HomeMy WebLinkAbout16Roadway, Storm D,ainage, and Water Items
Page 3
SW 19TH STREET - LIND AVENUE SW TO RAYMOND AVENUE SW
{112 Street Improvement Cost)
1. 4" Asphalt CI. B 600 TN $34
$20,400
2. Curb and Gutter 1,012 LF $B
$8.096
3. Sidewalk 7 F[, Wide 787.11 Stl $15
$11,605
4. Concreta Drive 40 SY $25
$1,000
1
5. Pavement Markings 1 LS $1,557
$1,557
`
i
6. Street Lighting 2 EA $4,600
$9,200
LL
7. Cleanup t LS $1,557
$1,557
0
8, Adjust Existing MH to Grade 2 EA $250.
$500
a �I
9. Remove Existing Curb and 75 LF $1.50
1112M
Gutter
$54,227.5
CV
Note: No City Administrative Cost h-eluded
I
SW 19TH STREET - LIND AVENUE SW TO RAYMOND AVENUE SW
(Roadway Storm Drainage Items)
`
BE: $103 _"7
Proposed Construction Est.
(t
1/2 Street Construction Est.
1 24
F
Justified Latecomer's A,nount
$11,978
Identified Latecomers Boundary for Roadway Storm Drainage Items:
.i
Lot 14 of BEN SP 431.79.8002269013
UTEC0,11 R'S ACRE.MW-is
92-391 DOCrA3e11bb
or