HomeMy WebLinkAbout1811
II
P
Roadway, Storm Drainage, and Water Items
Page 5
SW 19TH STREET - LIN D AL
ENUE S W TO RAYMOND AVENUE SW
T/2 Street Storm Drainage Cost
Mobilization
1
LS
$2,335
$2,335
Survey/Stsking
1
LS
$3,114
$3,114
Stripping
623
CY
52.50
$1,557.50
Type I CB (Orig. 3)
3
EA
$875
$2,625
Type iL CB (Orig. 0)
1
EA
$975
$975
Type II CS (Grip. 3)
1
EA
$1,500
$1,500
B" Dia. Pipe (Orig. 0)
83
LF
$24
$1,992
Cn
12" Dia. Pipe Wrig. 215)
805
LF
$26
$20,930
10
r
Crushed Rack Tranch Backfill
534
TN
$8.50
$4,539
0'
CD
Finish Grading
3,270
SY
01
$3,270
N
01
12" Bankrun Gr. Cl. B
3,445
TN
$11
$37,895
6" CSTC
779
TN
$13.50
110 616.50
$91,249.00
91-920:CEM:pv
Art"C nt1
LATECOMERS AOREF_IIFM • 15
92-393DOC/AbIlMh