THIS AMENDMENT, dated August 8, 2017, is by and between the City of Renton (the "City"), a
Washington municipal corporation, and PND Engineers, Inc. ("Consultant"), an Alaska
Corporation doing business in WA. The City and the Consultant are referred to collectively in
this Amendment as the "Parties." Once fully executed by the Parties, this Amendment is
effective as of the last date signed by both parties.
Whereas, the City engaged the services of the Consultant under Agreement CAG-17-105 , dated
05/08/2017, to provide necessary services for the Gene Coulon Park Facility condition
Assessment (referred to herein as the "Agreement");
Whereas, the Parties wish to amend the Agreement to change the scope of work, [and] change
the compensation in order to provide for the structural assessment of the wave break
structure adjacent to the public boat launch.
NOW THEREFORE, It is mutually agreed upon that CAG-17-105 is amended as fo►lows:
1. Scope of Work: Section 1, Scope of Work, is amended to add work as specified in Exhibit
A, which is attached and incorporated herein.
2. Time of Performance: Section 3, Time of Performance, N/A.
3. Compensation: Section 4, Compensation, is amended so that the maximum amount of
compensation payable to Consultant is increased from $97,600.00 to $106,400.00 plus
any applicable state and local sales taxes. The additional compensation shall be paid
based upon Work actual performed on a Time and Materials basis in the amount of
$8,800.00 according to the rate(s) or amounts specified in Exhibit A, which is attached
and incorporated herein
4. All terms of the Agreement not explicitly modified herein shall remain in full force and
effect and such terms shall apply to Work performed according to this Amendment as if
fully set forth herein.
IN WITNESS WHEREOF, the Parties have voluntarily entered into this Agreement as of the date
last signed by the Parties below.
CITY OF RENTON CONS LTANT
\
By: _ B
Kelly Bey r 1im Campbell, .E.
Administrator
PND Engineers, Inc.
1736 Fourth Ave S. Seattle WA 98134
206-624-1387
��� 17 ��s-r � ,�,c, t�
Date Date
Approved as to Lega) Form
�w�%�I1� ���}�
.��
Shane Moloney
Renton City Attorney
ContractTemplate Updated 05/30/2017
Page 2 of 2 � ""'
� � �
ENCINEERS, INC:.
Engineering Services: AUgUSt 8, 2�17
c,�•�t PND No. 174037
Planning
Sun�eying
st�,�t„ral Todd Black,Capital Project Coordinator
re�a�;cr�ng Parks Planning& Natural Resources
fiyarol��v City of Renton
Geotechnical 1055 South Grady Way
l;nVironmental R2nton,WA 98057-3232
Transportation
Manne ra��u�s Subject: Gene Coulon Park—Structural Assessment—Amendment#01
Coastal Engincering
Boat Launch Wave Break Assessment
Contract Administration
Construction Engr.Support
Dear Todd:
otr�es:
seatti� Additional design services have been requested to provide structural assessment
1�3�r�o�rth A��e,,,,e s of the wave break structure adjacent to the public boat launch at Gene Coulon
seattie,wasr„ngt��n<�s�3a Memorial Beach Park in Renton.The wave break reduces the height and impact of
Ph�ne:�o�.cza.t38� waves at the boat launch facility.
P�,�iana The wave break consists of horizontal treated timber supported by steel beams
ZaoNvvs�6 n�enue spanning between vertical and battered steel piles. We understand that the wave
n�>rtiaaa,Oregon 97209 break structure has not previously been assessed. The structural assessment will
nh�ne:sos.�is.�33� include all elements above and below the water. As with the other structures
assessed under the original scope of work, Levels I, II, and III assessments will be
��n�h��� conducted to determine the current condition of the wave break. PND will work
ls��W�St 3�th��e��� with our sub-consultant, Echelon Engineering, to determine the conditions of the
t�n�ho�e,�laska��s�3 structure below the water line.
Phone:907.561.1017
The results of this wave break assessment will be included in the complete
Ju„ea� assessment report,generated as part of the original scope of work.
9360 Glacier Hwy,Suite 100
Juneau,Alaska 99801 Deliverables
i�h�„e:�o�.ss�.ao��s The contract deliverables will remain unchanged. The wave break structural
assessment will be included as an additional facility in the report.
Houston
10497'1'own&Country Way Assumqtions
SUite Zlo All assumptions as defined in the original scope of work will remain.
Houston,'1'exas 77024
Phone:832.930.4837 Schedule
Following approval of this proposal by the City of Renton, PND agrees to perform
the above-described services and to diligently pursue the project and make every
reasonable effort to finish all items in a timely manner.The following is an update
to the originally proposed schedule for the project. PND will refine this schedule
based on further discussion with the City
www.pndenginccrs.co m
August 8, 2017 � Page 2
General Schedule
Notice to Proceed Week of August 7, 2017
Supplemental Dive Survey August 10, 2017
Draft Report August 29, 2017
Final Report September 26, 2017
Fee
The total compensation for the work on this project shall be adjusted with this amendment. Note that
work associated with this amendment will be completed on a time and expenses basis.
Total Base Contract Amount(Hourly,NTE) $97,600.00
Amendment No.01-Wave Break Assessment(Hourly,NTE) $8,800.00
Total Fee $106,400.00
We look forward to performing this work for the City. If there are any questions regarding this
Amendment proposal, please call anytime.
Sincerely,
PND Engineers, Inc. � Seattle Office
��� � �
. � � �
Ir �
Jot� R� p.E. Ji�n C�mpbe ,P,E.
Senior Engineer President
� � � � �
E.�hib�t B
PROJECTTITLE:CityofReotoo-GeneConlooPark-FacJityCondifiooAsses9ment-Ameodment#Ol Rev�sed� 8/8/2017
CLIENT:CITY OF RENTON PARKS PLANNING AND NATORAL RESOURCES
LABOR:
::::::�..:......... ........... . .
.......a..........e:..:::..::::.:::::r.,.::::::.:r .. :il:.
�::: .>�.r.....,..: ...� ...
............ . ��::. ::::::::::::��.. ...... .....
......."v<!"�............. ::: ....,...: . ........ .
. �:.. .�..:-:��::.::::�::� :::�.:::�::.�.:.::�. ; ........
:::::::..,�... .,.,..i=t:�ii!�a1nC:�ki .......E .��::��i:....,,;.,,:-:�::�:!::::;:_;"�.?>�_',r:t_ttt::::::: .�::,...<i'.CAp:s:::::ii�'.?.';;.:P;i:_.!;;..:::[:_.:.;;,
iiii����.:�.�......�.:.::::::::.:.. i ;�.�i;..;;.�_' .. ::;:�.��:.::.;�ig�.:..:::7:t:€[
t�:::::::.�:i::til!Yi:..::�. �. ....:�!K.:.:
Task Item :::::::::.::.f:::..:.:%�".�,_:_,:::?::C............ ......_ ::::.:::��'::�:::�:� S�f&el�ieJtY�'�ek.(....;.,....::^.
..-v.:.:............... �
...:::��:::��:::�::..�::�::.: . .... ......
............. :::::::.. ........... ........:r...�... ...;::::..::.�....:::� ..�.. :.:::: To Labor
._::�::�: .:::::....
.......... ............ . .............:....... ..� ......:��:.�
No Task(Scopeof5erv�ces) S160 $165 5145 $135 §I15 $105 a9p §750 $100 S90 $7U Ho Cost
10 MaplewoodGolfCourse
- Report(Wavc Break) l 6 8 1 I9 $2 330 UO
Subtotal 1 U 6 0 8 0 0 0 0 J 0 19 $2�30.00
TOTALPNDLABOR 1 0 6 0 8 0 0 0 0 � U 19 52,330.00
EXPENSES:
�m Cost Eape�es
QuaNity Tnps Unrt pe O t Muk p C t
1 Travel-M�Icage 0 8 EA $0.535 1 I SO W
I Muc Inc�dentals 0 8 EA $20 I I $0 00
TOTAL EXPENSES gp.pp
SOBCONSULTANTS:
Subconvact Subwn
Amount Marku C st
1 Echelon(WaveBreak) $5,8?IOU 11 SG,41110
TOTAL SUBCONSULTANTS $6p14.10
Total-Labor $2.770 00
Total-Expenses SO 00
To�al-Subconsultanls $6,J1J lU
TOTAL- 58,71J.111
Notes.
1 Sec assumphons and scope dalcd Apnl 27,2017