Loading...
HomeMy WebLinkAbout26Environmental Checklist 10) thence southwesterly along said curve, through a central angle of 88 50'43" an arc length of 85 28 feet to the south line of said Lot 4; thence south 89 49'01" east along said south line 19.60 feet to the true point of beginning. Site Plan and Vicinity Map (Neighborhood Detail Map) included with Environmental and Site Plan Reviews submittals. B. ENVIRONMENTAL ELEMENTS 1. Earth: a. General description of the site (circle one): r a , rolling, hilly, steep slopes, mountainous. other- b. What is the steepest slope on the site (approximate percent slope)? The site is basically flat. A landscaped berm surrounds and separates the office buildings from the parking lots. The berms are sloped at 13%, average. C. What general types of soils are found on the site (for example, clay, sand, gravel, peat, muck)? If you know the classification of agricultural soils, specify them and note any prime farmland. Unknown. d. Are there surface indications or history of unstable soils in the immediate vicinity? If so, describe. The existing office buildings' foundations consist of friction type timber piles and a structural concrete slab, which indicates that native surface soils were inadequate to .support the structures. More than, this is not known at this time. e. Describe the purpose, type, and approximate quantities of an fillip or grading proposed, indicate source of fill. y g The purpose of the proposed filling in Phases / and // is to construct level play areas adjacent to new classrooms inside the existing building. Fill will consist of on -site excavated materials where possible and imported structural fill from approved quarry source as supplement. Phase 1 quantity of proposed excavation is 20.59 cubic yards. Quantities of proposed fill are 20.59 cubic yards of native material and 258.41 cubic yards of imported fill for a total of 279 cubic yards. There will be 0 cubic yards of native material to be disposed of. Phase lI quantity of proposed excavation is 14.9 cubic yards. Quantities of proposed fill are 14.9 cubic yards of native material and 320.1 cubic yards of imported fill for a total of 335 cubic yards. Therz will be 0 cubic yards cf native material to be disposed of. Could erosion occur as a result of clearing, construction, or use? If so, generally describe. Yes, temporary and very isolated erosion could occur in both Phases I and ll, after exterior areas are cleared of existing vegetation, in preparation for construction of new outdoor play areas. Page 3