Minor Franchise Permit: MFP22006438
IVR Number: 22006438
Permit Information
Permit Name: Puget Sound Energy - Electric
Address/Location:12/13/2022Application Date:3344500234Parcel Number: 1417 N 24TH ST
Permit Type:12/16/2022Issue Date:Franchise
Permit Work Class:12/18/2023Expiration Date:Minor Utility
Job Number: 101154427Franchise Type:Electric
Description: Puget Sound Energy Electric CREW TO REMOVE POLES AT P01 AND P03. CREW TO SET NEW POLES AT P02
AND P04. CREW TO SET NEW HH AND HH2 AND UG SERVICES FROM HH TO PRIVATE PROPERTY. POTHOLE
ALL EXISTING UTILITIES. RESTORATION PER CITY OF RENTON STANDARDS.
Contacts
Name Address PhoneTypeBilling
Corrie Rydberg
Puget Sound Energy
3702 71st Ave W
University Place, WA 98466
C: (253) 905-5031ApplicantX
Vicki Henson
Potelco Inc
8001 212th St S
Kent, WA 98032
B: (253) 863-0484Contractor
Business License Number: 5109Electrical Contractor: POTELI*344O4
Construction Contractor: POTELI*227PL
Puget Sound Energy Inc 10885 NE 4th Street, PSE08-N08
Bellevue, WA 98009
B: (888) 225-5773Emergency
Contact
MANGAT SUKHJINDER & SINGH P 1415 N 24TH ST
RENTON, WA 98056
Owner
Corrie Rydberg
Puget Sound Energy
3702 71st Ave W
University Place, WA 98466
C: (253) 905-5031Specialized
Billing
General Conditions & Signature
Permission is hereby given for the work described on this permit according to the conditions hereon and according to the
approved plans and specifications pertaining thereto, subject to compliance with the Ordinance of the City of Renton.
Ÿ
This permit and plans must be posted at the job site at all times.Ÿ
I hereby certify that no work is to be done except as described above and in approved plans, and that work is to conform to
Renton Trench Restoration and Street Overlay Requirements.
Ÿ
Call 425.430.7203 or go to: https://permitting.rentonwa.gov one working day in advance to schedule an inspections and for ANY
work in the Right of Way.
Ÿ
Call 8 1 1 to locate underground utilities at least two full business days prior to any excavation.Ÿ
In accordance with RCW 19.122.033(4) the permit holder is required to contact (Williams Northwest Pipeline at 425.868.1010)
(Olympic Pipeline at 425.235.7736) (Puget Sound Energy at 425.375.3397) to request a consultation with the transmission
pipeline company prior to performing any construction or excavation activities. This requirement to consult with the
transmission pipeline company is in addition to the requirement to Call before You Dig as required in RCW 19.122.
Ÿ
(Date)(Signature)
Page 1 of 1THIS PERMIT AND PLANS MUST BE POSTED AT THE JOB SITE AT ALL TIMES
Note: The Applicant is responsible for compliance with all codes and regulations, whether or not described in this document.
DEPARTMENT OF PUBLIC WORKS
Page 1 of 3 | Published: 10/27/2021
Transportation Division | 1055 South Grady Way, 5th Floor | Renton, WA 98057 | 425-430-7380
Website: rentonwa.gov
TRAFFIC CONTROL PLAN APPLICATION
Published: 10/27/2021
TRAFFIC CONTROL PLAN (TCP) MUST BE SUBMITTED TO PUBLIC WORKS TRANSPORTATION DIVISION
FOR REVIEW/APPROVAL AT LEAST FIVE (5) WORKING DAYS BEFORE THE DATE OF WORK.
The City of Renton requires any contractor, firm, corporation, or other public/private agency to prepare a traffic control
plan (TCP) and obtain city's approval of that plan when construction, repair, or maintenance work is to be conducted
within the city's right-of-way.
1. Fill out the Traffic Control Plan (TCP) Application form and prepare required submittal documents.
2. The following items are all required for submittal of the TCP Application:
☐Electronic Copy of the TCP Application
☐Electronic Copy of the TCP Layout, on 11” X 17” paper size format, which shall:
Include map(s) showing the location of the project and work area.
Be legible lettering and clear, contrasting, symbols of viewing or printing.
Must indicate street names, and north arrow and scale.
Types of plans required:
o Work hour plan – show all mobility impacts during construction hours.
o Non-work plan - show all mobility impacts after work hours when limited or no work is
happening in the right-of-way (ROW), if applicable.
o Changing construction phases – show construction sequence and each construction phase
change even if the traffic control is not modified, if applicable.
o Pedestrian access/detour plan, if applicable.
- Shall conform to the Washington State Traffic Control Flagger Certification handbook, by the
Evergreen Safety Council.
3. Submit Application via email to TCP@rentonwa.gov with the subject line “TCP Application – [Project Name].”
Project Name: Permit #:
Site Address:
Work Date: From _____________ To _____________ Work Time: Start ______________ End ______________
Construction Company:
Contact Name: Phone/Cell: _________________________
Business Address: City/State: Zip:
Description of Work:
Approval By: _________________________________________________ Date:____________________
Transportation Engineering
PLEASE SEE ATTACHED
POTELCO, INC
6905 S 228TH ST KENT, WA 98032
101154427
1415 N 24TH ST
TYLER PUTERBAUGH 206-584-4182
MFP22006438
Monday - Friday 8:00AM - 3:00PM
Scott Warlick CED 12/16/2022
Note: The Applicant is responsible for compliance with all codes and regulations, whether or not described in this document.
Page 2 of 3 | Published: 10/27/2021
PERMIT HOLDER AGREES TO ALL THE FOLLOWING:
Must have approved Traffic Control Plan (TCP) prior to commencing the work.
Maintain existing pedestrian access. The work on pedestrian facilities, shall be limited to one corner at a time,
with the least possible inconvenience or delay to pedestrians.
WORK TIME begins when any street or travel lane is fully or partially closed. This includes set up within the
traveled way.
Comply with all traffic regulations of the City of Renton and the State of Washington.
Prepare a traffic control plan and obtain City approval of that plan. That plan shall be implemented for all street
and lane closures, and the plan shall be performed in compliance with the Manual on Uniform Traffic Control
Devices.
Notify emergency services (253-852-2121) twenty-four (24) hours before any street or lane closures.
Contractor or entity must call Renton School District (425-204-4455) or any public/private agency, including public
transit, to be affected by a temporary lane or road closure a minimum of five business days (excluding weekends
and holidays) prior to starting any work.
Contractor or entity must notify King County Metro in writing at construction.coord@kingcounty.gov a minimum
of five business days (excluding weekends and holidays) prior to starting any work impacting bus stops, a
temporary lane or road closure. Work requiring removing a bus shelter or sign requires notification in writing a
minimum of 30 business days (excluding weekends and holidays). Please call King County Metro at 206-477-1140
with any questions.
Any lane or street closures not in conformance with the approved traffic control plan and/or without notification
of emergency services may result in receiving a citation for violation of R.C.W. 47.36.200 Signs or Flaggers at
thoroughfare work sites and R.C.W. 9A.36.050 Reckless Endangerment, and other applicable State and City codes.
Indemnify and hold harmless the City of Renton from any and all claims, actions, and judgments, including all
costs of defense and attorney’s fees incurred in defending against same, arising from and related to
implementation of the approved traffic control plans including claims arising from towing of private vehicles and
the acts of the Permit Holder’s agents and employees.
The City of Renton shall be entitled, in its reasonable discretion, to settle claims prior to suit or judgment, and in
such event shall indemnify and hold harmless the City for any such claims paid, including the City’s reasonable
attorney’s fees and litigation costs incurred resulting from such claim.
In the event any claim or suit is brought against City within the scope of this Agreement, Permit Holder will pay for
legal counsel chosen by the City to defend against same.
Flagger and sign placement are subject to revision by the City Inspector on site, if needed to address traffic or
pedestrian safety or travel.
All permit conditions shall be met.
NOTES:
Total road closure lasting more than twenty-four (24) hours is subject to the approval by the City Council.
Work Zone Traffic Control shall be in accordance with the Manual on Uniform Traffic Control Devices (MUTCD)
and shown by a traffic control plan layout or reference to WSDOT.
Approved Temporary Traffic Control Plan must be at the work site during work hours.
Complete assistance and accommodation shall be provided to all kinds of pedestrian traffic when sidewalk or
walkway is impeded to safely redirect pedestrians around a work zone.
Signage shall be used to warn motorcyclists/bicyclists of the potential hazards on any uneven surfaced or slippery
road conditions during work and non-work hours.
Any vehicle, equipment, barricade, or portable tow-away sign used within the work area must display a company
logo or any legally acceptable sign showing the company name, address, and telephone number at a conspicuous
place on the vehicle or equipment.
Note: The Applicant is responsible for compliance with all codes and regulations, whether or not described in this document.
Page 3 of 3 | Published: 10/27/2021
In the case of Temporary No Parking Zones, all the following apply in addition to previous:
Contractor must complete form to show limits of Temporary No Parking Zone identifying barricade locations for
vacate parking or curb lane usage.
Contractor must post notice of dates and time of Temporary No Parking Zone with at least two signs per block
seventy-two (72) hours in advance of effective date and time.
The cover sheet of this Traffic Control Plan form must be attached to each Temporary No Parking Sign on the
project site.
Temporary traffic control devices must be removed immediately when work is done or no construction activities
are going on. If deemed abandoned, City crews will remove and store them at the City’s maintenance shop (3555
NE 2nd Street).
I certify that the information on this application and within the submittal documents are accurate to the best of my
knowledge and I acknowledge all the requirements on this application.
Applicant’s Signature Date
Applicant’s Name (Print)
CORRIE RYDBERG
#1415MEADOW AVE N
MEADOW AVE N N 24TH STN 24TH STN 24TH STGARDEN CT N111112121212
88
88101099
N 26TH STPLACE SIGNSBOTH SIDES OFWORK AREAFROMTOTOW AWAY AREAPHONE 888-9999INFRASOURCE LLC 000 0000000NO PARKINGNO-PARKFROM TO
TOW AWAY AREA
PHONE 888-9999
INFRASOURCE LLC 000 0000000
NO PARKING
NO-PARK
W20-7AROADWORKAHEADW20-1W20-4ONE LANEROADAHEAD100'100'100'W20-7AROADWORKAHEADW20-1W20-4ONE LANEROADAHEAD100'100'100'RESIDENT(S) WILL BE INFORMEDOF POSSIBLE TEMPORARYDRIVEWAY CLOSUREP04P01HH1P03P02HH2STOP
FLAGGER
W20-7AW20-4ONE LANEROADAHEAD100'100'100'ROADWORKAHEADW20-1
STO
P
FLAGGER
M04M03M01FLAGGERS SHALL STOP TRAFFICIN ALL DIRECTIONS (SHORT DURATION:APPROX 10 MINUTES) FOR LINE DROP.TEMPORARY TRAFFIC CONTROL PLANNSIGN SPACINGMPH60/6545/5535/403025"X"1000'500'350'200'100'CHANNELIZATIONDEVICE SPACINGMPH55/7035/4525/30TAPER403020TANGENT806040Notes:1. All signs and spacing to conform to theMUTCD and City of Renton standards.2. All sidewalks, driveways, exits and egressesshall be completely clear unless otherwise indicated.3. Channelizing devices are 28" traffic cones.Use traffic drums (barrels) with steady burningType C lights on all State State Routes and Hwys.4. Sign size can be a minimum of 36" x 36" andshall not obstruct pedestrian access.5. Crew is required to leave a minimum of 11' fortraveling lane width.6. Alert affected residents and businesses.7. Work to take place between 9 a.m. and 4 p.munless otherwise specified. All work for arterialsand major roadways will be from 9 a.m. to 3 p.m.Project Address:PagePSEPUGETSOUNDENERGYDesigner:Job #REV12/02/2022 5128841690 1415 N 24TH ST, RENTON, WA 98056.JASON BISENIUS425-424-7316Jason.bisenius@pse.com1 OF 2Puget Sound EnergyTraffic Control Supervisor:Gregory HarwoodCard No. 012238Card Exp. 09/30/2023gregory.harwood@pse.com(425)424-642528" TRAFFIC CONELEGENDTRAFFIC FLOWSIGN LOCATIONFLAGGERSTOPPOLEWORK VEHICLE/FLASHING LIGHTSRIGHT OF WAYMFP22006438
#1415MEADOW AVE N
MEADOW AVE N N 24TH STN 24TH STN 24TH STGARDEN CT N111112121212
88
88101099
N 26TH STPLACE SIGNSBOTH SIDES OFWORK AREAFROMTOTOW AWAY AREAPHONE 888-9999INFRASOURCE LLC 000 0000000NO PARKINGNO-PARKFROM TO
TOW AWAY AREA
PHONE 888-9999
INFRASOURCE LLC 000 0000000
NO PARKING
NO-PARK
W20-7AROADWORKAHEADW20-1W20-4ONE LANEROADAHEAD100'100'100'W20-7AROADWORKAHEADW20-1W20-4ONE LANEROADAHEAD100'100'100'RESIDENT(S) WILL BE INFORMEDOF POSSIBLE TEMPORARYDRIVEWAY CLOSUREP04P01HH1P03P02STO
P
FLAGGERSTOP
FLAGGER
STOP
FLAGGER
W20-7AROADWORKAHEADW20-1
W20-4ONE LANEROADAHEAD100'100'100'M04M03M01HH2Notes:1. All signs and spacing to conform to theMUTCD and City of Renton standards.2. All sidewalks, driveways, exits and egressesshall be completely clear unless otherwise indicated.3. Channelizing devices are 28" traffic cones.Use traffic drums (barrels) with steady burningType C lights on all State State Routes and Hwys.4. Sign size can be a minimum of 36" x 36" andshall not obstruct pedestrian access.5. Crew is required to leave a minimum of 11' fortraveling lane width.6. Alert affected residents and businesses.7. Work to take place between 9 a.m. and 4 p.munless otherwise specified. All work for arterialsand major roadways will be from 9 a.m. to 3 p.m.Project Address:PagePSEPUGETSOUNDENERGYDesigner:Job #REV12/02/2022 5128841690 1415 N 24TH ST, RENTON, WA 98056.JASON BISENIUS425-424-7316Jason.bisenius@pse.com2 OF 2Puget Sound EnergyTraffic Control Supervisor:Gregory HarwoodCard No. 012238Card Exp. 09/30/2023gregory.harwood@pse.com(425)424-6425TEMPORARY TRAFFIC CONTROL PLANNSIGN SPACINGMPH60/6545/5535/403025"X"1000'500'350'200'100'CHANNELIZATIONDEVICE SPACINGMPH55/7035/4525/30TAPER403020TANGENT80604028" TRAFFIC CONELEGENDTRAFFIC FLOWSIGN LOCATIONFLAGGERSTOPPOLEWORK VEHICLE/FLASHING LIGHTSRIGHT OF WAYMFP22006438
1512
2409
1412
2407
1509
1404
1405 I-405N 24TH ST
HIG
15
ROW
30'
319012-166298
37.5 kVA (A)
319005-166259
319029-166280
25 kVA (A)
SLAS2197
HIG
15
MEADOW AVE N319012-166249
37.5 kVA (A)
POTELCO TO
REROUTE
PRIMARY FROM
V01 TO P02
POTELCO TO
REROUTE
PRIMARY FROM
P03 TO P04
1412 2407
1415
1404
1405
N 24TH ST MEADOW AVE N319013-166262
25kVA 120/240V (A)
319012-166280
POWER GENERAL NOTES - RESIDENTIAL PROJECT
N
Vicinity Map
47.513, -122.199
ARE TO BE INSTALLED, CROSS SECTION DETAILS OF THE TYPICAL EROSION
STRUCTURES, & SPECIAL REQUIREMENTS FOR WORK IN SENSITIVE AREAS.)
EROSION & SEDIMENT CONTROL REQUIREMENTS
NOTES DETAILING WHERE EROSION OR SEDIMENT CONTROL STRUCTURES
(LOCAL JURISDICTIONS MAY HAVE ADDITIONAL REQUIREMENTS INCLUDING
0150.3200 TECHNIQUES FOR TEMPORARY EROSION & SEDIMENT CONTROL
EROSION & SEDIMENT CONTROL SHALL BE PER PSE STANDARD PRACTICE
& ANY ADDITIONAL LOCAL JURISDICTION REQUIREMENTS.
CIRCUIT LOADING TABLE
AS OF
EXIST. PEAK LOAD
EST. NEW LOAD
TOTAL
CIRCUIT:
A PHASE B PHASE C PHASE
HIG-15
09/2020
171 158 125
1.68 --
172.68 158 125
FOREMAN (CHECK BOX WHEN COMPLETED)
PSE Equipment LOCKED/SECURED & Work Area left in CLEAN/SAFE Condition.
Grid, Cable, and Switch numbers INSTALLED & VERIFIED.
Field Changes RED-LINED on As-built.
Indicate correct FUSE SIZE on As-built & VERIFY proper PHASE.
Foreman's Signature _______________________________________________
Print Name ___________________________________ Date ______________
Material VERIFIED and CHANGES noted on Paperwork.
Total PRIMARY Cable noted on As-built.
Company ID#'s RECORDED in correct location on As-built.
Deviations noted on the As-built and their reason.
I certify that the work performed meets PSE's standards and procedures
and that all quality requirements are met.
CIRCUIT FEET ADDED:
10.
7.
6.
5.
4.
3.
2.
1.All materials to be installed in accordance with Puget Sound Energy's (PSE) standards. Any deviation from
this work sketch must be AUTHORIZED by PSE's Project Manager and NOTED on the Foremans' Copy.
All switching arrangements and/or outage arrangements are to be made with the Project Manager at least
three (3) working days in advance.
Contact the Utilities Underground Location Center (1-800-424-5555) at least 48 hours prior to commencing
work to get the underground facilities located.
STAKING: The customer will provide all staking (transformer, handhole, trench, grade, lot, pole, sidewalk,
etc.). See sketch and details for locations. Equipment locations must be approved by the Project Manager.
SITE PREPARATION: The work area will be at or near finished grade, clear of trench spoils or construction
materials which would restrict construction and/or equipment access, before work can begin.
Roads shall be paved or have a compacted , crushed rock base in place.
CLEARANCES: Transformers require a minimum of 6 feet from fire fighting equipment, 10 feet from
combustible walls, overhangs, doors, and windows, and a minimum of 5 feet from the back of curb (or guard
posts will be required per PSE standards). All conduits and vaults are to be at least 5 feet away from water,
storm and sewer lines when paralleling them in the right of way, and at least 1 foot when crossing them.
All work is to be done in accordance with local municipal and county permit requirements as applicable.
Inclement weather conditions may cause delays in construction times and dates.
EXCAVATION: The customer is to provide all trenching, backfill, vault excavations, compaction and
restoration per this sketch and per PSE standards. A minimum protective cover of 36" is required over
PSE's primary voltage equipment and 24" is required of PSE's secondary voltage equipment. The customer
will provide any and all shoring or they will side slope the trench to 1:1.
8.
9.
REMOVAL SITE PLAN
SCALE: NONE
Installed at site:
Grid Number:
kVA Rating:
Foreman to redline the following information
TRANSFORMER INSTALLATION
Company ID#:
Primary phase connected to:
Tested Secondary Voltage
Material ID#:
P02
319016-166264
50kVA
6211350
OH WIRE REMOVAL TABLE
Work
Location Wire Size & Type Quantity
Length
(per
conductor)
Remarks
From To
P01 M01 OH SVC WIRE 1 125'
P01 M03 OH SVC WIRE 1 110'
CABLE REMOVAL TABLE
SPAN ACTUAL LENGTH REMARKS
FROM TO CABLE TAG LENGTH CONDUIT WIRE
P01 HH1 UG SVC 65'-
P01 M04 UG SVC 130'
Removed at site:
Grid Number:
kVA Rating:
Foreman to redline the following information
TRANSFORMER REMOVAL
Company ID#:
Primary phase connected to:
Tested Secondary Voltage
P01
319013-166262
25kVA
POLE TABLE (REMOVAL)
Site
#
Pole Data
Grid #Height Class Year Remarks / Location Ref.
P01 319013-166262 40 UNK UNK PSE Equip #
SITE SPECIFIC NOTES
AT P01: 319013-166262
-REMOVE EXISTING DISTRIBUTION POLE
- REMOVE EXISTING XFMR, RETURN TO PSE YD
AT P02: (NEW) 319003-131370
-INSTALL 45', CL 3 DISTRIBUTION POLE PER STAKED LOCATION
(PD453) 6010.1000
-INSTALL (1) 2" SINGLE PHASE PRIMARY RISER WITH NEW S/O BRACKET
(RIS2CSS) 6042.1000
-INSTALL (1) HOT CLAMP, TAP A PHASE
-INSTALL (1) 50kVA OH XFMR 120/240V W/LB C/O (FUSE @ 65T)
PER STD 6025.1000 (TRFRXF)
-INSTALL (1) 3/8" PRIMARY DOWN GUY (S) (GYD3SA) 6013.0100
-INSTALL (1) 10" SINGLE HELIX ANCHOR ROD 7' S (ANDH1) 6012.1000
-TRANSFER "1404" SVC FROM P01 TO P02
-INSTALL SWITCH #
-INSTALL (1) 3" RISER ON EXISTING STANDOFF BRACKETS PER STD 6042.1000
-INSTALL GRID # "319003-131370"
AT P03: 319012-166280
-EXISTING DISTRIBUTION POLE TO BE REMOVED
AT P04: (NEW) 319016-166276
-INSTALL 45', CL 3 DISTRIBUTION POLE PER STAKED LOCATION (PD453) 6010.1000
-INSTALL 1Ø POLE TOP PIN PER STD 6031.1010 (TAN11 )
-INSTALL (1) STIRRUP & HOT CLAMP TAP A PHASE
-INSTALL (1) LB C/O ON NEW C/O BRACKET FUSE @ T)
-INSTALL (1) 3/8" PRIMARY DOWN GUY (S) (GYD3SA) 6013.0100
-INSTALL (1) 3/8" ANC GUY w/ AUTO GRIP PER STD 6013.0100 (GYD3SA)
-INSTALL (1) 10" SNGL HELIX ANCHOR PER STD 6012.1000 (ANDH1)
-INSTALL GRID#
AT V01:
-EXISTING VAULT TO REMAIN
AT HH1:
-EXISTING HAND HOLE TO REMAIN
AT HH2 (NEW):
-INSTALL (1) 17" X 30" PE SEC HAND HOLE PER STD 6050.2000 (HH16350)
-INSTALL (1) 6-POS #10-350CMIL CONNECTOR BAR (MID #7651005)
DEVELOPER & CUSTOMER NOTES
A PRE CONSTRUCTION MEETING IS REQUIRED WITH YOUR PROJECT
MANAGER PRIOR TO STARTING ANY SITE WORK.
CUSTOMER IS RESPONSIBLE FOR ALL TRENCHING, SELECT BACKFILL,
COMPACTION & RESTORATION PER PUGET SOUND ENERGY
STANDARDS & LOCAL MUNICIPALITY.
CUSTOMER IS RESPONSIBLE FOR THE FOLLOWING:
CROSSING & CONDUIT RESPONSIBILITY:.
-PROJECT MGR OR DESIGNATED REPRESENTATIVE MUST BE ON SITE
DURING CONSTRUCTION WORK IN RIGHT OF WAY.
-EXCAVATION CONTRACTOR MUST BE LICENSED AND BONDED TO
PERFORM WORK IN RIGHT OF WAY.
VAULTS & WORK PITS.
-PROVIDE A 4 X 4' WORK PIT AT P02.
-PROVIDE A 4 X 4' WORK PIT AT P04.
-PROVIDE A 4'-5" X 5-6" WORK PIT AT HH2.
-PROVIDE A 4' X 4' WORK PIT & 3/4 YARD OF SAND AT M02.
-PROVIDE A 4' X 4' WORK PIT & 3/4 YARD OF SAND AT M04.
JOB SITE READINESS.
-JOB SITE NEEDS TO BE 100% READY FOR INSPECTION 5 BUSINESS
DAYS PRIOR TO CONSTRUCTION DATE.
-ALL WORK IN RIGHT OF WAY MUST BE COORDINATED WITH PROJECT
MANAGER AND LOCAL MUNICIPALITY.
-ALL TRENCH, AND LOCAL ELECTRICAL MUNICIPALITIES AKA "L&I, CITY",
INSPECTIONS MUST BE COMPLETED 5 BUSINESS DAYS PRIOR TO
SCHEDULED CONSTRUCTION DATE.
-REQUIRED TO OPERATE AND PROVIDE EQUIPMENT TO PUMP OUT
WATER FOR WORK PITS, VAULTS & TRENCH AT ALL TIMES.
-REQUIRED TO HAVE EXCAVATION EQUIPMENT AND BE ON SITE THE
DAY OF CONSTRUCTION TO COMPLETE BACKFILLING.
-IF A PRE-CON IS REQUIRED BY THE CITY, COUNTY OR W.S. DOT A PSE
PROJECT MANAGER WILL SET-UP AND SCHEDULE A MEETING WITH THE
MUNICIPALITY BEFORE ANY EXCAVATION OR INSTALLATION BEGINS.
00 1"2"
00 50'100'
Owner / Developer Contact Info
officeATTN:
SUKHJINDER MANGAT
10623 SE 279TH ST
KENT, WA 98030
SUKHJINDER MANGAT 917-225-9720
THIS SKETCH NOT TO BE RELIED UPON FOR EXACT LOCATION OF EXISTING FACILITIES
CALL 811 TWO BUSINESS DAYS BEFORE YOU DIG
For contacts below dial 1-888-CALL PSE (225-5773)
HP Svc/MSA
Distribution
SUPERIOR
ORDER#NOTIF#PROJECT PHASE
CABLE TV
PHONE
GAS
Service Stubs
UTILITIES
CONTACT
PHONE#
COUNTY
1/4 SEC
U-MAP NO (POWER)
OP MAP
Emer Sect Gas Wk Ctr POWER WK CTR
PLAT MAP
JOINT FACILITIES ARRANGEMENTS
DRAWN BY
CHECKED BY
APPROVED BY
FOREMAN #1
FOREMAN #2
MAPPING
INCIDENT MAOP
Gas Order Elect Order
SCALE PAGE
ENGR - POWER
ENGR - GAS
FUNCTION
PROJECT MGR
PERMITREAL ESTATE/EASEMENT
2
1
REV#
3
DATE DESCRIPTIONBY
CONTACT PHONE NO DATE
OH CKT MAP CIRCUIT NOUG CKT MAP
TYLER PUTERBAUGH 253-281-3017 6/27/22
ANN BETTENCOURT 206-584-4182 6/27/22
---
ANN BETTENCOURT 206-584-4182 6/27/22
REQUIRED RENTON
MANGAT
PRI LE/POLE RPLCMNT/XFMR UPGRADE/NEW HH/NEW UG SVC
1415 N 24TH ST, RENTON, WA 98057
N/A N/A
N/A
AS SHOWN 1/2
KING N/A N/A CSPSKEPM
NW 14-A2N-405 N/A N/A
2305E018 2305E040 2305E018 HIG-15
N/A
N/A
N/A
N/A
N/A
N/A
N/A
N/A
N/A
N/A
N/A
N/A
N/A N/A N/A
N/A N/A N/A
N/A N/A N/A
512606540
E-Mail:
Cell Phone:
Project Manager Contact Information:
Manager:TYLER PUTERBAUGH
253-281-3017
TYLER.PUTERBAUGH@PSE.COM
PSE
No
No
No
Yes
Yes
Yes
No
YesDeveloper
"Flagging Required"
"Outages Required"
"Locates Required"
X
X
X
X
LRC:
% V. Drop:
% Flicker:
Sq. Footage:
Panel Size:
Heat Type:
Est. Demand:
4290 SQ.FT.
200 AMPS
GAS
11.5 KW
140A
1.6%
3.2%
POLE TABLE (REMOVAL)
Site
#
Pole Data
Grid #Height Class Year Remarks / Location Ref.
P03 319012-166280 40 UNK UNK PSE Equip #
319016-166276
SLAH5202
P04
319016-166264
50kVA 120/240V (A)
SITE PLAN
SCALE: 1" = 50'
LOT 1 LOT 2
P02
M
HH2
101154527101154527
101154527
POLE TABLE (NEW)
Site
#
Pole Data
Grid #Height Class Year Remarks / Location Ref.
P04 319016-166276 45 3 PSE Equip #
POLE TABLE (NEW)
Site
#
Pole Data
Grid #Height Class Year Remarks / Location Ref.
P02 319016-166264 45 3 PSE Equip #
WIRE STRINGING
PRIMARY & SECONDARY
Location
Usage Wire Size & Type
Quantity
of wires
Length
(per wire)TotalFromTo
P02 M03 S SEC 1/0 OH TPX 1 155'155'
AT M01:
-EXISTING METER TO BE REMOVED
AT M02 (NEW):
-INSTALL 200A METER
AT M03:
-EXISTING METER TO REMAIN
AT M04:
-EXISTING METER TO REMAIN
-INSTALL NEW UG SECONDARY SERVICE w/4/0 UG TPX
-INSTALL NEW UG SECONDARY SERVICE w/4/0 UG TPX
PRIMARY CABLE & CONDUIT TABLE
LOCATION CONDUIT PRIMARY CABLE
ASBUILT INFORMATION
SIZE Qty LENGTH
Design
(ft)
BENDS PULL PULL Cable LENGTH
Design
(ft)
Cable Numbers Foreman Please Record Foreman - Complete
FROM TO (in)90°45°22°11°(lbs)
Rev
(lbs)Size A B C Manufacturer Compound Year Actual Amount Installed (Conduit & Cable)
P02 P04 2 1 195'0 0 0 0 93 124
PRI 12KV
1/0 UG 225'
SECONDARY CABLE & CONDUIT TABLE
LOCATION
CABLE CONDUIT VOLTAGE ASBUILT INFORMATION
SIZE LENGTH SIZE LENGTH BENDS DROP FLICKER Foreman - Complete
FROM TO (1/O,4/O,350)Design (ft)(in)Design (ft)90°45°22°11°(Percent)(Percent)Actual Amount Installed Cable Conduit
P02 HH1 350 125'3 90'----
P02 HH2 350 70'3 35'----
P02 M02 4/0 145'3 105'
P02 M04 4/0 110'3 95'
HH2 LOT 1 4/0 15'60'3
HH2 LOT 2 4/0 70'3 60'
OVERHEAD CIRCUIT MAP
SCALE: 6" = 1 MILE
JOB SITE
----
----
----
----
HH1
MFP22006438
RESTORATION PER CITY OF RENTON STANDARDS
FLOW DIRECTION
LAY 8" BOTTOM SKIRT ON TOP OF NATIVE SOIL,
SECURE WITH PEA GRAVEL BAGS (MID 9995692).
6'
3'
8"
TECHNIQUES FOR EROSION AND SEDIMENT CONTROL
SILT FENCE DETAIL
Not to Scale 0150.3200
TRENCH DETAIL
Electric Service Cable in Conduit (NTS)
Electric Service Cable in Conduit
Excavated Dirt Pile
Final Grade
24" Min
24" Min
to
36" Max
Cover
12" Typical
(6" Min)
Backfill for Conduit
Free of rocks
larger than 8"
in diameter)
36" MINIMUM COVER
IN RIGHT OF WAY
To Excavated Dirt Pile
3" Schedule 40 Grey PVC
Backfill for In Conduit - The backfill layer shall be soil that is free from construction debris,
glass, sharp rocks, frozen clods, and rocks larger than 8" in diameter.Excavated Dirt Pile
Final Grade
24" Min
Backfill for Schedule 40 Conduit
(NO Rocks over 10" Diameter
or foreign objects)Separation
12" Min
18" Min
JOINT TRENCH DETAIL
Primary-Schedule 40 (NTS)
48"
Max
36"
Min
Cover
Phone & TV Primary Power Cable
in Customer Provided
Schedule 40 Conduit
ROADSIDE
To Excavated Dirt Pile
METER DETAIL @ M01
SCALE: NONE
32"
Typical
24"
Min
24"-36"
4'Top View
Electric & Joint Utility
Work Pit Dimensions
36"
Min
Drainage Pipe
12" Minimum Clearance
from Gas Service Lines
Conduit Depth
24" to 36" Max
Regulator
Gas MeterAssembly
48"
4'8"
Service (Permanent Detail:)
Not to Scale
ConduitEndsClosed
4'8"
24" Min36" Typical
3'
To Trench
Property Line
Conduit Stakes
Customer Provided
3" Schedule 40 or 80 Grey PVC
Power Cable Conduit
Customer Provided
Gas Service Line Conduit
2 5 Conduit Service Riser
Customer Provided
Elec. Mtr Base
Elec Mtr
utility provided
Gas Meter
Relief Vent
Building Wall
Elec. Mtr
Vent
Utility
Provided
Sea
24"-36"
PSE 1730 POLYETHELYNE HANDHOLE PLAN VIEW
2"
APPROX
30"
APPROX17"ELECTRIC
4' - 5"
PENTABOLTLOCK COVER
5' - 6"
18"
SIDE VIEW4" X 4"
KNOCKOUT
(2 PLACES)
APPROX 27"APPROX 40"20"
CONDUITS ENTER FROM BENEATHAT ONE END OF HANDHOLE
1Ø "1730" SECONDARY HANDHOLE EXCAVATION DETAIL
Not to scale
UTILITIES
CONTACT
PHONE#
COUNTY
1/4 SEC
U-MAP NO (POWER)
OP MAP
Emer Sect Gas Wk Ctr POWER WK CTR
PLAT MAP
JOINT FACILITIES ARRANGEMENTS
DRAWN BY
CHECKED BY
APPROVED BY
FOREMAN #1
FOREMAN #2
MAPPING
INCIDENT MAOP
Gas Order Elect Order
SCALE PAGE
ENGR - POWER
ENGR - GAS
FUNCTION
PROJECT MGR
PERMITREAL ESTATE/EASEMENT
2
1
REV#
3
DATE DESCRIPTIONBY
CONTACT PHONE NO DATE
OH CKT MAP CIRCUIT NOUG CKT MAP
TYLER PUTERBAUGH 253-281-3017 6/27/22
ANN BETTENCOURT 206-584-4182 6/27/22
---
ANN BETTENCOURT 206-584-4182 6/27/22
REQUIRED RENTON
MANGAT
PRI LE/POLE RPLCMNT/XFMR UPGRADE/NEW HH/NEW UG SVC
1415 N 24TH ST, RENTON, WA 98057
N/A N/A
N/A
AS SHOWN 2/2
KING N/A N/A CSPSKEPM
NW 14-A2N-405 N/A N/A
2305E018 2305E040 2305E018
N/A
N/A
N/A
N/A
N/A
N/A
N/A
N/A
N/A
N/A
N/A
N/A
N/A N/A N/A
N/A N/A N/A
N/A N/A N/A
Field Face
Quadrant
Climbing
Space
Road Face
Quadrant
Climbing
Space
5" Min
CL
LC
Direction of Vehicular Traffic
TOP VIEW
CONDUIT RISER PLACEMENT DETAIL (P??)
SCALE: NONE
UTILITY POLE EROSION CONTROL DETAIL
TOP VIEW
FLOWING DITCH or BODY OF WATER
SLOPE
Secure bottom of fence
with gravel bags
Place straw mulch
on disturbed areaExcavated or
Augered Hole
Pole
SLOPE
Not to scale Adjacent to flowing ditches or bodies of water
Install silt fence around
pole excavation
6" to 12"
Under Normal
Conditions
40" Min for Single Helix
65" Min for Triple Helix
Not To Scale
ANCHOR DETAIL - SINGLE HELIX 101154527101154527