Loading...
HomeMy WebLinkAbout16Roadway, Storm D,ainage, and Water Items Page 3 SW 19TH STREET - LIND AVENUE SW TO RAYMOND AVENUE SW {112 Street Improvement Cost) 1. 4" Asphalt CI. B 600 TN $34 $20,400 2. Curb and Gutter 1,012 LF $B $8.096 3. Sidewalk 7 F[, Wide 787.11 Stl $15 $11,605 4. Concreta Drive 40 SY $25 $1,000 1 5. Pavement Markings 1 LS $1,557 $1,557 ` i 6. Street Lighting 2 EA $4,600 $9,200 LL 7. Cleanup t LS $1,557 $1,557 0 8, Adjust Existing MH to Grade 2 EA $250. $500 a �I 9. Remove Existing Curb and 75 LF $1.50 1112M Gutter $54,227.5 CV Note: No City Administrative Cost h-eluded I SW 19TH STREET - LIND AVENUE SW TO RAYMOND AVENUE SW (Roadway Storm Drainage Items) ` BE: $103 _"7 Proposed Construction Est. (t 1/2 Street Construction Est. 1 24 F Justified Latecomer's A,nount $11,978 Identified Latecomers Boundary for Roadway Storm Drainage Items: .i Lot 14 of BEN SP 431.79.8002269013 UTEC0,11 R'S ACRE.MW-is 92-391 DOCrA3e11bb or