g. About what percent of the site will be covered with impervious surfaces
after project construction (for example, asphalt or buildings)?
After Phase 1. 83%
After Phase Il 83.76
h. Proposed measures to reduce or control erosion, or other impacts to the
earth, if any:
Erosion control measures will be implemented to meet or exceed
methods described in, the Construction Best Management Practices
Manual. See Construction Mitigation Description.
I Air:
a. What type of emissions to the air would result from the proposal (i.e.,
dust, automobile, odors, industrial wood smoke) during construction and
when the project is completed? If any, generally describe and give
approximate quantities if known.
Standard construction emissions, e.g. dust, from typical interior tenant
improvement build -out and from raising existing grade adjacent to
building. No emissions expected once the project is completed.
b. Are there any off -site sources of emissions or odor that may affect your
proposal? If any, generally describe.
No
C. Proposed measures to reduce or control emissions or other impacts to
air, if any:
Fugitive dust from site grading work will be minimized by sprinklerirg
affected areas with water. Areas of temporarily exposed soils will be
covered with temporary ground cover, or temporary stabilization
measures such as seeding, mulching or matting.
3. Water:
a. surface Water:
i) Is there any surface water body on or in the immediate vicinity of the site
(including year-round and seasonal streams, saltwater, lakes, ponds,
wetlands)? If yes, describe type and provide names. If appropriate, state
what stream or river it flows into.
Springbrook Creek runs north -south, approximately 400 feet west of the
project site. The SW 19" Street surface drainage system runs east -west
approximately 80 feet south of the project site's south property line, and
approximately 200 feet south of the actual Phase I project location within
the project site.
2) Will the project require any work over, in, or adjacent to (within 200 feet)
the described waters. If yes, please describe and attach available plans.
The southern edge of the new outdoor play areas in Phase I is
approximately 200 feet from the SW 19" Street surface drainage system.
See Site Plan, Sheet A1.1.
There are no areas of work within 200 feet of the described waters for
Phase Il.
Page 4