Loading...
HomeMy WebLinkAbout1811 II P Roadway, Storm Drainage, and Water Items Page 5 SW 19TH STREET - LIN D AL ENUE S W TO RAYMOND AVENUE SW T/2 Street Storm Drainage Cost Mobilization 1 LS $2,335 $2,335 Survey/Stsking 1 LS $3,114 $3,114 Stripping 623 CY 52.50 $1,557.50 Type I CB (Orig. 3) 3 EA $875 $2,625 Type iL CB (Orig. 0) 1 EA $975 $975 Type II CS (Grip. 3) 1 EA $1,500 $1,500 B" Dia. Pipe (Orig. 0) 83 LF $24 $1,992 Cn 12" Dia. Pipe Wrig. 215) 805 LF $26 $20,930 10 r Crushed Rack Tranch Backfill 534 TN $8.50 $4,539 0' CD Finish Grading 3,270 SY 01 $3,270 N 01 12" Bankrun Gr. Cl. B 3,445 TN $11 $37,895 6" CSTC 779 TN $13.50 110 616.50 $91,249.00 91-920:CEM:pv Art"C nt1 LATECOMERS AOREF_IIFM • 15 92-393DOC/AbIlMh