HomeMy WebLinkAbout15Roadway, Storm Drainage, and Wate. Items
Page 2
SW 19TH STREET- LIND AVENUE SW TO RAYMOND AVENUE SW
(Roadway Items)
RE:
RECOMMENDED LATECOMERS AMOUNT FOR ITEMS LISTED ON SHEET 2
Proposed Construction Est. S 64,795.00
N 1
117 Street Construction Est, 4 227.501
Justified Latecomers Amount $ 10,567.50
9
i Identified Latecomers Boundary for Poadway items:
o I-ot p4 of REIN SP 431-79-8002269013
o •' O
SW 19TH STREET - LIND AVENUE SW TO WEST ENTRANCE
it
(650 Feet of Roadway Minus Sidewalk, North
side)
1. 4- Asphalt Cl. B.
650
TN
$34
$22,100
01
l N
2. Curb and Gutter
1,380
LF
$8.00
$11,040
3. Sidewalk 7 Ft. Wide
502
SY
$15.00
$7,530
4. Conc. Driveway
40
SY
$25.00
$1,000
5. Pavement Markings
1-S
$2,000
$2,000
! `
6. Street Lighting
4
EA
$4,600
$18,400
7. Cleanup 1 LS $2,000 $2 000
S. Adjust Existing MH :o Grade 2 EA $250 $500
9. Remove Existing Curb and 150 LF $1.50 $225 -
Gutter
Cost (Roadway Constructionl $64 7a5
Note: Ng City Administrative Cost Included
1
LITECONEAYAGIIEENFM• 12
92;191D0C/ANIt/bh