Loading...
HomeMy WebLinkAboutCO 04 CAG-17-088, . CO #4-17 ,. CI�Y(:1F i�ENTORI _ Community.Services Department _. _ . _ . ; CONTRACT:GHANGE ORDER A6RE�MENY io/s/:oi�: CONTRACT: City of Renton CAG17-088. . CONTRAGTOR: Road ConStruction Northwest;Ine.. ; CHAiN�E DRDER; No.4 : . . _ SUMMARV OF PROPOSED CHANGE: : . _ . R�aso n/J ustification: 1:. Revised elevation to fQoting for restroom bufldirtg. . _ . . Contract Change: : 1. Additional work to revise footing forms DESGRIFTIOYV: Item Qty. Descript(on Unit Price Amount No; wJ 1NSST:: . . 1 . : 3 Additional work to revise footing forms : $ 5,Z18.30 $; 5,74:Q:13 � Total this Chan e Orde�: $ 5,740:13 ORIGfNAL CONTRACP : CURRENT CONTRACE NfT.CHANGE REVISED CONTRAR ' AMOUNT(W/WSS�, AMOUNT ,, , ,. THIS ORDER(W/WSST�. . TOTAI AFfER GHANGE. .. S P,351,010.48 :: $ 2,367,138:39 . : $ 5,740.13 .$ 2,372,878.52. ' Additional Calendar Daysc (0)Calendar DayS; : The;payment specified and agreed:4o in this change order includes every clafm by the contractor for any :: _ eztra Payment with respect fo fhe.work described'in thie change order. The work.covered by this change ; order must be perfor:rimed under the same terrtis and conditions as tfiat included in the original agreemen#. Ail of the otherterms of the original agreement remafn in:effect. SIG�ATURES: _ : Contractor: ., , Jeffre M.Kan erlPrestdent. Date: fn i 3 f: L, � � i Projeci Manager: � � Date. � � `C� _ _ �--- �`�" � �r 6lpproved�y: Date: lo- �- � (Commun Servites dministretor� • Road Construction Northvvest; I nc. . _ n ` PO Box 2228 Renton, lNashing4on 98056 (425)254-9999 (425)254-1334 ax ' . , E Ocfober 3,2017 Ta City of Renton 1055 South Grady Way Renton,WA 98057 . A�T'N.: Ms.Todd B.lack RE: City of Renton-Sunset Neighborhood Park(P�ase 1)Project City Project#CAG-17-08� RCNW Froject#1710 ` SUBJ: C�ange�rder Request/Revised Itestroom Elevations Dear Todd, Please see attached cost proposal from Four Seasons Concrete Construction LLC for the added costs to the revision of the RestroomElevations. S��unary of costs are as follows: Four Seasons Goncrete Cost Proposal 1-LS @$4,659.20 � 4.659.20 SUBTOTAI. $ 4,659.20 Subcontractor 12%Mark Up $4,659.20 @ 12% $ . 559.10 TOTAL � 5,218.30 This price EXCLUDES Washington State Sales Tax. .For your convenience allowable mark ups for Force Account(Secdon 1-09.6 of the 2016 WSDOT Standard Specificafions)have been added. A total cost to City of Renton for completing this REVISED Scope of Work is 55,218.30. Please issue us a Work,Authorization and Change Order so that we reimburse Four Seasons Concrete for this added cost. ' Should you have any questions or concerns,please contact.me at(425)777-7323. Very tnily yours, Jake Boose Proj ect Manager Road Consiruction Northwest,Inc: Page 1 of 7 . t � � { Four Seasons Concrete Construction, LLC �. , P.O. Box 5390 Spanaway, WA 98387 Office (253) 961-0974 ' � , r CHAtVGE ORDER Date: 27-Sep-17 � Contractor: Road Construction NW,Inc. Change Order:#1 Project: NE 10th St.&Sunset Lane SNPl-Footing Elevation Change Location: Renton,WA Description , Quantity llnit Price Total Labor-Super,Journey, Laborer 1 $3,615.00 $ 3,615.00 Material-Forms 1 $ 182.00 $ 182.00 Tools&Equipment 1 S 363.00 $ 363.00 Profit/Overhead 124� $ 499.20 Total Does not include WSST [$ 4,659.20] Clarificat3ons Inclusions: Labor,Tools, Forms to perform footing elevation change for restroom EXCIU51o115: -Excludes taxes,permits and fees -Excludes all layout,surveying,asbuilts,testing and treffic control -vehicle and Pedestrian foot traffic control. -Subgrade must be flrm,unyieldfng and+/- .lOth prior to setup,and provtdes sufficient room for forms -All work not specifically fncluded above is excluded - Signature Date , Cht-i.s Aden General Manager � FOUR SIEASONS CONCRETE CONSTRUCTION CeIL• (2531961-0974 � - � I i ; •; � � � � �