HomeMy WebLinkAboutCO 2 CAG-17-054, CO#2-17 � ��� j=�= Document G701TM - 2001 Change Order PROJECT(Name and address): CHANGE ORDER NUMBER:002 OWNER:� 5unset Lane Demo(ition DATE:August 23,2017 ARCHITECT:❑ Renton,WA TO CONTRACTOR(Name and address): ARCHITECT'S PROJECT NUMBER: CONTRACTOR:❑ Dickson Company CONTRACT DATE:May 9,2017 FIELD:❑ 3315 S.Pine St.Tacoma,WA 98409 CONTRACT FOR:Demolition of seven(7)structures each consisting of four(4)unit aparhnents. OTHER:❑ THE CONTRACT IS CHANGED AS FOLLOWS: (Include,where applicab(e,any undisputed nmount attributable to previously executed Construction Change Directives) Dickson was given an allowance to charge against for apptiance removal and the actual cost was less than the allowance amount. See attached Exhibit 1. The original Contract Sum was $ 351,650,20 The net change by previously authorized Change Orders $ 13,685.00 The Contract Sum prior to this Change Order was $ 365,335.20 The Contract Sum will be decreased by this Change Order in the amount of $ 3,575.00 The new Contract Sum including this Change Order will be b 361,760.20 The Contract Time will be unchanged by Zero(0)days. The date of Substantial Completion as of the date of this Change Order therefore is S/9/2017 NOTE:This Change Order does not include changes in the Contract Sum,Contract Time or Guaranteed Maximum Price which have been authorized by Construction Change Directive until the cost and time have been agreed upon by both the Owner and Contractor,in which case a Change Order is executed to supersede the Construction Change Directive NOT VALID UNTIL SIGNED BY THE ARCHITECT,CONTRACTOR AND OWNER. Dickson Company City of Renton ARCHITECT(Firm name) CONTRACTOR(Firm name) OWNER(Frrm name) 3315 S.Pine St.,Tacoma,WA 98409 ADDRESS ADDR S , ADD S o��B�ezJ BY(Signature) BY( ignature) BY(Signature) ,PrcHe,�� ��rs�e�.l 1"��LL1,1 L✓`��'�1��� (Typed name) (Typed name) ('1'yped name) Q�+.C,�sc 23, 20�'� Kelly Beymer �,�/�� DATE DATE DATE AIA Document G701 TM'—2001.Copyright m 1979,1987,2000 and 2001 by The American Institute of Architects.All rights reserved.WARNING:71�is AIA�'' Document is protected hy U.S.Copyri�ht L�iw and fnternational Treafi�as.Unau4hvrized reproduction or distribution of this A(A�''Documenf,or any .� portion of it,may restOt in scvere civil and criminal F�ertaltir.s,and will be prosecuted ta the maxirt�um extent possibie under ihe law.This document was produced by AIA software at 11:41:47 on 08/23I2017 under Order No.2200627950 which expires on 02117/2018,and is not for resale. User Notes: (3B9ADA1 B) . ���rat� 1 '� Community Services ~ Facilities Division CONTRACT CHANGE ORDER PROPOSAL COP#2 (COP) TO: Dickson Company (CONTRACTOR) Proposal Request Date: 21-AUg-17 You are directed to prepare a cost proposal for the work described below and/or detailed on the attachment referred to: Appliance removal accounting. Dickson Company allowance per contract $10,000.00 Dickson Company allowance per appliance $250.00 Dickson Company removed 27 appliances for a total of$6,750.00 Credit Due $10,000.00 minus$6,750.00 equals:$3,250.00 plus 109'o sales tax. REASON FOR CHANGE Design Errors Oesign ��� Latent Code Value Engineering Ommissions Conditions Requireme�t EXPLANATION;Dickson was given an allowance to charge against for appliance removal and the actual cost was less that the allowance amount. DATE PROPOSAL REQUIR 9/1/2017 CHANGE ORIGINATED BY: Robert Ebert (14 days from Request Date,unless other date agreed to) PROPOSAL REQUESTED BY: Robert Ebert TO: (A/E) T0: COR WE AGREE TO PERFORM ALL CHANGE IN THE WORK DESCRIBED IN THE PROPOSAL REQUEST FOR: CONTRACT SUM: { � NO CHANGE �)INCREASE OF: Three Thousand Five Hundred Seventy Five Dollars $3,575.00 ;.f� DECREASE (�/�/ASHINGTON STATE SALESTAX IS INCLUDED) In accordance with the general condidtion,Cost Estimate Detail Sheet(s)are attached hereto. CONTRACT TIME: i��� NO CHANGE ; j INCREASE OF CALENDAR DAYS ;._,� DECREASE The foregoing amount covers everything requi�ed in connection with the change.Allother provisions of the contract remain in full force and effect. We understand that this proposal does not constitute authorization to proceed with the specified changes in the work until incorporation of this COP Into a Change Order by the City of Renton. :' Dickson Company � `` ' 8�22��� CONTRACTOR SIGNATURE � DATE We have carefully examined this proposal and�nd the cost to be reasonable. Therefore,we recommend acceptance. A/E DATE CITY OF RENTON DATE