HomeMy WebLinkAbout36TRANSPORTATION 04
1. A Traffic Mitigation Fee of $75.00 per Additional Average Gaily Trip shall be assessed.
The SEPA checklist states Phase 1 shall generate 26 daily trips for a fee of $1950. The
same checklist states Phase 2 shall generate 24 daily trips for a fee of $1800. Total traffic
mitigation fee for the entire project is $3750.
PLAN REVIEW - GENERAL
1. All plans shall conform to the Renton Drafting Standards.
2. A construction permit may be required if utility relocation work is necessary. If needed
three copies of the drawings, two copies of the drainage report, a construction estimate,
application and appropriate fee shall be submitted to the sixth floor counter of Renton City
Hall.
RECOMMENDED CONDITIONS
1. Tem.porary Erosion Control Measures shall be installed and maintained to the satisfaction
of the representative of the Development Services Division for the duration of the project.
CC: Neil Watts
WIZARDS GF