HomeMy WebLinkAboutCO 02 _
CAG-17-088, �0 #2-17
CITY OF RENTON
Community Services Department,
CONTRACT:CHANGE ORDER AGREEMENT
_ . ..
_
io/z/zoi� .
_ CONTRACT: Ci.ty of:Renton
CAG-17-088
CONTRACTOR: Road Construction Northwes#,Inr.
CHANGE ORDER: No.2
SUMMARY OF pROPOSED CHANGE:
Reason/Justification: ;
' 1: ThreeType I junction boxeswill provide mi;nimal handhold space
Contract Change:...
1,. Proyide three Type Il.junction boxes in lieu of three Type.l boxes
DESCRIPTION:
Item Qty: Description UnitPride A.mount
No. w/WSST
T 3 ProvideType II.Junction Boxes in lieu oflype l .: . .$ 968.34 $ ..1;065.1Z
Total this Change Order: $ 1,065:17
ORIGINAL CONTRACT CURRENT CONTRACT NETCHANGE REVISED CONTRACT
" PiIVIOUNT(W/WSST) AM�UNT ..:. THIS ORDER(W/WSST). TOTAL AFTER CHANGE:.'
$.2,351,010.48 $ 2,366,073.22 $ 1;065:17 $ 2,367,138.39
_
Additionel Calender.Days:
(0)Calendar Days
ThQ payment specified and agreed to in this change.order includes every claim by.the contractor for any
extra payment with respect to the work described in thischange.order..The work cove�ed by this change
_
order must be.performed under the same terms and conditions as that included in the original
_..
agreement. All,ofthe otherterms ofthe original.agreement remain.in.effect. -
SIGNATURES:
r :
., ;
Contractor: . ' - Jeffre M.Kan er.f President.Date: fQ � /.
Project Manager: . D� 4� Date �� 'y- � !
APProved By: Date: .�v��!�
. - _- � . � ' . unit rvices Administraror) � - � � ._ - �
_
_ _ . .
_ _
_
_ .
.
Road Construc�ion Northvve�t, Inco
_ _ _
PO Box 2228 Renton,.Washington 98056 (425).254-9999 (425J 254-1334 fax
_
September 27;201.7
To: City. of Renton
1055 South.Grady Way.
Renton,WA 98057:
ATT1�I.: 1Vl:r.Todd.Blacic. :
I2E: City of Renton—Sunset Neighborhood Parli(Phase I)Project :
City Projeet#CAG-17-08� �:
12CNW Projec�#1710
SU�J:: Change Oraer Request/itevise THREE 3unction�oxes to Type:IIs
Dear Todd,
Per your site yisit last Friday,.Totein'Electric was directed by you to change THREE(3)Type I Jt�nction:
Boxes to Type IIs per E=Mai1 dated September 22i1d at 2:16PM: Please see attached cost proposal from
Totein Electric for:the added costs of this:revision.: Summary of costs are as follows: .
_ :
Tot'etri�lectric Cost Proposal dated 9/26//20:17 1 LS @$864.59 $ 864.59
5USTOTAd� $ �64.59
Subcontractor 12% 1!'Iarl�-Up ��b4:59 @ 12%
_ . : � 103.75 _ :
TOTr�L : $ 968.34: ::
Tlus price EXCI�UDES VVashington State Sales Tax. .For your.conveiiience allowable marl�-ups for
Force Account(Section 1-09.b of tfie 2016 WSDOT:Standard;Specification.$)have been added.
_ .
Total costs to City of Renton for completiiig this REVISED Scope of Work is�96�.34: Please issue us a
Work Authorizatian and Change Order so tliat.we,r.eimburse Totem Electric for this added costs. Should
you have any:questions or coiicerns,:please contact me at.(425)777-7323.
_
Very:truly yours,
_ . u'�
�,�,�/ �
�
u'"_ ` _
�
Gordori Lee
Road Construction Northwest
_
:
�G�3/i �
_
Page 1 of 1
Road Construction Northwest, Inc.
PO Box 2228 Renton, Washington 98056 (425) 254-9999 (425) 254-1334 fax
September 27,2017
To: City of Renton
1055 South Grady Way
Renton, WA 98057
ATTN.: Mr.Todd Black
laE: City of Renton—S�anset Neighborhood Park(Phas�1)Project
City Project#CAG-17-0��
ItCN�V Project#1710
SUBJ: Change Order Itequest/Revise THItEE Junction Boxes to'�'ype IIs
Dear Todd,
Per your site visit last Friday,Totem Electric was directed by you to change THREE(3)Type I Junction
Boxes to Type IIs per E-Mail dated September 22nd at 2:16PM. Please see attached cost proposal from
Totem Electric for the added costsl of this revision. Summary of costs are as follows:
Totem Electric Cost Proposal dated 9/26//2017 1-LS @$864.59 $ 864.59
SUB'Y'O'I'AL $ 864.59
Subcontractor 12% Mark-Up $864.59 @ 12% $ 103.75
TOTAL $ 96�.34
This price EXCLUIDES Washington State Sales Ta�c. .For your convenience allowable mark-ups for
Force Account(Section 1-09.6 of the 2016 WSDOT Standard Specifications)have been added.
Total costs to City of Renton for completing this REVISED Scope of Work is $968.34. Please issue us a
Work Authorization and Change Order so that we reimburse Totem Electric for this added costs. Should
you have any questions or concerns,please contact me at(425)777-7323.
Very truly yours,
��, ��, �,�.�-
.��
Gordon Lee
Road Construction Northwest
Page 1 of 1
�h�ar�� ���} ��3����
` ���������������
����a .
��.�.�����
_ y�....._, � .....
Road Construction IVorthwest, In�.
4561 — Sunset Neighborhood Park COR Subject: Change three Type 1 Junction Boxes to Type 2
Ph�se 1 Junction Boxes
'rp Gordon Lee COR Number: 4561-�
Road Construction Northwest Inc COR Revision Number: 0
PO Box 188 COR Date: 9/27/2017
Renton, WA 98057 Work Type : Price / Proceed
Phone No: 425-254-9999
Fax No: 425-254-1334 1/alid for 30 Days.
Return To Jeff Stephens
Totem Electric of"facoma, Inc.
2332 S. Jefferson Ave
Tacorna, WA 98402
Phone No: 253-722-2839
Fax No: 253-272-5214
jefifs@totemelectric.com
Scope Of VVork / T�me Extension Request
Change three Type 1 Junction Boxes to Type 2 Junction Boxes
Details
: �,ra �1 � } `�� � s::� �� r ��F ' ;
�S 5 3 l`1.�i.. �'e ?&1 1ke .33 0. F � ..�.'� 'f`•� �. 3 �� , 1 �' Oy,' �b.� F�� f� �'°v L Ml 'l:
�� � �
����I��, ���i� � D��r����car� T�pe ��a�e �I�r�� k '�rrr��+r� � ���:
� �:....� ��h.... .�.. ...�....... :x.�e �..>.. .. .. .., ; ... , .....::<.
3
105—Conduit
001 Ft Junction Delete 3 Type 1 Labor $83.0,� -6.60 1.00 ($548.06)
Junction Boxes Hrs
Boxes
105—Conduit Add 3 Type 2 9.60
002 �t Junction Labor $83.04 1.00 $797.18
Junction Boxes Hrs
Boxes
Delete Type 1 3.00
003 Material ($320.00) - ($960.00)
Junction Box Each
Add Type 2 Junction 3.00
004 BoX Material $440.00 �.aC� - $1,320.00
�: E� .L ,� '. : F ,,� E : ', '�.g)S "„�" F
, � � ' t
���� ��� ��
�,�r����a �ud�'� . - ��r��z��rs� � � T��� ' �� ���t� J t�r� �����r� ' ��'
3: G ^,
w...... ... ....< .. ...,: .�..:.. ...... ... �..,.. .�..�..:.. a.F .::<: . ......;.�. �?.,. .?; ,
� . . ' ... '.:... .�:�...:.n:..,
� . ... ..... .. .. ... . .. . .".
005 Equipment Rental Other $29.65 3.00 - $88.95
Breakout
Labor : $249.12
Gross Margin Percent @ 29%: $72.24
Material : $360.00
Gross Margin Percent @ 21%: $75.60
Other : $88.95
Gross Margin Percent @ 21%: $18.68
Total: $864.59
Reservation of Rights
This COR does not include any amount for impacts such as interference, disruptions, rescheduling, changes in the
sequence of work, delays and/or associated acceleration. We expressly reserve the right to submit our request for
any of these items.
�
Signed By: '"`� � Dated: 9/27/2017
Jeff Stephens
Projeet Mana�er