Loading...
HomeMy WebLinkAboutAdden 1 CAG-17-046,Adden#1-17 -11101 CITY OF AMENDMENT NO. 1 TO AGREEMENT FOR ARCHITECTURAL SERVICES, FIRE STATION #15 1133111 THIS AMENDMENT, dated , is by and between the City of Renton (the "City"), a Washington municipal corporation, and Schreiber Starling Whitehead Architects ("Consultant"), a Washington State Professional Services Corporation.The City and the Consultant are referred to collectively in this Amendment as the "Parties." Once fully executed by the Parties, this Amendment is effective as of the last date signed by both parties. Whereas,the City engaged the services of the Consultant under Agreement CAG-17-046, dated March 15, 2017, to provide necessary services for the design of Fire Station #15 (referred to herein as the "Agreement"); Whereas, the Parties wish to amend the Agreement to change the compensation to correct a calculation error in the proposed fee schedule in Exhibit A relating to the Welsh Commissioning Group amount+10%-the original mistakenly listed only the commission and not the cost of the actual work. NOW THEREFORE, It is mutually agreed upon that CAG-17-046 is amended as follows: 1. Scope of Work:Section 1,Scope of Work, is amended to add the cost of work as specified in Exhibit 1,which is attached and incorporated herein. 2. Time of Performance:Section 3,Time of Performance, N/A 3. Compensation: Section 4, Compensation, is amended so that the maximum amount of compensation payable to Consultant is increased from$763,486.00 to$784,226.00, plus any applicable state and local sales taxes. The additional compensation shall be paid based upon Work actual performed according to the rate(s) or amounts specified in Exhibit 1,which is attached and incorporated herein. 4. All terms of the Agreement not explicitly modified herein shall remain in full force and effect and such terms shall apply to Work performed according to this Amendment as if fully set forth herein. IN WITNESS WHEREOF,the Parties have voluntarily entered into this Agreement as of the date last signed by the Parties below. CITY OF RENTON CONSULTANT , - s�-.,.� By: By: Kelly Beyme Keith ch i Administrator Principa( �`��/�� (8 �.1GvS1 2�("[ Date Date clb 8-16-i1 ��x� Page 2 of Z -----_- �'w�`��� �xr�18rT � rt ��� ��J�! �RfHiTECTi SCNREIBER STARLING WNITENEAD 11 AUJUSt 2017 901 Fi�TN AYE N0310G SEATiLE.ViA 98ib4 Mr.Robert Ebert 206-682-8300 Capital ProJects Coordinator sswaucN�tEcrs con Community Services Department Renton City Hall-6'"Floor 1055 South Grady Way Subject: Fire Station#15 Agreement CAG-17-046 Request for Amendment Dear Robert: As we discussed today,I recently discovered an error in my proposal/our agreement for the new Fire Station. The formula contained in my spreadsheet,which summarizes the fees from our specialty consultants,was corrupted for the Commissioning Agent. The proposal made by the Walsh Commissioning Group(WCG),attached to our summary,clearly identified their fee for commissioning of the building systems as$20,740. My summary only carried forward the 10% mark-up($2,074)and neglected to account for the costs of the actual services. Due to this latent formula error,our agreement currently does not have fees to cover the needed consulting services. I request that an Amendment be made to our agreement in the amount of$20,740 to provide building systems commissioning. Thank you very much for your attention to this request. Respectful ly, v""'���. Keith Jame c er AIA Principal � , FEE PROPOSAL SUMMARY Renton Fire Station#15 ; � . , � _�' �. ` " �,K �- 8 +� ��. _ _ c ',.� Scope of Work MACC OFM FEE 96 � $3,200,000 9.24% '• ' � � SchemqtJc ' Daslgn [onsh�uctton � •Bidding ConstrircHon �� �� ' . " � Dalgn � Devel�ment Docum�entisr " ' � AdminlstratloriT i . o .� t�?k:,;'f�.•.r tf'�J.�"�� t "� °��>.� � �t';��;�?,,t,.-,-„��.,. ��yi�: ii �, �A. Strudural Engineering $7,020 $7,800. $12,090 $780 $10,530 Mechanical and Electrical Engineering $9,599 $10,666 $16,532 $1,067. $14,399 SubrotalConsuRanrFees S16,619 S18,466 S�8,6�2 $1,847 $24,929 ConsutiantMaik-up at 1096 S 1,662 $1,847 $2,862 S 185 $Z493 Architedural $34,810 $38,770 $60�170 $3,780 S52,210 , r o '•; p° p• ,�' � c e o'o �:�' OFM Perce�tage 1896 20% 31% 2% . �7% OF141 Targe! 53,222 59,136 91,661 5,914 79,834 Note:Conshuction Adminlstratlon and Uose-Out is 6e ond QFM sca/e due to need fa more on-sKe observation and CA Coord(natiort �~D D 0 � . 0 R J i����,H�����,v� }`�• `K!'.r� ' ' . . e�Cr �wK�l +�ti wt�y-� Programming/Predeslgn 5 26,655 Land UsePermltNng $ 14,570 Bosed on supportAniegratfon wi[h WacerTowerproject AddJdona/Mestings&Pr�sentatlons $ 6,150 ExtendedConstructionAdminlshatlon $ 129,980 Record Drawings S 12,620 Clvll(see attached) S 78,980 LPD Proposal+10% SlteStructrrral $ 3,300 LundProposal+l0% Londscape (see aitached) $ 45,888 HBB rproposal+]096 (Includes 4k for arbor�sq Geotechnlca/ (see attached) $ 33,754 HWAaf 16K+14K+1096(lncludesPltTesting) Independen!Estimoting (see attached) $ 12,650 Robfnson C0. Slgnoge/Graphics $ 5,000 Allowance AV $ - BTdder-deslgned A/erting $ - Bldde�-Deslgned Trafflcslgnal/zatlon (seeattached) 5 44,825 TenNW+]0% Bas/c Commissloning (see attached) 5 2,074 Welsh Commissining Group+t0% MEPbrSuppor! S 3,080 PerHultz+f096 ConstruttJon Testing $ 42,438 PerMTC+10%(Nofe the/r proposal ls T&M) Relmbursable Expenses $ 4,000 Al/owance for expenses not inclu/ded on overhead by ag►eemeni Subtotal Additional Services . !TOTAL�ALL�SERVICES�� � .. , -..�.., .�,� .� . .- .. -- . ��.w,�;ti ---�-:� 4��_._.._�__..i._.�.....�._ �.�__._..__....�..a._.�._.._a......._��_.._._._�.....-.... _..�..�..._..�.._.._,�..._..__,.,r,�_,.. __.�_�...�,_�.. i y , - .-- ��I��II������il���� � �exrh Co.mmissioning i�roup, Inc. Proposat for Commissioning Authority Servlces ` City of Renton—New Fire Station Date: January 5,2017 To: Mary Jo Lux Schreiber Starling&Lane Architects By: Bryan Welsh,President , Welsh Commissioning Group,Inc. ' �-• r(�i•�i(/� . / ' Welsh Commissioning Group,Inc.(WCG)is pleased to offer the following proposal for services per the listed Scope of Work and Cost Proposal Detail. Project Descrlption: Construction of a new approximately 7,500 SF fire station located in Renton,WA. Scope of Work: , � The systems to be commissioned under this proposal include those as outlined in Attachment—A, Commissioned Systems and Equipment List. ' , The following are the duties of the Commissioning Authority(CxA)including commissioning deliverables. Note:Design Team refers to the Arclutect and Engineer of Record and their sub- consultants. The Commissioning Team refers to the Client,Owner(if different than Client), Design Team,Contractor,Sub-Contractors and Equipment Suppliers. 1. The C1cA shall review the project documents for issues related to constructability, maintainability and ability to commission. Any issues discovered will be reported to the Owner and Design Team in a written report. 2. The CxA shall develop and provide to th�Project Architect the project specification sections related to commissioning procedures.This documentation shall be provided to the Project Architect in a timely fashion to allow the document to be included in the bid set of Project Documents. 3. The G`xA shall review selected Contractor provided submittal documentation for systems and equipment to be commissioned.This review is in addition and supplernentary to the format review as provided by the Project Design Engineer(s)of record Any issues discovered will be reported to the Owner and Design Team in a written report. 4. The CxA shall provide a complete Commissioning Plan to tha Commissioning Team in a timely fashion follovving the date of submittal approval by the Design Team for all . systems to be commissioned. At a minimum,this Commissioning Plan shatl include the . following: 4508 Aubutn Way N.,Suite B www.wcxg.com Phone (253)856-3322 Aubutn,WA 98002 � Fax (253)854-2072 • A complete list and description of all equipment and systems to he commissioned. • Installation verification data entry forms for systems and equipment to be commissioned. • Startup documents(checklists)for systems and equipment as provided by the Contractors. • Functional performance test procedures and data entry forms for systems and equipment designated to be functionally perfarmance tested. • A sample version of the commissioning issues list. This list is to be maintained and updated by the CxA on a regular basis daring the entire commissioning process. 5. 'The CacA shall schedule,organize and coardinate an initial on-site commissioning coordination meeting. The initial meeting shall be with the Owner,Design Team and Contractors to present the commissioning plan,and discuss issues related to the proposed commissioning process. Meeting agenda and minutes shall be provided by the CxA 6. The CxA shall schedule,arganize and coordinate a controls integration meeting. The controls integration meeting shall be with the�iVAC control contractor,lighting control contractor and Design Team to review control strategies and testing;to be held after receipt of submittals and prior to programming. Meeting agenda and minutes shall be provided by the CxA 7. The CxA shall schedule,organize and coordinate on-site commissioning meetings and site observations. Commissioning meetings will be foc the purposa of coordinating coramissioning tasks with the contractor and discussing unresolved issues. Meeting agenda and minutes shall be provided by the CxA. Coincident with meetings,site observations shall be conducted by the CxA during the construcrion process. The purpose of these observatians will be to evaluate compliance to contractual obligations such as cleanliness,capping ductwork,access to equipment,maintainabitity and so forth to idenrify concems before they are repeated throughout the project. A site observation report will be provided. The number of ineetings will be as agreed upon in the Fee Proposal. 8. The CxA shall be responsible for perfozming documented Installation Verifications(IV) for verifying that the equipment and systems designated for commissioning are completely installed and ready for functional testing. Issues discovered during the N will be documented by the CxA in a Commissioning Issues Log and communicated to the Commissioning Team, The completed N forms will be provided by the CxA in the final report. 9. The CxA sha11 review the TAB report and provide written comments to the Commissioni.ng Team. The GScA sha11 verify testing,adjusting and balancing(TAB) work(10%sample basis). Issues discovered during the TAB review will be documented by the CxA in the Commissioning Issues Log and communicated to the Commissioning Team. 10. The CacA shall be responsible for scheduling,coordinating aud participating in the compledon of functional performance testing as detailed in the Commissioning Plan.This work includes the completion of all data entry forms for inclusion in the Commissioning Report. Issues discovered during functional test will be documented by the CxA in a Commissioning Issues Log and communicated to the Comnnissioning Team. The completed funcrional test forms will be provided by the G�cA in the final report, 11. The C�cA shall retest or otherwise verify reported corrections on a one time per issue basis. The CxA shall provide an updated Commissioning Issues List to the r ` Commissioning Team. Additional re#esting and verificatiott of corrections beyond the one time per issue shall constitute work beyond the commissioning scope of work. 12. At the completion of all commissioning related procedures,the CxA shall be responsible for assembling and producing the Commissioning Report for sub�rtission to the Owner. This report shall contain at a minimum the following: • A copy of the Commissioning Plan. • Copies of completed data entry fornas related to installation verificarion checklists, stazt-up checklists,and functional performance tests. • A final version of the commissioning issues list showing the current resolution status of all issues,including the status of those issues still outstanding. • Cost Proposal Detail: Item Descriptlon Unita Rate Extension ' 1 Desi n review with re ort 8 Hrs 122 976 2 Devel commissionin s catlons 4 Hrs 122 488 3 Revlew of ui ment submittals 12 Hrs 122 1 4B4 4 Develo formal commissionin lan includin all forms 16 Hrs 122 '1 952 5 Conduct initial commissionin coordination meetin 6 Hrs 122 732 6 Conduct HVAC and li htin controls fnt ratlon meetin 6 Hrs 122 732 � 7 Additional meet+n s/site observatlons 3 on-site meetin s 15 Hrs 122 1 830 8 Perform Installation Verification 12 Hrs 122 14B4 9 RevEew TAB re ort and v ' TAB rovide re ort 12 Hrs 122 1 464 10 Perform and witness functlonal ertormance tests 54 Hrs 122 6 588 11 Re-test of faited s tems and back-check issues 19 Hrs 122 2,3,18 12 Pre are and vide the Commissionin Re ort 6 Hrs 122 732 *Tatal: 20 74d *Please note that per the Terins and Conditions the total does not include fees for additional insurance or special insurance forms beyond the limits and scope that WCG currently maintains. Any additional fees w�I be billed at cost. Please see Terms and Conditions below for a listing of the insurance coverage included in this fee proposal. �