Loading...
HomeMy WebLinkAbout120 M Eh111BIT D FINAL ASSESSMENT ROLL NOTICE OF ADDITIONAL WATER OR SEWER FACILITY TAP OP. CONNECTION CHARGES REQUIRED BY RCW 65.08.17 (3) (RCW 35.92.025) MUNICIPALITY - CITY OF RENTON ADDITIONAL TAP OR Vyzis Company/Southgate Office Plaza, Water Storm CONNECTION CHARGE PER Water and street Improvement Latecomer Agreement PROJECT NO.: W-1065, S-534 RECIPIENT: Vyzis Company, Stonehenge 11 Limited Partnership BRIEF PROJECT DESCRIPTION: installation of 110 feet of 6" and 767 feet of 8" watermain, 105 feet of W and 532 feet of 12" storm water line and 663 feet of street improvements and all appurtenances TOTAL ASSESSMENT COST: $48,469.00 TOTAL ASSESSMENT CALCULATION: See attached summary sheet If there is any QUeStiDn regarding the paid or unpaid status of the following assessments, please call the City of Renton, Property Management et 235-2631. 0wner�hip Legal Description Assessment or Additional Charge Farrel No. 1 Kino County Tax Acct. 0334040.4000 Boeing Company POR 24-31 ) GSIC Realty HILLMANS EARONGTON GARDENS 01 Water: 525,923.E Box 3707 MIS 1F09 LOT 4 CITY OF RENTON SP #431.79 Seattle, WA 98124 REC AF #8002269013 SD SP Storm Water: $11,978.00 OAF - ALL OF VAC ELKS 24 & 31 & VAC VALENTINE AVE BET SO Street Improvements: 010,567.50 ELKS OF SD SUED LY 5 OF S MGN OF SW 16TH ST LESS STS SUBTOTAL ASSESSMENT COST OF RECOVERY: 548,459.00 LESS 1 S % PROCESSING FEE DUE CITY OF RENTON: $-7,270.35 $1,000 CREDIT FOR DEPOSIT: 51. O90.t?0 TOTAL LATECOMER FEE DUE DEVELOPER $42,198.65 91.415b:AMH:p4 WtCOMFAS AGAMIENT' 9 `-)2-3 D0C/A1II1'M r