HomeMy WebLinkAboutCO 04 CAG-17-088, . CO #4-17
,.
CI�Y(:1F i�ENTORI _
Community.Services Department
_.
_ . _ .
; CONTRACT:GHANGE ORDER A6RE�MENY
io/s/:oi�:
CONTRACT: City of Renton
CAG17-088. .
CONTRAGTOR: Road ConStruction Northwest;Ine.. ;
CHAiN�E DRDER; No.4 : . .
_
SUMMARV OF PROPOSED CHANGE: : .
_ .
R�aso n/J ustification:
1:. Revised elevation to fQoting for restroom bufldirtg.
. _ . . Contract Change: :
1. Additional work to revise footing forms
DESGRIFTIOYV:
Item Qty. Descript(on Unit Price Amount
No; wJ 1NSST:: . .
1 . : 3 Additional work to revise footing forms : $ 5,Z18.30 $; 5,74:Q:13
�
Total this Chan e Orde�: $ 5,740:13
ORIGfNAL CONTRACP : CURRENT CONTRACE NfT.CHANGE REVISED CONTRAR
' AMOUNT(W/WSS�, AMOUNT ,, , ,. THIS ORDER(W/WSST�. . TOTAI AFfER GHANGE. ..
S P,351,010.48 :: $ 2,367,138:39 . : $ 5,740.13 .$ 2,372,878.52.
' Additional Calendar Daysc
(0)Calendar DayS; :
The;payment specified and agreed:4o in this change order includes every clafm by the contractor for any :: _
eztra Payment with respect fo fhe.work described'in thie change order. The work.covered by this change ;
order must be perfor:rimed under the same terrtis and conditions as tfiat included in the original
agreemen#. Ail of the otherterms of the original agreement remafn in:effect.
SIG�ATURES: _ :
Contractor: ., , Jeffre M.Kan erlPrestdent. Date: fn i 3 f:
L,
� � i
Projeci Manager: � � Date. � � `C� _
_ �--- �`�" � �r
6lpproved�y: Date:
lo- �- �
(Commun Servites dministretor� •
Road Construction Northvvest; I nc.
. _ n
` PO Box 2228 Renton, lNashing4on 98056 (425)254-9999 (425)254-1334 ax ' .
, E
Ocfober 3,2017
Ta City of Renton
1055 South Grady Way
Renton,WA 98057 .
A�T'N.: Ms.Todd B.lack
RE: City of Renton-Sunset Neighborhood Park(P�ase 1)Project
City Project#CAG-17-08�
RCNW Froject#1710 `
SUBJ: C�ange�rder Request/Revised Itestroom Elevations
Dear Todd,
Please see attached cost proposal from Four Seasons Concrete Construction LLC for the added costs to
the revision of the RestroomElevations. S��unary of costs are as follows:
Four Seasons Goncrete Cost Proposal 1-LS @$4,659.20 � 4.659.20
SUBTOTAI. $ 4,659.20
Subcontractor 12%Mark Up $4,659.20 @ 12% $ . 559.10
TOTAL � 5,218.30
This price EXCLUDES Washington State Sales Tax. .For your convenience allowable mark ups for
Force Account(Secdon 1-09.6 of the 2016 WSDOT Standard Specificafions)have been added.
A total cost to City of Renton for completing this REVISED Scope of Work is 55,218.30. Please issue us
a Work,Authorization and Change Order so that we reimburse Four Seasons Concrete for this added cost. '
Should you have any questions or concerns,please contact.me at(425)777-7323.
Very tnily yours,
Jake Boose
Proj ect Manager
Road Consiruction Northwest,Inc:
Page 1 of 7 .
t
�
�
{
Four Seasons Concrete Construction, LLC �.
,
P.O. Box 5390 Spanaway, WA 98387
Office (253) 961-0974 '
�
,
r
CHAtVGE ORDER
Date: 27-Sep-17
�
Contractor: Road Construction NW,Inc. Change Order:#1
Project: NE 10th St.&Sunset Lane SNPl-Footing Elevation Change
Location: Renton,WA
Description , Quantity llnit Price Total
Labor-Super,Journey, Laborer 1 $3,615.00 $ 3,615.00
Material-Forms 1 $ 182.00 $ 182.00
Tools&Equipment 1 S 363.00 $ 363.00
Profit/Overhead 124� $ 499.20
Total Does not include WSST [$ 4,659.20]
Clarificat3ons
Inclusions: Labor,Tools, Forms to perform footing elevation change for restroom
EXCIU51o115: -Excludes taxes,permits and fees
-Excludes all layout,surveying,asbuilts,testing and treffic control
-vehicle and Pedestrian foot traffic control.
-Subgrade must be flrm,unyieldfng and+/- .lOth prior to setup,and provtdes sufficient room for forms
-All work not specifically fncluded above is excluded
- Signature Date ,
Cht-i.s Aden
General Manager �
FOUR SIEASONS CONCRETE CONSTRUCTION
CeIL• (2531961-0974 �
- �