HomeMy WebLinkAboutAdden 1 CAG-17-105,Adden#1-17 CITY OF - en on � AMENDMENT NO. 1 TO AGREEMENT FOR GENE COULON MEMORIAL BEACH PARK FACILITY CONDITION ASSESSMENT CAG-17-105 THIS AMENDMENT, dated August 8, 2017, is by and between the City of Renton (the "City"), a Washington municipal corporation, and PND Engineers, Inc. ("Consultant"), an Alaska Corporation doing business in WA. The City and the Consultant are referred to collectively in this Amendment as the "Parties." Once fully executed by the Parties, this Amendment is effective as of the last date signed by both parties. Whereas, the City engaged the services of the Consultant under Agreement CAG-17-105 , dated 05/08/2017, to provide necessary services for the Gene Coulon Park Facility condition Assessment (referred to herein as the "Agreement"); Whereas, the Parties wish to amend the Agreement to change the scope of work, [and] change the compensation in order to provide for the structural assessment of the wave break structure adjacent to the public boat launch. NOW THEREFORE, It is mutually agreed upon that CAG-17-105 is amended as fo►lows: 1. Scope of Work: Section 1, Scope of Work, is amended to add work as specified in Exhibit A, which is attached and incorporated herein. 2. Time of Performance: Section 3, Time of Performance, N/A. 3. Compensation: Section 4, Compensation, is amended so that the maximum amount of compensation payable to Consultant is increased from $97,600.00 to $106,400.00 plus any applicable state and local sales taxes. The additional compensation shall be paid based upon Work actual performed on a Time and Materials basis in the amount of $8,800.00 according to the rate(s) or amounts specified in Exhibit A, which is attached and incorporated herein 4. All terms of the Agreement not explicitly modified herein shall remain in full force and effect and such terms shall apply to Work performed according to this Amendment as if fully set forth herein. IN WITNESS WHEREOF, the Parties have voluntarily entered into this Agreement as of the date last signed by the Parties below. CITY OF RENTON CONS LTANT \ By: _ B Kelly Bey r 1im Campbell, .E. Administrator PND Engineers, Inc. 1736 Fourth Ave S. Seattle WA 98134 206-624-1387 ��� 17 ��s-r � ,�,c, t� Date Date Approved as to Lega) Form �w�%�I1� ���}� .�� Shane Moloney Renton City Attorney ContractTemplate Updated 05/30/2017 Page 2 of 2 � ""' � � � ENCINEERS, INC:. Engineering Services: AUgUSt 8, 2�17 c,�•�t PND No. 174037 Planning Sun�eying st�,�t„ral Todd Black,Capital Project Coordinator re�a�;cr�ng Parks Planning& Natural Resources fiyarol��v City of Renton Geotechnical 1055 South Grady Way l;nVironmental R2nton,WA 98057-3232 Transportation Manne ra��u�s Subject: Gene Coulon Park—Structural Assessment—Amendment#01 Coastal Engincering Boat Launch Wave Break Assessment Contract Administration Construction Engr.Support Dear Todd: otr�es: seatti� Additional design services have been requested to provide structural assessment 1�3�r�o�rth A��e,,,,e s of the wave break structure adjacent to the public boat launch at Gene Coulon seattie,wasr„ngt��n<�s�3a Memorial Beach Park in Renton.The wave break reduces the height and impact of Ph�ne:�o�.cza.t38� waves at the boat launch facility. P�,�iana The wave break consists of horizontal treated timber supported by steel beams ZaoNvvs�6 n�enue spanning between vertical and battered steel piles. We understand that the wave n�>rtiaaa,Oregon 97209 break structure has not previously been assessed. The structural assessment will nh�ne:sos.�is.�33� include all elements above and below the water. As with the other structures assessed under the original scope of work, Levels I, II, and III assessments will be ��n�h��� conducted to determine the current condition of the wave break. PND will work ls��W�St 3�th��e��� with our sub-consultant, Echelon Engineering, to determine the conditions of the t�n�ho�e,�laska��s�3 structure below the water line. Phone:907.561.1017 The results of this wave break assessment will be included in the complete Ju„ea� assessment report,generated as part of the original scope of work. 9360 Glacier Hwy,Suite 100 Juneau,Alaska 99801 Deliverables i�h�„e:�o�.ss�.ao��s The contract deliverables will remain unchanged. The wave break structural assessment will be included as an additional facility in the report. Houston 10497'1'own&Country Way Assumqtions SUite Zlo All assumptions as defined in the original scope of work will remain. Houston,'1'exas 77024 Phone:832.930.4837 Schedule Following approval of this proposal by the City of Renton, PND agrees to perform the above-described services and to diligently pursue the project and make every reasonable effort to finish all items in a timely manner.The following is an update to the originally proposed schedule for the project. PND will refine this schedule based on further discussion with the City www.pndenginccrs.co m August 8, 2017 � Page 2 General Schedule Notice to Proceed Week of August 7, 2017 Supplemental Dive Survey August 10, 2017 Draft Report August 29, 2017 Final Report September 26, 2017 Fee The total compensation for the work on this project shall be adjusted with this amendment. Note that work associated with this amendment will be completed on a time and expenses basis. Total Base Contract Amount(Hourly,NTE) $97,600.00 Amendment No.01-Wave Break Assessment(Hourly,NTE) $8,800.00 Total Fee $106,400.00 We look forward to performing this work for the City. If there are any questions regarding this Amendment proposal, please call anytime. Sincerely, PND Engineers, Inc. � Seattle Office ��� � � . � � � Ir � Jot� R� p.E. Ji�n C�mpbe ,P,E. Senior Engineer President � � � � � E.�hib�t B PROJECTTITLE:CityofReotoo-GeneConlooPark-FacJityCondifiooAsses9ment-Ameodment#Ol Rev�sed� 8/8/2017 CLIENT:CITY OF RENTON PARKS PLANNING AND NATORAL RESOURCES LABOR: ::::::�..:......... ........... . . .......a..........e:..:::..::::.:::::r.,.::::::.:r .. :il:. �::: .>�.r.....,..: ...� ... ............ . ��::. ::::::::::::��.. ...... ..... ......."v<!"�............. ::: ....,...: . ........ . . �:.. .�..:-:��::.::::�::� :::�.:::�::.�.:.::�. ; ........ :::::::..,�... .,.,..i=t:�ii!�a1nC:�ki .......E .��::��i:....,,;.,,:-:�::�:!::::;:_;"�.?>�_',r:t_ttt::::::: .�::,...<i'.CAp:s:::::ii�'.?.';;.:P;i:_.!;;..:::[:_.:.;;, iiii����.:�.�......�.:.::::::::.:.. i ;�.�i;..;;.�_' .. ::;:�.��:.::.;�ig�.:..:::7:t:€[ t�:::::::.�:i::til!Yi:..::�. �. ....:�!K.:.: Task Item :::::::::.::.f:::..:.:%�".�,_:_,:::?::C............ ......_ ::::.:::��'::�:::�:� S�f&el�ieJtY�'�ek.(....;.,....::^. ..-v.:.:............... � ...:::��:::��:::�::..�::�::.: . .... ...... ............. :::::::.. ........... ........:r...�... ...;::::..::.�....:::� ..�.. :.:::: To Labor ._::�::�: .:::::.... .......... ............ . .............:....... ..� ......:��:.� No Task(Scopeof5erv�ces) S160 $165 5145 $135 §I15 $105 a9p §750 $100 S90 $7U Ho Cost 10 MaplewoodGolfCourse - Report(Wavc Break) l 6 8 1 I9 $2 330 UO Subtotal 1 U 6 0 8 0 0 0 0 J 0 19 $2�30.00 TOTALPNDLABOR 1 0 6 0 8 0 0 0 0 � U 19 52,330.00 EXPENSES: �m Cost Eape�es QuaNity Tnps Unrt pe O t Muk p C t 1 Travel-M�Icage 0 8 EA $0.535 1 I SO W I Muc Inc�dentals 0 8 EA $20 I I $0 00 TOTAL EXPENSES gp.pp SOBCONSULTANTS: Subconvact Subwn Amount Marku C st 1 Echelon(WaveBreak) $5,8?IOU 11 SG,41110 TOTAL SUBCONSULTANTS $6p14.10 Total-Labor $2.770 00 Total-Expenses SO 00 To�al-Subconsultanls $6,J1J lU TOTAL- 58,71J.111 Notes. 1 Sec assumphons and scope dalcd Apnl 27,2017