HomeMy WebLinkAbout120
M
Eh111BIT D
FINAL ASSESSMENT ROLL
NOTICE OF ADDITIONAL WATER OR SEWER
FACILITY TAP OP. CONNECTION CHARGES
REQUIRED BY RCW 65.08.17 (3)
(RCW 35.92.025)
MUNICIPALITY - CITY OF RENTON
ADDITIONAL TAP OR Vyzis Company/Southgate Office Plaza, Water Storm
CONNECTION CHARGE PER Water and street Improvement Latecomer Agreement
PROJECT NO.: W-1065, S-534
RECIPIENT: Vyzis Company, Stonehenge 11 Limited Partnership
BRIEF PROJECT DESCRIPTION: installation of 110 feet of 6" and 767 feet of 8"
watermain, 105 feet of W and 532 feet of 12" storm
water line and 663 feet of street improvements and
all appurtenances
TOTAL ASSESSMENT COST: $48,469.00
TOTAL ASSESSMENT CALCULATION: See attached summary sheet
If there is any QUeStiDn regarding the paid or unpaid status of the following
assessments, please call the City of Renton, Property Management et 235-2631.
0wner�hip
Legal Description
Assessment or
Additional Charge
Farrel No. 1
Kino County Tax Acct. 0334040.4000
Boeing Company
POR 24-31
)
GSIC Realty
HILLMANS EARONGTON GARDENS 01
Water: 525,923.E
Box 3707 MIS 1F09
LOT 4 CITY OF RENTON SP #431.79
Seattle, WA 98124
REC AF #8002269013 SD SP
Storm Water: $11,978.00
OAF - ALL OF VAC ELKS 24 & 31
& VAC VALENTINE AVE BET SO
Street Improvements: 010,567.50
ELKS OF SD SUED LY 5 OF S
MGN OF SW 16TH ST LESS STS
SUBTOTAL ASSESSMENT COST OF RECOVERY:
548,459.00
LESS 1 S % PROCESSING FEE DUE CITY OF RENTON:
$-7,270.35
$1,000 CREDIT FOR DEPOSIT:
51. O90.t?0
TOTAL LATECOMER FEE DUE DEVELOPER
$42,198.65
91.415b:AMH:p4
WtCOMFAS AGAMIENT' 9
`-)2-3 D0C/A1II1'M
r