Loading...
HomeMy WebLinkAbout27Environmental Checklist g. About what percent of the site will be covered with impervious surfaces after project construction (for example, asphalt or buildings)? After Phase 1. 83% After Phase Il 83.76 h. Proposed measures to reduce or control erosion, or other impacts to the earth, if any: Erosion control measures will be implemented to meet or exceed methods described in, the Construction Best Management Practices Manual. See Construction Mitigation Description. I Air: a. What type of emissions to the air would result from the proposal (i.e., dust, automobile, odors, industrial wood smoke) during construction and when the project is completed? If any, generally describe and give approximate quantities if known. Standard construction emissions, e.g. dust, from typical interior tenant improvement build -out and from raising existing grade adjacent to building. No emissions expected once the project is completed. b. Are there any off -site sources of emissions or odor that may affect your proposal? If any, generally describe. No C. Proposed measures to reduce or control emissions or other impacts to air, if any: Fugitive dust from site grading work will be minimized by sprinklerirg affected areas with water. Areas of temporarily exposed soils will be covered with temporary ground cover, or temporary stabilization measures such as seeding, mulching or matting. 3. Water: a. surface Water: i) Is there any surface water body on or in the immediate vicinity of the site (including year-round and seasonal streams, saltwater, lakes, ponds, wetlands)? If yes, describe type and provide names. If appropriate, state what stream or river it flows into. Springbrook Creek runs north -south, approximately 400 feet west of the project site. The SW 19" Street surface drainage system runs east -west approximately 80 feet south of the project site's south property line, and approximately 200 feet south of the actual Phase I project location within the project site. 2) Will the project require any work over, in, or adjacent to (within 200 feet) the described waters. If yes, please describe and attach available plans. The southern edge of the new outdoor play areas in Phase I is approximately 200 feet from the SW 19" Street surface drainage system. See Site Plan, Sheet A1.1. There are no areas of work within 200 feet of the described waters for Phase Il. Page 4