Loading...
HomeMy WebLinkAbout15Roadway, Storm Drainage, and Wate. Items Page 2 SW 19TH STREET- LIND AVENUE SW TO RAYMOND AVENUE SW (Roadway Items) RE: RECOMMENDED LATECOMERS AMOUNT FOR ITEMS LISTED ON SHEET 2 Proposed Construction Est. S 64,795.00 N 1 117 Street Construction Est, 4 227.501 Justified Latecomers Amount $ 10,567.50 9 i Identified Latecomers Boundary for Poadway items: o I-ot p4 of REIN SP 431-79-8002269013 o •' O SW 19TH STREET - LIND AVENUE SW TO WEST ENTRANCE it (650 Feet of Roadway Minus Sidewalk, North side) 1. 4- Asphalt Cl. B. 650 TN $34 $22,100 01 l N 2. Curb and Gutter 1,380 LF $8.00 $11,040 3. Sidewalk 7 Ft. Wide 502 SY $15.00 $7,530 4. Conc. Driveway 40 SY $25.00 $1,000 5. Pavement Markings 1-S $2,000 $2,000 ! ` 6. Street Lighting 4 EA $4,600 $18,400 7. Cleanup 1 LS $2,000 $2 000 S. Adjust Existing MH :o Grade 2 EA $250 $500 9. Remove Existing Curb and 150 LF $1.50 $225 - Gutter Cost (Roadway Constructionl $64 7a5 Note: Ng City Administrative Cost Included 1 LITECONEAYAGIIEENFM• 12 92;191D0C/ANIt/bh