Loading...
HomeMy WebLinkAbout11City of Renton Pk3/PW Departrnen! Idministrative Site Plan Approval & Environmt l Review Committee Staff Report WIZARDS CHILD CARE CENTER _ LUA-00-019, SA -A, ECF REPORT .AND DECISION OF MARCH 7, 2000 Page 3 of 8 Two small portions of the developed site, one in the northwest corner and one along the center of the north property line, are designated as flood hazard zones. The proposal would not include any alterations or construction within these areas. Therefore, no significant adverse flood impacts from the project are anticipated. Due to the site's impervious surface, excavated or stockpiled materials could erode and potentially impact the existing storm water systems on and near the site. In order to mitigate potential erosion impacts from the proposed development, staff reco,nmends the applicant be required to install and maintain temporary erosion control measures to the satisfaction of the representative of the Development Services Division for the duration of the project. Mitication Measures: Temporary Erosion Control shall be installed and maintained to the satisfaction of ',he representative of the Development Services Division for the duration of the project Nexus: Environmental Ordinance (SEPA), Mining, Excavation and Grading Ordinance Transportation Impacts: The proposal would result in an increase in traffic trips and is, therefore, subject to the City's Traffic Mitigation Fee. The Traffic Mitigation Fee is calculated at a rate of $75 per net new average daily trip associated with the project. The fee for this proposal is estimated at $3,750.00 (Phase I - 28 trips x $75 = $1,950.00/Phase li — 24 trips x $75 = $1,800.00). The fee is payable prior to the issuance of building permits. ""itiaation Measures: The applicant shall pay the applicable Traffic Mitigation Fee at a rate of $75 per each net new average daily trip associated with the project. The Traffic Mitigation Fee is payable prior to the issuance of building permits. Policy Nexus: Environmental Ordinance (SEPA), Transportation Mitigation Fee Resolution and adopting ordinance. B. Recommendation Based on analysis of probable impacts from the proposal, staff recommends that the Responsible Officials mace the following Environmental Determination: Determination of Determination of Non -Significance XX Non - Significance - Mitigated. Issue DNS with 14 day Appeal Period. Issue DNS-M with 14 day Appeal XX Period. C. Mitigation Measures Temporary Erosion Control shall be installed and maintained to the satisfaction of the representative of the Development Services Division for the duration of the project. 2. The applicant shall pay the applicable Traffic Mitigation Fee at a rate of $75 per each net new average daily trip associated with the project. The Traffic Mitigation Fee is payable prior to the issuance of building permits. sarpt