Loading...
HomeMy WebLinkAboutCO 03 _ _ . _� - - CAG-17-088, CO #3-1:7 _ CITI(OF REN�'ON Gommunity Services DepartmenY , CONTRACF:CHANGE ORDER AGREENIEiVT _ , - : _ io/a/zoiz CONTRACT: City of Renton _ . . CAG-17-088 _ . . CONTRACTOR: Road Construction Northwest,Ine: CHANGE:ORDER; :. No.3 _. SUMMARY OF PROPOSED CMANGE: Reaso n%J ustiflcati on: : 1. Additio.nal contract time requi�ed due to Teamster's concrete strike . . Contract Ehange;.., _ _ 1. Extend contre�t period to Substantial Completion DESCRIPTION: Item Qty.: Descrip#ion UnitPrice . Amount No. w/WSST: 1: 33 Extend contrac4 period to Substantial Completion. $ - $ . - Total this:Change Order: .�� "ORIGINAL CONTRACT'; CURRENT CONTRACT NET CHANGE REVISED CONTRACT AMOUNT'(W/WSST) AMOUNT.. THIS ORDER(W/WSST) TOTAL'AFTER CHANGE. �:: : _ j $.2,35.1,U10.A8 $ Z�367,138.39 $. - $ . 2;367,138.39 Additional Calendar:Days: (33)Calendar Days=New Substantial Com.pletion Date is January.15;2018 ;: The payment specified and agreed to in this change order includes every claim;by the contractor for any �: . ext�a payment with respect to:the work described in ihis change order. The work covered by this change order must be.performed under the same.terms and conditions as that included in the original .. agreement. All of the other terms of the original agreement remain in,effect. SIGNATURES: ` . : :..,i. Contrecto�: . : ` —,�; :� Jeffre M.Kan er President Date: ,/D /:7:... 'c./ r _ Project.Manager: ����1 �� Date !� �.�� ' � _ , _ , l Approved By: Date:. . � . � - � � �, � � � (C unty _ icesAd.ministrator) . � � � ' � T�dd �9ack F���� Jake Boose <Jake@RCNW.com> S��g� Friday, September 22, 2017 12:59 PM T�� Todd Black ec: matt@rcnw.com;gordon@rcnw.com;'George Tucker'; brian@rcnw.com; chad@rcnw.com;jeff@rcnw.com;Thr@rcnw.com 5a�bj�et: RE:Sunset IVeighborhood Park Pahse I Hello Todd, Thank for responding to our letter requesting more contract days due to the Teamster Strike and granting this request. We appreciate that you have granted us this and look forward to seeing your change order. Thank You, Jake Boose [sfimator/Praject Manager Road Cons#ruction IVorth+n��st,Inc. � 8b20 Holly Drive,Suite 210,Everett,WA 98208.PO Box 2228,Renton,WA 98�56 Tel 425-777-7325 fax 425-228 2457 Cet1425•532�0380 Jake@RCNW.com Plotice�7his message,inuuding ottachments,contams confidential ond privile,qed 8iformotion for the exclusi�e use of the intended recipient(sl.Any unouthorized�rsn Is prohi6ited.If tft�s ernnll�s not for you,plense aatijy the sender and then destroy the me.ssoges.TAonk you. From: Todd Black [mailto:TBlack@Rentonwa.gov] S�s�t: Friday, September 22, 2017 11:57 AM Toe 'Jake Boose' Cce matt@rcnw.com; gordon@rcnw.com; 'George Tucker'; brian@rcnw.com; chad@rcnw.com;jeff@rcnw.com; Thr@rcnw.com S�abj�: RE: Sunset Neighborhood Park Pahse I Hi Jake,et.al, Thank you for the letter requesting additional time due to the Teamsters strike.After review of the August 7, 2017 Three week look ahead schedule, I note that the concrete sub was scheduled to start the week of August 21, 2017. Due to the strike,their start time was repeatedly pushed out. You request that the timeframe commence on August 15,2017. If the contractor was not scheduled for that week, I believe that the duration of the reimbursement of calendar days be from August 21 to September 22,2017,for a total of 33 days. If this is acceptable, I will provide a change order, with the new Substantial Completion date of lanuary 15, 2018. If you have any questions,please don't hesitate to ask. Regards, Todd BJack, PLA,ASLA Capital Project Coordinator � Parks Planning�e Natural Resources 1055 S Grady Way � 6th Floor � Renton,WA 98057 1 Phone:425.430.6571 I tblack@rentonwa.�ov �� ��'l�t�T� � From:Jake Boase fmailto:JakeC�RCNW.coml Sen�: Monday,September 11,2017 10:12 AM To:Todd Black<TBlack@Rentonwa.�ov> +�c:mattC�rcnw.com,�ordonCn�rcnw.com: 'George Tucker'<geor�e@rcn�r.com>; brian@rcnw.com;chad@rcnw.com, ieff�rcnw.com:ThrC�rcnw.com SubJeege Sunset fVeighborhood Park Pahse I Todd, Please see attached letter regarding the Teamsters Strike Last Month. looking forward to hearing back from you . Thank You, lake Boose EstimalorJproject Manager Road Construction t�or4hwest,Inc. 8620 Holiy Drive,Sulte 210,Everett:WA 98208.PO Box 2228,Renton,WA°8056 Tei�25-777-7325 Fax 425-�28•2957 Cell A25-531-038Q Jake@ RCN W.com Notfre.This rnessnge,inr.luding attn�hments,c.ontolns confrdr.ncrn!nnd priv�leged infonnntion fo�the r.xrlusive use of thF infr.nded reclpient/sJ.Any unnuthorized v;e �s prvhr'bited.1�fliis emad is not for yau,pleose notify the senderond then destroy!he messnges.7haik yvu. 2 . � � ' . . � , . � . - � . �. � z�. . � . - . � � . . . . ..z. ��, . . . . - � . . � . . . _ . . �� _ ' . ., � .� . . . ;�' . , . . . _ , . . . , „. � . .. . ' . . . . . ,3;... � . . � . . � . . - ' , � . . . . . . � ...� .. . : . � �- . • - - ; Road Construction Northwe�t, I nc. � __ . .. . PO Box 2228 Renton, Washington 98056 (425)254-9999 (425)254- 4 ax September 11,2017 VIA: Email Serial Letter#1 To: Todd Black,PLA,ASLA � - . .City of Renton 1055 S Grady Way . � Renton,WA 9�057 Project; City of itenton—Sunset Neighborhood Park Phase I City Proj�ct No.: CAG17-08$ /RCNiW Job#17Y0 .SiJ�J: Strikes I�: 1-08.8 Extensions of T'ime Dear Mr.Black: As you lrnow,the strike by the Teamsters has caused our concrete subcontractor significant impacts to their scheduled work.There has been resolution to the Teamsters strike, but the resolution didn't come without impacts to the concrete"trades.The strike stared on 8/15/17 and ceased on�121/17 it put our concrete subcontractorbehind schedule on projects that . were supposed to be completed prior to their arrival on this proj ect.Additionally,it appears that the iarger concrete pours are taking precedence over the smaller'concrete pours.Unfortunately, this project would be considered a smaller pour. . As shown on our critical path schedule cement concrete is our critical path.Additionally, th.ese delays could nof have been avoided by resequencing the work or by using reasonable alternatives. Our concrete subcontractor is able to schedule concrete on 9/18/17. Due to these circumstances out of the control of the contracfor and in accordance with WSDOT specification section 1-08.8/4.et, al,we are requesting a reimbursement of calendar days caused by the . ' Teamsters Concrete Strike.We are requesting 39 calendar days for the timeframe from 8/15/17— 9/22/17 be added to the contract duration. If you have any questions or comments regarding this serial letter,please feel free to contact me at your earliest convenierice. , Sincerely; � , � � , Jake Boose ° Project Manager Road Construction Northwest,Ina .�,. �