Loading...
HomeMy WebLinkAbout32Environmental Checklist Approximately how many people would reside or work in the completed Projected? In Phase 1, 13 staff members and 46 children of Wizards of the Coast employees are anticipated. In Phase li, 12 staff members and 56 children of Wizards of the Coast employees are anticipated. l Approximately how many people would the completed project displace? In Phase /, less than 10 employees of Wizards of the Coast will be relocated to another area within the existing office campus. /n Phase 1l, subtenants of Wizards of the Coast are already planning to relocate to another location, k. regardless of new construction work. Proposed measures to avoid or reduce displacement impacts, if any: In Phase 1, displaced employees are to be relocated into other available space within the office campus. In Phase //, subtenants will be relocating to another site. Proposed measures to ensure the proposal i and projected land uses and plans, if any: Is compatible with existing Both Phases / and ll of the project will be analyzed through the City of s land use review inn the process. Child care uses are allowed outright the COCzone. HOUSING: How many units would be provided, if any? Indicate whether high, middle, or low-income housing, None, whether h gh middle oar ow income houif singo.uld be eliminated Indicate None. Proposed measures to reduce or control housing impacts, if any I'Vot applicable. AESTHETICS: What is the tallest height of any proposed structure()s , not including antennas; what is the principal exterior building material(s) proposed? Irn Phases l and Il, proposed roofs over portions of outdoor /a to 16 feet tall, maxim. Proposed roofs have no walls and are to be builtIt primarily of siee/mup ,' areas are What views in the immediate vicinity would be altered or obstructed? No views would be altered or obstructed. Page 9