Environmental Checklist
3) Proposed measures to reduce or control noise impacts, if any:
Construction will take place Monday through Friday, during normal
working hours.
In Phase 1, the outdoor play areas of the child care center is sited at a
remote corner of the office building, and its boundaries are 180 feet from
the closest property line (to the south).
In Phaso ll, the outdoor play areas of the child care center is sited
approximately 450 feet from the closest adjacent property line.
8. LAND AND SHORELINE USE:
a. What is the current use of the site and adjacent properties?
The site is currently an office campus surrounded by a parking lot.
Properties to the north and south are office buildings surrounded by
parking lots. Property to the east is partially vacant and partially office
building with parking. Property to the west is a distribution warehouse for
groceries.
b. Has the site been used for agriculture? If so, describe.
No.
C. Describe any structures on the site.
There are currently four office buildings on the site. Each has a footprint
of approximately 26,000 square feet and is two stories high. The four
buildings are surrounded by a landscaped perimeter and landscaped
parking areas.
d. Will any structures be demolished? If so, what?
In Phase 1, an existing abandoned, below -grade concrete pit with
concrete side walls will be demolished. The abandoned pit measures
approximately 14 feet by 23 feet and was previously used to locate
utilities equipment. In Phase Il, no structures will be demolished.
e. What is the current zoning classification of the site?
CO, Commercial Office Zone
f. What is the current comprehensive plan designation of the site?
Employment Area Valley (EAV),
g. If applicable, what is the current shoreline master program designation of
the site?
Not applicable.
h. Has any part of the site been classified as an "environmentally sensitive"
area? If so, specify.
Small portions of the site ,may be F!oor Hazard Zones. See Site Plan,
sheet A1.1 and Site Survey, sheets Tl.I and T1.2.
Page 8