Loading...
HomeMy WebLinkAbout10the WORKS Fa� Community Design Works, Inc. CONSTRUCTION MITIGATION DESCRIPTION Wizards of the Coast Child Care Center Feb. 8, 2000 • Construction is proposed to start by approximately April 24, 2000 and to be completed by approximately August 24, 2000. • Construction is expected to occur during typical weekday business hours. Occasional construction on weekend days may 0ccl.1r, but is not expected at this time. • Hauling and transportation routes will primarily access the site from the west, via Raymond Avenue S.W., into the backside of the site. Access from the east, via Lind Avenue S.W. will be discouraged, although some may occur given the curb cuts along the east property line are the primary entries to the office campus. • After existing vegetation is cleared from underlying soils, during excavation for new retaining wall footings, and while importing and placing soil needed to raise grades for new outdoor play areas, the affected areas of the site will be sprinkled with water to minimize fugitive dust. Dust resulting from exposed sails will be minimized by employing temporary ground cover, or temporary stabilization measures such as seeding, mulching or matting, per the General Contractor's preference. • Traffic and transportation impacts are not expected to be noticeable, given the small scale of the project. The various trades arriving at the site in the morning and leaving at the end of the day will create all of the traffic impacts. Trades will be staggered according to their scheduling during construction - not all trades will be on site at any one time. Since the interior tenant improvement build -out is less than 4,000 square feet, only a few workers in any one trade will be on site at one time. The greatest traffic impact will be from trucks bringing imported soils to the site. These trucks will be routed into the site from the west and all necessary filling will occur within 3 — 4 days. • The only potential erosion will occur during the limited time that soils are exposed and, given the context, will only occur over the surface of the existing parking lot, towards the existing catch basins. In order to limit the transportation of sediment, the areas of the site to be excavated and filled will be completely surrounded by a straw bale barrier. In addition, the appropriate catch basins in the vicinity will be outfitted with storm drain inlet protection such as a filter fabric fence, a concrete block and gravel filter, a gravel and wire mesh filter, or a straw bale barrier, per the General Contractor's preference. • Noise impacts are only expected to affect people working in spaces adjacent to the tenant improvement, within the Wizards of the Coast office campus, and are not expected to impact adjacent sites. • Occasional cor istruction on weekend days may occur, but is not planned for at this time. • Construction -related traffic will be directed to access the project from the back of the site, via Raymond Avenue S.W. 402 15th Avenue East Seattle WA 98112-4599 206 328 7664 206 329 5494 fax works@eworks.org