A 14-day appeal period commenced on December 12, 2022 and ends on December 28, 2022. No appeals of the threshold determination have been filed as of the date of this report. DocuSign Envelope ID: A9DF7815-B3DD-446A-A307-4426D38E96D5 City of Renton Department of Community & Economic Development Duvall and 17th LLC Office Administrative Modification Report & Decision LUA22-000374, ECF, MOD Report of December 12, 2022 Page 3 of 8 D_Duvall_Office_FINAL 14.Representatives from various city departments have reviewed the application materials to identify and address issues raised by the proposed development. These comments are contained in the official file, and the essence of the comments has been incorporated into the appropriate sections of this report and the Departmental Recommendation at the end of this report. 15.Zoning Development Standard Compliance: The purpose of the Commercial Arterial Zone (CA) is to evolve from “strip commercial” linear business districts to business areas characterized by enhanced site planning and pedestrian orientation, incorporating efficient parking lot design, coordinated access, amenities and boulevard treatment with greater densities. The CA Zone provides for a wide variety of retail sales, services, and other commercial activities along high-volume traffic corridors. Residential uses may be integrated into the zone through mixed-use buildings. The zone includes the designated Automall District. The proposal is compliant with the following development standards, as outlined in RMC 4 -2- 120.A, if all conditions of approval are met: Compliance CA Zone Develop Standards and Analysis Compliant if condition of approval is met Setbacks: The minimum front yard setback is 15 ft. The minimum setback may be reduced to 0 ft. through the site plan review process, provided blank walls are not located within the reduced setback. A maximum front yard setback of 20 ft. is required. The minimum secondary front yard setback is 15 ft. The maximum secondary front yard setback is 20 feet. There are no minimum side or rear yard setbacks, except 15 ft. if the lot abuts or is adjacent to a lot zoned residential. The minimum front yard or secondary front yard setback may be modified through the site plan review process if it can be demonstrated to the Administrator’s satisfaction that the following criteria are met: i.The perceived scale of the proposed structure that is created by the reduced setback is compatible with the abutting structures and the surrounding neighborhood; and ii.The required street frontage landscaping identified in RMC 4-4-070F1 is increased to fifteen feet (15') along all public street frontages with the exception of walkways, driveways, programmed pedestrian plazas, and the area of reduced setback; and iii.Enhanced landscaping, such as increased caliper size of trees, increased container size of shrubs, and/or increased quantity or diversity of plantings, is provided within the public right-of-way on the street frontage abutting the reduced setback; and iv.The project includes a public art installation, subject to review and approval, with a minimum monetary value of one percent (1%) of the assessed value of the proposed structure, or when the Administrator determines that it is impractical to install public art on site, payment of a fee-in-lieu may be approved in an amount of money approximating one percent (1%) of the assessed value of the proposed structure; and v.The design of the proposed structure complies with all of the following requirements: a)Back of house facilities such as walk-in freezers, bathrooms, breakrooms, storage rooms, or other rooms that do not contain windows, are not located along any building facade that fronts a public street; and DocuSign Envelope ID: A9DF7815-B3DD-446A-A307-4426D38E96D5 City of Renton Department of Community & Economic Development Duvall and 17th LLC Office Administrative Modification Report & Decision LUA22-000374, ECF, MOD Report of December 12, 2022 Page 4 of 8 D_Duvall_Office_FINAL b)Floor to ceiling transparent windows are provided for at least fifty percent (50%) of the ground floor building facade that fronts a reduced setback; and c)The proposed structure includes design features such as step-backs of upper levels, changes in roof plane, and changes in roof form/slope in a manner that serves to reduce the apparent bulk of the proposed structure; and d)Canopies or similar design features are provided along any building facade that fronts a public street, with emphasis provided to the primary entry; and e)Structured parking is not located along any building facade that fronts a reduced setback. Staff Comment: The proposed office building would provide the required 15-foot front yard setback from Duvall Ave NE; a minimum one and one-half foot(1 ½’) setback is proposed between the new building and the south property line; a 15-foot setback is proposed along the west property line where the site abuts a residential zone; and a 0- foot to 11-foot secondary front yard setback is proposed along the north property line (along NE 17th St). The portion of the building within the 15-foot setback include modulations, a vehicular opening for the structured parking as well as variations in building materials. In addition, landscaping is proposed between the building and public right-of-way to provide additional interest. As part of the previous site plan approval (LUA19-000300), a street frontage modification was approved to relocate three (3) feet of the eight (8) foot wide right-of-way landscape strip between the sidewalk and proposed building along NE 17th St, providing a three (3)-foot landscaped buffer between the sidewalk and new building. An updated Conceptual Landscape Plan (Exhibit 4) was included with the site plan modification application materials. According to the submitted site plan, the landscaped area between the building and sidewalk along NE 17th where the zero (0) foot setback is requested is proposed to be planted within Thuja occidentalis ‘emerald green’, which is an evergreen tree. Street frontage landscaping has been maximized at the west end of the site extending all along the west elevation going south. In addition, approximately 25 feet of landscaped area is provided along Duvall Ave NE and landscape plantings are maximized throughout. The applicant has indicated that space would be provided for installation of art approved by the City at a minimum value of one percent (1%) of the assessed value of the proposed building, however a detail regarding the proposed art was not submitted with the application materials. Staff recommends as a condition of approval, that the project include a public art installation, subject to review and approval by the Current Planning Project Manager prior to the issuance of a building permit, with a minimum monetary value of one percent (1%) of the assessed value of the proposed structure, or when it has been determined that it is impractical to install public art on site, payment of a fee-in-lieu may be approved in an amount of money approximating one percent (1%) of the assessed value of the proposed structure. The art installation shall be completed prior to the issuance of a Certificate of Occupancy for the new building or as otherwise determined by the Current Planning Project Manager. Floor to ceiling (head height of 8’-0” and sill of 10”) glazing has been provided for 24.3’ of the 60’ or 41% of the north elevation at the proposed reduced setback. Although this DocuSign Envelope ID: A9DF7815-B3DD-446A-A307-4426D38E96D5 City of Renton Department of Community & Economic Development Duvall and 17th LLC Office Administrative Modification Report & Decision LUA22-000374, ECF, MOD Report of December 12, 2022 Page 5 of 8 D_Duvall_Office_FINAL would be less than the required 50%, the glazing proposed exceeds minimum glazing requirements in that they provide operability at the transom for the building users. Glazing has been maximized per the proposed office layout along NE 17th Street. The windows closest to the north elevation on the west and east facades have been made to be floor to ceiling as well to maximize the glazing viewed from the exterior along NE 17th Street. ✓ Tree Retention: The City’s adopted Tree Retention and Land Clearing Regulations (4-4- 130) require the retention of 30 percent of trees in a commercial development. Tree credit requirements shall apply at a minimum rate of thirty (30) credits per net acre. Significant trees shall be retained in the following priority order: Priority One: Landmark trees; significant trees that form a continuous canopy; significant trees on slopes greater than twenty percent (20%); significant trees adjacent to critical areas and their associated buffers; and significant trees over sixty feet (60') in height or greater than eighteen inches ( 18") caliper. Priority Two: Healthy tree groupings whose associated undergrowth can be preserved; other significant native evergreen or deciduous trees; and other significant non-native trees. Priority Three: Alders and cottonwoods shall be retained when all other trees have been evaluated for retention and are not able to be retained, unless the alders and/ or cottonwoods are used as part of an approved enhancement project within a critical area or its buffer. Staff Comment: There are no existing onsite significant trees, therefore, the thirty percent (30%) retention requirement does not apply to the project site. The proposal would be subject to the minimum tree credit requirements of 30 tree credits per net acre. Based on a site area of 0.19 acres, the project site would be required to provide 5.7 tree credits. The submitted conceptual landscape plan (Exhibit 4) included a tree credit calculation. The applicant is proposing to plant eight (8) small trees with a tree credit value of 0.25 credits per tree for a total tree credit of two (2), and nine (9) large trees with a tree credit value of two (2) credits per trees for a total tree credit of eighteen (18). The proposal for 20 total tree credits would exceed the minimum 5.7 tree credits required. 16.Site Plan Modification Analysis: The applicant is requesting a site plan modification in order to increase the upper floor building footprint from 2,647 sq. ft. to 2,906 sq. ft., an increase of 259 sq. ft. or 7%. The proposal would result in an increase in building lot coverage, from 2,982 sq. ft. to 3,233 sq. ft., an increase of 251 SF or 8%. The proposal would also result in a decrease in impervious surface coverage, from 5,587 sq. ft. to 4,944 sq. ft., a decrease of 643 sq. ft. or 9%. The proposal is compliant with the following modification criteria, pursuant to RMC 4-9-200.H.2, if all conditions of approval are met. Therefore, staff is recommending approval of the requested modification, subject to conditions as noted below: Compliance Modification Criteria and Analysis ✓ a.Involve more than a ten percent (10%) increase or decrease in any measurable aspect of the approved plan such as, but not limited to, area, scale, building height, density, commercial area, amenities, public or private open space, landscaping, parking spaces, building materials (e.g., glazing), etc.; Staff Comment: The proposed changes include an increase in the upper floor building footprint from 2,647 sq. ft. to 2,906 sq. ft., an increase of 259 sq. ft. or 7%. The proposal DocuSign Envelope ID: A9DF7815-B3DD-446A-A307-4426D38E96D5 City of Renton Department of Community & Economic Development Duvall and 17th LLC Office Administrative Modification Report & Decision LUA22-000374, ECF, MOD Report of December 12, 2022 Page 6 of 8 D_Duvall_Office_FINAL would result in an increase in building lot coverage, from 2,982 sq. ft. to 3,233 sq. ft., an increase of 251 SF or 8%. The proposal would also result in a decrease in impervious surface coverage, from 5,587 sq. ft. to 4,944 sq. ft., a decrease of 643 sq. ft. or 9%. The proposal would not include a ten percent (10%) increase in any measurable aspe ct of the approved plan. ✓ b. Have a significantly greater impact on the environment and/or public facilities than the approved plan; or Staff Comment: The proposed changes are minor and would not have a significantly greater impact on the environment and/or public facilities. The City’s Environmental Review Committee is a Determination of Non-significance on December 12, 2022, that identified mitigation was unnecessary the proposed modification. ✓ c. Change the boundaries of the originally approved plan; and Staff Comment: The proposed changes would not change the boundaries of the originally approved plan. ✓ d.Substantially alter a key feature of the approved plan. Staff Comment: Key features, which are integral to this project include structured parking below the building, landscaping, seat walls, benches, sconce lighting, and the trellis features along the facade. The proposed changes would not substantially alter a key feature of the approved plan. D.DECISION: The proposal satisfies four of the four criteria listed in RMC 4-9-200H for the approval of a minor site plan modification. Therefore, the Duvall and 17th LLC Office Minor Site Plan Modification, File No. LUA22-000374, ECF, MOD, is approved and is subject to the following conditions: 1.The project shall include a public art installation, subject to review and approval by the Current Planning Project Manager prior to the issuance of a building permit, with a minimum monetary value of one percent (1%) of the assessed value of the proposed structure, or when it has been determined that it is impractical to install public art on site, payment of a fee-in-lieu may be approved in an amount of money approximating one percent (1%) of the assessed value of the proposed structure. The are installation shall be completed prior to the issuance of a Certificate of Occupancy for the new building. 2.Project conditions from February 20, 2020 Hearing Examiner decision (Exhibit 14) have not been altered as part of this minor modification and remain in full effect. DATE OF DECISION ON LAND USE ACTION: SIGNATURE: Vanessa Dolbee, Planning Director Date DocuSign Envelope ID: A9DF7815-B3DD-446A-A307-4426D38E96D5 12/12/2022 | 4:45 PM PST City of Renton Department of Community & Economic Development Duvall and 17th LLC Office Administrative Modification Report & Decision LUA22-000374, ECF, MOD Report of December 12, 2022 Page 7 of 8 D_Duvall_Office_FINAL TRANSMITTED on December 12, 2022 to the Owner/Applicant/Contact: Owner: Applicant: Contact: 1625 Duvall Realty Investors LLC 15309 SE 49th Pl Bellevue, WA 98006 Kevin Broderick Broderick Architects 55 S Atlantic St, suite 301 Seattle, WA 98134 Shawn Keenan Broderick Architects 55 S Atlantic St, suite 301 Seattle, WA 98134 TRANSMITTED on December 12, 2022 to the Parties of Record: Duwamish Tribe preservationdept@duwamishtribe.org Jerry Jackson JerryJWJ@Gmail.com TRANSMITTED on December 12, 2022 to the following: Chip Vincent, CED Administrator Brianne Bannwarth, Development Engineering Director Amanda Askren, Acting Economic Development Director Matt Herrera, Current Planning Manager Anjela Barton, Fire Marshal E.LAND USE ACTION APPEALS, REQUEST FOR RECONSIDERATION, & EXPIRATION: The administrative land use decision will become final if the decision is not appealed within 14 days of the decision date. APPEAL: This administrative land use decision will become final if not appealed in writing to the Hearing Examiner on or before 5:00 PM on December 28, 2022. An appeal of the decision must be filed within the 14- day appeal period (RCW 43.21.C.075(3); WAC 197-11-680). Appeals must be submitted electronically to the City Clerk at cityclerk@rentonwa.gov or delivered to City Hall 1st floor Lobby Hub Monday through Friday. The appeal fee, normally due at the time an appeal is submitted, will be collected at a future date if your appeal is submitted electronically. The appeal submitted in person may be paid on the first floor in our Finance Department. Appeals to the Hearing Examiner are governed by RMC 4-8-110 and additional information regarding the appeal process may be obtained from the City Clerk’s Office, cityclerk@rentonwa.gov. EXPIRATION: The Modification decision will expire on August 20, 2024 per the Extension of Site Plan Approval (Exhibit 17). RECONSIDERATION: Within 14 days of the decision date, any party may request that the decision be reopened by the approval body. The approval body may modify his decision if material evidence not readily discoverable prior to the original decision is found or if he finds there was misrepresentation of fact. After review of the reconsideration request, if the approval body finds sufficient evidence to amend the original decision, there will be no further extension of the appeal period. Any person wishing to take further action must file a formal appeal within the 14-day appeal time frame. THE APPEARANCE OF FAIRNESS DOCTRINE: provides that no ex parte (private one-on-one) communications may occur concerning the land use decision. The Doctrine applies not only to the initial decision, but to Appeals to the Hearing Examiner as well. All communications after the decision/approval date must be made in writing through DocuSign Envelope ID: A9DF7815-B3DD-446A-A307-4426D38E96D5 City of Renton Department of Community & Economic Development Duvall and 17th LLC Office Administrative Modification Report & Decision LUA22-000374, ECF, MOD Report of December 12, 2022 Page 8 of 8 D_Duvall_Office_FINAL the Hearing Examiner. All communications are public record and this permits all interested parties to know the contents of the communication and would allow them to openly rebut the evidence in writing. Any violation of this doctrine could result in the invalidation of the appeal by the Court. DocuSign Envelope ID: A9DF7815-B3DD-446A-A307-4426D38E96D5 CITY OF RENTON DEPARTMENT OF COMMUNITY AND ECONOMIC DEVELOPMENT ADMINISTRATIVE MODIFICATION REPORT & DECISION EXHIBITS Project Name: Duvall and 17th LLC Office Land Use File Number: LUA22-000374, ECF, MOD Date of Report December 12, 2022 Staff Contact Jill Ding Senior Planner Project Contact/Applicant Shawn Keenan Broderick Architects 55 S Atlantic St, Suite 301, Seattle, WA 98134 Project Location 1625 Duvall Ave NE, Renton, WA 98059 The following exhibits are included with the Administrative Modification Report: Exhibits 1-12: ERC Report and Exhibits Exhibit 13: Administrative Modification Decision Exhibit 14: LUA19-000300 Hearing Examiner Decision Exhibit 15: Project Narrative Exhibit 16: Comment Email from the Duwamish Tribe and City Response Exhibit 17: Extension of Site Plan Approval DocuSign Envelope ID: A9DF7815-B3DD-446A-A307-4426D38E96D5