Press Alt + R to read the document text or Alt + P to download or print.
This document contains no pages.
HomeMy WebLinkAboutMFP23002136.pdfDEPARTMENT OF COMMUNITY
AND ECONOMIC DEVELOPMENT
Minor Franchise Permit: MFP23002136
IVR Number: 23002136
Permit Information
Permit Name: Puget Sound Energy - Electric
Address/Location:04/24/2023Application Date:1923059016Parcel Number:
Permit Type:05/09/2023Issue Date:Franchise
Permit Work Class:05/08/2024Expiration Date:Minor Utility
Job Number: 101149899Franchise Type:Electric
Description: Puget Sound Energy Electric Transformer upgrade at grid 317066 165830 for WSDOT cabinet SUA 4550 for
WSDOT's I 405 Renton to Bellevue widening and express toll lanes project. Upgrading overhead transformer from a
25kVA 120/240v to a 50kVA 240/480v.. no hs cuts
Contacts
Name Address PhoneTypeBilling
Corrie Rydberg
Puget Sound Energy
3702 71st Ave W
University Place, WA 98466
C: (253) 905-5031ApplicantX
Vicki Henson
Potelco Inc
8001 212th St S
Kent, WA 98032
B: (253) 863-0484Contractor
Business License Number: 5109Electrical Contractor: POTELI*344O4
Construction Contractor: POTELI*227PL
Puget Sound Energy Inc 10885 NE 4th Street, PSE08-N08
Bellevue, WA 98009
B: (888) 225-5773Emergency
Contact
RENTON CITY OF 1055 S GRADY WAY
RENTON , WA 98057
Owner
Corrie Rydberg
Puget Sound Energy
3702 71st Ave W
University Place, WA 98466
C: (253) 905-5031Specialized
Billing
General Conditions & Signature
Permission is hereby given for the work described on this permit according to the conditions hereon and according to the
approved plans and specifications pertaining thereto, subject to compliance with the Ordinance of the City of Renton.
Ÿ
This permit and plans must be posted at the job site at all times.Ÿ
I hereby certify that no work is to be done except as described above and in approved plans, and that work is to conform to
Renton Trench Restoration and Street Overlay Requirements.
Ÿ
Call 425.430.7203 or go to: https://permitting.rentonwa.gov one working day in advance to schedule an inspections and for ANY
work in the Right of Way.
Ÿ
Call 8 1 1 to locate underground utilities at least two full business days prior to any excavation.Ÿ
In accordance with RCW 19.122.033(4) the permit holder is required to contact (Williams Northwest Pipeline at 425.868.1010)
(Olympic Pipeline at 425.235.7736) (Puget Sound Energy at 425.375.3397) to request a consultation with the transmission
pipeline company prior to performing any construction or excavation activities. This requirement to consult with the
transmission pipeline company is in addition to the requirement to Call before You Dig as required in RCW 19.122.
Ÿ
(Date)(Signature)
Page 1 of 1THIS PERMIT AND PLANS MUST BE POSTED AT THE JOB SITE AT ALL TIMES
Note: The Applicant is responsible for compliance with all codes and regulations, whether or not described in this document.
DEPARTMENT OF PUBLIC WORKS
Page 1 of 3 | Published: 10/27/2021
Transportation Division | 1055 South Grady Way, 5th Floor | Renton, WA 98057 | 425-430-7380
Website: rentonwa.gov
TRAFFIC CONTROL PLAN APPLICATION
Published: 10/27/2021
TRAFFIC CONTROL PLAN (TCP) MUST BE SUBMITTED TO PUBLIC WORKS TRANSPORTATION DIVISION
FOR REVIEW/APPROVAL AT LEAST FIVE (5) WORKING DAYS BEFORE THE DATE OF WORK.
The City of Renton requires any contractor, firm, corporation, or other public/private agency to prepare a traffic control
plan (TCP) and obtain city's approval of that plan when construction, repair, or maintenance work is to be conducted
within the city's right-of-way.
1. Fill out the Traffic Control Plan (TCP) Application form and prepare required submittal documents.
2. The following items are all required for submittal of the TCP Application:
☐Electronic Copy of the TCP Application
☐Electronic Copy of the TCP Layout, on 11” X 17” paper size format, which shall:
Include map(s) showing the location of the project and work area.
Be legible lettering and clear, contrasting, symbols of viewing or printing.
Must indicate street names, and north arrow and scale.
Types of plans required:
o Work hour plan – show all mobility impacts during construction hours.
o Non-work plan - show all mobility impacts after work hours when limited or no work is
happening in the right-of-way (ROW), if applicable.
o Changing construction phases – show construction sequence and each construction phase
change even if the traffic control is not modified, if applicable.
o Pedestrian access/detour plan, if applicable.
- Shall conform to the Washington State Traffic Control Flagger Certification handbook, by the
Evergreen Safety Council.
3. Submit Application via email to TCP@rentonwa.gov with the subject line “TCP Application – [Project Name].”
Project Name: Permit #:
Site Address:
Work Date: From _____________ To _____________ Work Time: Start ______________ End ______________
Construction Company:
Contact Name: Phone/Cell: _________________________
Business Address: City/State: Zip:
Description of Work:
Approval By: _________________________________________________ Date:____________________
Transportation Engineering
PLEASE SEE ATTACHED
POTELCO, INC
6905 S 228TH ST KENT, WA 98032
101149899
2200 East Valley Rd
Jessica Schultz 425-480-2925
MFP23002136
Monday - Friday 8:00AM - 3:00PM
Scott Warlick CED 5/9/2023
Note: The Applicant is responsible for compliance with all codes and regulations, whether or not described in this document.
Page 2 of 3 | Published: 10/27/2021
PERMIT HOLDER AGREES TO ALL THE FOLLOWING:
Must have approved Traffic Control Plan (TCP) prior to commencing the work.
Maintain existing pedestrian access. The work on pedestrian facilities, shall be limited to one corner at a time,
with the least possible inconvenience or delay to pedestrians.
WORK TIME begins when any street or travel lane is fully or partially closed. This includes set up within the
traveled way.
Comply with all traffic regulations of the City of Renton and the State of Washington.
Prepare a traffic control plan and obtain City approval of that plan. That plan shall be implemented for all street
and lane closures, and the plan shall be performed in compliance with the Manual on Uniform Traffic Control
Devices.
Notify emergency services (253-852-2121) twenty-four (24) hours before any street or lane closures.
Contractor or entity must call Renton School District (425-204-4455) or any public/private agency, including public
transit, to be affected by a temporary lane or road closure a minimum of five business days (excluding weekends
and holidays) prior to starting any work.
Contractor or entity must notify King County Metro in writing at construction.coord@kingcounty.gov a minimum
of five business days (excluding weekends and holidays) prior to starting any work impacting bus stops, a
temporary lane or road closure. Work requiring removing a bus shelter or sign requires notification in writing a
minimum of 30 business days (excluding weekends and holidays). Please call King County Metro at 206-477-1140
with any questions.
Any lane or street closures not in conformance with the approved traffic control plan and/or without notification
of emergency services may result in receiving a citation for violation of R.C.W. 47.36.200 Signs or Flaggers at
thoroughfare work sites and R.C.W. 9A.36.050 Reckless Endangerment, and other applicable State and City codes.
Indemnify and hold harmless the City of Renton from any and all claims, actions, and judgments, including all
costs of defense and attorney’s fees incurred in defending against same, arising from and related to
implementation of the approved traffic control plans including claims arising from towing of private vehicles and
the acts of the Permit Holder’s agents and employees.
The City of Renton shall be entitled, in its reasonable discretion, to settle claims prior to suit or judgment, and in
such event shall indemnify and hold harmless the City for any such claims paid, including the City’s reasonable
attorney’s fees and litigation costs incurred resulting from such claim.
In the event any claim or suit is brought against City within the scope of this Agreement, Permit Holder will pay for
legal counsel chosen by the City to defend against same.
Flagger and sign placement are subject to revision by the City Inspector on site, if needed to address traffic or
pedestrian safety or travel.
All permit conditions shall be met.
NOTES:
Total road closure lasting more than twenty-four (24) hours is subject to the approval by the City Council.
Work Zone Traffic Control shall be in accordance with the Manual on Uniform Traffic Control Devices (MUTCD)
and shown by a traffic control plan layout or reference to WSDOT.
Approved Temporary Traffic Control Plan must be at the work site during work hours.
Complete assistance and accommodation shall be provided to all kinds of pedestrian traffic when sidewalk or
walkway is impeded to safely redirect pedestrians around a work zone.
Signage shall be used to warn motorcyclists/bicyclists of the potential hazards on any uneven surfaced or slippery
road conditions during work and non-work hours.
Any vehicle, equipment, barricade, or portable tow-away sign used within the work area must display a company
logo or any legally acceptable sign showing the company name, address, and telephone number at a conspicuous
place on the vehicle or equipment.
Note: The Applicant is responsible for compliance with all codes and regulations, whether or not described in this document.
Page 3 of 3 | Published: 10/27/2021
In the case of Temporary No Parking Zones, all the following apply in addition to previous:
Contractor must complete form to show limits of Temporary No Parking Zone identifying barricade locations for
vacate parking or curb lane usage.
Contractor must post notice of dates and time of Temporary No Parking Zone with at least two signs per block
seventy-two (72) hours in advance of effective date and time.
The cover sheet of this Traffic Control Plan form must be attached to each Temporary No Parking Sign on the
project site.
Temporary traffic control devices must be removed immediately when work is done or no construction activities
are going on. If deemed abandoned, City crews will remove and store them at the City’s maintenance shop (3555
NE 2nd Street).
I certify that the information on this application and within the submittal documents are accurate to the best of my
knowledge and I acknowledge all the requirements on this application.
Applicant’s Signature Date
Applicant’s Name (Print)
CORRIE RYDBERG
2200 E Valley Rd
Renton
WA 98057
USA
P01
121213
12121111
SR-167
SRMP 25.67
ONE WAYONE WAY©
©TAL/3R100RIGHTSHOULDERCLOSEDW21-5aRX'X'X'ROADWORKAHEADW20-1SHOULDERWORKW21-5B1 MILE
BEFORE
WORK AREA
PCMS
PLACE PCMS BOARD 1 MILE
BEFORE WORK AREA.
TWO-SECOND SEQUENCE
2-LINE, 8 CHARACTER
MESSAGES WILL READ:
1)
2)
3)
UTILITY
WORK
AHEAD
SHOULDER
WORK
AHEAD
VICINITY MAP
WORK AREA
AAA
TEMPORARY TRAFFIC CONTROL PLAN
0'80'40'
PRINT ON
11X17" SHEETS ONLYN
SIGN SPACING
MPH
60/65
45/55
35/40
30
25
"X"
1000'
500'
350'
200'
100'
CHANNELIZATION
DEVICE SPACING
MPH
55/70
35/45
25/30
TAPER
40
30
20
TANGENT
80
60
40
Project Address:
Page
PSE PUGETSOUNDENERGY
Designer:
Job #
REV
Safaa Al Neema
(425) 398-6077
safaa.alneema@pse.com
1 OF 22200 E Valley Rd, Renton, WA 98057
0
511238210
04/05/2023
Puget Sound Energy
Traffic Control Supervisor:Safaa Al Neema
Card No. 012611
Card Exp. 10/31/2024
Safaa.alneema@pse.com
(425)398-6077
Notes:
1. Notify WSDOT at least 5 days prior to scheduled date.
2. At time of work, call wsdot radio (per region as instructed in
permit) at the time the lane is closed (or intersection flagged); and
again when the lane/intersection is opened. leave a contact name
and cell phone number with radio.
3. All advanced warning signs and spacing to conform to the
MUTCD and WSDOT standards.
4. Channelizing devices shall be traffic drums (barrels) with
steady burning Type C lights on all State Routes and Hwys.
5. All signs are 48" x 48", Black legend on Orange background.
Use class B signs unless otherwise specified.
6. Flaggers shall be in radio contact with each other at all
times; flagger stations shall be illuminated during hours of
darkness with minimum 150w lights
7. All lane closures shall not infringe upon adjacent lanes.
8. Alert affected residents and businesses if existing on
WSDOT roadways. All sidewalks, driveways, exits and
egresses shall be completely clear unless otherwise
indicated.
9. Work areas will be noted as per distances between State
Route milepost markers.
10. See sheet 2 for WSDOT Notes and Tables.
TRAFFIC BARRELS
WITH BEACONS
TRAFFIC FLOW
SIGN LOCATION
LEGEND
POLE
CAUTION
BOARD
WORK VEHICLE/
FLASHING LIGHTS
RIGHT OF WAY
Order # 101149899
MP 25.67
Additional approval from WSDOT will
be needed for work in their ROW
MFP23002136
TEMPORARY TRAFFIC CONTROL PLAN
WSDOT NOTES & TABLES
””
–
Project Address:
Page
PSE PUGETSOUNDENERGY
Designer:
Job #
REV
Safaa Al Neema
(425) 398-6077
safaa.alneema@pse.com
2 OF 22200 E Valley Rd, Renton, WA 98057
0
511238210
04/05/2023
Puget Sound Energy
Traffic Control Supervisor:
Safaa Al Neema
Card No. 012611
Card Exp. 10/31/2024Safaa.alneema@pse.com
(425)398-6077
Order # 101149899
MFP23002136
VALLEYFWYT
T
T
T
50kVA 240/480V
336 ACSR
336 ACSR
336 ACSR
336 ACSRCBACBACBACBA
"SUA 4550"UG SVCARE TO BE INSTALLED, CROSS SECTION DETAILS OF THE TYPICAL EROSION
STRUCTURES, & SPECIAL REQUIREMENTS FOR WORK IN SENSITIVE AREAS.)
EROSION & SEDIMENT CONTROL REQUIREMENTS
NOTES DETAILING WHERE EROSION OR SEDIMENT CONTROL STRUCTURES
(LOCAL JURISDICTIONS MAY HAVE ADDITIONAL REQUIREMENTS INCLUDING
0150.3200 TECHNIQUES FOR TEMPORARY EROSION & SEDIMENT CONTROL
EROSION & SEDIMENT CONTROL SHALL BE PER PSE STANDARD PRACTICE
& ANY ADDITIONAL LOCAL JURISDICTION REQUIREMENTS.
LEGEND
EXIST. OH 1Ø 1/0 WIRE
EXISTING TRANSMISSION POLE
EXIST. 115KV WIRE
EXISTING PSE POLE
T
EXIST. UG 3Ø 1/0 WIRE
SCALE: 1" = 50'
SITE PLAN
SITE
OVERHEAD CIRCUIT MAP
SCALE: NO SCALE
P01: 317066-165830
-UPSIZE OH 25kVA TO 50kVA XFMR (MID 6203250)
Removed at site:
Grid Number:
kVA Rating:
Foreman to redline the following information
TRANSFORMER REMOVAL
Company ID#:
Primary phase connected to:
Tested Secondary Voltage
P01
317066-165830
25kVA 240/480v
Installed at site:
Grid Number:
kVA Rating:
Foreman to redline the following information
TRANSFORMER INSTALLATION
Company ID#:
Primary phase connected to:
Tested Secondary Voltage
Material ID#:
P01
317066-165830
50kVA 240/480v
6203250
GENERAL SPECIFICATIONS
Scope of Work
Upgrade OH 25kVA to 50kVA XFMR
General
-All work is to be completed per PSE Standards & Practices. Copies of all PSE
Standards are available upon request.
-Work sites shall be kept clear of debris and all construction materials; equipment
and packing shall be removed daily.
-Return all unused and removed poles, transformers and hardware to PSE,
storeroom. All copper shall be coiled and returned the day it is removed from the
poles. Remove all unused pins and insulators.
Preconstruction
- Notify appropriate city, County or DOT authorities 48 to 72 hours, or as required by
permitting agency, in advance of starting work in Right-of-way involving a Permit.
- All system switching shall be approved by System Operations (425-882-4652) a
minimum of 48 hours in advance.
- Notify customers of all outages 48 hours in advance.
Work Drawings & Documents
- Field design changes shall be approved by PSE Project Manager or Engineer.
- Mark all field changes, equipment ID numbers and Underground cable information in
red on Foreman's copy of worksketch.
- Return one Foreman's copy of worksketch to Project Manager at completion of job.
- When permits are required, a copy shall be available on work site at all times.
Safety
- Refer to PSE standards 6275.3000 and 6275.6000 for system ground requirements.
- Refer to PSE standards 6275.9050 for personal protective grounding requirements.
- Refer to PSE standards 6275.9150 for vehicle grounding and barricading
requirements.
- Proper line clearances shall be taken at the beginning, and released at the end, of
each work day, or as otherwise instructed by the System Operator.
- Provide signs, barricades, and traffic control in conformance with permit regulations.
- Utilize flagging and other vehicle traffic control as necessary and in conformance with
local traffic regulations.
- Maintain traffic flow as required by permitting agency.
N
Vicinity Map
47.4592, -122.2164
Owner / Developer Contact Info
officeATTN:
THIS SKETCH NOT TO BE RELIED UPON FOR EXACT LOCATION OF EXISTING FACILITIES
CALL (800) 424-5555
2 BUSINESS DAYS BEFORE YOU DIG
For contacts below dial 1-888-CALL PSE (225-5773)
FOREMAN (CHECK BOX WHEN COMPLETED)
PSE Equipment LOCKED/SECURED & Work Area left in CLEAN/SAFE Condition.
Grid, Cable, and Switch numbers INSTALLED & VERIFIED.
Field Changes RED-LINED on As-built.
Indicate correct FUSE SIZE on As-built & VERIFY proper PHASE.
Foreman's Signature _______________________________________________
Print Name ___________________________________ Date ______________
Material VERIFIED and CHANGES noted on Paperwork.
Total PRIMARY Cable noted on As-built.
Company ID#'s RECORDED in correct location on As-built.
Deviations noted on the As-built and their reason.
I certify that the work performed meets PSE's standards and procedures
and that all quality requirements are met.
PHONE
CABLE TV
511238210 101149899
N/A N/A
PROJECT PHASE
PWR
NOTIF#ORDER#
Superior
OH Misc Expense
UG Misc Expense
OH Xfmr Expense
UG Xfmr Expense
Removal
DESIGNED BY
UTILITIES
CONTACT
PHONE#
COUNTY
1/4 SEC
U-MAP NO (POWER)
OP MAP
Emer Sect Gas Wk Ctr POWER WK CTR
PLAT MAP
JOINT FACILITIES ARRANGEMENTS
DRAWN BY
CHECKED BY
APPROVED BY
FOREMAN #1
FOREMAN #2
MAPPING
INCIDENT MAOP
Gas Order Elect Order
SCALE PAGE
ENGR - POWER
ENGR - GAS
FUNCTION
PROJECT MGR
PERMITREAL ESTATE/EASEMENT
2
1
REV#
3
DATE DESCRIPTIONBY
CONTACT PHONE NO DATE
OH CKT MAP CIRCUIT NOUG CKT MAP
E-Mail:
Cell Phone:
Project Manager Contact Information:
Manager:
###
###
###
No
No
No
Yes
Yes
Yes
"Flagging Required"
"Outages Required"
"Locates Required"
SITE
J. SCHULTZ 425-480-2925 7/07/22
J. SCHULTZ 425-480-2925 7/07/22
...
T. MYER 714-893-2405 7/07/22
N/A City of Renton
WSDOT SUA 4550
UPGRADE OH 25kVA TO 50kVA XFMR
2200 E VALLEY RD, RENTON, WA 98057
PUGET SOUND ENERGY
N/A N/A
N/A 101149899
1" = 50' 1 OF 1
KING N/A N/A QCSOKE
S19-T23N-R05E N/A N/A
2305E076 2305E076 2305E076SW VIC-16
.
.
.
.
.
.
.
.
.
.
.
.
JESSICA SCHULTZ
425-480-2925
Jessica.Schultz@pse.com
WSDOT
-
-
JIM RHODES 425-213-9930 101149899N/A
N/A
N/A
N/A
N/A
N/A
UNIVERAL MAP (2305E076)
JOB SITE
TPX SERVICE
EXISTING GUY AND ANCHOR
SCALE: NO SCALE
SUA 4550 MP 25.72
WSDOT I-405 EXPANSION
583072431
N/A
RESTORATION PER CITY OF RENTON STANDARDS
Additional approval from WSDOT will be
needed for work in their ROW
MFP23002136